Resume images beckyvas
description
Transcript of Resume images beckyvas
OXO InternationalNew York, New YorkLeroy Street Studio
This 14,500 office/showroom for the houseware producer OXO International is located at the Starrett Lehigh building on Manhattan’s West Side Highway. The majority of the space is devoted to open office, with city views as backdrop. Inserted into the open plan are two conference room pavilions constructed in brick and polygal, imitating the exterior wall and playing with perceptions of interior and exterior. Back of house (storage room and lab, additional meeting space, mailroom, etc.) is fronted by curtain which hides a wall with floor-to-ceiling storage. At the reception is a long display of backlit shelving framed with black mdf that extends beyond the entrance door and folds horizontally to become signage for the company in the public corridor beyond.
B E C K Y V A S 821 Union Street #3F, Brooklyn, New York 11215 cell phone. 347- 583-1926 email. beckyvas
@ post. harvard.edu
373635 3834
373635 38 3934 40 41 42
40 41 42
3332 39
S
R
Q
P
O
N
Q
P
O
N
38
3332
Mixed-Use BuildingAmesbury, MassachusettsWilliam Sloan Associates
This new building of 14 condominium units and 3 ground floor retail spaces is on the site of a burned-out building on the main street of Amesbury, a historic town on the north shore of Massachusetts. The project required multiple regulatory reviews and approvals, including special permit, historic district, design review, and site plan approvals. The projects was designed, approvals obtained, and building permit documents completed to allow construction to begin less than six months from our first meeting with the client. Completed in 2007.
B E C K Y V A S 821 Union Street #3F, Brooklyn, New York 11215 cell phone. 347-583-1926 email. beckyvas
@ post. harvard.edu
POZEN PERFORMANCE CENTER FLOOR PLAN SCALE: 1/8"=1'-0"
POZEN PERFORMANCE CENTER REFLECTED CEILING PLANSCALE: 1/8"=1'-0"
BLDG.ADMINISTRATION
BLDG.COLL INS
PALA
CE
RD
.
COURTYARD
HUNTI
NGTO
N AVE.
TOWERBLDG.
TETLOW ST.AREA OF WORK
KEY PLAN.
EAST BUILDING
NORTH BLDG.
NORTH
POWERED CHAIN HOISTS AND LOAD ARRESTOR(2 @ STAGE, 4 @ MAIN LIGHTING GRID)DETAIL A1-1
ACOUSTICFABRICCEILING(N.I.C.)
AV JUNCTION BOX (N.I.C.)
20" FINISHEDOPENING FORTRUSS CHAIN(N.I.C.)
SPRINK-LERHEADS(N.I.C.)
ARTICULATINGARM
SCREW EYEARM SUPPORT(N.I.C.)
ELEC. JUNCTIONBOX (N.I.C.)
ARTICULATINGARM (POSITIONAT CENTER PT. BETWEEN TRUSS CHAINS)
AV JUNCTION BOX (N.I.C.)
ELEC. JUNCTIONBOX (N.I.C.)
20" FINISHEDOPENING FORTRUSS CHAIN(N.I.C.)
SCREW EYEARM SUPPORT(N.I.C.)
20.5" LIGHTING GRID BELOW
20.5" LIGHTING GRIDABOVE
12"LIGHTINGGRID ABOVE
12"LIGHTINGGRID BELOW
A111
A111
LIGHT GRIDCONTROL POINT
DRAPERY TRACKASSEMBLY
DRAPERY TRACKASSEMBLY
UNDERSTAGEBOX- RIGHT
AV-4
UNDERSTAGEBOX- LEFT
AV-3
AV BACKSTAGERIGHT
AV BACK-STAGE LEFT
AV BOX
AV-1
AV BOX
AV-2
ENTRYCONTROLSTATION
LIGHTINGCONTROLS,EQUIP. RACK
AV AND LIGHTINGFACE PLATES INFRONT OF STAGE
AV AND LIGHTINGFACE PLATES INFRONT OF STAGE
187POZEN PERFORMANCE CENTER
188BACKSTAGE
187ASTAGE
POZEN PERFORMANCE CENTER FLOOR PLAN SCALE: 1/8"=1'-0"
POZEN PERFORMANCE CENTER REFLECTED CEILING PLANSCALE: 1/8"=1'-0"
BLDG.ADMINISTRATION
BLDG.COLL INS
PALA
CE
RD
.
