Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars...

25
Revision Report Pending Approval 7/19/2019 A1.19 Scope: Approved Dollars AMHERST (41413) Rehab of red list bridge carrying NH 122 (Main St) over NH 101 in the Town of Amherst (135/109) NH Route 122 Route/Road/Entity: $3,045,582 All Project Cost: Funding Total Other State Federal Year Phase PE 2021 $237,263 $0 $0 $237,263 STP-State Flexible, Toll Credit $237,263 $0 $0 $237,263 RPC: NRPC _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ No DOT E-19 Regionally Significant: Managed By: CAA Code: Proposed Dollars AMHERST (41413) No Change Scope: NH Route 122 Route/Road/Entity: $2,818,238 All Project Cost: Funding Total Other State Federal Year Phase PE 2019 $220,000 $0 $0 $220,000 STP-State Flexible, Toll Credit PE 2021 $225,610 $0 $0 $225,610 STP-State Flexible, Toll Credit $445,610 $0 $0 $445,610 RPC: NRPC No DOT E-19 Regionally Significant: Managed By: CAA Code: Page 1 of 23 Includes indirects and inflation

Transcript of Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars...

Page 1: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Scope:

Approved Dollars

AMHERST (41413)

Rehab of red list bridge carrying NH 122 (Main St) over NH 101 in the Town of Amherst (135/109)

NH Route 122Route/Road/Entity:

$3,045,582All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2021 $237,263 $0 $0 $237,263 STP-State Flexible, Toll Credit

$237,263 $0 $0 $237,263

RPC: NRPC

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

No DOT E-19Regionally Significant: Managed By: CAA Code:

Proposed Dollars

AMHERST (41413)

No ChangeScope:

NH Route 122Route/Road/Entity:

$2,818,238All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $220,000 $0 $0 $220,000 STP-State Flexible, Toll Credit

PE 2021 $225,610 $0 $0 $225,610 STP-State Flexible, Toll Credit

$445,610 $0 $0 $445,610

RPC: NRPCNo DOT E-19Regionally Significant: Managed By: CAA Code:

Page 1 of 23Includes indirects and inflation

Page 2: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Scope:

Approved Dollars

ANDOVER (20650)

Replace bridge carrying NH 11 over NHRR(ABD) (206/137)

NH 11Route/Road/Entity:

$3,866,150All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $221,000 $0 $0 $221,000 STP-Non Urban Areas Under 5K, Toll Credit

PE 2020 $225,610 $0 $0 $225,610 STP-Non Urban Areas Under 5K, Toll Credit

ROW 2019 $33,000 $0 $0 $33,000 STP-Non Urban Areas Under 5K, Toll Credit

Construction 2020 $3,158,540 $0 $0 $3,158,540 Bridge On/Off System, Toll Credit

$3,638,150 $0 $0 $3,638,150

RPC: LRPC

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

No DOT ATTRegionally Significant: Managed By: CAA Code:

Proposed Dollars

ANDOVER (20650)

Replace 2 bridges - NH 11 over NHRR(ABD) (206/137) and NH 11 over Sucker Brook (208/137)Scope:

NH 11Route/Road/Entity:

$8,259,487All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $221,000 $0 $0 $221,000 STP-Non Urban Areas Under 5K, Toll Credit

PE 2020 $220,000 $0 $0 $220,000 STP-Non Urban Areas Under 5K, Toll Credit

PE 2021 $169,208 $0 $0 $169,208 STP-Non Urban Areas Under 5K, Toll Credit

PE 2022 $57,841 $0 $0 $57,841 STP-Non Urban Areas Under 5K, Toll Credit

ROW 2020 $73,500 $0 $0 $73,500 STP-Non Urban Areas Under 5K, Toll Credit

ROW 2021 $39,482 $0 $0 $39,482 STP-Non Urban Areas Under 5K, Toll Credit

ROW 2022 $11,568 $0 $0 $11,568 STP-Non Urban Areas Under 5K, Toll Credit

$792,598 $0 $0 $792,598

RPC: LRPCNo DOT ATTRegionally Significant: Managed By: CAA Code:

Page 2 of 23Includes indirects and inflation

Page 3: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Proposed Dollars

ASHLAND (41370)

Reconstruct sidewalks to ADA compliance and construct new sidewalks on Main Street US Rte 3/25Scope:

Main Street, NH Routes 3 / 25Route/Road/Entity:

$620,365All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $11,760 $0 $2,940 $14,700 STP-Enhancement, Towns

ROW 2019 $3,486 $0 $872 $4,358 STP-Enhancement, Towns

Construction 2020 $324,987 $12,765 $224,455 $562,207 Non Par DOT, Non Par Other, TAP -

Transportation Alternatives, Towns

$340,234 $12,765 $228,266 $581,265

RPC: LRPCNo Muni/Local ATTRegionally Significant: Managed By: CAA Code:

Page 3 of 23Includes indirects and inflation

Page 4: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Scope:

Approved Dollars

CONWAY (41755)

Con non-motorized 2.8mile transportation pathway located in a heavily trafficked section on Conway.

