PACIFIC GAS AND ELECTRIC COMPANY NUCLEAR POMER GENERATION DIABLO CANYON POMER PLANT SURVEILLANCE TEST PROCEDURE NUMBER STP I"9-L920 REVISION 4 PAGE 1 OF 13 UNIT TITLE: REFUELING MATER STORAGE TANK 1"1 LEVEL CHANNEL LT-920 CALIBRATION 1.0 SCOPE EFFECTIVE DATE PROCEDURE CLASSIFICATION: QUALITY RELATED 1.1 This test provides instructions for the calibration of Refueling Water Storage Tank (RWST) 1-1 water level channel. 1.1.1 Affected Loop: 9-1. 1.1.2 Affected Devices: LT-920, LQ-920, LC-920A/B, LC-920C/D, LM-920, LI-920, and ERFDS 03/08. 1.1.3 PME Indicator (Ref MA2.ID2): LI-920. 1.2 This test satisfies the L-920 CHANNEL CALIBRATION specified in TS 4.3.3.6, Tbl 4.3-7, Item 8. 1.3 This test may be performed in any Mode subject to the conditions stated in the Prerequisites Section. 2.0 DISCUSSION 2.1 Devices included in this test collectively function to provide: ~ One input to Residual Heat Removal (RHR) Pump trip 2 out of 3 coincidence. ~ Control Room and ERFDS indication of RWST 1-1 water level. ~ Control Room alarm of RWST l-l High, Low, and Low-Low water level. 2.2 This test is structured such that it allows for the independent calibration of the transmitter and electronics. 2.2.1 Section 8.3 performs a calibration of the transmitter. 2.2.2 Section 8.4 performs a calibration of the electronics. 3.0 RES PONS I B I L ITIES 3.1 Cognizant Foreman (Test Director) is responsible for performance and initial management review of this test. 'P903i8oi2i 9903ii PDR aoacx osooomsf P PDR 01183204.06a lI 01183204.06A 0222. 1058

Transcript of Rev 4 to STP I-9-L920, 'RWST 1-1 Level Channel LT-920 Calibr.'

Page 1: Rev 4 to STP I-9-L920, 'RWST 1-1 Level Channel LT-920 Calibr.'

PACIFIC GAS AND ELECTRIC COMPANY

NUCLEAR POMER GENERATION

DIABLO CANYON POMER PLANT

SURVEILLANCE TEST PROCEDURE

NUMBER STP I"9-L920

REVISION 4

PAGE 1 OF 13

UNIT

TITLE: REFUELING MATER STORAGE TANK 1"1LEVEL CHANNEL LT-920 CALIBRATION

1.0 SCOPE

EFFECTIVE DATE

PROCEDURE CLASSIFICATION: QUALITY RELATED

1.1 This test provides instructions for the calibration of RefuelingWater Storage Tank (RWST) 1-1 water level channel.

1.1.1 Affected Loop: 9-1.

1.1.2 Affected Devices: LT-920, LQ-920, LC-920A/B, LC-920C/D,LM-920, LI-920, and ERFDS 03/08.

1.1.3 PME Indicator (Ref MA2.ID2): LI-920.

1.2 This test satisfies the L-920 CHANNEL CALIBRATION specified inTS 4.3.3.6, Tbl 4.3-7, Item 8.

1.3 This test may be performed in any Mode subject to the conditionsstated in the Prerequisites Section.

2.0 DISCUSSION

2.1 Devices included in this test collectively function to provide:~ One input to Residual Heat Removal (RHR) Pump trip 2 out of 3

coincidence.~ Control Room and ERFDS indication of RWST 1-1 water level.~ Control Room alarm of RWST l-l High, Low, and Low-Low water

level.

2.2 This test is structured such that it allows for the independentcalibration of the transmitter and electronics.

2.2.1 Section 8.3 performs a calibration of the transmitter.

2.2.2 Section 8.4 performs a calibration of the electronics.

3.0 RES PONS IB ILITIES

3.1 Cognizant Foreman (Test Director) is responsible for performanceand initial management review of this test.

'P903i8oi2i 9903iiPDR aoacx osooomsfP PDR

01183204.06a lI01183204.06A 0222. 1058

Page 2: Rev 4 to STP I-9-L920, 'RWST 1-1 Level Channel LT-920 Calibr.'

