RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author:...

56
Geneva 19.06.2019 Workshop RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE prof. NU OMA Igor Gladkykh [email protected] head of RiS center in UA Oleksiy Liashenko ass.prof. NU OMA Igor Krupov

Transcript of RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author:...

Page 1: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

Geneva 19.06.2019 Workshop

RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE

prof. NU OMA Igor [email protected] of RiS center in UAOleksiy Liashenkoass.prof. NU OMAIgor Krupov

Page 2: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

We are all and everything that surrounds us, is in movement i.e. in a dynamic condition. Therefore, all considered and studied processes should be considered in dynamics condition. However, dynamic processes can be "significant" and "insignificant" depending on the scale of the space and time where and when they occur.

Page 3: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

We introduce the concept of "scale factor" to determine the degree of significance of the impact of dynamic processes in research. In order to explain why we needed to introduce this concept, let's try to answer a philosophical question. What primary is matter or consciousness? The answer is simple and both exist "always" (as for time) and "everywhere" (as for space), because both are "infinite". This leads to we have apparent proofs that mathematical regularity in different scales are displayed differently or not work at all with the approach to (+) or (-) infinity. The purpose of this work is to conduct research in the field of modeling of dynamic processes of the environment during the movement of the vessel, as well as to determine the qualitative characteristics of "significance" when using the proposed 5th element of the spatial dimension "scale factor".

Page 4: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

Modern technologies allow us to derive an image of the vessel in dynamics way in interaction with the environment, taking into account the selected parameter "scale factor".

In determining the "significant" scale will be based on the parameters of the object of study, as well as the choice of "sufficient" amount of time required for this scale. These are the geometric dimensions of the vessel, sediment, deadweight, displacement, the area of interaction with the elements of the environment (wind, wave, current, depth, etc.) and the time interval at which you can set the characteristic patterns. In this paper we analyze the existing models of the environment in dynamics and try to find patterns of impact on a moving ship in this environment.

Page 5: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

According to the principle of construction of mathematical models are

divided into analytical and simulation. In analytical models, the processes

occurring in the environment can be represented as functional

dependencies, which are used:

‒ equations;

‒ approximation problems;

‒ optimization problem.

In the simulation by preliminary measurements, which are the initial

data, it is possible to simulate the dynamics of the process at a certain

period of time, but the prediction of the dynamics is very difficult.

Page 6: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

Geneva 19.06.2019 Workshop

Sea/river bottom dynamic model

& Sea/river surface dynamic

model

chart dynamic model consist

from

CDMIn real time

S/R-BDMper month

S/R-SDMper minutes

DIFERENT SCALE OF TIME IN THIS MODELS

Page 7: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

1. water level dynamic model2. sea/river bottom dynamic model3. ships mooving model

Page 8: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

Task 1.Navier-Stokes is main equation for task 1.Тhermocapillary Marangoni effect, thermocapillary convection, Benard-Marangoni convection Investigation of the nonlinear Korteweg-de-Vries (KdV), Kura-moto-Sivashinsky equations (CS), Burgers, etc. evolution of the free surface of a liquid

Differential equations of fluid motion

Тhe integral of Euler's equations of motion for a steady flow is the Bernoulli equation

Frouda Criterion, Euler Criterion, Reynolds criterion

Page 9: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

Dynamic of sea surface – satellite image

Page 10: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 11: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

11

Reference surface in dynamic

Page 12: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

Task 2Kinematic Model, Hypothetic ModelD - the model is deterministic; there is no (more precisely, it does not take into account)the influence of random processes.

H - model is continuous, information and parameters are continuous.A - is an analytical model, the functioning of the model is described as equations (linear, non-linear, systems of equations, differential and integral equations)

Page 13: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 14: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 15: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 16: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 17: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 18: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 19: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 20: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 21: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 22: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

22

Wind(direction, speed, frequency)

Waves (long, hight, direction)

Current (speed, direction, depth)

Depth measurement (3D, isoline)

O B S E R V A T I O N S

Sate

llite

al

tim

etry

Sea surface altimetry model

Gau

ges

info

rmat ion

Sea (river) level measurement

Co

rio

lisfo

rce

Coriolis influence

Multivariate analyses

Fx,y,z function

Fx`,y`,z` function

Sea (river) bottom model Sea (river) surface model

Chart dynamic model

CDM

Evaluation

Comparison

Mathematic statistic

modificationsrectificationChart

dynamic predict

amendments compare

Page 23: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 24: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

Depth contours dynamic in chart

2013-2016 years observations

24

wind

waves

current

Page 25: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 26: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 27: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 28: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 29: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 30: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 31: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 32: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 33: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 34: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 35: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

Task 3All existing mathematical models of ship motion can be divided into three categories:a) linear models;b) partially linearized models;c) nonlinear models.

No model is absolutely perfect, none always provides acceptable accuracy! There is need take into account ”scale factor”.

Page 36: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

AREA CodeDynamic Model of

Choosing area

In due course of dynamic

forecast

STATISTICChoose the mathematic

Model

Model Evaluation,

Probability

D RIS Index

Page 37: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 38: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

NtS IENCD RIS index

encoding

Using Dynamic Model via D RIS Index of Area N

IMAGE/symbol

DM

Page 39: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

Inland Aids to Navigation

Page 40: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 41: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

Эта фотография, автор: Неизвестный автор, лицензия: CC BY

Page 42: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 43: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

Harlingen12-16 Sept.2016RIS Workshop in Geneva 23-rd of June 2016

H

Page 44: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 45: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

Unmanned Surface Vessels (USVs)

• HYPACK working with:• Teledyne Oceanscience Z Boat• Searobotics• ASV, Ltd.

1) Collect on vessel with Autopilot (Ready!)

1) Collect on vessel, control from shore (Ready!)2) Collect on shore, control from shore (working

on it….)

Page 46: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

Monitor, economize and provide reports for trailing hopper, cutter suction, excavator and bucket dredges. NOT FOR SURVEY.

DREDGEPACK®

Page 47: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

DREDGEPACK®

Real time dredging software to show you where is the digging tool, how deep is the design depth, and keep a history of the digging operation.

Page 48: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

DREDGEPACK®

Cutter Suction Dredges Excavators

HopperDredges Bucket Dredges

DREDGEPACK is compatible with cutter suction, hopper, crane and excavator operations. The Silent Inspector routines meet USACE reporting guidelines.

Page 49: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

Monitor, economize and provide reports for trailing hopper, cutter suction, excavator and bucket dredges. NOT FOR SURVEY.

DREDGEPACK®

Page 50: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 51: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 52: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 53: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...
Page 54: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

54 Wieland Haupt

Page 55: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

Geneva 19.06.2019 Workshop

Page 56: RESULTS ANTICIPATE of DEVELOPMENT RIS IN UKRAINE · Презентация PowerPoint Author: Microsoft Office User Created Date: 6/27/2019 11:17:32 AM ...

Geneva 19.06.2019 Workshop