AUGUST 2003 Resource consent annual compliance report 2003 FOR FURTHER INFORMATION

Transcript of Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable...

Page 1: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

AUGUST 2003

Resource consent annualcompliance report 2003

FOR FURTHER INFORMATION

Page 2: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent
Page 3: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

Contents

Introduction 1

Wellington landfills 4Commendable compliance 5Compliance requiring improvement 6Closed landfill compliance 10

Wairarapa landfills 12Compliance requiring improvement 12

Wellington discharges to air 13Compliance requiring improvement 14

Wairarapa discharges to air 18

Wellington wastewater treatment plants 19Commendable compliance 20Compliance requiring improvement 23

Wairarapa wastewater treatment plants 27Commendable compliance 28Compliance requiring improvement 28

Wellington agricultural and miscellaneous discharges 29Commendable compliance 30Compliance requiring improvement 30

Wairarapa agricultural and miscellaneous discharges 38Commendable compliance 38Compliance requiring improvement 38

Wellington water treatment plants and water permits 39Water Treatment Plants 40Commendable compliance 43Compliance requiring improvement 43

Wairarapa water permits 45

Wellington land use consents 47Commendable compliance 48

Wairarapa landuse consents 49Commendable compliance 50

Wellington major river works 51Commendable compliance 52

Page 4: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

Wellington coastal 56Commendable compliance 58Compliance requiring improvement 59

Wairarapa coastal 60Commendable compliance 60

Wellington roading, forestry and subdivision 61Commendable compliance 62Compliance requiring improvement 63

Wellington enforcement summary 65

Wairarapa enforcement summary 67

Page 5: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

1

Introduction

BackgroundThe annual resource consent compliance report is a summary of all compliancemonitoring undertaken in the 2002/2003 financial year on consents monitored by theGreater Wellington Regional Council (GWRC) from offices in both Wellington and theWairarapa.

This report is intended to provide a comprehensive background to compliance statusover the year for all on-going consented activities such as municipal sewage discharges,landfill operations, major river works and industrial air discharges, as well as smaller‘one-off’ activities and works such as those in the coastal marine area.

What is compliance monitoring and how do we measure it?The GWRC undertakes inspections on all consented activities, which have a potentialenvironmental impact. Depending on the scale and type of activity, compliancemonitoring may consist of a site visit and inspection, review of monitoring andreporting information, and the taking of samples and analysis for audit sampling.Inspections may take any of the following forms:

Routine inspections which have been pre-arranged with consent holders;Random inspections where the consent holder is not notified;Proactive surveillance inspections as a result of previous non-compliance at thesite; andInspections following a complaint about a consented activity.

In terms of measuring the compliance we undertake, the GWRC uses a four tieredsystem to classify consent holder compliance as shown below.

These are based on the financial year from 1 July to 30 June.

Fully complying 100% compliance with all consent conditions at alltimes.

Mainly complying Compliance with all conditions relating toenvironmental effects during the year. However, theremay be minor non-compliance with administrative-typeconditions, e.g., late (but by no more than one month)submission of management reports. All administrativeconditions are met at the end of the financial year.

Partially complying Compliance with all conditions relating toenvironmental effects during the year. However, theremay be non-compliance with administrative-typeconditions, e.g., late submission of managementreports. The consent holder needs to be prompted byGreater Wellington Regional Council before suchadministrative conditions are met at the end of the

Page 6: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

2

financial year.

Non-Complying Non-compliance with condition(s) relating toenvironmental effects during the financial year (thisincludes any confirmed complaints) and/or not alladministrative-type conditions met at the end of thefinancial year.

Following annual inspections, a compliance report is prepared by GWRC and providedto the consent holder showing the consent compliance ratings. Operations such asWastewater Treatment Plants, Landfills, and larger Industrial Plants may receive severalinspections during the year. Inspection reports may be issued after each inspectionnoting the compliance and operation issues for that inspection but a final compliancerating is not given until the final end of year inspection report is completed.

How does this year compare to the previous year?