PACIFIC GAS AND ELECTRIC COMPANY

DIABLO CANYON POMER PLANT

TITLE: REFUELING MATER STORAGE TANK 1-1LEVEL CHANNEL LT"920 CALIBRATION UNIT 1 0

NUMBER STP I"9-L920REVISION 4PAGE 2 OF 13

4.0 REFERENCES

4.1 102033, Instrument Schematic.

4.2 102009, Piping Schematic.

4.3 106709, OVID.

4.4 106733, OVIDIP.

4.5 109809, Functional Loop Diagram.

4.6 437591, Residual Heat Removal Pumps Schematic Diagram.

4.7 6000784-28, Xmtr Manual.

4.8 663230-81, Hagan Manual.

4.9 6001169-9, Hatch Manual.

4.10 663100-245, Indicator Manual .

5.0 ACCEPTANCE CRITERIA

5.1 If "As Found" data for LT-920 or LI-920 are out-of-tolerance dueto an apparent module failure, then notify your Supervisor andinitiate an AR. "As Left" data for these devices shall be withindesired.

5.2 If "As Found" data exceeds a "TS or ECS OOT" accuracy, then notifyyour Supervisor and initiate an AR. "As Left" data for same shallbe within desired.

5.3 If "As Found" data exceeds a "PME OOT" accuracy, then theSupervisor to report IAW MA2. ID2. "As 'Left" data for thesedevices, as well as LM-920, shall be within desired prior to useof this channel for PME purposes.

5.4 Other Administrative Requirements for "As Left" Data

ERFDS and LC-920ClD shall be within desired.

5.5

5.6

Acceptance Criteria for this test are denoted in the InstructionsSection by use of asterisks (*). If "As Found" actions do notoccur as desired, then notify your Supervisor and initiate an AR."As Left" actions for same shall be within desired. IData not denoted as Acceptance Criteria is desired. The TestDirector may return the channel to service with "As Left" data outof desired provided there is no significant degradation of,overallloop function and an AR has been generated to document the action.

'1183204.06a2I01183204.06A 0222.1058

Page 3: Rev 4 to STP I-9-L920, 'RWST 1-1 Level Channel LT-920 Calibr.'

(PACIFIC GAS AND ELECTRIC COMPANYDIABLO CANYON POMER PLANT

TITLE: REFUELING MATER STORAGE TANK 1"1LEVEL CHANNEL LT-920 CALIBRATION

NUMBER STP I"9"L920REVISION 4PAGE 3 OF 13

UNIT 1

E.E ~PRE E TEITEE

6.1 Performance of this test requires SFM authorization.

6.2 Job Preplanning

6.2.1 Applicable Technical Specifications - TS 3.3.3.6 andTS 3.5.5.

6.2.2 Indication/alarm functions provided by this loop.

6.2.3 One input to RHR Pump trip 2 out of 3 coincidence isprovided by this loop.

7.0 PRECAUTIONS AND LIMITATIONS

,

7.1

7.2

Transmitter Calibration (Section 8.3) requires that RWST LOW LEVELTRIP TEST LS-920 Switch be in the CUT OUT position. One input tothe RHR Pump trip 2 out of 3 coincidence will be defeated duringthe performance of this section.

One input to the RHR Pump trip 2 out of 3 coincidence will be madeup during part of the Analog Channel Calibration (Section 8.4).

01183204.06a 3I01183204.06A 0222.1058

Page 4: Rev 4 to STP I-9-L920, 'RWST 1-1 Level Channel LT-920 Calibr.'

PACIFIC GAS AND ELECTRIC COMPANYDIABLO CANYON POWER PLANT

TITLE: REFUELING WATER'STORAGE TANK 1"1LEVEL CHANNEL LT"920 CALIBRATION

NUMBER STP I"9"L920REVISION 4PAGE 4 OF 13

UNIT

8.0 ~NET UCTIII

8.1 Initial Conditions

START DATA SECTIO

8.1.1 Measuring and Test Equipment (Mt'TE)

a. Section 8.3: Test Gauge and one DMM.

b. Section 8.4: Two or more DMMs for 3 concurrent measurements.