NARoute/Road/Entity:

$2,047,225All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $88,812 $0 $59,208 $148,020 Congestion Mitigation and Air Quality Program,

Towns

PE 2020 $60,718 $0 $40,479 $101,196 Congestion Mitigation and Air Quality Program,

Towns

ROW 2020 $800 $0 $533 $1,333 Congestion Mitigation and Air Quality Program,

Towns

Construction 2020 $1,078,006 $0 $718,670 $1,796,676 Congestion Mitigation and Air Quality Program,

Towns

$1,228,335 $0 $818,890 $2,047,225

RPC: NCC

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

No Muni/Local ATTRegionally Significant: Managed By: CAA Code:

Proposed Dollars

CONWAY (41755)

No ChangeScope:

NARoute/Road/Entity:

$2,000,000All Project Cost:

FundingTotalOtherStateFederalYearPhase

Construction 2020 $1,600,000 $0 $400,000 $2,000,000 Congestion Mitigation and Air Quality Program,

Towns

$1,600,000 $0 $400,000 $2,000,000

RPC: NCCNo Muni/Local ATTRegionally Significant: Managed By: CAA Code:

Page 4 of 23Includes indirects and inflation

Page 5: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Scope:

Approved Dollars

CORNISH, NH - WINDSOR, VT (25067)

Cornish Windsor Covered Bridge Scour Mitigation

Cornish Toll Bridge RoadRoute/Road/Entity:

$2,907,050All Project Cost:

FundingTotalOtherStateFederalYearPhase

Construction 2019 $2,485,094 $0 $304,574 $2,789,668 Bridge Special, Non Participating, STP-Non

Urban Areas Under 5K, Toll Credit

$2,485,094 $0 $304,574 $2,789,668

RPC: UVLSRPC

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

No DOT ATTRegionally Significant: Managed By: CAA Code:

Proposed Dollars

CORNISH, NH - WINDSOR, VT (25067)

No ChangeScope:

Cornish Toll Bridge RoadRoute/Road/Entity:

$2,901,682All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $44,000 $0 $20,000 $64,000 STP-State Flexible, Toll Credit, Vermont

Construction 2020 $2,423,300 $0 $297,000 $2,720,300 Bridge Special, STP-Non Urban Areas Under

5K, Toll Credit, Vermont

$2,467,300 $0 $317,000 $2,784,300

RPC: UVLSRPCNo DOT ATTRegionally Significant: Managed By: CAA Code:

Page 5 of 23Includes indirects and inflation

Page 6: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Scope:

Approved Dollars

DEERFIELD (24477)

NH 107 over Freese's Pond - Replace Bridge Number 137/116.

NH 107Route/Road/Entity:

$1,271,990All Project Cost:

FundingTotalOtherStateFederalYearPhase

ROW 2021 $56,403 $0 $0 $56,403 STP-Non Urban Areas Under 5K, Toll Credit

Construction 2022 $0 $1,051,650 $0 $1,051,650 SB367-4-Cents

$56,403 $1,051,650 $0 $1,108,053

RPC: SNHPC

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

No DOT ATTRegionally Significant: Managed By: CAA Code:

Proposed Dollars

DEERFIELD (24477)

No ChangeScope:

NH 107Route/Road/Entity:

$1,371,990All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $0 $100,000 $0 $100,000 SB367-4-Cents

ROW 2021 $56,403 $0 $0 $56,403 STP-Non Urban Areas Under 5K, Toll Credit

Construction 2022 $0 $1,051,650 $0 $1,051,650 SB367-4-Cents

$56,403 $1,151,650 $0 $1,208,053

RPC: SNHPCNo DOT ATTRegionally Significant: Managed By: CAA Code:

Page 6 of 23Includes indirects and inflation

Page 7: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Scope:

Approved Dollars

DERRY - LONDONDERRY (13065)

I-93 EXIT 4A - Prelim., Final Design, ROW & Construction of NEW INTERCHANGE and connecting

roadway

I-93Route/Road/Entity:

$53,628,652All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $0 $0 $1,547,735 $1,547,735 Non Participating