COURTYARD
HUNTI
NGTO
N AVE.
TOWERBLDG.
TETLOW ST.AREA OF WORK
KEY PLAN.
EAST BUILDING
NORTH BLDG.
NORTH
POWERED CHAIN HOISTS AND LOAD ARRESTOR(2 @ STAGE, 4 @ MAIN LIGHTING GRID)DETAIL A1-1
ACOUSTICFABRICCEILING(N.I.C.)
AV JUNCTION BOX (N.I.C.)
20" FINISHEDOPENING FORTRUSS CHAIN(N.I.C.)
SPRINK-LERHEADS(N.I.C.)
ARTICULATINGARM
SCREW EYEARM SUPPORT(N.I.C.)
ELEC. JUNCTIONBOX (N.I.C.)
ARTICULATINGARM (POSITIONAT CENTER PT. BETWEEN TRUSS CHAINS)
AV JUNCTION BOX (N.I.C.)
ELEC. JUNCTIONBOX (N.I.C.)
20" FINISHEDOPENING FORTRUSS CHAIN(N.I.C.)
SCREW EYEARM SUPPORT(N.I.C.)
20.5" LIGHTING GRID BELOW
20.5" LIGHTING GRIDABOVE
12"LIGHTINGGRID ABOVE
12"LIGHTINGGRID BELOW
A111
A111
LIGHT GRIDCONTROL POINT
DRAPERY TRACKASSEMBLY
DRAPERY TRACKASSEMBLY
UNDERSTAGEBOX- RIGHT
AV-4
UNDERSTAGEBOX- LEFT
AV-3
AV BACKSTAGERIGHT
AV BACK-STAGE LEFT
AV BOX
AV-1
AV BOX
AV-2
ENTRYCONTROLSTATION
LIGHTINGCONTROLS,EQUIP. RACK
AV AND LIGHTINGFACE PLATES INFRONT OF STAGE
AV AND LIGHTINGFACE PLATES INFRONT OF STAGE
187POZEN PERFORMANCE CENTER
188BACKSTAGE
187ASTAGE
BV
WS1/4"=1'-0"20 SEPTEMBER, 2004
POZEN PERFORMANCE CENTERINTERIOR ELEVATIONS
A2
CUT LINECUT LINE
THE COMMONWEALTH OF MASSACHUSETTSDIVISION OF CAPITAL ASSET MANAGEMENTBOARD OF HIGHER EDUCATION
WILLIAM SLOAN ASSOCIATESA R C H I T E C T S
551 MAIN STREET WINCHESTER, MA 01890
DESCRIPTIONNO. DATE
REVISIONS
DRAWN:
DRAWING NO:
SCALE:DATE:CHECKED:
WINDOW ELEVATION POZEN PERFORMANCE CENTERSCALE: 1/4"=1'-0"
ENTRANCE ELEVATION POZEN PERFORMANCE CENTERSCALE: 1/4"=1'-0"
PROSCENIUM ELEVATION POZEN PERFORMANCE CENTERSCALE: 1/4"=1'-0"
REAR ELEVATION POZEN PERFORMANCE CENTERSCALE: 1/4"=1'-0"
MASS COLLEGE OF ARTTHEATRICAL LIGHTS AND AUDIO/VISUAL SYSTEM
x x x
20"
10'-7
"10
'-6"
2'-8
"
1'-1
1 1/
2"
x
2 5/
8"
2 1/
2"
5 7/8"
6"
NEW PROJECTIONSCREEN
NEW LIGHT 20.5" TRUSSW/ 4 CHAIN HOISTSAND LOAD ARRESTORS
NEW 20.5" x 20.5"LIGHT TRUSSW/ 4 CHAIN HOISTSAND LOAD ARRESTORS
NEW HOUSELIGHTS
12" x 12"STAGELIGHT TRUSS
HOUSE LIGHTS SHOWN
2" ALUMINUMLADDER LOWER ARTICULATING ARM
ELECTRICAL WIRING
1/4" GAGEAIRCRAFT CABLEUPPER ARM
A/V JNCT.BOX
EYELET SCREWCEILING CONNECTOR
PIVOTPIN
HINGE2" ALUMINUM PIPETRUSS CHORDS
HINGEAND CABLE SHOE
ELECTRICAL WIRING
TIES
