Review Ppt

30
COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY INSTRUCTION 1

description

Review Ppt

Transcript of Review Ppt

Page 1: Review Ppt

COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

1

Page 2: Review Ppt

COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

2

Page 3: Review Ppt

COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

3

Network Snapshot

Technology Sites MSCs BSC

2G 2174 4 40

Technology Sites RNC BSC

3G 505 3  

       

Technolgy Sites MSC BSC

CDMA 742 2 4

BU cluster wise BTS Count

2G 3G CDMA

BERHAMPUR  411 38  157BHUBANESHWAR  380 178  119

CUTTACK  842 196  293ROURKELA  538 92  173

Network Snapshot

Page 4: Review Ppt

4COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

4

Traffic Trend– NBH

GSM:

Due to reduction in free minutes, Tariff plan changes

Page 5: Review Ppt

5COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

5

MOU Report

Due to reduction in free minutes, Tariff plan changes

Page 6: Review Ppt

Data Traffic Growth 24 Hrs

In increasing trend.

Page 7: Review Ppt

Core Network Performance- OR

ALU BSC01  planned to be re-homed  from HMSC01 to HMSC04.

LAC re-dimensioning completed as Aircel ICR is closed & PSR is under observation

Page 8: Review Ppt

POI utilization and its augmentation plan

GSM

CDMA

Sr. NoCircle  Operator Name  Working Devices

Capacity in (ERL) Carried Traffic utilz Remarks

                1   OR   Aircel 895 791.85 338.98 42.8%

                2   OR   Airtel 1611 1500.55 567.2 37.8%

                3   OR   BSNL 785 526.51 75.71 14.4%

                4   OR   Cellone 2785 2650.47 574.97 21.7%

                5   OR   Idea 525 458.6 148.89 32.5%

                6   OR   Tata 1143 1027.44 194.19 18.9%

                7   OR   Vodafone 928 867.89 409.06 47.1%

                8   OR   RTL 3525 3143.15 1176.89 37.4%

Sr. No CIRCLEOperator

NameWorking

E1's Capacity

[Erl]

Carried traffic (ERL)

Utiliz. Action plan to bring down the utilization @70%

1 OR Aircel 88 2439.92 2071.81 85.97% Traffic balancing has been done

2 OR Airtel 279 8177.41 5664.22 69.25%15 E1 augmented on dated 05th Jul'2013 & 10 E1

augmented on 13th Jul'2013 for Airtel O/G  & SO generated for 25 E1 augmentation in RTL O/G TG.

3 OR Cellone 189 5521.51 4052.7 72.60%Letter submitted to BSNL for 33 E1s augmentation on 14th

Jun'13 (19  & 14 E1s from MSC2 & MSC3 respectively)

4 OR Idea 65 1897.33 1110.14 57.61%  

5 OR Tata 68 1947.84 1086.21 56.64%  6 OR Vodafone 146 4260.96 2922.1 68.09%  

7 OR RCOM CDMA 48 1313.2 507.44 42.37%  

8 OR BSNL TAX 64 1671.33 469.01 28.32%  

Page 9: Review Ppt

Network Congestion

****76 TGT Required for partial faulty Cases where as rest of 45 cases planned by next week.

Congestion relief Plan No of Cells

Hardware Issues 138

New Site Planned 11

New Site Required 26Physical Optimization required for Traffic

Sharing 17

TRX Addition Required 228

6 TRX/6 Sector Upgradation 36

Grand Total 456

Requirement for Decongestion-

3G

No of Cell

BPC Card Required

15

New Site Required 26

CircleCount of Congested Cells

CDMA GSM HSD 3G

OR 0 456 NA 15

Page 10: Review Ppt

KPI Performance-CDMA

All CDMA KPI’s meeting the benchmark

Page 11: Review Ppt

KPI Performance-GSM

TASR :Sites fluctuation>9 times increased 215 to 263 & Flicks Count increased 21588 to 33874 as compared to wk-3301 Cells continuously coming for TASR (27 cells=TRX upgrade required,45 Cells=BSS issues need to be cleared,105 cells=Transport & 86 Cells= Utility issues need to cleared)TCR:RTC drop increased from 42863 WK-3 to 61460 WK-4 & & Flicks Count increased 21588 to 33874 as compared to wk-3301 Cells continuously coming for TCR (TRX Addition for 8 cells ,16 cells further physical optimization required .HW issues in 17,109 cells=Transport & 66 Cells= Utility issues need to cleared . Impacted due to increase in RTC drop

Page 12: Review Ppt

KPI Performance-3G NBH

Data PS drop rate & SHO 3G KPI Meeting the Bench markCS+PS Access Failure: After Firewall Activity done in SGSN end, then Paging Response increases in Orissa circle. So RCB 5,7,13 utilization Increases to 80%.In Busy Hour CS and PS Access Failure Increases. 30 sites having CE utilization More than 80%.BPC card Required For Augmentation.After  123 Plan Lunch,IUPS utilization >70%.BW Augmentation Pending in RDN end.Day to day fiber cut Decreased  Access Success Rate as well as increased call drop rate. 