Some prominent aspects of this year’s compliance monitoring are:

The percentage of overall fully complying consents has decreased from 77% lastyear to 69% this year.

The percentage of overall non-complying consents has increased from 13.3% lastyear to 15% this year.

The percentage of both mainly complying and partially complying consents hasincreased this year.

0%

10%

20%

30%

40%

50%

60%

70%

80%

FullyComplying

MainlyComplying

PartiallyComplying

NonComplying

Combined Wellington/Wairarapa compliancesummary

2001/20022002/2003

Page 7: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

3

Some prominent aspects of formal enforcement taken compared to last year is asfollows:

AbatementNotices

Infringementnotices

Enforcementorders

Prosecutions

2001/02 2002/03 2001/02 2002/03 2001/02 2002/03 2001/02 2002/03

Wairarapa 9 10 3 4 0 0 2 1

Wellington 2 10 11 8 1 0 3 0

TOTAL 11 20 14 12 1 0 5 1

Page 8: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

4

Wellington landfillsFully Complying Mainly Complying Partially Complying Non-Complying

51 1 1 15

Note: These numbers are for individual resource consents for all landfills (open andclosed), not overall ratings.

During this financial year:

Overall, fully complying consents remained exactly the same as last year.

The percentage of non-compliance also remained exactly the same.

The number of municipal landfills that are fully complying with all their consentsremains at three. Although, two of the three are different from two that were fullycomplying last year.

In general, non-compliance was either due to failure to comply with administrativeconditions, such as the late submission of reports, or failure to meet certain limitsfor monitoring parameters. GWRC is currently working with a number of consentholders to resolve these issues.

There continues to be ongoing issues of non-compliance with the conditions ofcleanfill and demolition fill consents. There is outstanding legal action against oneof the consent holders, which we anticipate should be resolved in the 2003/2004year. Other non-compliance should be resolved by a variation, which was appliedfor in December 2002, but that is on hold while the consent holder obtains writtenapprovals. These matters are discussed in more detail below.

GWRC currently monitors three closed landfills. The results for these are reportedseparately from the operating landfills. There are several outstanding complianceissues with two of the closed landfills and these are discussed in more detail below.

Landfill compliance

76%

22%1%

Fully ComplyingMainly ComplyingNon Complying

Page 9: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

5

Commendable compliance

Southern Landfill, Carey’s Gully, Landfill Road, WellingtonConsent Holder: Wellington City Council

WGN940045 (01)-(04)1 discharge permit to land1 discharge permit to air2 land use consents

WGN970233 (01) & (02)1 discharge permit to land1 discharge permit to air

WGN970254 (01) & (02)1 discharge permit to land1 discharge permit to air

The only issue identified during the compliance inspection was the provision ofreports on the nature and volume of waste deposited at the site. GWRC is satisfiedthat detailed information is held at the landfill. However, we have requested thatWellington City Council supply reports quarterly, rather than yearly, as is the caseat present.

The number of odour complaints from people living in the vicinity of Carey’sGully have remained high, although no odour incidents were confirmed that relatedto the operation of the landfill.

All the stakeholders at the site are currently considering their options with regard toodour issues related to the site. GW has requested a timeframe for the suggestedactions and will follow this up when the information is provided.

Otaki Landfill, Riverbank Road, OtakiConsent Holder: Kapiti Coast District Council

WGN930179 (02)-(06)1 discharge permit to air2 land use consents1 discharge permit to water1 water permit

The Otaki Landfill was closed in 1996 and now operates as a refuse transfer stationonly. Waste deposited here is compacted and transferred to Otaihanga Landfill.

Consents to take groundwater, discharge contaminants to air and groundwater,diversion of stormwater and discharge of stormwater are still operative.

Previous non-compliance at this site has been associated with the failure to providemonitoring results. GWRC is pleased to note that this issue has been resolved and

Page 10: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

6

all data required by conditions of the consents has been provided in a timelymanner.

