Mohammad Kamruzzaman – Assistant Project Manager / QC Manager
Email: [email protected], Cell: 703-203-5646, US Permanent ResidentEducation
National University of Singapore (NUS)
Civil Engineering
Skills and Certifications Certified – ISO 9001: 2008 Certified - Primavera 6.2 for Project Management OSHA 30-Hour Course AutoCAD, ArcGIS, MS Office suite, Plan Swift Professional 10.0,
RSMeans, Minitab Codes & Standards: ACI 318, AISC, ASTM, AASHTO, AWS, ISO, BS
etc. Languages: English, Bengali, Hindi Expertise: Design & Construction Project Management; Quality
Control, Construction Safety, Site Inspection & Supervision, Project Scheduling, Procurement, Estimation
Projects involved: Commercial Buildings, Highways, Elevated Rail Viaducts, Underground Mass Rapid Transit Station & Tunnels and Utilities.
Integrated Design Build Contracts, Renovation & New Construction of Federal, State, and Local US Government Projects
Work ExperienceAssistant Project Manager / QC Manager – Montage, Inc., D.C. 20010, US
March, 2016 - Present
Site Security Upgrades and Minor Land Improvements for FBI Facility, US Department of Justice - Pocatello, Idaho
In brief, the project involves construction of Mail and Warehouse Building, Visitor Screening Facility Building, New Security Entrance Gate and Civil Works (Sewer and Storm Lift Station, Expansion of Parking Area and miscellaneous utilities works). To review project specifications, working drawings, shop drawings, to prepare submittal register, prepare and review submittals on shop drawings, product data, samples, materials, safety, prepare schedule for construction activities, monitoring construction progress, procurement of materials, safety and quality aspects on site, coordination with design team, project owner and sub-contractors, supervision on civil, structural, geotechnical, architectural, mechanical, electrical and plumbing works.
Overseas Building Operation (OBO) Projects:Upgrade of Emergency Egress Stair – US Embassy, Copenhagen, DenmarkCMR Upgrade, US Embassy, Department of State, Tokyo, JapanCompound Security Upgrade – US Embassy, Department of State, Hamilton, BermudaCompound Security Upgrade – US Embassy, Department of State, Madrid, SpainCompound Security Upgrade – US Embassy, Department of State, Prague, Czech Republic
![Page 2: Resume of Mohammad Kamruzzaman](https://reader031.fdocuments.us/reader031/viewer/2022013120/588595ba1a28abd2498b4a81/html5/thumbnails/2.jpg)
Design-Build for Photovoltaic System – US Embassy, Burkina Faso
Review specifications and plans. Prepare & review schedule, prepare submittal register and submittals. Coordinate with government, consultants, subcontractors, and material suppliers in reviewing the shop drawings, material procurement process, closeouts. Assistant Civil Engineer, Virginia International University; Fairfax, US
October 2015 – March 2016
Responsibilities includes to supervise the building maintenance works, to monitor the HVAC and roofing installation works, to schedule ahead for the materials orders, delivery, machinery and manpower required to complete the works, coordination with government agencies for the application of building occupancy permit, use of engineering tools and equipments for the assembly and installation works, prepare weekly and monthly progress report, review building plans, evacuation plans and safety aspects of the university and provide recommendations.
Resident Engineer - JIB Specialist Consultants Pte Ltd., Singapore
March 2014 – October 2015
Contract T217: construction of Napier station and its associated tunnels with project value S$189million
Performed construction supervision of 32m deep underground station box, launch shaft, bored tunnels, and sumps and cross passage between NPR and Orchard Boulevard Station. Examined and reviewed shop drawings, design, method statement and specifications, geological profiles, monitored quality & safety. Supervised ERSS, contiguous, secant, foundation, micro, sheet, soldier, king/deck Post, pile installation. Supervised ground Improvement (jet, permeation and fissure grouting, grout block) observation & recharge well, soil nailing for slope protection. Supervised the steel bridge fabrication and installation for Pedestrian Overhead Bridge. Supervised utility & traffic diversion, deep excavation, king & deck post, RC and steel decking.Resident Engineer - Tritech Consultants Pte Ltd., Singapore
November 2012 – March 2014
Contract C1686: Construction of Stations EW33, EW32 and Viaducts for Tuas West MRT with a contract value of S$150 million.
Coordinated and inspected day to day field works according to contract drawings and specification and resolved site issues. Attended weekly, monthly progress, safety meeting with contractor and concerned agencies to discuss about projects’ progress, quality and safety issues. Supervised civil, geotechnical, foundation & structural works on site. Supervised geotechnical instrumentation installation and monitoring. Supervised soil investigation, drainage, road diversion, piling, reinforcements, ERSS, excavation, pile cap, column, crosshead beam, pre-cast segment beam, waterproofing membranes, reinforced concrete, steel works. Supervised pile tests (ultimate, working load, PDA, sonic
![Page 3: Resume of Mohammad Kamruzzaman](https://reader031.fdocuments.us/reader031/viewer/2022013120/588595ba1a28abd2498b4a81/html5/thumbnails/3.jpg)
logging & coring, lateral load, O-cell test, pot bearing tests). Supervised and managed all resident technical officers for their daily supervision works. Managed road works for public roadway water & sewer lines installation, relocation of underground utilities (gas, telephone, electric etc.), concrete sidewalk, granite and steel curb and asphalt paving.Project Engineer - L&M Foundation Specialist Pte Ltd., Singapore
February 2012 – November 2012
Contract ER295: Construction and Completion of Sentosa Gateway Tunnel along Sentosa Gateway and Contract C926 Construction and Completion of Tampines West MRT Station.
Major responsibilities include to construction of Diaphragm Wall (D-Wall) and bored pile. Coordinated with main and sub-contractors about project drawings, requirements, specifications. Prepared project schedule and ensured projects quality meet with design and specifications. Verified soil characteristics of site with geological details (soil type, shear strength, density, porosity, SPT-N value, vane shear test etc.). Proper documentation of the works, supervision of platform preparation, trial trench and/or excavation, trench stability, construction of guide-wall, trench verticality check with koden machine.Geotechnical Engineer - Kiso-Jiban Consultants Co. Ltd., Singapore
February 2010 – February 2012
ExxonMobil Singapore Parallel Train (SPT)Arts & Science Museum Package at IR Marina Bay Sands Reclamation of International Cruise Terminal, Pasir Panjang Container Terminal Phase 3 & 4C485 Marina Coastal Expressway (Marina Bay Crossing) C916 Beauty World Station DTL2 Land Reclamation of Jurong Island Jurong Rock Cavern Underground Oil Storage Facility Reclamation at Pulau Ubin and Pulau TekongCommon Service Tunnel (CST) at Downtown Marina Bay Soil Investigation & Seismic Survey at Tuas View Proposed 6m diameter Segmental Tunnel at Pioneer Road.
Worked with multiple infrastructure projects for specialized geotechnical works involving soil investigation and geotechnical instrumentation and monitoring works. Under soil investigation, supervised the drilling and coring works, classify soil/rock, prepare borelog for each soil/rock sample, carry out point load (PT) test, unconfined compression load (UCS) test and finally prepare report. Under geotechnical instrumentation works, supervise installation of ground and/or building settlement markers, crack meters, inclinometers, extensometers, tilt plate, water stand pipes, piezometers, load cell, strain gauges, noise meters, vibration meters etc.