TRUSSCHAIN
NEW SEAMLESSACOUSTIC TREATMENT
ELEC. JNCT.BOX
TIES
HINGEAND CABLE SHOE
HOUSE LIGHTS
NEW 12" x 12"LIGHT TRUSS AT STAGE
NEW 20.5" x 20.5" PRIMARY LIGHTTRUSS
NEW 20.5"LIGHT TRUSS
2" ALUMINUMLADDER LOWER ARTICULATING ARM
1/4" GAGE AIRCRAFT CABLE UPPER ARM
2'-11 7/8"
A/V JNCT.BOX
ELEC. JNCT. BOX
NEWDRAPERYTRACKASSEMBLYDETAIL 11-A1
A111
NEWDRAPERYTRACKASSEMBLYDETAIL 11-A1
A111
NEW I.G.OUTLET
AV FACEPLATESTAGE RIGHT
NEW I.G.OUTLET
AV FACEPLATESTAGE LEFT
LIGHTINGCONTROL FACEPLATE
AV FACEPLATEBACK THEATER RIGHT
ENTRYCONTROLSTATION
AV-2
AV FACEPLATEBACK THEATER LEFT
AV-1
NEW PROJECTIONSCREEN
NEW PROJECTIONSCREEN
DOOR
DOOR
BV
WS1/4"=1'-0"20 SEPTEMBER, 2004
POZEN PERFORMANCE CENTERINTERIOR ELEVATIONS
A2
CUT LINECUT LINE
THE COMMONWEALTH OF MASSACHUSETTSDIVISION OF CAPITAL ASSET MANAGEMENTBOARD OF HIGHER EDUCATION
WILLIAM SLOAN ASSOCIATESA R C H I T E C T S
551 MAIN STREET WINCHESTER, MA 01890
DESCRIPTIONNO. DATE
REVISIONS
DRAWN:
DRAWING NO:
SCALE:DATE:CHECKED:
WINDOW ELEVATION POZEN PERFORMANCE CENTERSCALE: 1/4"=1'-0"
ENTRANCE ELEVATION POZEN PERFORMANCE CENTERSCALE: 1/4"=1'-0"
PROSCENIUM ELEVATION POZEN PERFORMANCE CENTERSCALE: 1/4"=1'-0"
REAR ELEVATION POZEN PERFORMANCE CENTERSCALE: 1/4"=1'-0"
MASS COLLEGE OF ARTTHEATRICAL LIGHTS AND AUDIO/VISUAL SYSTEM
x x x
20"
10'-7
"10
'-6"
2'-8
"
1'-1
1 1/
2"
x
2 5/
8"
2 1/
2"
5 7/8"
6"
NEW PROJECTIONSCREEN
NEW LIGHT 20.5" TRUSSW/ 4 CHAIN HOISTSAND LOAD ARRESTORS
NEW 20.5" x 20.5"LIGHT TRUSSW/ 4 CHAIN HOISTSAND LOAD ARRESTORS
NEW HOUSELIGHTS
12" x 12"STAGELIGHT TRUSS
HOUSE LIGHTS SHOWN
2" ALUMINUMLADDER LOWER ARTICULATING ARM
ELECTRICAL WIRING
1/4" GAGEAIRCRAFT CABLEUPPER ARM
A/V JNCT.BOX
EYELET SCREWCEILING CONNECTOR
PIVOTPIN
HINGE2" ALUMINUM PIPETRUSS CHORDS
HINGEAND CABLE SHOE
ELECTRICAL WIRING
TIES
TRUSSCHAIN
NEW SEAMLESSACOUSTIC TREATMENT
ELEC. JNCT.BOX
TIES
HINGEAND CABLE SHOE
HOUSE LIGHTS
NEW 12" x 12"LIGHT TRUSS AT STAGE
NEW 20.5" x 20.5" PRIMARY LIGHTTRUSS
NEW 20.5"LIGHT TRUSS
2" ALUMINUMLADDER LOWER ARTICULATING ARM
1/4" GAGE AIRCRAFT CABLE UPPER ARM
2'-11 7/8"
A/V JNCT.BOX
ELEC. JNCT. BOX
NEWDRAPERYTRACKASSEMBLYDETAIL 11-A1
A111
NEWDRAPERYTRACKASSEMBLYDETAIL 11-A1
A111
NEW I.G.OUTLET
AV FACEPLATESTAGE RIGHT