Silverstream Landfill, Reynold Bach Road, SilverstreamConsent Holder: Hutt City Council

WGN970164 (01)-(08)1 discharge permit to land2 discharge to water permits1 discharge permit to air4 water permits

WGN930165 (01)1 discharge to air permit

The landfill continues to be well maintained and operated. Full compliance wasachieved with all consent conditions.

There have been no confirmed offensive or objectionable odours at or beyond theboundary during the 2002/2003 compliance year.

Although fully complying with all consent conditions, guideline concentrations ofsome contaminants in surface water and groundwater were regularly exceededduring the year. These guidelines, based on the ANZECC irrigation water qualityguidelines, have been set as a point of comparison for the monitoring, and theconsents do not require the contaminant concentrations to be below the guidelinevalues. However, GWRC will be contacting the consent holder to discuss thesecontaminant levels, and determine what can be done to improve them.

Compliance requiring improvement

Waikanae Landfill, Park Avenue, WaikanaeConsent Holder: Kapiti Coast District Council

WGN930178 (01)-(06)1 discharge to land permit1 discharge to air permit1 land use consent1 discharge to water permit2 water permits

The landfill operates as a transfer station for green waste and recyclable material.

Monitoring of the Waimeha Stream has shown exceedences for faecal coliformsduring the 2002/2003 year. Monitoring of the bores has shown severalexceedences for ammonia during the 2002/2003 year. The landfill has a history ofexceedences at these points. However, the number of exceedences has dropped,compared to previous years.

Page 11: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

7

Further work is needed by the consent holder to avoid additional exceedences ofmonitoring limits imposed by the resource consents.

Northern Landfill, Westchester Drive, Grenada, WellingtonConsent Holder: Wellington City Council

WGN9301391 discharge permit to land

WGN9301401 discharge permit to air

WGN9301411 discharge permit to land

WGN9301421 discharge permit to land

WGN9301431 land use consent

WGN9301441 water permit

WGN9401241 water permit

Neither the discharge to land permit nor the discharge to air permit for thecomposting operation were exercised this year.

The diversion and discharge of stormwater permit, both water take permits and thedischarge of landfill gas to air were all assessed as fully complying.

The discharge to land permit, authorising the discharge of contaminants onto landfor the purpose of landfilling wastes was classified as mainly complying. Thisrelates to non-compliance with monitoring conditions in relation to bore hole 10.The consent holder recently submitted an application to vary this condition and thiswas granted in June 2003.

Page 12: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

8

T&T Landfills, Happy Valley Road, Happy Valley, WellingtonConsent Holder: T & T Landfills Limited

WGN970047 (01)-(06)1 discharge permit to water3 land use consents1 discharge permit to land1 discharge permit to air

The non-compliance at the site relates to the drainage network and the need toprovide GWRC with a $100,000 bond.

GWRC has received a number of complaints about this site during the 2002/2003compliance year. These all relate to the disposal of non-cleanfill waste. None ofthese complaints have been confirmed. However, GWRC has reiterated theimportance of only accepting cleanfill waste to the consent holder.

An application to vary conditions of the resource consents was lodged on 16December 2002. This is currently on hold while written approvals are obtainedfrom affected parties. If these approvals are not obtained, the application will bepublicly notified. GWRC continues to meet with the consent holder in order toresolve the outstanding issues.

C & D Demolition Landfill, Landfill Road, Happy Valley, WellingtonConsent Holder: Burrell Demolition Limited

WGN9400571 discharge permit to land

This landfill continues to have issues in relation to what can and cannot bedisposed of at the site.

A declaration concerning the nature of waste material allowed under the terms ofthe resource consent was heard in the Environment Court on 8 December 2000.On 30 April 2001, the High Court overturned the decision of the EnvironmentCourt not to make a declaration in respect to the Burrell consents. Subsequentlythe High Court granted Burrell Demolition Ltd and its director leave to appeal tothe Court of Appeal. The Court of Appeal has invited a joint memorandum fromCounsel to dispose of any variation that may be necessary to the High Court’sdeclaration.

The proceedings to hear the charges in the District Court are now expected in the2003/2004 financial year.