Page 13: Review Ppt

13COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

BBH KPI’S GSM CDMA 3G

Page 14: Review Ppt

COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

14

RF KPI Trend– CDMA-Top 10 Town

Top 10 Tch Completion affected due to frequent site outages. NWA for the week 99.03% 23 cells affected intermittently due to Low Call Volume ( < 50 calls during BBH) 16 cells affected due to null zone / remote facing cells 4 Cells affected due to BB nil, Low Voltage cases 4 cells affected due to low antenna height 6 cells affected due to hardware hang issue due to High Room Temperature

Page 15: Review Ppt

COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

15

RF KPI Trend– CDMA - RON

RON TCH Completion degrading due to LCV for 365 cells, Standalone & remote facing cells – 309 cells, NWA dip – 96.81 (multiple fiber cut, DG auto issue, BB issue & SEB failure). Access issue-3 cell, RF cable theft-3cell, HW issue in 11 cell, E1 Fluctuation in increasing trend.

Page 16: Review Ppt

COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

16

MAJOR ACTIVITIES CONDUCTED DURING THE WEEK - CDMA

Sl. No Activity Status KPI Impacting/Purpose of the Activity

1Physical Optimization completed for 7 cells in Top 10

& 5 cells in RON (as per DCR improvement plan)Completed TCH Completion Rate slightly improved

2PM activity conducted in 5 sites in Top 10, 15 sites in

RON (as per DCR improvement plan)Completed Site hygiene improved

3BM Drive Test completed for Berhampur. Drive

Analysis under progressCompleted Analysis under progress

4 Database audit for Huawei sites completed completed Database discrepancies cleared

5 NL audit completed for 56 cells CompletedUnwanted neighbours deleted. Neighbourlist

updated as required

6Survey for Mayfair location completed at 13

locations across OrissaCompleted

Survey for coverage status as per marketing requirement

Page 17: Review Ppt

COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

17

All KPI are in improving trend

RF KPI TREND – GSM – TOP 10 TOWN

Page 18: Review Ppt

COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

18

TCR:RTC drop increased from 42863 WK-2 to 61460 WK-3 & & Flicks Count increased 21588 to 33874 as compared to wk-3301 Cells continuously coming for TCR (TRX Addition for 8 cells ,16 cells further physical optimization required .HW issues in 17,109 cells=Transport & 66 Cells= Utility issues need to cleared . Impacted due to increase in RTC drop

Rx-Qual : KPI dipped on 22 & 27 Jul’13 due to sites Flicks increases in IBSC63 & IBSC61

RF KPI TREND – GSM – RON

Page 19: Review Ppt

COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

19

MAJOR ACTIVITIES CONDUCTED DURING THE WEEK - GSM

Circle Activity Description Purpose & Reason for carrying out the Activity Date of Activity Remarks

Orissa NL Audit Completed for 12 cells NW KPI Improvement 22th & 25th July 13 Completed

Orissa FR to HR tuning for 20 cells NW KPI Improvement 25th & 27th July 13 Completed

Orissa SD Reconfiguration for 80 cells NW KPI Improvement 22th & 26th July 13 Completed

Orissa LAC Change for 14 sites NW KPI Improvement 22th & 24th July 13 Completed

Orissa TRP Tuning done for 53 sites NW KPI Improvement 22th & 24th July 13 Completed

Orissa Physical Optimization 12 sites NW KPI Improvement 22th & 28th July 13 Completed

Orissa Survey for coverage – MayfairAscertaining coverage

status at Mayfair locations as per marketing team

23rd to 28th July 13 Completed

Page 20: Review Ppt

COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

20

RF KPI Trend– 3G BBH

CS+PS Access Failure: After Firewall Activity done in SGSN end, then Paging Response increases in Orissa circle. In Busy Hour CS and PS Access Failure Increases. 30 sites having CE utilization More than 80%. BPC card Required For Augmentation.After 123 Plan Lunch,IUPS utilization >70%.BW Augmentation Pending in RDN end.Day to day fiber cut Decreased Access Success Rate as well as increased call drop rate.