NEW I.G.OUTLET
AV FACEPLATESTAGE LEFT
LIGHTINGCONTROL FACEPLATE
AV FACEPLATEBACK THEATER RIGHT
ENTRYCONTROLSTATION
AV-2
AV FACEPLATEBACK THEATER LEFT
AV-1
NEW PROJECTIONSCREEN
NEW PROJECTIONSCREEN
DOOR
DOOR
Pozen Performance CenterMassachusetts College of Art, Boston, MassWilliam Sloan Associates
An alumna donation generated this renovation of an auditorium for the Studio for Interrelated Media (SIM Department) at the Mass College of Art. The renovation was intented not only for providing necessary technologies for a department of experimental media arts, but to create a venue for attracting an audience from the greater Boston community. To this end a new entrance sequence was designed which included new entrance doors and signage, handicap access, a ticket booth, a refurbished green room and gallery, and gallery corridors. The theater itself is a 4,000 sf space built in the early 1900’s in elaborate neoclassical style, with paneled walls and ceiling, and a plaster frieze replicating that of the Parthenon. Our approach was to treat the historic space not as a ‘black box’ but a ‘grey box,’ refurbishing details and and adding high tech but minimalist additions. Completed in 2005.
B E C K Y V A S 821 Union Street #3F, Brooklyn, New York 11215 cell phone. 347-583-1926 email. beckyvas
@ post. harvard.edu
EXISTING PLASTER CORNICE
CONTINUOUS2" x 2" ALUM.ANGLE
LIGHT FIXTURETYPE C, LAMPSMAXIMUM20" O.C.
CONTINUOUS 1" x 1"ALUMINUM ANGLE,COUNTERSUNKFASTENERS, PAINTED
1" x 6" WOOD SHELFOGEE EDGE ON ALLOPEN SIDES, CONTINOUS PERIMETEROF PERFORMANCECENTER PAINT FINISH
3/4"MOULDING
1"
COVE UPLIGHT, CORNICE MOUNTED SCALE: 6" =1'-0" (ALTERNATE NO. 2)
EXISTINGPLASTER CORNICE
1/4" STEEL PLATE
1/4" PL. BRACKET2-0" O.C.
ANCHOR @ 12" O.C.
DRAPERY TRACK
EXIST.BRICK
NEW WOOD SHELFAND COVE LIGHT
EXISTINGC CHANELAPPROX. 4" O.C.W/ WIRE WRAPPING
EXISTINGPLASTER ON WIRE MESH
EXIST.1-1/2" X 1-1/2" ANGLEAPPROX. 50" O.C.
EXISTINGSTRAPPING
SEE DETAIL 12-A5.4
4"8"
6"
DRAPERY TRACK DETAIL SCALE: 3" =1'-0" (ALTERNATE NO. 2)
TRUSS POWER ARM CEILING CONNECTION DETAIL SCALE: 3" =1'-0"
EXISTNGSTRAPPING
FABRIC-WRAPPED ACOUSTICALTREATMENT
EXISTING1-1/2" x 1'1/2'ANGLE APPROX.50" O.C.
