Miguel Ramirez Feliciano Project & Construction Engineer
787-400-0030
Fifteen years of experience in project management and commissioning for the pharmaceutical industry. Strong
practice in structural engineering with hands on experience in construction field inspection. Successfully
represented the client managing construction contracts and the general project administration.
EXPERIENCE
Project / Construction Engineer
Managed various projects as a project and
construction engineer. My responsibilities have
included:
• Project Administration
• Change Order Evaluations
• Construction Supervision
• Structural Analysis & Design
• Capital projects development
EDUCATION & QUALIFICATIONS
• BS Civil Engineer, Polytechnic
University of Puerto Rico, San Juan,
PR
• E.I.T Certified (2002)
• STAAD Certified Engineer (SCE)
• American Concrete Institute (ACI) Puerto
Rico Chapter Member
• Professionals Society of Accident
Prevention of PR Member
• “Inspección de Proyectos y Manejo de
Reclamaciones"
• “Manejo de Proyectos Utilizando CPM”
• Corrosion of Steel Reinforced Concrete
• “Reglamento de Siembra, Corte Y
Forestación de Puerto Rico – Reglamento
de Planificación Num. 25”
• Self Compacting Concrete & Chemical
Admixtures
• 318-02 Building Code Seminar (Miami)
• Project Controls & Change Management
• Fundamentals of Connection Design
• Construction Site Management
KEY PROJECTS
Pharmaceutical and Chemical
Infrastructure Upgrade Project
Process Lines MOC Project
Tank Farm Dike Upgrade
Fire Protection Upgrade Project
Relief Valve Upgrade Project
Security System Upgrade Project
Pipe Rack Upgrade Project
Pipe Rack Decommissioning
Site Back Up Power & Filtering System
Plant Expansion Program
EHS & TOU Upgrades Project
API Manufacturing Facility Retrofit
Manufacturing Utilities Reconfiguration
Clean Rooms Construction and Qualification
SPA Project campaign
De-Scoping Pin Mill Project
API product registration Project
PROJECT DETAILS
DuPont Agricultural Caribe Industries (DACI), Manati, PR (March 2014-March 2015)
Construction Engineer
Construction Management of all ongoing Capital Projects: Plant infrastructure upgrade projects, Tank
Farm Dike Upgrade Project, Fire Protection Upgrade Project, Process Piping MOC Upgrade Projects, Relief
Valves Upgrade Project, Waste Water Treatment Plant Pump Replacement Project, Security System
Upgrade Project, Solvent Recovery Structural Upgrade Project Plant shutdowns construction management.
For all projects and daily management activities, maintain all proper documentation for quality purposes,
performed construction inspection, quality audits, create general master schedule for all year activities, track
procurement process, RFIs, Submittals and lead weekly planning and construction meetings with the client.
Dow AgroSciences – Guayama,PR (July 2013 – March 2014)
Project Engineer: Coordinate all submittals approvals. Constant coordination with design firm. Bristol – Myers Squibb, Humacao, PR (July 2009-July 2013)
Civil / Structural / Architectural & Mechanical
For the Pipe Rack Upgrade Project, managed and coordinated all civil, structural, mechanical and electrical
activities for new pipe rack installation and existing pipe rack refurbish. Activities included excavations for
footings, inspections for grading, grounding, reinforcing steel installation, concrete pours quality, structural
steel fabrication and assembly monitoring; managed design and construction project for seismic upgrade
to existing pipe rack according to codes (in coordination with structural designers); and provided structural
analysis and design for piping supports and field conditions. For mechanical activities, coordination of
installation of utilities such as cooling water, steam, compressed air, sanitary, city water, well water, reuse
water and DI water. Also bio waste, kerosene and diesel. Commissioning tests were coordinated and
supervised for these installations.
In addition, provided construction supervision for capital projects involving chillers installations, utilities
reconfiguration, demolitions, waste treatment plant upgrade and reconfiguration (new, pumps, new
agitator, system update, plant procedures updates), cooling tower revamping, shut down activities, utilities
transfers and startups. Coordinated and inspected the installation activities and weekly coordination
meetings. Coordinated all piping welding and ultrasonic inspections with third parties and audit all
commissioning documentation.