MEASURING 8 TEST EQUIPMENT (Equivalent Spec)

DMM, Fluke 45 or 8842A (a0.002 VDC)

Test Gauge, x0.85 INWC, 180-770 INWC min range

PGKE ID NUMBER CALIB DUE DATE

8.1.2 Tools and Other Equipment

a. Transmitter Substitution Box (TSB)

8.2 Channel Removal From Service

8.2. 1 CO informed of impending testing.

~ RWST Low Level Trip Test LS-920 Switch will be placedin the Cut Out position for this test.

~ Alarm actuation of RWST Low Level Relay UV.

8.2.2 Perform a CHANNEL CHECK on the following indicators:a. LI-920 (VB2)

b. LI-921 (VB2)

c. LI"922 (VB2)

8.2.3 Affix 00S sticker to LI-920.

PERF VERIF

DATE:

TIME:

"001183204.06a 4I01183204.06A 0222. 1058

Page 5: Rev 4 to STP I-9-L920, 'RWST 1-1 Level Channel LT-920 Calibr.'

PACIFIC GAS AND ELECTRIC COMPANY

DIABLO CANYON POWER PLANT

TITLE: REFUELING WATER STORAGE TANK 1-1LEVEL CHANNEL LT"920 CALIBRATION

~ /

NUMBER STP I-9"L920REVISION 4PAGE 5 OF 13

UNIT 1

8.2.4 If plant is in Modes 1 thru 4, verify the following RWSTLOW LEVEL TRIP TEST Switches are in the "NORMAL"position: [ ]N/A

NOTE: In Modes 5 and 6, it is not required to have 2RWST level channels OPERABLE.

. LS-921 (PIA) AND

. LS-922 (PIB),.

8.2.5 Inform CO that RWST LOW LEVEL TRIP TEST LS-920 Switchwill be placed in the CUT OUT position which will causeMain Annunciator Window PK03-04 to alarm.

8.2.6 At Panel PIC, place RWST LOW LEVEL TRIP TEST LS-920Switch in the CUT OUT position. Attach Caution Tag toswitch.

8.2.7 At Rack 27, connect DMM to LC-920A/B 82 IN(+) andCOMMON(-) (109809) .

NOTE: Sections 8.3 and 8.4 may be performed in any order.

8.3 For Transmitter Calibration, perform Appendix 10.1.

8.4 For Analog Channel Calibration, perform Appendix 10.2.

8.5 Channel Return To Service

8.5.1 Verify "As Left" data is within desired values. If not,obtain your Supervisor's permission to proceed'.

[ ]N/A

[ ]N/A

***********************************************************4'*************************CAUTION: Do not place RWST LOW LEVEL TRIP TEST LS-920 Switch in the NORMAL position.*4'**********************'k4'****************************4'******************************

8.5.2 Rack test equipment removed and pre-test configurationrestored.

01183204.06a 5I01183204.06A 0222.1058

4

Page 6: Rev 4 to STP I-9-L920, 'RWST 1-1 Level Channel LT-920 Calibr.'

PACIFIC GAS AND ELECTRIC COHPANYDIABLO CANYON POWER PLANT

TITLE: REFUELING WATER STORAGE TANK l-lLEVEL CHANNEL LT-920 CALIBRATION UNIT 1 0

NUHBER STP I"9-L920REVISION 4PAGE 6 OF 13

8.5.3 Perform a CHANNEL CHECK on the following indicators:

NOTE: Level indications should be within 4'f each other.

a. LI-920 (VB2)

b. LI-921 (VB2)

c. LI-922 (VB2)

8.5.4 Remove OOS sticker from LI-920.

8.5.5 Verify one of the following conditions met:

[ ] The following auxiliary relays indicate "OFF":PIA) ANDPIA) ANDPIB) ANDPIB .

~ LS921X1. LS921X2~ LS922X1 (~ LS922X2 (

~OT : Auxiliary relay indicator will indicate "ON"if channel is tripped or "OFF" if channel is nottripped.

OR

[ ] Risk assessment performed IAW HAl.DC10 thataddresses RHR pump operati on and automati c triplogic.

8.5.7 Verify the following indications are consistent withexisting plant conditions.

NOTE: Auxiliary relay indicators should indicate "OFF" withLI-920 indication greater than 33~.

a. LC920AX Relay Indicator (PIC) .

b. LS920X1 Relay Indicator (PIC) .

c. LS920X2 Relay Indicator (PIC).