ROW 2019 $3,410,000 $0 $0 $3,410,000 STP-Areas Over 200K, Toll Credit

ROW 2020 $4,826,532 $0 $0 $4,826,532 STP-Areas Over 200K, Toll Credit

ROW 2021 $2,106,964 $0 $0 $2,106,964 STP-Areas Over 200K, Toll Credit

Construction 2019 $2,200,000 $0 $2,136,595 $4,336,595 Non Participating, STP-State Flexible, Toll

Credit

Construction 2020 $5,687,735 $0 $0 $5,687,735 STP-State Flexible, Toll Credit

Construction 2021 $10,198,710 $0 $0 $10,198,710 STP-State Flexible, Toll Credit

Construction 2022 $15,201,710 $0 $0 $15,201,710 STP-State Flexible, Toll Credit

$43,631,652 $0 $3,684,330 $47,315,982

RPC: SNHPC

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Yes DOT N/ERegionally Significant: Managed By: CAA Code:

Proposed Dollars

DERRY - LONDONDERRY (13065)

No ChangeScope:

I-93Route/Road/Entity:

$70,558,027All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $0 $0 $1,040,885 $1,040,885 Non Participating

ROW 2019 $3,410,000 $0 $0 $3,410,000 National Highway System, Toll Credit

ROW 2020 $4,706,516 $0 $0 $4,706,516 National Highway System, Toll Credit

ROW 2021 $5,977,367 $0 $0 $5,977,367 National Highway System, Toll Credit

Construction 2019 $2,200,000 $0 $2,646,445 $4,846,445 National Highway System, Non Par Other, Toll

Credit

Construction 2020 $5,546,304 $0 $0 $5,546,304 National Highway System, Toll Credit

Construction 2021 $20,584,538 $0 $3,309,596 $23,894,135 National Highway System, Non Par Other, Toll

Credit

Construction 2022 $14,823,706 $0 $0 $14,823,706 National Highway System, Toll Credit

$57,248,431 $0 $6,996,926 $64,245,358

RPC: SNHPCYes DOT N/ERegionally Significant: Managed By: CAA Code:

Page 7 of 23Includes indirects and inflation

Page 8: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Scope:

Approved Dollars

DURHAM (41753)

Transit facility improvement at the UNH-Durham rail station to increase passenger ridership.

UNHRoute/Road/Entity:

$974,000All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $80,000 $0 $20,000 $100,000 Congestion Mitigation and Air Quality Program,

Other

ROW 2019 $36,000 $0 $9,000 $45,000 Congestion Mitigation and Air Quality Program,

Other

Construction 2019 $663,200 $0 $165,800 $829,000 Congestion Mitigation and Air Quality Program,

Other

$779,200 $0 $194,800 $974,000

RPC: SRPC

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

No Muni/Local E-28Regionally Significant: Managed By: CAA Code:

Proposed Dollars

DURHAM (41753)

No ChangeScope:

UNHRoute/Road/Entity:

$974,000All Project Cost:

FundingTotalOtherStateFederalYearPhase

Other 2019 $779,200 $0 $194,800 $974,000 Congestion Mitigation and Air Quality Program,

Towns

$779,200 $0 $194,800 $974,000

RPC: SRPCNo Muni/Local E-28Regionally Significant: Managed By: CAA Code:

Page 8 of 23Includes indirects and inflation

Page 9: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Scope:

Approved DollarsProject is being removed from the STIP.

FRANCONIA (40514)

Pavement joint south of Exit 35 to Pavement joint north of exit 42 includes Exits 35 thru 42

I-93Route/Road/Entity:

$26,399,457All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2022 $118,631 $0 $0 $118,631 National Highway System, Toll Credit

ROW 2022 $59,316 $0 $0 $59,316 National Highway System, Toll Credit

$177,947 $0 $0 $177,947

RPC: NCC

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

No DOT ATTRegionally Significant: Managed By: CAA Code:

Proposed DollarsProject is being removed from the STIP.

