Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional...

35
Retro-Fit Retro-Fit Denitrification for Denitrification for Small Wastewater Small Wastewater Treatment Facilities Treatment Facilities Tenth Annual Tenth Annual Vail Professional Wastewater Operators Seminar Vail Professional Wastewater Operators Seminar Friday, October 29, 2004 Friday, October 29, 2004 Zachary J. Matyja, E.I.T. Jacobson Helgoth Consultants, Inc.

Transcript of Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional...

Page 1: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

Retro-Fit Denitrification Retro-Fit Denitrification for Small Wastewater for Small Wastewater Treatment FacilitiesTreatment Facilities

Tenth AnnualTenth AnnualVail Professional Wastewater Operators SeminarVail Professional Wastewater Operators Seminar

Friday, October 29, 2004Friday, October 29, 2004

Zachary J. Matyja, E.I.T.Jacobson Helgoth Consultants, Inc.

Page 2: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

2

Presentation OutlinePresentation Outline

• Denitrification Process• Improvements at Genesee Water and Sanitation District• Implementation Process• Questions

Page 3: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

3

Denitrification ProcessDenitrification Process

Page 4: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

4

Denitrification ProcessDenitrification Process

• Ammonia (NH3)• In WW Process, Nitrogen bonds to Organic Molecules to form Ammonia-Nitrogen (NH3 & NH4)• NH3 Converted to Nitrates in Aeration Process

• Nitrates (NO3)• Common in Natural Water• Sources include: Ag Runoff, Organic Matter, WWTF Discharges• 10 mg/L Limit for Drinking Water• Can Cause “blue baby syndrome”

Page 5: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

5

Denitrification ProcessDenitrification Process

• Denitrification• The biological conversion of nitrate-nitrogen to nitrogen gas (N2), nitrous oxide (N2O), and nitric oxide (NO)• Occurs under anoxic conditions (no free oxygen available)

• Various Denitrification Processes• Attached Growth• Proprietary Processes• Single-Sludge Nitrification/Denitrification

Page 6: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

6

Single-Sludge Nitrification / DenitrificationSingle-Sludge Nitrification / Denitrification

• All modifications to existing nitrification facility take place in aeration basin• Anoxic Zone precedes Aeration• Internal Water Recycle (400-500% of Influent Flow)

Anoxic Zone(Denitrificatio

n)

RECYCLE

Aeration Zone

(Nitrification)

Influent Effluent

N2 Gas

Page 7: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

7

Effect of Recycle on Nitrate ReductionEffect of Recycle on Nitrate Reduction

0

10

20

30

40

50

60

70

80

90

100

0 100 200 300 400 500 600 700 800

Recycle Rate (%)

Nitra

te R

educt

ion (%

)

Page 8: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

8

Denitrification ChemistryDenitrification Chemistry

• Ammonia First Passes Through Anoxic Zone• Ammonia is Converted to Nitrate in Aeration Zone• Nitrate are Recycled to Anoxic Zone• Nitrate are Converted to Nitrogen gas in Anoxic Zone

Anoxic Zone(Denitrificatio

n)

RECYCLE

Aeration Zone

(Nitrification)

InfluentEffluent

N2 Gas

NO3 Converted to N2NO3 Converted to N2 NH3 Converted to NO3NH3 Converted to NO3

Page 9: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

9

Denitrification CalculationsDenitrification Calculations

• Conventional Nitrification Calculations Required First• Denitrification Calculations, Solve For

• Recycle Ratio• Aerobic / Anoxic Residence Times• Aerobic / Anoxic Tank Volumes• Aerobic / Anoxic Ratio

Page 10: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

10

Genesee Water and Sanitation DistrictWastewater Treatment Facility

Page 11: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

11

Project BackgroundProject Background

• In Foothills West of Denver, Near I-70 • District Serves 4,000+ People• Activated Sludge Facility• Discharge to Bear Creek

Page 12: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

12

Need for ProjectNeed for Project

• 2002 Drought – Low Flows in Bear Creek• Bear Creek Water Quality for Downstream Users• Potential District Water Quality Problems• Potential Water Reuse• “Stay Ahead of the Game”• Potential Future Nitrate Effluent Regulations

Page 13: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

13

Existing Wastewater Process SchematicExisting Wastewater Process Schematic

•Two Aeration Basins Operated in Parallel (0.25 MGD Capacity, Each)•Three Secondary Clarifiers Operated in Series

Aeration Basins(typ.)