8.5.8 CO informed testing is complete.

8.5.9 SFH informed testing is complete.

8.5.6 At PIC, place RWST LOW LEVEL TRIP TEST LS-920 Switch inthe NORHAL position. Remove Caution Tag.

0

0

0

[ )ON [ ]OFF

[ ]4N [ ]OFF

[ ]ON [ ]OFF

DATE:

TINE:

01183204.06a 6I01183204.06A 0222. 1058

Page 7: Rev 4 to STP I-9-L920, 'RWST 1-1 Level Channel LT-920 Calibr.'

PACIFIC GAS AND ELECTRIC COMPANY

DIABLO CANYON POWER PLANT

TITLE: REFUELING WATER STORAGE TANK 1-1LEVEL CHANNEL LT"920 CALIBRATION.

NUMBER 'TP I"9-L920REVISION 4PAGE 7 OF 13

UNIT 1

9.0 DOCUMENTATION OF TEST RESULTS

REMARKS:

:

PERFORMED BY:

REVIEWED BY:

10.0 APPENDICES

10.1 Transmitter Calibration

10.2 Analog Channel Calibration

11.0 ATTACHMENTS

None

DATE

AR¹

DATE

ACCEPTABLE [ ]Y [ ]N

[ ]N/A

01183204.06a 7I01183204.06A 0222. 1058

Page 8: Rev 4 to STP I-9-L920, 'RWST 1-1 Level Channel LT-920 Calibr.'

PACIFIC GAS 'AND ELECTRIC COMPANYDIABLO CANYON POWER PLANT UNIT NO- 1

TITLE: REFUELING WATER STORAGE TANK 1"1LEVEL CHANNEL LT"920 CALIBRATION

NtJMBER STP I"9-L920REVISION 4PAGE 8 OF 13

APPENDIX 10.1PAGE 1 OF 2

A~El .1

TRANSMITTER CALIBRATIONPERF VERIF

8.3.1 At PM160, valve LT-920 Out-of-Service by closing valve1-09L-1B (106733). Attach Caution Tag to valve.

8.3.2 Calibrate Xmtr per Tl.

NOTE: Effort should be made to optimize calibration.~INPUT Connect to Xetr HP (Var).side.

LT-920

LT-920 Output Measured atLC-920A/8 Input (R27)f2 IN(+) 6 COMMON(-)

INPUTINWC

DESIREDVOC AS FOUND

[ ]AFsNALAS LEFT

8.3.3 Restoration

180.3 * 1.000

327.6 * 2.000

474.8 ~ 3.000

622.1 " 4.000

769.3 5.000

622.1 4.000

~ ~ 474.8 * 3.000

327 ' ~ 2.000

180.3 " 1.000

U>q~cton)gj)Cji"'""j4 DESIRED ACC ' sa +0 020 VDC

PME OOT IF ) e0.020 9 1.000 0 5.000 VOC* TS OOT IF 0 -0.030 9 1.000 + 5.000 VDC

a. Remove test gauge and pressure source from Xmtr.

b. Fill and vent Xmtr using primary grade water.

c. Valve Xmtr into service. Remove Caution Tag.

[ ]N/TX

01183204.06a 8I01183204.06A 0222. 1058

Page 9: Rev 4 to STP I-9-L920, 'RWST 1-1 Level Channel LT-920 Calibr.'

PACIFIC GAS AND ELECTRIC COMPANY

DIABLO CANYON POMER PLANT UNIT NO. 1

TITLE: REFUELING MATER STORAGE TANK 1 "1LEVEL CHANNEL LT-920 CALIBRATION

~t

NUMBER STP I"9-L920REVISION 4PAGE 9 OF 13

'PPENDIX10.1PAGE 2 OF 2

8.3.3 (Cont'd)

d. Verify valve lineup:

VALVE NUMBER POSITION DESCRIPTION

1-09L-1C1-09L-1D1-09L-1B

CLOSED Xmtr HPCLOSED Xmtr HP

OPEN Xmtr HP (

Var)Var)Var

DrainVentIso

e. Xmtr test equipment removed and pre"test configurationrestored.

REMARKS:

PERFORMED BY: DATE

01183204.06a 9I01183204.06A 0222. 1058

Page 10: Rev 4 to STP I-9-L920, 'RWST 1-1 Level Channel LT-920 Calibr.'