Page 21: Review Ppt

COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

21

MAJOR ACTIVITIES CONDUCTED DURING THE WEEK – 3G

Sl. No Activity Status

KPI Impacting/Purpose

of the Activity

15 site packet loss issue Resolve after Transport card rectification on jajpur 

town.Completed

CS+PS Access failure Improved

2 12 cells optimization done Completed CS+PS Access

failure Improved

33 site PM activity done with

Transport team .Completed

for Packet loss issue rectification

Page 22: Review Ppt

COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

22

•Drive Test Status

S.No Total BM DT ScopeTotal BM

DT Completed

% of Completion Scope

% of Pendin

g Scope

Remarks

170 (10 Voice BM,10 GPRS BM,02 MOS,38 IB BM,10 highway BM)

6 (3 BM,3 HW)

8.57 % 91.43%  

Page 23: Review Ppt

COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

23

Packet Loss > 2% : Site Counts & Bucketisation

    Reason

Circle Name

No. of Node B Having Packet

Loss>2%

Due to MW issue

Due to Fiber Media

issue

Due to BW constraint

Due to Utility Issue

ORISSA

142 5 0 17 120

Page 24: Review Ppt

COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

24

Zero Cell

Bucketization 3G CDMA GSM ETRACCESS ISSUE 3   6 RCOMAccessories Theft case

9   10Accessories required/ Planned by 31 July-13

Hardware issue   3 ETR by 31 July-13IP COLO issue     2 Escalated to ConcernPAC   3   ETR by 31 July-13Transport issue  3 ETR by 24th July-13Under rectification     3 ETR by 2 Aug-13Utility issue     ETR by 24th July-13Grand Total 12 9 21  

Page 25: Review Ppt

COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

25

Customer Complaints Trend – All Technologies

Month wise 1000 per sub. Trend

Month wise no of complaints escalated Trend

Month GSM CDMA 3GJan 0.3 0.3 0.3Feb 0.2 0.2 0.2

March 0.5 0.1 0.5April 0.3 0.3 0.3May 0.4 0.3 0.4June 0.6 0.4 0.6

Month GSM CDMA 3GJan 410 30 65Feb 300 26 49

March 298 16 44April 387 32 36May 415 31 46June 525 60 61

Page 26: Review Ppt

26COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

RJIL Project

Page 27: Review Ppt

27COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

Cluster Site CountSurvey Completed as Declared by Cluster

Lead

ANNEXURE- H-COPY SUBMITTED

HAND SKETCH & SHELTER LAYOUT WITH DIMENSION

SCAN COPY SUBMITTED

BALASORE 283 186 177 140

BERHAMPUR 282 144 130 109

BHUBANESWAR 532 155 117 111

SAMBALPUR 342 135 61 71

Grand Total 1439 620 485 431

RCOM Own Sites_ALU

RJIL – Tower Delivery

Page 28: Review Ppt

28COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

SUMMARY OFC P2 PROJECT

Sl No Scope Activity Progress(KM)1

103

Cumulative Achievement Till Date 42.99

2Achievement In Last 1 Week 0.3km T&D Compete & 1 New 

section(T&D) started

3Material Utilization Report

134 km duct & 43.45 km OFC received & Handed over to Vendor

4Hand Over Formalities Completed With

O&M10section - complete  &  11section - 

WIP

OFC PROJECT P2 DETAILS

OFC Project P2 – RJIL Delivery

Page 29: Review Ppt

COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

29

Wireline (Fiber and Utilities)

Requirement of 392 Battery Banks  for BTS Sites to reduce Down time and Improve NWA availability.Requirement of 200 DG battery to maintain DG Sets in Auto Mode to avoid site outage  SEB failure .Requirement of 100 SMPS for BTS sites where SMPS faults are recurring in nature and of vintage Make .100 sites  BER case PAC to be replaced as High Room Temperature affecting site performance as well as customer satisfaction. Also hardware failure rate increasing & affecting R&R process & NWA.SEB Restoration at 5 Sites (Gotmara, Sanibazar, Station Bazar,Ghanteswar and Biswanathpur). Permanent  SEB connectivity at 03 Operational sites where Dg is running continuously (Kutiguda,Balguda and Torenga).Access issue of Bhimtanki, Maharsi College , Sailshree Vihar (Bhubaneswar) & Nayabazar(Balasore) to be resolved. Joint closure 800 required for tray replacement. 150 KM  Fiber re routing  required to bury overhead cables & shift the cable to safer site. Which would be affected during road expansion.  200 KM OFC required for undergrounding & re routing.

 Wireless

 250 ALU 900TGT required to relieve GSM Traffic Congestion 8 BPC card & 6 RU 40 card required to decongest the network & clear ‘0’ cells

Support Required - Orissa

Page 30: Review Ppt

COPYRIGHT © 2011 ALCATEL-LUCENT. ALL RIGHTS RESERVED. ALCATEL-LUCENT — CONFIDENTIAL — SOLELY FOR AUTHORIZED PERSONS HAVING A NEED TO KNOW — PROPRIETARY — USE PURSUANT TO COMPANY

INSTRUCTION

30

Thank You !