For all projects, managed the quality documentation in coordination with designer (RFIs); and managed
new Capital Projects Development: assessment, define scopes description, budgetary assessment, prepare
technical data for bidding purposes, bidding process, bid analysis, purchase orders monitoring and
management, and projects executions supervision (Projects: Pipe rack retrofit, building improvements and
remodeling, facilities improvements (paint, pedestrian walkways, building access), chillers refurbish, plant
infrastructure modifications (storm sewers
Other projects: Site back up power, manufacturing building expansion (new building), new packaging lines
(building upgrade): design reviews, projects coordinator, construction supervision and inspection.
Lilly del Caribe, Guayama: PR06 Building 23 - Expansion Project
Position: Professional Services as Mechanical Superintendent - (October 2008-July 2009)
Responsibilities: Coordinate and supervise all mechanical and instrumentation activities during the night shift.
Inspection of mechanical installations, such as isometrics, instrumentation and equipment. As part of the team,
also supervised other discipline activities such as civil, architectural and structural in order to comply with
client’s quality and specification requirements. Audit documentation and assist preparation of turnover
packages.
Lilly del Caribe, Guayama: PR06 100MT API Capacity and Tadalafil Projects
Position/Work Type: Validation Consultant – (August 2007- May 2008)
Bristol-Myers Squibb, Barceloneta, PR
Civil / Structural / Architectural & Construction Manager (August 2005 to August 2007)
For the EHS & TOU Upgrades Project (Emission Control Upgrade-Relocation of two thermal oxidizer),
coordinated and managed all civil, mechanical and electrical activities. Directed weekly contractor’s
coordination meetings and worked in a daily basis with drawing reviews, RFIs (Request for information in
coordination with designers), change orders evaluation, inspections, and reports to client. In addition,
prepared scopes of work and technical packages for RFPs (Requests for proposal) for multidiscipline
activities and biddings procedures; assisting with commissioning procedures and “as built”drawings; and
preparing documentation and project tracking made through “Constructware” (Construction Management
Software).
Summary: Relocation of TOU’s, new office area, new control room and new sub-station.
Amgen, Juncos, PR (With Washington Group, the following roles @ Amgen from 2003 to 2005)
Civil Engineer and Quality Inspector ( 2003-August 2005)
Civil, Structural and Architectural Consultant
Represented the Discipline Engineering Department by performing the daily quality inspections of new
buildings, QA Laboratory, Epogen Building, Neupogen Building, New Warehouse and Site works, at Opus
Project.
Amgen, Juncos, PR
Space Planning Consultant 2003
Responsibilities included supervising and developing the temporary facilities; assisting with all
development plans including earthwork calculations, parking designs (codes compliance), temporary
personnel buildings designs (in compliance with AISC, ACI and Factory Mutual for winds and earthquakes),
cost estimates and bidding packages; and providing inspection and management during construction
phases.
Washington Group Engineering Dept. (2002 to 2003), the following projects:
Pharmaceutical Facility, Arecibo, PR (2002 to 2003)
Structural Engineer
Provided structural engineering design and worked as a consultant for an API Retrofit. Duties included the
coordination of the structural design works and the interaction with various other departments.
Merck, Barceloneta, PR (2002 to 2003)
Structural Engineer
Provided structural engineering design and worked as a consultant for the latest changes to SPA Project
campaign at the Barceloneta Plant.
Pharmacia, Barceloneta, PR (2002 to 2003)
Structural Engineer
Provided structural engineering design and worked as a consultant for the design of De-Scoping PinMill
Project at the Barceloneta Plant. All structural analysis was performed using the software program “STAAD
PRO 2002”.
Pharmacia, Arecibo, PR (2002 to 2003)
Commissioning & Field Engineer
Represented the client as the Commissioning group leader for an API product registration Project.
Merck, Barceloneta, PR (2000 to 2002)
Commissioning & Field Engineer
Prepared the scope of work for piping hydrostatic tests and supervised the execution of these tests.
Responsibilities included preparing job books for all hydrostatic tests, including isometric drawings, as-built
and P&ID markups; providing support and coordinating various field tasks during the construction phase
such as civil, mechanical, instrumentation and QA/QC controls (equipment/material receiving inspections,
painting codes execution verification, insulation and piping specifications inspections) in order to assure
compliance with Engineer and Manufacturing specifications; and completing IQ documentations.