NEW 3" x 3" x 1/4" x 8'-10'STEEL ANGLE
1/4" THICK4" DIAMETERALUMINUM PLATE
WOOD BLOCKING
1" X 8" @9" O.C.
1/4" GAGEAIRCRAFT CABLE (ALT. NO.2)
STAINLESSSTEEL 5/16" EYE BOLT
BOLT
BOLT
1" HAT CHANNELS@ 12 O.C.
EXISTING ROOFSLAB
EXISITING TERRA COTTAVAULT
1" HAT CHANNELS@ 12" O.C.
EXISTING STRAPPING
FABRIC-WRAPPED ACOUSTICA TREATMENT
EXISTING 1-1/2" x 1-1/2" ANGLE APPROX.50" O.C.
ELECTRICALCONDUIT
6"
ELECTR. OR A.V. BOX. SECURE TOSTRUCTURE ABOVE
TRUSS POWER SUPPLY
1/4" GAGEAIRCRAFT CABLEUPPER ARM(ALT. NO.2)
CEILING CONNECTION(REFER TO DETAIL 9-A5.4)
1' x 8" @ 9" O.C.
POWER/AV CEILING PLACEMENT SCALE: 1" =1'-0"
EXISTING ROOFSLAB
EXISITING TERRA COTTAVAULT
DEMOLISH TERRA COTTA TILES AS RECQUIRED FORNEW STRUCTURAL WORK
SPRAY-ON FIRE-PROOFINGAT ALL NEW STRUCTURAL STEEL, TYPICAL
1" THICK 4' x 4' PLYWOOD PANEL AT OPENING
1" HAT CHANNELS@ 12" O.C.
1/4" x 3"FORMED ALUMINUMTRIM AT OPENINGS
EXISTING STRAPPING
1' x 8" @ 9" O.C.
CONNECTION TO STEELSUPPORT BEAM FORCHAIN HOIST AND LOAD ARRESTORS BY THEATRICAL EQUIP. INSTALLER
BLOCKING
20" DIAMETER OPENING INACOUSTIC TREATMENT
PERIMETER TENSIONING TRIM
ACOUSTIC FABRIC CEILING
EXISTING 1-1/2" x 1-1/2" ANGLE APPROX.50" O.C.
REFER TO STRUCTURAL
DRAWINGS
TRUSS SUPPORT CEILING DETAIL SCALE: 1" =1'-0"
7/8" HAT CHANNEL @ 16" O.C.
1-1/2" CEILING CHANNELSUSPENDED FROM EXISTING STRUCTURE@ 48" O.C.
TYPICAL ACOUSTICTREATMENT SYSTEM
FABRIC FORFIELD PAINT FINISH
MIDSEAMTENSIONINGTRACK
1 x 8 SHEATHINGFIRE TREATED
TYPICAL MID-SEAM @ ACOUSTIC FABRIC CEILINGSCALE: 6"=1'-0"
EXISTINGFRAMING
PATCH EXISTING PLASTER TO REMAINAND SKIM COAT VENEER PLASTER ON ALL EXPOSED SURFACES
PERIMETER TENSIONINGTRACK
BLOCKINGEXISTING/NEWFRAMING
NEW 7/8" FURRING CHANNEL @ 16 O.C.SHIM AS REQUIREDFOR FLUSH CEILING
NEW FIRE TREATED 1" x 8" SHEATHING SPACED WITH 1" SPACES
1" RIGID FIBERGLASS CORE
ACOUSTIC TREATMENT W/ FIELD-PAINTED FINISH
TYPICAL EDGE @ ACOUSTIC FABRIC CEILINGSCALE: 6" =1'-0"
EXISTING PLASTER CORNICE
CONTINUOUS2" x 2" ALUM.ANGLE
LIGHT FIXTURETYPE C, LAMPSMAXIMUM20" O.C.
