CHALLENGES IN CONSTRUCTION OF URBAN
ROAD TUNNELS, THE CASE HISTORY OF TOHID
EXPRESSWAY TUNNELS IN CENTRAL TEHRAN Jamal Rostami Mohsen Kashi
Penn State University, SRS Engineering,
University Park, PA Tehran, Iran
![Page 2: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/2.jpg)
OUTLINE
Introduction
Tunnel Alignment and Profile
Site Development
Portals and Construction Shafts
Tunneling Operation
Crossing an active Subway Station
Conclusions
![Page 3: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/3.jpg)
South Portal
![Page 4: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/4.jpg)
BACKGROUND
Tehran & Suburbs is the home for over 10 million people
City is spread over an area of around 50 km in the E-W and 30 km in
N-S direction
Tehran has experienced a rapid growth in past 3 decades,
The original fabric is old and does not have sufficient ratio of traffic
space to residential space to accommodate the flow
Streets are congested, slow traffic
2 subway lines are operational, 5 under construction
A network of highways has been constructed around the town
A series of road tunnels are planned to connect the highways
First highway tunnel (Resalat) was completed in 2004 (6 lanes)
2nd one is Towheed, Inaugurated in Feb 2010, 3rd is under
construction for 9 km + a 2000 car capacity underground parking
![Page 5: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/5.jpg)
پروژه تونل توحيد
![Page 6: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/6.jpg)
Project Map
![Page 7: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/7.jpg)
Tunnel
The Least Neighborhood Interference
Fuel Cost
Traffic Congestion
Travel Time
![Page 8: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/8.jpg)
ALIGNMENT & PORTALS
![Page 9: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/9.jpg)
VERTICAL ALIGNMENT
![Page 10: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/10.jpg)
Project North
End Point
Toeheed Shaft North
Portal Jomhoury Shaft
Azadi Shaft South
Portal Project
South End
Point
557-m 310-m 2136-m
Metro Line No. 4
Metro Line No.2
557-m 677-m 496-m 406-m
Work Sites Site Name
1 The North Portal
2 Toeheed Shaft
3 Azadi Shaft
4 Jomhouri Shaft
5 The South Portal
Longitudinal Profile North Ramp Slope 6%
Tunnel Overall Slope 4%
South Ramp Slope 4.29%
![Page 11: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/11.jpg)
TUNNEL PROFILE
![Page 12: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/12.jpg)
GENERAL INFORMATION
Tunnel Height : 8.5-m
Tunnel Width: 13.5-m Each
Overall Project length: 3003-m
The Tunnel Length: 2136-m
Tunnel Cross Section Area: 305-m2
Approach Half-Tunnels North 577-m
South 310-m
Start Date: June 10, 2007
![Page 13: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/13.jpg)
Quantity Unit Activity
750000
m3
Open Excavation
660000 m3 Tunnel Excavation
26000 m Pile Construction
56000 m2 Formwork
25000 Ton Steel Reinforcement
200000 m3 Concrete Placement
450000 m2 Shotcrete Application
250000 m2 Wire Mesh
50000 m2 Precast Concrete Elements
Bill of Quantities
Project Budget ~$400M
![Page 14: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/14.jpg)
INTERFACES WITH OTHER UNDERGROUND STRUCTURES
Subway Line No. 2 (Existing). The longitudinal profile of the tunnel is designed to go under the Subway Station Line No. 2 located around station 2+392 of this tunnel.
Subway Line No. 4 (under construction). The Toeheed tunnel passes beneath the Subway Line No. 4 currently under construction.
Subway Line No. 7 (future construction). The tunnel will essentially run parallel to the No. 7 Subway Line and provisions shall be made in the design and construction of this subway line to assure constructability and other operational issues involved.
Urban Utilities. Several underground utilities including water, gas, electric and telephone lines did interfere with the tunnel and other auxiliary structures such as the shafts, galleries, and the access ramps.
