RESUME ALI RAZA HydCrk,CDU,GCU, UPDQ NOV14

4
Mr.ALI RAZA Mr.ALI RAZA E-mail: [email protected], [email protected] SKYPE Id: [email protected] Contact no. : 00923325206909 Postal address : PARCO housing complex IQ 10/ 204 Qasba Gujarat Mehmood Kot Teh. Kot Addu Distt. Muzaffar Gard Pakistan. Subject: C V For the post of Rover Operator. Objective My objective is to pursue a career, which will professionally utilize my experience Oil Refineries, and Petrochemical Plants Turnarounds, Pre-Commissioning, Commissioning, Startup, shutdown. and provide me with an opportunity to excel in my professional experience. I would like to undertake exciting and challenging jobs at offshore onshore, which would enhance my professional experience. Education and Training Detail Duration Diploma of Associate Engineering (Chemical Technology.) 2003 ~ 2006 PBTE Lahore Pakistan Total Experience 09 years Pak-Arab crude oil Refinery Ltd PARCO MCR Pakistan. 24 th March, 2006 to till date. Professional Experience: Pak-Arab Refinery Ltd (MCR) Pakistan. (A Pakistan Abu Dhabi joint venture) I S O 9001, I S O 14001 & OHSAS 18001 CERTIFIED ENERGY COMPANY. I am working with PAK-ARAB crude oil REFINERY Ltd MCR as a Senior Plant Operator from 24th March, 2006 to till date on following units. Gas concentration Unit. The Gas concentration process Unit is Designed to recover C3/C4 LPG and produce a stabilized Naphtha feed to the NHT Plat forming GCU is composed of the following process section: Compressor section. (Dry Gas seal Multistage Centrifugal Compressor) Absorption section. Primary absorber, Sponge absorber, Stripper and Debutanizer. LPG Recovery. Distillation Section CRUDE DISTILLATION Unit. Capacity (100,000BPSD).& VACCUM DISTILLATION Unit. Capacity ( 42,800 BPSD). The CDU is designed to process (662.44 m3/hr) of either Arabian light crude oil or a 70/30 volumetric blend of upper zakum and Murban crude oils. In order to maximize the recovery of gas oil .the VDU is one which flashes gas oil from reduce crudes at pressures much lower then atmospheric ,0.007 Kg/cm2a , at temperatures at which neither gas oil fraction nor the bottoms residue will suffer any thermal decomposition .

Transcript of RESUME ALI RAZA HydCrk,CDU,GCU, UPDQ NOV14

Page 1: RESUME ALI RAZA HydCrk,CDU,GCU, UPDQ NOV14

Mr.ALI RAZAMr.ALI RAZA

E-mail: [email protected], [email protected] Id: [email protected] Contact no. : 00923325206909 Postal address : PARCO housing complex IQ 10/ 204 Qasba Gujarat Mehmood Kot Teh. Kot Addu Distt. Muzaffar Gard Pakistan.

Subject: C V For the post of Rover Operator. ObjectiveMy objective is to pursue a career, which will professionally utilize my experience Oil Refineries, and Petrochemical Plants Turnarounds, Pre-Commissioning, Commissioning, Startup, shutdown. and provide me with an opportunity to excel in my professional experience. I would like to undertake exciting and challenging jobs at offshore onshore, which would enhance my professional experience.Education and Training Detail Duration

Diploma of Associate Engineering (Chemical Technology.) 2003 ~ 2006 PBTE Lahore PakistanTotal Experience 09 years

Pak-Arab crude oil Refinery Ltd PARCO MCR Pakistan. 24th March, 2006 to till date.Professional Experience: Pak-Arab Refinery Ltd (MCR) Pakistan. (A Pakistan Abu Dhabi joint venture) I S O 9001, I S O 14001 & OHSAS 18001 CERTIFIED ENERGY COMPANY. I am working with PAK-ARAB crude oil REFINERY Ltd MCR as a Senior Plant Operator from 24th March, 2006 to till date on following units. Gas concentration Unit. The Gas concentration process Unit is Designed to recover C3/C4 LPG and produce a stabilized Naphtha feed to the NHT Plat formingGCU is composed of the following process section:

Compressor section. (Dry Gas seal Multistage Centrifugal Compressor)Absorption section. Primary absorber, Sponge absorber, Stripper and Debutanizer. LPG Recovery.Distillation Section

CRUDE DISTILLATION Unit. Capacity (100,000BPSD).& VACCUM DISTILLATION Unit. Capacity ( 42,800 BPSD). The CDU is designed to process (662.44 m3/hr) of either Arabian light crude oil or a 70/30 volumetric blend of upper zakum and Murban crude oils. In order to maximize the recovery of gas oil .the VDU is one which flashes gas oil from reduce crudes at pressures much lower then atmospheric ,0.007 Kg/cm2a , at temperatures at which neither gas oil fraction nor the bottoms residue will suffer any thermal decomposition . Plant is composed of the following process section:

Fired Heaters Section. (Forced Draft Box Type)

Fractionation Section. (Atmospheric & vacuum / Distillation Column)

Crude Desalters (Two Stages) Section.