Page 13: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

9

Old and New Wainuiomata Landfill, Coast Road, WainuiomataConsent Holder: Hutt City Council

WGN0001821 discharge permit to water

WGN950052 (01)-(10)1 discharge permit to land2 discharge permits to water1 discharge permit to air4 water permits2 land use consents

The consent holder was fully complying with all consents except the consents forthe discharge of contaminated stormwater to surface water and for the discharge toland of contaminated stormwater from the old Wainuiomata Landfill.

Non-compliance at the old landfill was related to an absence of signage, monitoringresults not being submitted and a future management plan not being submitted.These matters are in the process of being rectified.

Non-compliance at the new landfill was associated with exceedence of severalmonitoring parameters. The consent holder has been asked to identify whatremedial action is proposed to ensure that this consent is not breached in the future.

Spicer Landfill, Broken Hill Road, PoriruaConsent Holder: Porirua City Council

WGN940046 (01)-(04)1 discharge permit to land1 discharge permit to air2 water permits

The discharge consents were classified as non-complying because the permitholder failed to fully cover refuse and waste at the landfill with suitable soil coverby day’s end (16 September 2002). An associated complaint of offensive odourcould not be confirmed but an infringement notice was issued for the failure tocover the landfill. Otherwise, good management practices have prevailed at thelandfill, whilst a weighbridge for commercial vehicles, a residential unloadingfacility, and ‘Trash Palace’ – the permit holder’s recycle and re-use centre, were allestablished at the landfill.

Page 14: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

10

Otaihanga Landfill, Otaihanga Road, ParaparaumuConsent Holder: Kapiti Coast District Council

WGN930177 (01-05, 07)

1 discharge permit to land1 discharge permit to air2 discharge permits to water2 water permits

The discharge consents were found to be non-complying because the permit holderfailed to fully cover refuse and waste at the landfill with suitable soil cover byday’s end (incidents of 5 March 2003 and 12 March 2003). A complaint ofoffensive odour was also confirmed on 12 March 2003, and the landfill’scomposting operation was found to be expanded well beyond what GWRC hadpreviously certified. Otherwise, good management practices have prevailed at thelandfill, with the application of lagooned sludge from Paraparaumu wastewatertreatment plant as a final cover. This soil rehabilitation has been successfullyapplied to the completed south-east cell of the landfill without any odour incidentsor vector control problems.

Monitoring results for the period up to March 2003 indicate that the groundwatermoving away from the site towards the eastern branch of the Mazengarb Streamcontinued to be of poor background quality and with possible leachatecontamination. However, the area also contains abundant low permeability peatsoils, which are commonly associated with naturally elevated ammonia and ironlevels in groundwater. No significant landfill gas has been detected in anymonitoring bores.

Surface water monitoring has continued to show that ammonia, a key leachateindicator, has declined sharply in the eastern branch of Mazengarb Stream thisyear. However, the western branch of Mazengarb Stream shows elevatedconcentrations of ammonia, BOD, boron, iron and manganese, all of which indicatesignificant leachate contamination. Leachate is currently collected in a drain alongthe western side of the landfill and passed to Paraparaumu Sewage TreatmentPlant.

Closed landfill compliance

Old Fort Dorset landfill, Ludlum Street, Seatoun, WellingtonConsent Holder: Seaside Haven Limited

WGN0200841 discharge permit to land

The works were inspected on three occasions during the 2002/2003 complianceyear. On all occasions the site appeared to be well maintained and tidy.

Page 15: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

11

The permit holder is non-complying with the resource consent because nomonitoring data was collected from bore 2 during the June 2002 sampling roundand was not provided to GWRC until this compliance year. The bore has sincebeen reinstated so that sampling can be undertaken.

Southgate Landfill, Southgate Park, WellingtonConsent Holder: Wellington City Council

WGN950140 (01)-(03)3 discharge to air permits

The consents relate to the discharge of landfill gas from the site. Landfill gas isactively discharged and flared from one point. There is also a passive dischargepoint and one consent relates to potential fugitive discharges.