![Page 15: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/15.jpg)
GROUND CONDITION
Mainly course grained soils, gravel/sand
Primarily dry except for certain sections
Intersecting old water works (qanats) Table 1. Borehole/Test Pit Soil Classifications
Borehole Station
(km)
Depths at Tunnel
Section(m) USCS Soil Symbols
BH-1 0+360 5-15 SC/GC-GM/GC
BH-2 0+850 9-18 SC-SM/GC-GM
BH-3 1+070 12-21 GM/GC-GM/SC-SM
BH-7 1+810 20-30 SC
BH-8 1+920 21-30 GC-GM/GM/SC-SM
BH-9 2+150 22-31 SC-SM
Test Pits
TP-1 0+270 0-5 GW/SW/GP
TP-2 0+400 0-10 GP/GP-GM/GW/GP
TP-3 0+520 4-13 GW-GM/GM/GP/GM
TP-4 1+200 15-22 GW/GC/GW
![Page 16: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/16.jpg)
Embedded U-Turn Lane
UNIQUE PORTAL ENTRY DESIGN
![Page 17: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/17.jpg)
HALF ARCH U-TURN LANE
Provides additional traffic lane for U-turn
Allows for easier transition to daylight
![Page 18: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/18.jpg)
MOBILIZATION, SITE PREPARATION
![Page 19: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/19.jpg)
Power House, bar Bending & Batching
Plant
![Page 20: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/20.jpg)
Power House
![Page 21: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/21.jpg)
Equipment
![Page 22: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/22.jpg)
10,000 Ton Cement Silos
![Page 23: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/23.jpg)
Staging Area, Equipment Shops
![Page 24: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/24.jpg)
NORTH RAMP
SITE PREPARATION
![Page 25: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/25.jpg)
Traffic Diversion & Preparatory Work Relocating 600-mm Water main Pipe Traffic Diversion Barriers Road Widening
Supporting 1000-mm Water main Pipe Relocating the military base walls
![Page 26: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/26.jpg)
REDIRECTING
TRAFFIC
![Page 27: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/27.jpg)
![Page 28: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/28.jpg)
![Page 29: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/29.jpg)
CONTINUED HEAVY TRAFFIC
![Page 30: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/30.jpg)
TOEHEED SHAFT SITE
![Page 31: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/31.jpg)
Toeheed Shaft
Chain Bucket
Vertical Conveyor
![Page 32: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/32.jpg)
![Page 33: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/33.jpg)
Lowering the Road Header
Inside the shaft
![Page 34: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/34.jpg)
Towheed Shaft
Side Gallery
![Page 35: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/35.jpg)
Middle Gallery
Inside Towheed Shaft
![Page 36: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/36.jpg)
AZADI SHAFT SITE
![Page 37: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/37.jpg)
AZADI
SHAFT
METRO
Station
Azadi
Shaft Site
![Page 38: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/38.jpg)
AZADI SHAFT 677-M TO TOEHEED SHAFT
496-M TO JOMHOORI SHAFT
![Page 39: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/39.jpg)
AZADI
SHAFT
METRO
LINE
كارگاه شفت
آزادي
Galleries Excavated in the Access Tunnel
from Azadi Shaft
![Page 40: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/40.jpg)
JOMHOORI SHAFT SITE
![Page 41: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/41.jpg)
JOMHOORI
SHAFT
METRO
LINE
Jomhoori
Shaft Site
![Page 42: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/42.jpg)
![Page 43: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/43.jpg)
JOMHOORI SHAFT
496-M TO AZADI SHAFT 406-M TO THE SOUTHERN
PORTAL
![Page 44: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/44.jpg)
Middle Galleries inside the Jomhoori Shaft
![Page 45: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/45.jpg)
گالری های کناری شفت گالری میانی شفت جمهوری
Installing the Pre-cast Lining and Concreting جمهوری
![Page 46: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/46.jpg)
SITE PREPARATION FOR
SOUTHERN RAMP / PORTAL
![Page 47: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/47.jpg)
U Turn
South Portal
Face
km 2.600
South Ramp
28(m)
![Page 48: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/48.jpg)
28(m)
![Page 49: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/49.jpg)
South Ramp Portal Access
![Page 50: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/50.jpg)
گالری میانی فوقانی و تونلهای دسترسی شرقی و غربی
![Page 51: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/51.jpg)
A view of South Ramp at Night
![Page 52: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/52.jpg)
TUNNEL EXCAVATION METHOD
Sequential Excavation Method (SEM)
![Page 53: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/53.jpg)
Excavation of the upper part of the middle gallery
1
![Page 54: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/54.jpg)
Excavation of the Bench, or lower part of the middle gallery
1
2
![Page 55: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/55.jpg)
Excavation of the side galleries
2
1
3 3
![Page 56: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/56.jpg)
Construction of cast in placement of concrete piles Installation of a portion of final lining in the side galleries
3 3 2
1
4