FRANCONIA (40514)

Rehab (4R) of I-93 from MM 111.6 (south of Exit 35) to MM 116.1. Includes ramps at 35, 36, & 37.Scope:

I-93Route/Road/Entity:

$18,257,787All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2022 $115,682 $0 $0 $115,682 National Highway System, Toll Credit

$115,682 $0 $0 $115,682

RPC: NCCNo DOT ATTRegionally Significant: Managed By: CAA Code:

Proposed Dollars

GILFORD (41502)

Address Red List bridge carrying US 3 and NH 11 over US 3 and NH 11 in the town of

Gilford(114/066)

Scope:

US 3 and NH 11Route/Road/Entity:

$2,112,276All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $55,000 $0 $0 $55,000 STP-5 to 200K, Toll Credit

PE 2020 $165,000 $0 $0 $165,000 STP-5 to 200K, Toll Credit

PE 2021 $112,805 $0 $0 $112,805 STP-5 to 200K, Toll Credit

$332,805 $0 $0 $332,805

RPC: LRPCNo DOT ATTRegionally Significant: Managed By: CAA Code:

Page 9 of 23Includes indirects and inflation

Page 10: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Proposed Dollars

HINSDALE, NH - BRATTLEBORO, VT (12210D)

Bridge Rehab of bridges carrying NH Route 119 over Conn River between Hinsdale and BrattleboroScope:

NH Route 119Route/Road/Entity:

$9,679,575All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2020 $182,600 $0 $34,000 $216,600 STP-Non Urban Areas Under 5K, Toll Credit,

Vermont

$182,600 $0 $34,000 $216,600

RPC: SWRPC, UndeterminedNo DOT ATTRegionally Significant: Managed By: CAA Code:

Page 10 of 23Includes indirects and inflation

Page 11: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Scope:

Approved Dollars

HUDSON (41754)

Constructing a third southbound right turn lane on Lowell Rd/NH 3A

NH 3ARoute/Road/Entity:

$1,531,875All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $72,000 $0 $18,000 $90,000 Congestion Mitigation and Air Quality Program,

Towns

PE 2020 $48,000 $0 $12,000 $60,000 Congestion Mitigation and Air Quality Program,

Towns

Construction 2021 $1,025,500 $0 $256,375 $1,281,875 Congestion Mitigation and Air Quality Program,

Towns

$1,145,500 $0 $286,375 $1,431,875

RPC: NRPC

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

No Muni/Local E-51Regionally Significant: Managed By: CAA Code:

Proposed Dollars

HUDSON (41754)

No ChangeScope:

NH 3ARoute/Road/Entity:

$1,551,535All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $93,555 $0 $23,389 $116,944 Congestion Mitigation and Air Quality Program,

Towns

PE 2020 $42,173 $0 $10,543 $52,716 Congestion Mitigation and Air Quality Program,

Towns

ROW 2020 $80,000 $0 $20,000 $100,000 Congestion Mitigation and Air Quality Program,

Towns

Construction 2021 $1,025,500 $0 $256,375 $1,281,875 Congestion Mitigation and Air Quality Program,

Towns

$1,241,228 $0 $310,307 $1,551,535

RPC: NRPCNo Muni/Local E-51Regionally Significant: Managed By: CAA Code:

Page 11 of 23Includes indirects and inflation

Page 12: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Proposed Dollars

MANCHESTER (41414)

Rehab Red List bridge carrying Huse Road over I-293 and NH Route 101 (176/106)Scope:

Huse RoadRoute/Road/Entity:

$3,299,993All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $55,000 $0 $0 $55,000 STP-5 to 200K, Toll Credit

PE 2020 $110,000 $0 $0 $110,000 STP-5 to 200K, Toll Credit

PE 2021 $169,208 $0 $0 $169,208 STP-5 to 200K, Toll Credit

$334,208 $0 $0 $334,208

RPC: SNHPCNo DOT E-19Regionally Significant: Managed By: CAA Code:

Page 12 of 23Includes indirects and inflation

Page 13: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Scope:

Approved Dollars

NASHUA (10136A)

Widening of NH 101A from Sunapee Street to Blackstone Drive

NH 101ARoute/Road/Entity:

$9,716,138All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $132,962 $0 $0 $132,962 STP-Areas Over 200K, Toll Credit

PE 2020 $789,635 $0 $0 $789,635 STP-Areas Over 200K, Toll Credit

ROW 2020 $219,232 $0 $0 $219,232 STP-Areas Over 200K, Toll Credit

$1,141,829 $0 $0 $1,141,829

RPC: NRPC

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Yes DOT N/ERegionally Significant: Managed By: CAA Code:

Proposed Dollars

NASHUA (10136A)

Widening of NH 101A from Somerset Pkwy to Celina AveScope:

NH 101ARoute/Road/Entity:

$22,516,266All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $139,830 $0 $0 $139,830 STP-Areas Over 200K, Toll Credit

PE 2020 $1,966,586 $0 $0 $1,966,586 STP-Areas Over 200K, Toll Credit

PE 2021 $658,131 $0 $0 $658,131 STP-Areas Over 200K, Toll Credit

ROW 2020 $224,822 $0 $0 $224,822 STP-Areas Over 200K, Toll Credit

ROW 2021 $3,804,169 $0 $0 $3,804,169 STP-Areas Over 200K, Toll Credit

$6,793,538 $0 $0 $6,793,538

RPC: NRPCYes DOT N/ERegionally Significant: Managed By: CAA Code:

Page 13 of 23Includes indirects and inflation

Page 14: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Scope:

Approved DollarsProject is being removed from the STIP.

