Resume portfolio Raj Pillai
description
Transcript of Resume portfolio Raj Pillai
PORTFOLIO RESUME- RAJMURUGAN RAMALINGAM
EXPERIENCE SUMMARY
•12 + years of experience in interior design, project planning and
management ,interior
architecture planning and design, Real estate space planning,
office space planning
and Management ,project cost control
•9 years dedicated Corporate space designing ,project rollout
and project management
and Handled Fortune 500 companies like Verizon ,HCL, TCS,
and project management
and Handled Fortune 500 companies like Verizon ,HCL, TCS,
Boeing ,Bank of America
Alcatel Lucent. Etc with client management, client retention,
end-to-end project
handling
•Handled Projects upto 30MUSD in which from .5 MUSD to 12
MUSD in Lead position
•Design, deliver and manage Space Design management
processes and operations
•Pursuing LEED.V3 and PMP
Key Projects above .2 million sq.ft :
TCS E-Serve -0.2 Million Sq.ft in 2 PhasesTCS E-Serve -0.2 Million Sq.ft in 2 Phases
HCL -0.6 million sq.ft in Single Phase
Barclays - 0.15 million sq.ft in 2 Phases
Verizon - 0.7 million sq.ft in 5 phases
Bank of America - 0 .2million sq.ft in 2 phases
CONTENTS :
1) ARCHITECTURAL PRESENTION SAMPLE
2) CONCEPT PRESENTION SAMPLE
3) EXECUTED PROJECT IMAGE SAMPLE
ARCHITECTURAL PRESENTATION
PRESENTATION FOR
CORPORATE OFFICE
AIMS & OBJECTIVES
The Central Idea of the Design is to have a Building whichwhile serving as a Great Functional Fit for Clients usage isalso reinforcing with Global Branding and at the same timebeing Site & Climate responsive.
�SiteBuilding should belong to the site- designed in respect toClimate and land use around the building
�Circulation patternDefined movement for employee, visitors and services bothfor pedestrians and vehicles. .for pedestrians and vehicles. .
�Climate responsive design – Green Building concept for asustainable building.
�International look and feelUse of minimalistic understated style.
�Form & functionForm follows function- Building components clearlyExpressed in terms of Exteriors, Entrance, Workspace
ARCHITECTURAL STYLE
# Form follows function
Three Building components are clearlyexpressed in terms of;�Exteriors�Entrance and�Workspace
# International look and feelFORM FOLLOWS FUNCTION
# Signature, Minimalistic, Understated lasting style
# Usage of Natural Material
�Exposed Concrete�Locally quarried material�Timber/Wood�Aluminium�Steel
FORM FOLLOWS FUNCTION
CORPORATE OFFICE
SITE LOCATION
Plot Area- 4591 sq.m. Permissible Height - 21mts.
FAR – 125.
Basement – G2 allowed
CLIMATEHOT AND DRY
SUMMERS- MAX. 40
WINTERS- MIM. 15
RAINFALL- 140MM
SITE PLAN
Building should belong to the SiteEntrance landscape in the form of radial pattern to Match withthe FORM of the Building.
Elongated siteElongated and corner nature of site leads to a buildingdesign favorable for Circular module which maximum daylighting can be captured
North facing siteNorth facing site allows a generous use of glass in the front.
Loop RoadInternal design separates entry and exit leading to efficient
road around helpsin efficient circulation of the vehicles
circular building design helps in better penetration of light in the building
Rear entry for ramp and service
vehicles
Internal design separates entry and exit leading to efficientvehicular movement.Facilitates efficient parking in the basementby avoiding bottlenecks.Allows Rear ramp entry to basement .
SITE PHOTOS
North facing siteallows a generous use of glass in thefront
Entrance
CIRCULATION
Defined CirculationClearly defined movement for employee andvisitors such that the;-employees enter directly to office area and-the visitors to meeting or guest entertainment area.The circulation also defines rear service entry.