![Page 57: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/57.jpg)
Excavation of the crown region of the tunnels
2
1
3 3
4
5 5
![Page 58: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/58.jpg)
Removing the temporary supports, benching, and completion of crown lining
2
1
3 3
4
5 5
6 6
![Page 59: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/59.jpg)
Excavation of the lower portion of the tunnels
2
1
3 3
4
5 5
6 6
7 7
![Page 60: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/60.jpg)
Completing excavation of the lower parts of the tunnels
2
1
3 3
4
5 5
6 6
7 7 8 8
![Page 61: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/61.jpg)
Installation of Permanent Concrete Forms
and concreting
2
1
3 3
4
5 5
6 6
7 7 8 8 9 9
![Page 62: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/62.jpg)
Drainage Ditch and Base Slab Construction
2
1
3 3
4
5 5
6 6
7 7 8 8 9 9
10 10
![Page 63: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/63.jpg)
Completed Tunnel Profile
![Page 64: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/64.jpg)
Using Conveyor Belt for Soil Removal
![Page 65: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/65.jpg)
Excavation using Roadheader
![Page 66: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/66.jpg)
![Page 67: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/67.jpg)
Excavation using Roadheader
![Page 68: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/68.jpg)
![Page 69: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/69.jpg)
Shotcrete Application
![Page 70: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/70.jpg)
Reinforcing Cages For the Piles
![Page 71: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/71.jpg)
عملیات الینینگ دیواره های کناری عملیات بتن پاشی برای تثبیت دیواره گالری
Installation of Precast Elements
![Page 72: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/72.jpg)
Permanent Linings عملیات بتن پاشی برای تثبیت دیواره گالری
![Page 73: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/73.jpg)
![Page 74: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/74.jpg)
CHALLANGES
![Page 75: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/75.jpg)
CHALLENGES
Crossing the active subway line, under the station
Small footprint for work
Redirecting of traffic
Restriction in access, muck haulage
Fast -Track project, accelerated schedule
Maintaining existing utilities, (i.e. a1.8 m water main)
Dealing with historical waterworks (qanats)
Causing water leakage into the tunnel
Subsidence - sinkhole
![Page 76: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/76.jpg)
CROSSING OF THE ACTIVE SUBWAY
STATION
![Page 77: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/77.jpg)
PROFILE
![Page 78: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/78.jpg)
CROSSING OF SUBWAY STATION
Intersecting Station in
North
Middle
South
![Page 79: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/79.jpg)
ADDITIONAL PROVISIONS FOR STATION
CROSSING
Installation of Invert
beam in the middle
gallery
Heavy grouting of the
lining under the station
![Page 80: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/80.jpg)
MODELING AND ANALYSIS
Numerical Modeling of Sequential Excavation
under the station
![Page 81: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/81.jpg)
GROUND REACTION MODELING
![Page 82: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/82.jpg)
RESULTS
Max measured settlement at the station was:
![Page 83: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/83.jpg)
COMPLETION OF THE WORK
![Page 84: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/84.jpg)
CONSTRUCTION PROGRESS
![Page 85: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/85.jpg)
FINISHING TOUCHES
![Page 86: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/86.jpg)
VENTILATION AND CONTROL STRUCTURE
![Page 87: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/87.jpg)
UTILITIES & FIT OUTS
Ventilation
Fire protection
Lighting
Communication
Traffic Control
CCTV
Art Works!
![Page 88: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/88.jpg)
UTILITIES & FIT OUTS
70 jet fans, each powered at 30 KW.
North fan combined ventilation equipment: 3 axial fans, powered at 600 KW.
Niyayesh fan combined ventilation equipment: 2 axial fans (to let in fresh air into Tunnel) powered at 410 KW. 4 axial fans (to let out exhaust air from Tunnel) powered at 500 KW.
South portal fan combined ventilation equipment: 3 axial fans powered at 990 KW.
Air purification system at the air entering Niyayesh fans.
Lghts in the Tunnel: 1,064 lights powered at 550 KW.
Length of cables for the utilities: 220 km.
Special and standby power generators
Air pollution monitoring sensors
Smart firefighting system.
Traffic alarms.
Intercom telephones.
Closed-Circuit TV.
Vehicles counter.
Road closure system.
Traffic signs.
Thermal sensors.
![Page 89: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/89.jpg)
FINISHED TUNNEL
![Page 90: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/90.jpg)
FINISHED TUNNEL
![Page 91: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/91.jpg)
INAUGURATION CEREMONEY, FEB 2010
Opening of the project by Citizens / Veterans
![Page 92: RETC2011 Rostami Kashi](https://reader034.fdocuments.us/reader034/viewer/2022051616/553446894a7959394b8b4b4d/html5/thumbnails/92.jpg)
Questions ?????