NASHUA (10136B)

Phase II, Widening and improvements from Somerset Pkwy to Sunapee St & Blackstone Dr to Celina

Ave

NH Route 101ARoute/Road/Entity:

$12,249,305All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2020 $1,128,050 $0 $0 $1,128,050 STP-Areas Over 200K, Toll Credit

PE 2021 $641,767 $0 $0 $641,767 STP-Areas Over 200K, Toll Credit

ROW 2021 $3,709,575 $0 $0 $3,709,575 STP-Areas Over 200K, Toll Credit

$5,479,392 $0 $0 $5,479,392

RPC: NRPC

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Yes DOT N/ERegionally Significant: Managed By: CAA Code:

Proposed DollarsProject is being removed from the STIP.

NASHUA (10136B)

No ChangeScope:

NH Route 101ARoute/Road/Entity:

$0All Project Cost:

FundingTotalOtherStateFederalYearPhase

$0 $0 $0 $0

RPC: NRPCYes DOT N/ERegionally Significant: Managed By: CAA Code:

Page 14 of 23Includes indirects and inflation

Page 15: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Scope:

Approved Dollars

PETERBOROUGH (14772A)

RECONSTRUCT US ROUTE 202 @ MAIN STREET INTERSECTION INCLUDING BOULDER

RETAINING WALL STABILIZATION

US 202Route/Road/Entity:

$4,137,333All Project Cost:

FundingTotalOtherStateFederalYearPhase

Construction 2019 $3,500,000 $0 $0 $3,500,000 STP-Non Urban Areas Under 5K, Toll Credit

$3,500,000 $0 $0 $3,500,000

RPC: SWRPC

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

No Muni/Local ATTRegionally Significant: Managed By: CAA Code:

Proposed Dollars

PETERBOROUGH (14772A)

No ChangeScope:

US 202Route/Road/Entity:

$5,459,197All Project Cost:

FundingTotalOtherStateFederalYearPhase

Construction 2019 $4,821,864 $0 $0 $4,821,864 STP-Non Urban Areas Under 5K, Toll Credit

$4,821,864 $0 $0 $4,821,864

RPC: SWRPCNo Muni/Local ATTRegionally Significant: Managed By: CAA Code:

Page 15 of 23Includes indirects and inflation

Page 16: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Scope:

Approved Dollars

PROGRAM (ADA)

Upgrades to side walks, curb ramps, and signals to be compliant with ADA laws.

VariousRoute/Road/Entity:

$3,103,093All Project Cost:

FundingTotalOtherStateFederalYearPhase

Construction 2019 $200,000 $0 $0 $200,000 STP-Safety, Toll Credit

Construction 2020 $200,000 $0 $0 $200,000 STP-Safety, Toll Credit

Construction 2021 $205,100 $0 $0 $205,100 STP-Safety, Toll Credit

Construction 2022 $210,330 $0 $0 $210,330 STP-Safety, Toll Credit

$815,430 $0 $0 $815,430

RPC: Undetermined

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

No DOT E-33Regionally Significant: Managed By: CAA Code:

Proposed Dollars

PROGRAM (ADA)

No ChangeScope:

VariousRoute/Road/Entity:

$2,820,000All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2021 $70,000 $0 $0 $70,000 STP-State Flexible, Toll Credit

ROW 2021 $10,000 $0 $0 $10,000 STP-State Flexible, Toll Credit

Construction 2019 $200,000 $0 $0 $200,000 STP-Safety, Toll Credit

Construction 2020 $120,000 $0 $0 $120,000 STP-Safety, Toll Credit

Construction 2022 $340,000 $0 $0 $340,000 STP-Safety, Toll Credit

$740,000 $0 $0 $740,000

RPC: UndeterminedNo DOT E-33Regionally Significant: Managed By: CAA Code:

Page 16 of 23Includes indirects and inflation

Page 17: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Scope:

Approved Dollars

PROGRAM (BRDG-HIB-M&P)

Maintenance and preservation efforts for High Investment Bridges

VariousRoute/Road/Entity:

$34,640,000All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $800,000 $0 $0 $800,000 STP-State Flexible, Toll Credit