CONTINUOUS 1" x 1"ALUMINUM ANGLE,COUNTERSUNKFASTENERS, PAINTED
1" x 6" WOOD SHELFOGEE EDGE ON ALLOPEN SIDES, CONTINOUS PERIMETEROF PERFORMANCECENTER PAINT FINISH
3/4"MOULDING
1"
COVE UPLIGHT, CORNICE MOUNTED SCALE: 6" =1'-0" (ALTERNATE NO. 2)
EXISTINGPLASTER CORNICE
1/4" STEEL PLATE
1/4" PL. BRACKET2-0" O.C.
ANCHOR @ 12" O.C.
DRAPERY TRACK
EXIST.BRICK
NEW WOOD SHELFAND COVE LIGHT
EXISTINGC CHANELAPPROX. 4" O.C.W/ WIRE WRAPPING
EXISTINGPLASTER ON WIRE MESH
EXIST.1-1/2" X 1-1/2" ANGLEAPPROX. 50" O.C.
EXISTINGSTRAPPING
SEE DETAIL 12-A5.4
4"8"
6"
DRAPERY TRACK DETAIL SCALE: 3" =1'-0" (ALTERNATE NO. 2)
TRUSS POWER ARM CEILING CONNECTION DETAIL SCALE: 3" =1'-0"
EXISTNGSTRAPPING
FABRIC-WRAPPED ACOUSTICALTREATMENT
EXISTING1-1/2" x 1'1/2'ANGLE APPROX.50" O.C.
NEW 3" x 3" x 1/4" x 8'-10'STEEL ANGLE
1/4" THICK4" DIAMETERALUMINUM PLATE
WOOD BLOCKING
1" X 8" @9" O.C.
1/4" GAGEAIRCRAFT CABLE (ALT. NO.2)
STAINLESSSTEEL 5/16" EYE BOLT
BOLT
BOLT
1" HAT CHANNELS@ 12 O.C.
EXISTING ROOFSLAB
EXISITING TERRA COTTAVAULT
1" HAT CHANNELS@ 12" O.C.
EXISTING STRAPPING
FABRIC-WRAPPED ACOUSTICA TREATMENT
EXISTING 1-1/2" x 1-1/2" ANGLE APPROX.50" O.C.
ELECTRICALCONDUIT
6"
ELECTR. OR A.V. BOX. SECURE TOSTRUCTURE ABOVE
TRUSS POWER SUPPLY
1/4" GAGEAIRCRAFT CABLEUPPER ARM(ALT. NO.2)
CEILING CONNECTION(REFER TO DETAIL 9-A5.4)
1' x 8" @ 9" O.C.
POWER/AV CEILING PLACEMENT SCALE: 1" =1'-0"
EXISTING ROOFSLAB
EXISITING TERRA COTTAVAULT
DEMOLISH TERRA COTTA TILES AS RECQUIRED FORNEW STRUCTURAL WORK
SPRAY-ON FIRE-PROOFINGAT ALL NEW STRUCTURAL STEEL, TYPICAL
1" THICK 4' x 4' PLYWOOD PANEL AT OPENING
1" HAT CHANNELS@ 12" O.C.
1/4" x 3"FORMED ALUMINUMTRIM AT OPENINGS
EXISTING STRAPPING
1' x 8" @ 9" O.C.
CONNECTION TO STEELSUPPORT BEAM FORCHAIN HOIST AND LOAD ARRESTORS BY THEATRICAL EQUIP. INSTALLER
BLOCKING
20" DIAMETER OPENING INACOUSTIC TREATMENT
PERIMETER TENSIONING TRIM
ACOUSTIC FABRIC CEILING
EXISTING 1-1/2" x 1-1/2" ANGLE APPROX.50" O.C.
REFER TO STRUCTURAL
DRAWINGS
TRUSS SUPPORT CEILING DETAIL SCALE: 1" =1'-0"
7/8" HAT CHANNEL @ 16" O.C.
1-1/2" CEILING CHANNELSUSPENDED FROM EXISTING STRUCTURE@ 48" O.C.