PACIFIC GAS AND ELECTRIC COHPANY

DIABLO CANYON POWER PLANT UNIT NO- 1

TITLE: REFUELING WATER STORAGE TANK 1"1LEVEI CHANNEL LT-920 CALIBRATION

NlNBER STP I"9"L920-REVISION 4PAGE 10 OF 13

APPENDIX 10.2PAGE 1 OF 4

~EDIÃ I .2

ANALOG CHANNEL CALIBRATIONPERF VERIF

8.4.1 At Rack 27, TBD (109809):

a. Lift field wire E+(920RC01) from terminal 1.

b. Lift field wire E-(920RCOl) from terminal 2.

c. Connect TSB to terminals 1 and 2.

8.4.2 Calibrate devices per Tl and T2.

INPUT Vary

NOTE: Effort should be made to optimize calibration.TSB and Measure at LC-920A/B f2 IN(+) 5 COMHON(-);

LM-920

LM-920 Output Heasured atplant installed LDR at VBI

TBH32, term 10(+) 8 ll(")

ERFDS Qutput Heasured atMUX 3, SLOT 8 (VB1).Output TP(+) 5 GND(-)

LI-920 Indication(VB2)

INPUTVDC

1.000

2.000

3.000

4.000

5.000

4.000

3.000

2.000

1.000

DESIREDVDC AS FOUND

1.000

2.000

3.000

4.000

5.000

4.000

3.000

2.000

1.000

[ ]AF AL DESIREDAS LEFT VDC

-9.000

-4.500

0.000

4.500

9.000

4.500

0.000

-4.500

-9.000

AS FOUND[ ]AF~ALAS LEFT

DESIRED

Q

25

50

75

~ 100

* 75

* 50

* 25

Q

AS FOUND[]AAS LEFT

DESIRED ACC'Y % so ~ 020 VDC

" PHE 00T IF » +2 9 0 ~ 100 ~" TS QOT IF » +3 9 0 ~ 1QO %

DESIRED ACC'Y N +0.180 VDC DESIRED ACC'Y ~ x2~

T2 POMER SUPPLY

Lg-920 Output 9 100<

Measured at Lg-920 (R27)

1( ) a 2(-)

DESIRED

46.0 R2.3 VDC

~0.070 VAC

AS FOUND[ ]AF~ALAS LEFT

01183204.06a 10I01183204.06A 0222. 1058

Page 11: Rev 4 to STP I-9-L920, 'RWST 1-1 Level Channel LT-920 Calibr.'

PACIFIC GAS AND ELECTRIC COMPANY

DIABLO CANYON POWER PLANT UNIT NO. 1

TITLE: REFUELING WATER STORAGE TANK 1"1LEVEL CHANNEL LT-920 CALIBRATION

NtJMBER STP I-9-L920REVISION 4PAGE 11 OF 13

APPENDIX 10.2PAGE 2 OF 4

8.4.3 Calibrate devices per T3 through T6.

NOTE: Test is acceptable if Main Annunciator Windowdoes not clear at reset.

~INPUT Vary TSB and Heasure at LC-920A/B 92 IN(+) O COHHON( ).

LC-920A

SET ON

DESIRED SETTING - VOC

~ 2.300 (2.280 to 2.320)

T3 RWST LOW LEVEL 2 OF 3 RHR PUHP TRIP (33~0)

AS FOUND

f ]AF AL

AS LEFT

RESET g OFF 2.340 (2.320 to 2.360)

" ECS OOT IF <2.258 VDC OR >2.342 VDC

~INPUT Vary TSB and Heasure at LC-920A/B 92 IN(+) I COHHON(-).

LC-9200 LAMP DESIRED SETTING - VOC

T4 RWST LOW WATER LEVEL ALARM (33~0)

AS FOUND

[ ]AFteAL

AS LEFT

SET ON 2.300 (2.280 to 2.320)

RESET t OFF 2.340 (2.320 to 2.360)

ACTIONS AT SETPOINT - CLEAR AT RESET

1) Hain Annun Printer INPUT f410 in ALARM [] [] []2) Main Annun Window ALARM/REFLASH [] [] []

Y N N/A

[] f] [][] f] f]INPUT Vary TSB and Measure at LC-920A/8 f2 IN(+) 8 COMMON(-).