PE 2020 $100,000 $0 $0 $100,000 STP-State Flexible, Toll Credit

PE 2021 $100,000 $0 $0 $100,000 STP-State Flexible, Toll Credit

PE 2022 $100,000 $0 $0 $100,000 STP-State Flexible, Toll Credit

ROW 2019 $20,000 $0 $0 $20,000 STP-State Flexible, Toll Credit

ROW 2020 $20,000 $0 $0 $20,000 STP-State Flexible, Toll Credit

ROW 2021 $20,000 $0 $0 $20,000 STP-State Flexible, Toll Credit

ROW 2022 $20,000 $0 $0 $20,000 STP-State Flexible, Toll Credit

Construction 2019 $300,000 $0 $0 $300,000 STP-State Flexible, Toll Credit

Construction 2020 $1,004,640 $0 $0 $1,004,640 STP-State Flexible, Toll Credit

Construction 2021 $2,800,000 $0 $0 $2,800,000 STP-State Flexible, Toll Credit

Construction 2022 $2,800,000 $0 $0 $2,800,000 STP-State Flexible, Toll Credit

$8,084,640 $0 $0 $8,084,640

RPC: Undetermined

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

No DOT ALLRegionally Significant: Managed By: CAA Code:

Page 17 of 23Includes indirects and inflation

Page 18: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Proposed Dollars

PROGRAM (BRDG-HIB-M&P)

No ChangeScope:

VariousRoute/Road/Entity:

$45,475,360All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $800,000 $0 $0 $800,000 STP-State Flexible, Toll Credit

PE 2020 $100,000 $0 $0 $100,000 STP-State Flexible, Toll Credit

PE 2021 $100,000 $0 $0 $100,000 STP-State Flexible, Toll Credit

PE 2022 $100,000 $0 $0 $100,000 STP-State Flexible, Toll Credit

ROW 2019 $20,000 $0 $0 $20,000 STP-State Flexible, Toll Credit

ROW 2020 $20,000 $0 $0 $20,000 STP-State Flexible, Toll Credit

ROW 2021 $20,000 $0 $0 $20,000 STP-State Flexible, Toll Credit

ROW 2022 $20,000 $0 $0 $20,000 STP-State Flexible, Toll Credit

Construction 2019 $2,100,000 $0 $0 $2,100,000 STP-State Flexible, Toll Credit

Construction 2020 $2,800,000 $0 $0 $2,800,000 STP-State Flexible, Toll Credit

Construction 2021 $2,800,000 $0 $0 $2,800,000 STP-State Flexible, Toll Credit

Construction 2022 $2,800,000 $0 $0 $2,800,000 STP-State Flexible, Toll Credit

$11,680,000 $0 $0 $11,680,000

RPC: UndeterminedNo DOT ALLRegionally Significant: Managed By: CAA Code:

Page 18 of 23Includes indirects and inflation

Page 19: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Scope:

Approved Dollars

PROGRAM (ENV-POST-CON)

Environmental commitments for post-construction obligations.

STATEWIDERoute/Road/Entity:

$638,400All Project Cost:

FundingTotalOtherStateFederalYearPhase

Other 2019 $43,000 $0 $0 $43,000 STP-State Flexible, Toll Credit

Other 2020 $36,300 $0 $0 $36,300 STP-State Flexible, Toll Credit

Other 2021 $36,300 $0 $0 $36,300 STP-State Flexible, Toll Credit

Other 2022 $36,300 $0 $0 $36,300 STP-State Flexible, Toll Credit

$151,900 $0 $0 $151,900

RPC: Undetermined

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

No DOT ALLRegionally Significant: Managed By: CAA Code:

Proposed Dollars

PROGRAM (ENV-POST-CON)

No ChangeScope:

STATEWIDERoute/Road/Entity:

$1,639,100All Project Cost:

FundingTotalOtherStateFederalYearPhase

Other 2019 $43,000 $0 $0 $43,000 STP-State Flexible, Toll Credit

Other 2020 $200,000 $0 $0 $200,000 STP-State Flexible, Toll Credit

Other 2021 $100,000 $0 $0 $100,000 STP-State Flexible, Toll Credit

Other 2022 $100,000 $0 $0 $100,000 STP-State Flexible, Toll Credit

$443,000 $0 $0 $443,000

RPC: UndeterminedNo DOT ALLRegionally Significant: Managed By: CAA Code:

Page 19 of 23Includes indirects and inflation

Page 20: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Scope:

Approved Dollars

SALEM TO MANCHESTER (14633H)

I-93 NB & SB mainline reconstruction, Exit 5 to I-293 split (Londonderry & Manchester)