TYPICAL ACOUSTICTREATMENT SYSTEM
FABRIC FORFIELD PAINT FINISH
MIDSEAMTENSIONINGTRACK
1 x 8 SHEATHINGFIRE TREATED
TYPICAL MID-SEAM @ ACOUSTIC FABRIC CEILINGSCALE: 6"=1'-0"
EXISTINGFRAMING
PATCH EXISTING PLASTER TO REMAINAND SKIM COAT VENEER PLASTER ON ALL EXPOSED SURFACES
PERIMETER TENSIONINGTRACK
BLOCKINGEXISTING/NEWFRAMING
NEW 7/8" FURRING CHANNEL @ 16 O.C.SHIM AS REQUIREDFOR FLUSH CEILING
NEW FIRE TREATED 1" x 8" SHEATHING SPACED WITH 1" SPACES
1" RIGID FIBERGLASS CORE
ACOUSTIC TREATMENT W/ FIELD-PAINTED FINISH
TYPICAL EDGE @ ACOUSTIC FABRIC CEILINGSCALE: 6" =1'-0"
13'-3 5/ 8"
19' -4
3/4"
18'-7
1/8"
9 '-4 5/ 8"
8'-7
3/4"
18 '-3 3/ 8"
7'-93/ 8"
7'-9
3/8"
11'-93/ 8"
18' -71 / 8 "
16'-101/ 2"
7'-2
1/8"
15' -6 3/ 4 "
10'-3
7 /8"
14 ' -11 1/ 2"
6'-6 1/ 2"
13 '-7 1/ 2"
13'-13/ 8
"
8'-1
13/
8"
5 '-10 3/ 8"
11'-9
1/4"
7'-7 5/ 8"
11'-41/4"
5'-1
5/8"
9 ' -71/ 4"
6' -45/ 8"
9'-1
11/
2"
4'-4
3/4"
7' -11 1/ 8"
8' -2 5/ 8"
5'-2
3 /8"3 '-7 3/ 8"
4'-01/ 8"
6' -6 3/ 8"
6' -35/ 8
"
4'-0 1/ 8"
14"
5'-2
7/8"
6 '-71/ 4"
8 '-1 3/ 8"9' -83 / 8 "11
'-41 /
2"
13' -11/ 2"
14' -11 3/ 4"
16 '-11" 17'-8
7 /8"
17 '- 10 7/ 8"5' -2
3/ 8"
6'-4
5/8"
7' -7 5/ 8"
8'-11 3/ 8"
10'-3
7/8"
11' -9
3 /8 "
13' -3 5 / 8"9' -4 5/ 8"
7'-9
"height
a
b
cd
e
f
g
h
abc
d
ef g
h,i
B
C
D
E
F
G
i
HI
A
b
a
c
d
e
f
g
h
i
a
a
a
a
bb
bb
c
cc
c
dd
dd
e
e
e
e
ff
f
f ff ff
g
g
g
g
h
h
h
h,ii
a lower case= length in plan
A UPPER CASE= t rue lengt h
0
00
0
0
0
0
0-a
= slope= height
8.4/ 12
7.98/ 12
7.59/ 12
7.25/12
6 .9/ 12
6.56/ 12
6.24/ 12
5.53
/12
slope
8.4/ 12
DIMENSION KEY
Spiral GazeboTuftonboro, New HampshireWilliam Sloan Associates
This variation on an octagonal form was derived from the shifting rooflines and multiple turned corners experienced along the walkway connecting the garage and house entrance. The ‘tail’ of the gazebo roof attaches itself to the house, creating an entrance canopy for both the house and gazebo. Gazebo completed in 2007.