T5 RWST LOW-LOW WATER LEVEL ALARM (4<)

LC-9208 LAMP DESIRED SETTING - VDC

SET g OFF " 1.165 (1.145 to 1.185)

AS FOUND

[ ]AFteAL

AS LEFT

RESET g ON 1.205 (1.185 to 1.225)

ACTIONS AT SETPOINT - CLEAR AT RESETN N/A

1) Hain Annun Printer INPUT f411 in ALARM f ] [ ] [ ] f ] L ] f ]2) Main Annun Window ALARM/REFLASH [] [] [] [] [] []

* ECS OOT IF (1.123 VDC OR >1.207 VOC

01183204.06a 11I01183204.06A 0222. 1058

Page 12: Rev 4 to STP I-9-L920, 'RWST 1-1 Level Channel LT-920 Calibr.'

PACIFIC GAS AND ELECTRIC COMPANY

DIABLO CANYON POMER PLANT UNIT NO. 1

TITLE: REFUELING WATER STORAGE TANK 1"1LEVEL CHANNEL LT"920 CALIBRATION

NUMBER STP I"9-L920REVISION 4PAGE 12 OF 13

APPENDIX 10.2.PAGE 3 OF 4

~IMPUT Vary TSB aad Measure at LC-92OA/9 92 IM(+) B CONOM(-).

LC"920C DESIRED SETTING - VDC

T6 RWST HIGH WATER LEVEL ALARH (97<)

AS FOUND

[ 3AFsaAL

AS LEFT

SET

RESET $

OFF

ON

4.850 (4.830 to 4.870)

4.810 (4.790 to 4.830)

ACTIONS AT SETPOINT - CLEAR AT RESET

1) Hain Annun Printer INPUT f1315 in ALARH [ 3 [ l [ l [ 3 [ 3 [ 3

2) Hain Annun Window ALARH/REFLASH [l [3 [3 [3 [3 [3

8.4.4 RHR Pump Trip Logi c Test

a. Set TSB for less than 2.280 VDC at LC-920A/B P2 IN(LC-920A Lamp "ON") .

b. Verify one of the following conditions met:

[ ] The following auxiliary relays indicate "OFF":PIA) ANDPIA) ANDPIB) ANDP IB) .

LS921X1LS921X2 (LS922X1 (LS922X2 (

NOTE: Auxiliary relay indicator will indicate "ON"if channel is tripped or "OFF" if channel is nottripped.

OR

[ ] Risk assessment performed IAW MA1.DC10 thataddresses RHR pump operation and automatic triplogic.

1. LC920AX Aux Relay Indicator "ON" (PIC) .

2. LS920X1 Aux Relay Indicator "ON" (PIC) .

3. LS920X2 Aux Relay Indicator "ON" (PIC).

c. At PIC, place RWST LOW LEVEL TRIP TEST LS-920 Switch inthe NORMAL position and verify:

01183204.06a 12I01183204.06A 0222. 1058

Page 13: Rev 4 to STP I-9-L920, 'RWST 1-1 Level Channel LT-920 Calibr.'

t

PACIFIC GAS AND ELECTRIC COHPANY

DIABLO CANYON POWER PLANT UNIT NO. 1

TITLE: REFUELING MATER STORAGE TANK 1"1LEVEL CHANNEL LT-920 CALIBRATION

NUMBER STP I"9"L920REVISION 4PAGE 13 OF 13

APPENDIX 10.2PAGE 4 OF 4

(:,

8.4.4 (Cont'd)

d. Set TSB for greater than 2.360 VDC at LC-920A/B 82 IN(LC-920A Lamp "OFF") and verify:

1. LC920AX Aux Relay Indicator "OFF" (PIC).

2. LS920X1 Aux Relay Indicator "OFF" (PIC).

3. LS920X2 Aux Relay Indicator "OFF" (PIC).

e. At PIC, place RWST LOW LEVEL TRIP TEST LS-920 Switch inthe CUT OUT position.

8.4.5 Restoration

a. Remove test equipment.

b. At Rack 27, TBD:

1. Land wire E+(920RCOl) on terminal 1.

2. Land wire E-(920RCOl) on terminal 2.

REMARKS:

PERFORMED BY: DATE

01183204.06a 13I01183204.06A 0222. 1058

Page 14: Rev 4 to STP I-9-L920, 'RWST 1-1 Level Channel LT-920 Calibr.'