BUILDING ENTRANCE
Vastu�North-East entrance- favourable�Building morphology stepping from South to North�South is heavy in terms of massing�Central Entrance in an atrium representingBrhama sthan
BUILDING ENTRANCE
STEPPING BUILDINGMORPHOLOGY
Ramp entrance / Service entry
NE entrancefavourable
CLIMATE RESPONSIVE BUILDING
1. Construction related measures
2. Building design related measures
� Design elements� Materials� Shading devices� Rain water harvesting� Sewage treatment
Landscaping
ELEMENTS�Low wall to window ratio on the West wall
�More glass on NE for day light and View
�Terrace Gardens�Landscaping
3. Service Engineering related measures
� Landscaping
� Efficient HVAC system� Efficient lighting� Renewable energy
�Landscaping�Water Body�Increased Soft surface Area
�Courtyards as light well�Cavity Wall
Materials�Low e materials�Roof insulation�Double Glazing
LOUVERS
TERRACE GARDEN TO REDUCE HEAT INTAKE FROM ROOF
SHADINGDEVICE
TERRACE GARDEN
MORE GLASS ON NE TO MAXIMISEDAY LIGHT AND VIEW
CANTILEVER
DESIGN MEASURES-PASSIVE
ELEVATIONAL VIEWSHADING DEVICE
Area Statement:- Area Allowed Area Achieved
Plot Area - 4591 sq.m. Permissible Height - 21mts. FAR - 125.Basement - B2 allowed
1836 Sq.m (40%) 1638 sq.m (37%)
5738 Sq.m (125) 5721 sq.m
FLOOR PLANPLOT-16
Ground coverage- (60%) FAR (125) No of Cars
88 cars 85 in Basement10 in GF
GROUND FLOOR /SITE PLAN
Floor Area Statement:-
Basement Floor Area
Ground Floor Area
First Floor Area
Second Floor Area
Total Floor Area
Third Floor Area
1586 sq.m1638 sq.m
1574 sq.m
8893 sq.m
967 sq.m
88 cars 85 in Basement10 in GF
Basement Floor Area 1586 sq.m
1542 sq.m
FLOOR PLANPLOT-16
GROUND & FIRST FLOOR PLAN
SECOND FLOOR PLAN
FLOOR PLANPLOT -16
SECOND FLOOR PLAN
THIRD FLOOR PLAN
VIEWPLOT - 16
VIEW OF THE BUILDING
OFFICE-2
SITE LOCATION
Plot Area - 3792 sq.m.
Permissible - 21mts.Height
FAR - 125.
Basement - B2 allowed
CLIMATEHOT AND DRY
SUMMERS- MAX. 40
WINTERS- MIM. 15
RAINFALL- 140MM
SITE PLAN
Building should belong to the SiteEntrance landscape in the form of A Grid PatternTo Match the Angular Form .
Elongated site
Elongated and corner nature of site leads to a building designfavorable for L shaped module which maximum day lightingcan be captured
Loop RoadInternal design separates entry and exit leading to efficientvehicular movement.Facilitates efficient parking in the basement
Rear entry for ramp and service vehicles
Facilitates efficient parking in the basementby avoiding bottlenecks.Allows Rear ramp entry to basement .
SITE PHOTOS
Entrance landscape
Area Statement:- Area Allowed Area Achieved
2275 Sq.m (60%) 1973 sq.m (53%)
4740 Sq.m (125) 4738 sq.m
Ground coverage- (60%) FAR (125) No of Cars
Plot Area - 3792 sq.m. Permissible Height - 21mts. FAR - 125.Basement - B2 allowed
FLOOR PLANPLOT-20
86 cars 85 in Basement10 in GF
GROUND FLOOR /SITE PLAN
Floor Area Statement:-
Basement Floor -1
Ground Floor Area
First Floor Area
Second Floor Area
Total Area
1973 sq.m
1946 sq.m
1899 sq.m
8684 sq.m
893 sq.m
Basement Floor -2 1973 sq.m
86 cars 85 in Basement10 in GF
FLOOR PLANPLOT-20
BASEMENT FLOOR PLAN
FLOOR PLANPLOT-20
GROUND FLOOR PLAN
FLOOR PLANPLOT -20
FIRST FLOOR PLAN
FLOOR PLANPLOT -20
SECOND FLOOR PLAN
VIEWOPTION-1
VIEW – MAIN ENTRANCE
CONCEPT PRESENTATION
EXECUTED PROJECTS PRESENTATION
For Further Portfolio please visit www.issuu.com/wowfactoryin
THANK YOU
For Further Portfolio please visit www.issuu.com/wowfactoryin