I-93Route/Road/Entity:

$49,107,877All Project Cost:

FundingTotalOtherStateFederalYearPhase

Construction 2019 $426,990 $0 $0 $426,990 National Highway System, Toll Credit

$426,990 $0 $0 $426,990

RPC: SNHPC

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Yes DOT N/ERegionally Significant: Managed By: CAA Code:

Proposed Dollars

SALEM TO MANCHESTER (14633H)

No ChangeScope:

I-93Route/Road/Entity:

$50,207,877All Project Cost:

FundingTotalOtherStateFederalYearPhase

Construction 2019 $1,526,990 $0 $0 $1,526,990 National Highway System, Toll Credit

$1,526,990 $0 $0 $1,526,990

RPC: SNHPCYes DOT N/ERegionally Significant: Managed By: CAA Code:

Proposed Dollars

STATEWIDE (40915)

Exit sign renumbering along Tier 1 highways to comply with MUTCD.Scope:

Tier 1 RoadwaysRoute/Road/Entity:

$946,101All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2022 $115,682 $0 $0 $115,682 STP-State Flexible, Toll Credit

$115,682 $0 $0 $115,682

RPC: UndeterminedNo DOT ATTRegionally Significant: Managed By: CAA Code:

Page 20 of 23Includes indirects and inflation

Page 21: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Proposed Dollars

SUTTON (42419)

Rehabilitate from MM 24.2 to MM 28.7 including the ramps for exit 10Scope:

I-89Route/Road/Entity:

$17,228,598All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $110,000 $0 $0 $110,000 National Highway System, Toll Credit

PE 2020 $302,500 $0 $0 $302,500 National Highway System, Toll Credit

ROW 2020 $27,500 $0 $0 $27,500 National Highway System, Toll Credit

$440,000 $0 $0 $440,000

RPC: CNHRPCNo DOT ATTRegionally Significant: Managed By: CAA Code:

Page 21 of 23Includes indirects and inflation

Page 22: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Scope:

Approved Dollars

TROY (40371)

Bridge Replacement of the bridge (Br No 096/091) carrying NH Route 12 over NHRR (ABD)

NH Route 12Route/Road/Entity:

$5,868,092All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $275,000 $0 $0 $275,000 STP-Non Urban Areas Under 5K, Toll Credit

PE 2020 $289,204 $0 $0 $289,204 STP-Non Urban Areas Under 5K, Toll Credit

PE 2021 $118,631 $0 $0 $118,631 STP-Non Urban Areas Under 5K, Toll Credit

Construction 2021 $4,745,256 $0 $0 $4,745,256 Bridge On/Off System, Toll Credit

$5,428,092 $0 $0 $5,428,092

RPC: SWRPC

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

No DOT ATTRegionally Significant: Managed By: CAA Code:

Proposed Dollars

TROY (40371)

No ChangeScope:

NH Route 12Route/Road/Entity:

$6,113,186All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $275,000 $0 $0 $275,000 STP-Non Urban Areas Under 5K, Toll Credit

PE 2020 $289,204 $0 $0 $289,204 STP-Non Urban Areas Under 5K, Toll Credit

PE 2021 $118,631 $0 $0 $118,631 STP-Non Urban Areas Under 5K, Toll Credit

$682,836 $0 $0 $682,836

RPC: SWRPCNo DOT ATTRegionally Significant: Managed By: CAA Code:

Page 22 of 23Includes indirects and inflation

Page 23: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending Approval

7/19/2019A1.19

Scope:

Approved Dollars

WEBSTER (41429)

Address Red List bridge carrying NH 127 over Blackwater River in the Town of Webster (099/123)

NH Route 127Route/Road/Entity:

$5,017,835All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2021 $148,289 $0 $0 $148,289 STP-Non Urban Areas Under 5K, Toll Credit

$148,289 $0 $0 $148,289

RPC: CNHRPC

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

No DOT ATTRegionally Significant: Managed By: CAA Code:

Proposed Dollars

WEBSTER (41429)

No ChangeScope:

NH Route 127Route/Road/Entity:

$4,353,701All Project Cost:

FundingTotalOtherStateFederalYearPhase

PE 2019 $137,500 $0 $0 $137,500 STP-Non Urban Areas Under 5K, Toll Credit

PE 2021 $310,214 $0 $0 $310,214 STP-Non Urban Areas Under 5K, Toll Credit

PE 2022 $231,363 $0 $0 $231,363 STP-Non Urban Areas Under 5K, Toll Credit

ROW 2022 $115,682 $0 $0 $115,682 STP-Non Urban Areas Under 5K, Toll Credit

$794,758 $0 $0 $794,758

RPC: CNHRPCNo DOT ATTRegionally Significant: Managed By: CAA Code:

Page 23 of 23Includes indirects and inflation

Page 24: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending

Approval7/19/2019A1.19Scope Only Changes

Widening and rehabilitation where needed from NH 110A in Dummer to 0.2 miles south of NH 26.Approved Scope:

DUMMER - CAMBRIDGE - ERROL (16304B) All Project Cost: $4,295,549

Route/Road/Entity: NH 16

Widening and rehabilitation of approximately 1.4 miles of NH16 in Cambridge.Proposed Scope:

FundingTotalOtherStateFederalYearPhase

PE 2019 $157,927 $0 $0 $157,927 STP-Non Urban Areas Under 5K, Toll Credit

PE 2020 $394,818 $0 $0 $394,818 STP-Non Urban Areas Under 5K, Toll Credit

ROW 2019 $0 $0 $0 $0

ROW 2020 $112,805 $0 $0 $112,805 STP-Non Urban Areas Under 5K, Toll Credit

Construction 2021 $3,300,000 $0 $0 $3,300,000 STP-Non Urban Areas Under 5K, Toll Credit

NCCRPC:

$3,965,549 $0 $0 $3,965,549

DOT ATTNoRegionally Significant: Managed By: CAA Code:

Reconstruction of Winchester Street from NH 101 to Swanzey town lineApproved Scope:

KEENE (40666) All Project Cost: $4,522,324

Route/Road/Entity: NH 10 (Winchester Street)

Reconstruct Winchester St from NH 101 to Swanzey town line include Ash Swamp Brk Bridge

ReplacementProposed Scope:

FundingTotalOtherStateFederalYearPhase

PE 2020 $118,958 $0 $29,740 $148,698 STP-5 to 200K, Towns

PE 2021 $278,918 $0 $69,729 $348,647 STP-5 to 200K, Towns

PE 2022 $0 $0 $0 $0

ROW 2022 $170,272 $0 $42,568 $212,840 STP-5 to 200K, Towns

SWRPCRPC:

$568,149 $0 $142,037 $710,186

Muni/Local ATTNoRegionally Significant: Managed By: CAA Code:

Page 1 of 2Includes indirects and inflation

Page 25: Revision Report - NH.gov · Revision Report Pending Approval A1.19 7/19/2019 Proposed Dollars ASHLAND (41370) Scope: Reconstruct sidewalks to ADA compliance and construct new sidewalks

Revision Report Pending

Approval7/19/2019A1.19Scope Only Changes

Intersection safety improvementsApproved Scope:

SOMERSWORTH (40646) All Project Cost: $2,957,282

Route/Road/Entity: NH 9 (High Street), Blackwater Rd, Indigo Hill Rd

Intersection safety improvements; NH Route 9, Blackwater Road, Indigo Hill RoadProposed Scope:

FundingTotalOtherStateFederalYearPhase

PE 2020 $88,000 $0 $22,000 $110,000 STP-State Flexible, Towns

PE 2021 $121,829 $0 $30,457 $152,287 STP-State Flexible, Towns

PE 2022 $0 $0 $0 $0

SRPCRPC:

$209,829 $0 $52,457 $262,287

DOT E-51NoRegionally Significant: Managed By: CAA Code:

Pavement Rehab from Exit 9 (MM 20.5) to Exit 10 (MM 28.7), excluding SB MM 25.9 to 26.9.Approved Scope:

WARNER - SUTTON (15747) All Project Cost: $15,688,696

Route/Road/Entity: I-89

Pavement Rehab from MM 20.5 to MM 24.2Proposed Scope:

FundingTotalOtherStateFederalYearPhase

PE 2019 $165,000 $0 $0 $165,000 National Highway System, Toll Credit

PE 2020 $247,500 $0 $0 $247,500 National Highway System, Toll Credit

ROW 2019 $55,000 $0 $0 $55,000 National Highway System, Toll Credit

ROW 2020 $27,500 $0 $0 $27,500 National Highway System, Toll Credit

Construction 2019 $0 $0 $0 $0

Construction 2020 $0 $0 $0 $0

Construction 2021 $9,024,400 $0 $0 $9,024,400 National Highway System, Toll Credit

Construction 2022 $6,169,296 $0 $0 $6,169,296 National Highway System, Toll Credit

CNHRPCRPC:

$15,688,696 $0 $0 $15,688,696

DOT ATTNoRegionally Significant: Managed By: CAA Code:

Page 2 of 2Includes indirects and inflation