ClarifierClarifier Clarifier SandFilter

Grit

Scre

enin

g

ChlorineRAS

DISCHARGE

Page 14: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

14

Existing ConditionsExisting Conditions

• Activated Sludge Facility• Design Flow 0.5 MGD• Actual Flows ≈ 0.25 MGD• Achieving Near Complete Nitrification • Previous Average Conditions:

Influent EffluentLimits

• Ammonia (mg/L) 25-40 < 1.09-18.5

• Nitrates (mg/L) < 0.5 15-23 None

Page 15: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

15

Denitrification Calculation ResultsDenitrification Calculation Results

• Estimated Recycle Ratio = 295% • Aerobic Residence Time Required = 4.8 hours• Anoxic Residence Time Required = 2.0 hours• Aerobic Tank Volume Fraction = 71%• Anoxic Tank Volume Fraction = 29%

Page 16: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

16

Denitrification Design DrawingsDenitrification Design Drawings

Page 17: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

17

Denitrification DesignDenitrification Design

• Baffle Wall in Aeration Basin• Install Reinforced Flexible Baffle Curtain to Divide Basins• Attached on all sides to Basin• 3’ x 4’ Hole in Bottom Corner• Furnished and Installed by Lange Containment Systems, Inc.

Page 18: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

18

Baffle Wall InstallationBaffle Wall Installation

Page 19: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

19

Denitrification DesignDenitrification Design

• Submersible Mixer• Ensure Successful Mixing of Entire Anoxic Basin• Primary purpose to keep all solids in suspension, and prevent settling in Anoxic Basin• Evaluated Two Mixers, Flygt required two mixers to accomplish same mixing• Selected USFilter EMU Uniprop

Page 20: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

20

Mixer InstallationMixer Installation

Page 21: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

21

Denitrification Design DrawingsDenitrification Design Drawings

Page 22: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

22

Denitrification Design DrawingsDenitrification Design Drawings

• Piping Design From Pump

Page 23: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

23

Denitrification DesignDenitrification Design

• Submersible Pump• Designed for 900 gpm, 10’ TDH• 5 hp, 1750 rpm, submersible motor• Guide Rails to Raise Pump • ITT Flygt Submersible Sewage Pump Purchased

Page 24: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

24

Pump InstallationPump Installation

Page 25: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

25

Denitrification DesignDenitrification Design

• Flow Measurement• Electromagnetic Flow Meter –

Endress + Hauser, Promag 50W

• Flow Control• Ballcentric Plug Valve with Handwheel Gear – Pratt

• Piping and Related Equipment• C900 PVC Pipe, Fittings, and Glue• Ductile Iron Pipe, Fittings, and Hardware• Pipe Hangers, Support Brackets, and Hardware

Page 26: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

26

Flow and Piping InstallationFlow and Piping Installation

Page 27: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

27

Denitrification DesignDenitrification Design

• Electrical Modifications• Breakers, Starters, Controls• Installed for Pump, Meter, Mixer• Installed by Sub-Contractor

Page 28: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

28

Denitrification InstallationDenitrification Installation

• Aeration Basin Offline• Basin Power Washed• Diffusers Removed / Plugged• Baffle Wall Installed by Sub-Contractor• Pump, Piping, Mixer Installed• Electrical Hook-up by Sub-Contractor

• 200 Man-Hours by District Staff• 100 Man-Hours Electrical Sub-Contractor• 300 Man-Hours Total

Page 29: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

29

Denitrification Results at GeneseeDenitrification Results at Genesee

• Current Recycle Rate set at ≈ 230% • Effluent Nitrate Levels 3-5 mg/L (78% Reduction)

Page 30: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

30

Additional Benefits found at GeneseeAdditional Benefits found at Genesee

• A Substantial Decrease in Added Alkalinity Requirements has been Noted

• Alkalinity is recovered in Recycled Water in Anoxic Zone

• Better Settling and Clarity has been Noted in Clarifiers• A Decrease in Aluminum Sulfate Usage has been Noted

• Due to Increased Biological Phosphorous Uptake

• More Effective Dewatering Process (Centrifuge) • Reduced Air Requirement in Aeration Basins

Page 31: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

31

Negatives to Denitrification found at Negatives to Denitrification found at GeneseeGenesee

• Initial Electrical Consumption has increased 15%

• From Pump, Mixer, and Meter Usage• May Decrease because of Reduced Air Requirements

• Initial Operation Requirements to Determine Recycle Ratio• More Frequent Monitoring for Filamentous Control in the Anoxic Zone

Page 32: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

32

Total Costs Total Costs

• $46,000 for One (0.25 MGD) Aeration Basin Conversion

• Engineering – $ 6,500• Baffle Wall – $ 6,200• Pump & Equip. – $ 4,900• Jib Crane & Trolley – $ 1,400• Mixer & Equip. – $10,300• Flow Meter – $ 2,900• Plug Valve – $ 500• Pipe, Supports, Etc. – $ 3,300• Electrical – $ 9,900

Page 33: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

33

Design ImplementationDesign Implementation

Page 34: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

34

Design ImplementationDesign Implementation

• Determine Need• Establish Funding• Engineering Calculations / Design• Equipment / Materials Selection• Determine Resources Available• Installation• Financial / Chemical Changes

Page 35: Retro-Fit Denitrification for Small Wastewater Treatment Facilities Tenth Annual Vail Professional Wastewater Operators Seminar Friday, October 29, 2004.

35

Questions?Questions?