Recycle Gas Section (PD compressor). HYDRO CRACKER & HYDROTREATER (Mild Hydro Cracker) Unit. Having Capacity 22450 BPSD (148.72 m 3 /hr). The Hydro-cracker Unit is designed to process 22,450 BPSD (148.72 m3/hr) of light vacuum gas oil (LVGO) and heavy vacuum gas oil (HVGO) from the Vacuum Distillation Unit to maximize the production of Diesel. Properties for the vacuum gas oils are derived from the processing of the Arabian Light crude oil. The Hydro-cracker unit catalytically desulfurizes and denitrifies vacuum gas oil (VGO) feedstock and converts the feedsrock to a Diesel product, Kerosene, Naphtha, and light ends including LPG in the presence of Hydrogen. Reactor effluent liquid is stripped and fractionated to separate the products from unconverted VGO and H2S Strip out.The Hydro-cracker Unit consists of three processing section:

Page 2: RESUME ALI RAZA HydCrk,CDU,GCU, UPDQ NOV14

CATALYTIC REACTION SECTION :

The chemistry of the Hydro-cracker catalytic section is essentially that of selective hydrogenation and contaminants removal coupled with catalytic cracking. These reactions take place in the presence of excess hydrogen. Over a catalyst at elevated temperature and pressure .Pressures generally range form 70-90 Kg/cm2g. And temperatures 340-450 c for Mild hydro cracker.

Catalytic Reactor Section. (Packed CATALYST Fix Bed)

Recycle Gas Compressor Section Hydrogen Recycle gas, RECYCLE GAS COMPRESSOR (HITACHI BCH 408/A, Dry gas seal, Centrifugal, Capacity 26,364 Nm3/hr). (Horizontal Condensing steam Turbine Driven type SNM C5-R8-E Capacity HPS 21.4 Ton/hr).

Scrubbing Section:

H2S Amine Absorption (Amine Absorber). (Inc.Gas scrubbing,).

P roduct Fractionators & Thermal Cracking Section : (Atmospheric Fractionation)

H2S Stripping. Product Draw off system. Pump around system.Thermal Cracking system. Flash fractionation system.

Responsibilities (PTW & Operation): My responsibility is to unit optimization, Routine Schedule, Safety; Follow the startup, shutdown activities as procedures, standing instructions & daily instructions from the Shift Supervisor and Head of Unit. Reviews maintenance issues and interfaces with maintenance departments on planning and ensuring before maintenance work related issue to DCS control system (Yokogawa Centum CS 2000.) reviewed and ready for safe jobs executed.

Ensure that all plant deficiencies /leakage /dripping as identified and registered and inform to the Shift Supervisor.Conduct various checks of area and equipment including pumps, compressors and vessels operating parameters like levels, temperatures, flow and pressure to make sure they are within their defined operating range.Liaise and interface as needed with the maintenance team, production team, oncoming shift personnel, Panel Operator and subsurface personnel with regard to the systems and equipment status; preparation of equipment for maintenance; & execution status of the planned works.To contribute to ensuring pre-commissioning/commissioning activities.Generate maintenance work order requests and assist with priorities to address process and equipment issuesSafe preparation of equipments for maintenance, inspection & monitoring of job performed to ensure safe compliance of procedures.Shuts down and starts up process equipment including compressors, pumps, blowers, Fired Heater etc according to operational requirements.Respond timely to process upsets / emergencies that occure. Be able to troubleshoot simple process problems and suggest solution Maintains, reinforces, and extends job skills through training and application of training. Shares knowledge and experience to support shift team goalsAct as competent person, when required, in witnessing contractor tests on process and production systems and equipment.Act as coach and mentor to co workers and develop them to be qualified as Senior Field Operators. Reviews events of previous shift and identifies any anomalies or non-routine events occurring in Units and any carry forward situations resulting in the on-going attention of the incoming shift such as maintenance work in progress, etcControl access within his area of responsibility to engineering, inspection, maintenance, & facilities staff under the PTW system requirements & guidelines.Continuously or periodically monitor the work activities and progress to ensure compliance with the PTW requirements and restrictions.

Page 3: RESUME ALI RAZA HydCrk,CDU,GCU, UPDQ NOV14

HSE & Professional Courses, Achievement. I have knowledge about following.

Fire Fitting, First aid Training, Rescue training by RESCUE 1122 Pakistan, Emergency response Plan (ERP), FM200, DV Deluge valve, fire extinguishers system. Authorized Gas Tester, H2S effects, SCBA, OSHA , PTW (Permit to work) Lock out tag out procedure/Environmental Awareness, Job Safety Analyses (JSA)/ courses and workshop attend at Pak Arab refinery Ltd Pakistan. Certified Emergency response Team Member (ERT At Pak-Arab Crude oil Refinery Ltd MCR)I have Participation & attending workshop on COMMUNICATION SKILLS held for PARCO MCR on January 28,2013 by SAADI INSHA, corporate Trainer & motivational speakerGood computer skills, along with ability to input data into CMMS system (Maximo) & SAP.Good communication and excellent interpersonal skills in English, I have receive APPRECIATION LETTER from PARCO MCR High Management due to I observed minor leakage at Hydro cracker unit on January 25, 2013. Small fire occurred and immediately fire was extinguished with fire crew. Unit was emergency shutdown .if this leakage had not been checked timely, then it would have lead to a great loss to the unit and to the company. I have experience of Turnaround activities (2007, 2012) at PARCO MCR. SOP’s Developing & Implementation, Steam out, Hydrocarbon freeing, Checklist preparation & turn around activities, Safe Startup of the process unit.

I have experience of following Equipments normal operation, Trouble shooting, startup and shutdown. Recycle Gas centrifugal Compressor, PD Compressor, Pumps multistage, Steam Turbines, Steam Ejectors, Heaters (Natural, Induced, Force, Balance draft, , H2S Scrubber, AFC’S etc.

Personal Information:

Father Name: Muhammad Sadiq.Date of Birth: 2 December 1985.Age 28 YearsCNIC no. 33203-9709060-1Passport #: EZ9890602 Marital Status: Married Nationality: Pakistani.Languages English, Urdu.