NA 2002 On-Floor Seminar Series Welcomes You to Session 112
“Solving Work in Progress & Returnable Packaging Through Industrial Metal
Containers”Sponsored by: IMC&WDSpeaker: Todd Cozart
![Page 2: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/2.jpg)
4/17/02 2
Returnable Containers Cost Justification
Todd Cozart
![Page 3: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/3.jpg)
4/17/02 3
Why Do We Define Packaging?
• Quality• Cost• Order Planning• Standardization &
Modular• Manpower Planning• Inventory Control
![Page 4: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/4.jpg)
4/17/02 4
Why Do We Define Packaging Cont’d
• Supplier Control• Workstation Layout• Warehousing• Housekeeping• Transportation
Efficiencies• Safety• Eliminate Surprises
![Page 5: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/5.jpg)
4/17/02 5
Assemble Logistic Team
• Packaging Rep. • Materials Rep.• Transportation Rep.• Material Handling
Rep.• Production Rep.• Purchasing Rep.• Safety/Ergonomics
Rep.
![Page 6: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/6.jpg)
4/17/02 6
Identify Commodities• QDC Evaluation
– Gather Historical Information:• Quality Concerns and High $
Reject Rates • Delivery Concerns, Internal and
External• Transportation Cost by
Commodities• Labor Cost by Commodities• Disposal Cost of Packaging
Material• Packaging Material Cost• Safety and Ergonomic Concerns
![Page 7: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/7.jpg)
4/17/02 7
Prioritize Commodities
• Prioritize Based on Largest QDC Gains– $$$$$– Quality– Safety
• Hint - Large Parts Should Be the Targeted Parts
![Page 8: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/8.jpg)
4/17/02 8
Concept Phase• Logistic Team Define:
– Project Time Line Per Commodity– Product and Process Requirements:
• Visit Workstation• Part Orientation• Quantity Targets Per Container• Container Size• Critical Part Characteristics• Weight limits• Loading/unloading requirements• shipping storage and handling
methods– Sketch or mock-up container concept
![Page 9: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/9.jpg)
4/17/02 9
Preliminary Logistics Study
• Define Current Cost Vs Proposed Cost– Packaging Material Cost– Transportation Cost– Labor Cost– Disposal Cost– Inventory Cost
![Page 10: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/10.jpg)
4/17/02 10
Define Direction
• Logistic Team To:– Review Logistics Study– Continue or Stop– Review Concepts– Preliminary Buy-in– Review & Update Timeline
![Page 11: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/11.jpg)
4/17/02 11
Purchase Prototype Container
• Review – In Plant– At Supplier– Run Shipping Trial
![Page 12: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/12.jpg)
4/17/02 12
Prototype Container
• Modify If Necessary• Update Timeline• Buy off in Writing
![Page 13: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/13.jpg)
4/17/02 13
Finalize Logistics Cost
• Typical ROI Hurdle Rates Are:
– 25% to 35% Minimum Return on Investment for Cost Reduction Projects
– 15% ROI on Required Projects
![Page 14: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/14.jpg)
4/17/02 14
Request Funds for Project
• Included in Justification Are:– Logistics Cost Savings– Savings Commitment From Supplier/plant– Three Container Quotes– Final Approval
![Page 15: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/15.jpg)
4/17/02 15
Place Purchase Order
• Update Timeline
![Page 16: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/16.jpg)
4/17/02 16
Container Samples
![Page 17: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/17.jpg)
4/17/02 17
Logistic Pieces of the Pie
Packaging Transportation LaborDisposal Inventory Warehousing
![Page 18: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/18.jpg)
4/17/02 18
Packaging Cost
P ackaging T ransportation L aborD isposal Inventory W arehousing
![Page 19: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/19.jpg)
4/17/02 19
Packaging CostExample: Class 8 Truck Battery Box Lid
• Current Method:– Eight parts per crate– $34.00 per crate– $4.25 per part
• Proposed Method:– Twelve parts per returnable container– [($300/cont.)*(25 containers)/(8 yrs)] / (20 parts/day)*(250 Days/yr.) =
$0.19/Part
![Page 20: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/20.jpg)
4/17/02 20
Transportation Cost
Packaging Transportation LaborDisposal Inventory Warehousing
![Page 21: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/21.jpg)
4/17/02 21
Transportation Cost Example: Class 8 Truck Battery Box Lid
• Current Method:– Negotiated $425.00 one way (Truck Load Rate)– [($425/trailer)*(43% utilization)] / [(5 days supply)*(20 parts/day)] =
$1.83/Part
• Proposed Method:– Negotiated $625.00 Round Trip (Truck Load Rate)– [($625/trailer)*(14% utilization)] / [(5 days supply)*(20 parts/day)] =
$0.88/Part
Note: LTL uses rate per pound
![Page 22: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/22.jpg)
4/17/02 22
Disposal Cost
Packaging Transportation LaborDisposal Inventory Warehousing
![Page 23: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/23.jpg)
4/17/02 23
Disposal Cost Example: Class 8 Truck Battery Box Lid
• Current Method:– [(55 lbs./cont.) / (8 parts/cont.)]*($0.03/pound) = $0.21/Part
• Proposed Method:– Eliminated
![Page 24: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/24.jpg)
4/17/02 24
Labor Cost Example: Class 8 Truck Battery Box Lid
• Current Method:– [($37.00/hr)/(60 min/hr)]*[(4 min/cont)/(8 parts/cont)] =
$0.31/Part
• Proposed Method:– [($37.00/hr)/(60 min/hr)]*[(2 min/cont)/(12 parts/cont)] =
$0.10/Part
![Page 25: Returnable Packaging](https://reader036.fdocuments.us/reader036/viewer/2022082219/557d7992d8b42a75548b4ad0/html5/thumbnails/25.jpg)
4/17/02 25
Total Logistic Summary Pkg.
Cost/Part Transp. Cost/Part
Disposal Cost/Part
Labor Cost/Part
Total Cost/Part
Current $4.25 $1.83 $0.21 $0.31 $6.60
Proposed $0.19 $0.88 $0.00 $0.10 $1.17
Difference $4.06 $0.95 $0.21 $0.21 $5.43
$7,500 Investment / $27,150 Savings = ROI 28 %Note: Most companies use a tax & amortization schedule