Resume_Shishir

7
Shishir Jain Mob: 91-9953266285 [email protected] Objectives: - As a Control and Instrumentation Engineer, looking for a challenging position and to be a part of winning team of a professionally managed organization. Work Experience: - Haldor Topsoe India Pvt. limited – July, 2014 till date, working as Senior Instrumentation Engineer ABB limited – June, 2007 till June, 2014, worked as Senior Project Engineer Jubilant Organosys limited – Aug, 2005 till June, 2007, worked as Project Engineer Trainings and Certifications: - TUV Certified Functional SAFETY Engineer (ID: 4947/12). Skills: - Control Specifications Reviews FEED P&I Review IAT, FAT Quality Engineer, implementation of ISO 9001 and IEC 61508, 61511 Standards Internal Auditor of Projects DCS, ESD, F&G Third Party Interface using Modbus ISA, IEC, API, ISO, S88, Hook Ups Knowledge Project Documentation like Design Descriptions, FAT/ SAT Procedures, Installation Procedures etc. Project Management like Cost, Resource Management, Competency Development, Status Reports, Risk Mitigation etc. Customer Interaction, Site Installations. Six Sigma Project Execution Basic Engineering Design Packages for Topsoe Technologies Instrument Sizing like Orifice, Control Valves etc.

Transcript of Resume_Shishir

Page 1: Resume_Shishir

Shishir JainMob: [email protected]

Objectives: - As a Control and Instrumentation Engineer, looking for a challenging position and to be a part of winning team of a professionally managed organization.

Work Experience: -

Haldor Topsoe India Pvt. limited – July, 2014 till date, working as Senior Instrumentation Engineer ABB limited – June, 2007 till June, 2014, worked as Senior Project Engineer Jubilant Organosys limited – Aug, 2005 till June, 2007, worked as Project Engineer

Trainings and Certifications: -

TUV Certified Functional SAFETY Engineer (ID: 4947/12).

Skills: -

Control Specifications Reviews FEED P&I Review IAT, FAT Quality Engineer, implementation of ISO 9001 and IEC 61508, 61511 Standards Internal Auditor of Projects DCS, ESD, F&G Third Party Interface using Modbus ISA, IEC, API, ISO, S88, Hook Ups Knowledge Project Documentation like Design Descriptions, FAT/ SAT Procedures, Installation Procedures

etc. Project Management like Cost, Resource Management, Competency Development, Status

Reports, Risk Mitigation etc. Customer Interaction, Site Installations. Six Sigma Project Execution Basic Engineering Design Packages for Topsoe Technologies Instrument Sizing like Orifice, Control Valves etc.

Academia: -

Bachelor of Technology (Electronics & Instrumentation Engineering) from Uttar Pradesh

Technical University, 2005 with aggregate 66.6%.

Page 2: Resume_Shishir

Project Details: -

Role Control and Instrumentation EngineerOrganization Haldor Topsoe India Pvt. Ltd.Team Size 15

Project Description: -

A new Automotive Catalyst Plant was erected and commissioned in China. The whole Design, Engineering, Commissioning was done by Haldor Topsoe.

Key Roles/Responsibilities: -

Control System FEED study Vendor Interaction for various Third party Systems/ Packages Control System Design like the Topology, I/O Count, I/O Distribution, Load Calculation etc. Control Strategies Design according to S88, Alarm Philosophies decisions Trip Philosophies Datasheet preparation for various Instruments in the Plant Flow Element Sizing, Control Valve sizing using Standard software like Convel etc. General Instrumentation Specifications etc. Hook ups, Instrument selection Document Generation like FDS, FAT, O&M manuals, Training literatures etc. Loop checking Commissioning Training to the Operators Site Support

Page 3: Resume_Shishir

Client Topsoe Third Party ProjectsRole Control and Instrumentation EngineerOrganization Haldor Topsoe India Pvt.ltd

Project Description: -

These projects involve Basic Engineering Design Packages of different Topsoe Technologies for various clients.

Key Roles/Responsibilities: -

Datasheets generation for various Instruments Generation of documents like Instrument Specifications, ESD-DCS Connections Sizing of Flow Elements Cause and Effect sheets, Control Diagrams, Trip Diagrams P&I reviews Control System Specifications Co- ordination between cross functional teams

Page 4: Resume_Shishir

Client LG, ABB KoreaRole Lead Control EngineerOrganization ABB ltd.Team Size 15Controller PM890Software 800Xa System Version 5.1, FP4

Project Description: -

A new Chemical plant was commissioned in Korea. Control System Engineering from the Early works till commissioning was done by ABB.

Key Roles/Responsibilities: -

Identification of different Functional Requirements and Software design Control Strategies design in consultation with LG, Korea System Design like System Topology, Project Structure, Networking, HMI etc. System Installation and Design in the ABB Office, Bangalore Training to the Team Members Project Management activities like Status reporting, Resource Management, Client Interaction,

Estimation, Scheduling etc Testing with the Customers Commissioning Handover to LG

Page 5: Resume_Shishir

Client BPRole Lead EngineerOrganization ABB ltd.Team Size 20Controller PM865, PM866, PM864Software 800Xa System Version 5.0

Project Description: -

Caspian Healthcare Engineering Services, BP. It includes Modification/ Enhancement packages for the existing BP Platforms like Chirag, Shah Deniz, East Azeri etc. in the Caspian Sea, Azerbaijan from the ABB office in Baku, Azerbaijan.

Key Roles/Responsibilities: -

Preparation of Customer Quotations. Assistance in defining/maintaining department procedures and engineering change

documentation. Organization and control of Factory and Site Acceptance Tests. Specification, Design and Implementation of Hardware and Software Modifications to the ABB

DCS. Carry out engineering changes in accordance with the Client’s and ABB’s Standards and Change

Control Procedures. Ensure that work is implemented within agreed targets. Discussions with Site Engineer, Customers. Executed Projects like Fire and Gas modifications, SAFETY modifications, Serial Links

Configurations, MMS modifications, Module Additions, Controller replacement etc. Trip checks, Sequence Testing.

Page 6: Resume_Shishir

Project Autoclave, Jubilant Organosys ltd.Role Control and Instrumentation EngineerOrganization Jubilant Organosys ltd.Team Size 6Software RSLogix 5000, FlexLogix Controllers

Project Description: -

Autoclave is a High Pressure Reactor. A new unit had to be added to the existing Plant.

Key Roles/Responsibilities: -

Instrument Selection like Control Valves, Shut off Valves, Transmitters etc. System Setup and Hardware Configuration Witness to the FAT Participation in HAZOP Loop Configurations, Loop Checking, And Loop Tuning Discussions with the System Vendor and Instrument Vendors Panel Installation Checks Inventory Management like Software, Project Backup, and Instruments etc. Plant Startup Participation in ISO Audits Instrument Calibration, Preventive Maintenance Six Sigma Project Execution