Retaining WallMax height 1 · PDF fileEarth bund with clay bunding ... planting to outward...
Transcript of Retaining WallMax height 1 · PDF fileEarth bund with clay bunding ... planting to outward...
O
N
L
Y
I
N
D
I
C
A
T
I
V
E
ARABLE
ARABLE
ARABLE
POND
O
N
L
Y
I
N
D
I
C
A
T
I
V
E
L
V
S
E
C
T
I
O
N
H
V
S
E
C
T
I
O
N
R
IN
G
M
A
IN
U
N
IT
R
IN
G
M
A
IN
U
N
IT
Future - Phase 2
Digestate Storage
Tank No.3
Future - Phase 2
Digestate Storage
Tank No.4
Earth bund with clay bunding
and grass bank with tree
planting to outward slope
Rainwater balancing pond
Existing hedge
and tree line
Existing hedge
and tree line
Reeds planted within reed bed
soakaway.
Bridleway along south
side of hedge line
New Native Tree
landscaping
Sump for pumping water back into
building and sluice valve to control
water into reed bed
Gate
Proposed single
hand gate
R
e
t
a
i
n
i
n
g
W
a
l
l
M
a
x
h
e
i
g
h
t
1
.
3
m
R
e
t
a
i
n
i
n
g
W
a
l
l
m
a
x
h
e
i
g
h
t
1
.
1
m
Proposed
Floodgates
R
e
t
a
i
n
i
n
g
W
a
l
l
s
m
a
x
h
e
i
g
h
t
1
m
Crushed concrete farm
track to link up to existing
farm track network
Native Tree and
Shrub landscaping
New Native Tree
landscaping
8
a
7
a
9
1
0
8
H
V
S
E
C
T
I
O
N
L
V
S
E
C
T
I
O
N
3000
1800
4800 BASE
15
00
C
26
A
B
1
3
42
44
45
45
46
47
50
47
76
00
B
AS
E
26
Proposed Flare stack
DO NOT SCALE
Copyright Rolton Group Ltd 2017
This drawing shall remain the copyright of Rolton Group Ltd.
Standard construction hazards that a competent
contractor would be aware of have not been
identified on this drawing. Risks that may not be
immediately apparent are listed below:
!
Drawing Title:
Project:
Checked By: Scales:Drawn By: Date:
@A1
@A3
Project-Originator-Zone-Level-Type-Role-Classification-Number
RGL Project Ref:
01933 410909www.rolton.com
Specification(s):
-
Suitability-Revision
Drawing Number:
Issue Purpose: Status:
S3
170447-RGL-ZZ-XX-DR-A-100-0001
P1
TS ARC 1:500
1:1000
03.10.17
170447
Biogen (UK) Ltd
AD Power Station
Westwood Plant
Site Plan Denoting Proposed
Flue Stack Location
PRELIMINARY
S3-P1 04.10.17 ARCPreliminary issue
Revision DescriptionStatus Date Chkd
NOTES
1. This drawing is to be read in conjunction with all the
relevant contract documentation.
2. All dimensions are in mm unless otherwise stated.
Dimensions to be checked on site prior to construction
and any discrepancies reported to the Rolton Group
Engineer.
3. Drawings marked Preliminary are for guidance/ approval
only, i.e. NOT for Construction.
4. Revision clouds are shown for assistance only, the whole
drawing is to be checked for new/ amended information.
X:\17-0\4\4\7\D
esign D
ocs (deliverables)\D
raw
ings and S
ketches\W
orking D
raw
ings\S
tructural\170447-R
GL-Z
Z-X
X-D
R-A
-100-0001 S
ite P
lan S
how
ing F
lue S
tack Location.dw
g, 03/10/2017 16:33:08, D
WG
T
o P
DF
.pc3