EXISTINGTREES
EXISTINGTREES
EXISTINGSTONE WALL
LINE OFBUILDINGSETBACK
EXISTINGBENCH
EXISTINGTREES
EXISTINGTREES
EXISTINGSTONE WALL
LINE OFBUILDINGSETBACK
13'-3 5/ 8"
19' -4
3/4"
18'-7
1/8"
9 '-4 5/ 8"
8'-7
3/4"
18 '-3 3/ 8"
7'-93/ 8"
7'-9
3/8"
11'-93/ 8"
18' -71 / 8 "
16'-101/ 2"
7'-2
1/8"
15' -6 3/ 4 "
10'-3
7 /8"
14 ' -11 1/ 2"
6'-6 1/ 2"
13 '-7 1/ 2"
13'-13/ 8
"
8'-1
13/
8"
5 '-10 3/ 8"
11'-9
1/4"
7'-7 5/ 8"
11'-41/4"
5'-1
5/8"
9 ' -71/ 4"
6' -45/ 8"
9'-1
11/
2"
4'-4
3/4"
7' -11 1/ 8"
8' -2 5/ 8"
5'-2
3 /8"
3 '-7 3/ 8"
4'-01/ 8"
6' -6 3/ 8"
6' -35/ 8
"
4'-0 1/ 8"
14"
5'-2
7/8"
6 '-71/ 4"
8 '-1 3/ 8"9' -83 / 8 "11
'-41 /
2"
13' -11/ 2"
14' -11 3/ 4"
16 '-11" 17'-8
7 /8"
17 '- 10 7/ 8"
5' -23/ 8"
6 '-4
5/8"
7' -7 5/ 8"
8'-11 3/ 8"
10'-3
7/8"
11' -9
3 /8 "
13' -3 5 / 8"9' -4 5/ 8"
7'-9
"
height
a
b
cd
e
f
g
h
abc
d
ef g
h,i
B
C
D
E
F
G
i
HI
A
b
a
c
d
e
f
g
h
i
a
a
a
a
bb
bb
c
cc
c
dd
dd
e
e
e
e
ff
f
f ff ff
g
g
g
g
h
h
h
h,i
i
a lower case= length in plan
A UPPER CASE= t rue lengt h
0
0
0
0
0
0
0
0-a
= slope= height
8.4/ 12
7.98/ 12
7.59/ 12
7.25/12
6 .9/ 12
6.56/ 12
6.24/ 12
5.53
/12
slope
8.4/ 12
DIMENSION KEY
B E C K Y V A S 821 Union Street #3F, Brooklyn, New York 11215 cell phone. 347-583-1926 email. beckyvas
@ post. harvard.edu
‘Visible Space’Masters ThesisScott Cohen, George Baird, advisors
Each drawing for this series of exploratory drawings and models attempted a particular means to answer the question of how to call attention to, or ‘outline’ space in three dimensions. Outlines and lines were created by the edges of planes, by folds, and by the intersections of planes. Segments of space were articulated through the interruptions of planes. Volumes of spaces within space were evoked by the intersection of volumes.
B E C K Y V A S 821 Union Street #3F, Brooklyn, New York 11215 cell phone. 347-583-1926 email. beckyvas
@ post. harvard.edu
B E C K Y V A S 821 Union Street #3F, Brooklyn, New York 11215 cell phone. 347-583-1926 email. beckyvas
@ post. harvard.edu
Studio Building, Cambridge, Mass Jim Williamson, critic
In this project a sculpture of complex curves is translated to a building of planar geometry. Situated in the middle of a deep block that offers no clear building front, the building provides studio spaces, a gallery, café, meeting room, and outdoor sculpture garden for the Bunting Institute, a residential fellowship program for mid-career female professionals. Free-standing masonry piers support the volumes of studio spaces, each oriented according to a vista, alignment, or other local concern. The piers provide the spine from which floorplates torque from one level to the next, allowing for the different preferences in orientation that happen at each level, and for openings above so that each studio is skylit.
Multi-family Housing, Roxbury Massachusetts Scott Cohen, critic
Critical analysis of platting patterns in Boston’s Back Bay generated the focus for this housing project. With 35% open space at the interior of the block, the rowhouse lots are lit only front and back, A more checkerboard-like configuration of the same density, allows for a more picturesque park-like open space while also providing the living room of each apartment with windows in two orientations. Along the length of the site, the elevation differs front to back by as much as a storey, and while the front faces a boulevard, the backis of neighborhood scale. Two of the three building types that compose the project are used at both front and back, but two-storey penthouses add elevation to those only at front.
B E C K Y V A S 821 Union Street #3F, Brooklyn, New York 11215 cell phone. 347-583-1926 email. beckyvas
@ post. harvard.edu