REVISED PERT-CPM DIAGRAM
BAR CHART
S-CURVE
1
1
N
LFES
L E G E N D:
CRITICAL PATH
ACTIVITY
DUMMY
EVENT NO. - N
EARLY START - ES
LATE FINISH - LF
REVISED PERT/CPM TIME-SCALED NETWORK DIAGRAM
BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - MARCOS BRIDGE (BO1752LZ) ALONG MARCOS HIGHWAY (PHASE II)
(DUE TO TIME EXTENSION NO. 1)
REPUBLIC OF THE PHILIPPINES
NATIONAL CAPITAL REGION
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
2ND STREET, PORT AREA MANILA
CONSTRUCTION DIVISION
PROJECT AND LOCATION:
BRIDGE - REHABILITATION/MAJOR REPAIR OF
PERMANENT BRIDGES - MARCOS BRIDGE (BO1752LZ)
ALONG MARCOS HIGHWAY (PHASE II)
SHEET CONTENTS:PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED:
SHEET No.:
CEFERINO A. LONDINA
AUTHORIZED MANAGING OFFICER
EDGARDO S. RAMOS
ENGINEER III
PROJECT ENGINEER III
EDWIN M. LUZON
CHIEF, CONSTRUCTION DIVISION
ADOR G. CANLAS, CESO IV
REGIONAL DIRECTOR
SUBMITTED BY:
JUBY B. CORDON, CEO
ASSISTANT REGIONAL DIRECTOR
REVISED PERT - CPM
1
2 2
S
0 0
4
70 70
6
116116
3
39 39
10
222222
11
232232
7
162191
1
2 2
2
9 9
5
100100
9
191191
14
240240
8
177191
13
237240
12
232240