The operations were all well maintained and assessed as fully complying during the2002/2003 compliance year. There have been no odour complaints about this siteduring the 2002/2003 year.

Horokiwi Closed Landfill, Horokiwi, WellingtonConsent Holder: Wellington City Council

WGN0000481 discharge to water permit

The permit holder is non-complying because samples for lead and zinc haveexceeded limits specified in the resource consent. This may be because the on-sitewetland has only recently been commissioned.

GWRC are investigating the exceedences and will continue to monitor this site inthe future.

Page 16: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

12

Wairarapa landfillsFully Complying Mainly Complying Partially Complying Non-Complying

5 1 1 1

Note: These numbers are for individual landfill consents, not overall ratings.

During this financial year:

Compliance of Masterton District Council’s (MDC) landfills was unable to beassessed by the time this annual compliance report was due. An agreed timeframebetween MDC and GWRC means the annual report on the landfills is due by theend of July each year, which coincides with this annual report.

A new area of Martinborough landfill was opened up, and is operating generallyaccording to the consent conditions.

Groundwater contamination continues to be detected around the Carterton landfill.

Compliance requiring improvement

Carterton District Landfill, Dalefield Road, CartertonConsent Holder: Carterton District Council

WAR 940047 (01)-(03)1 discharge permit of solid waste to land1 discharge permit for leachate to land and water1 discharge permit to air

The non-compliance at this landfill relates to the groundwater contamination that isbeing detected in monitoring bores around the site. This has been an on-goingissue. The Carterton District Council has completed a certain amount ofinvestigation work and more is planned.

Wairarapa landfills

62%

12.6%12.6%

12.6%

Fully ComplyingMainly complyingPartially complyingNon-complying

Page 17: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

13

Wellington discharges to airFully Complying Mainly Complying Partially Complying Non-Complying

39 5 1 9

During the 2002-2003 financial year, 54 discharge to air permits were inspected inthe western section of the Wellington Region (not including Wastewater and WaterTreatment Plants, Landfills and Agricultural and Miscellaneous Discharges toLand, which are covered elsewhere in this report):

The overall compliance status of the consents inspected:

70% of consents were fully complying. This is a reduction from the 75% fullcompliance in the 2001/2002 financial year.

The cases where permit holders were partially or mainly complying were due toadministrative infringements such as the late submission of monitoring results,annual reports, maintenance records or operations manuals.

Of the ten consent-holders who were non-complying, three cases of non-compliance were due to offensive or objectionable discharges (e.g. odour) whilefour cases were due to non-submission of monitoring results.

Air discharge compliance

75%

14%2% 9%

Fully ComplyingMainly ComplyingPartially ComplyingNon Complying

Page 18: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

14

Compliance requiring improvement

Chemwaste Liquid and Hazardous Waste Treatment Plant, Seaview, Lower HuttConsent Holder: Chemwaste Industries Limited

WGN9900471 discharge permit to air

Non-complying because offensive odour was confirmed beyond the site boundaryon 26 September 2002. An infringement notice was issued for this confirmedincident.

The permit holder continued its failure to operate in accordance with the plant’srisk management plan on 25 February 2003 by allowing the discharge of wastegalvanising acid into an open bunded area rather than directly into acid holdingtanks.

Cryovac extrusion and printing plant, Elsdon, PoriruaConsent Holder: Cryovac Sealed Air Corporation

WGN9701171 discharge permit to air

Cryovac have expanded their operation since the consent was granted in March1997. The expansion of operations was outside of the activities applied for, so theconsent holder was in breach of the consent. This was discovered by GWRCduring a compliance inspection on 5 November 2002.

Cryovac subsequently applied to vary the consent conditions to allow for theirexpanded operation. This variation was granted in December 2002.

The consent requires the submission of an annual monitoring report by 20 March2003. Cryovac submitted a draft of this report on 2 April 2002, however, the finalversion was not received until 2 July 2003, and therefore Cryovac was onlypartially complying with this condition.

Cryovac did not test ozone emissions in May 2003 as required by the consent. Thetesting has subsequently been carried out and the results forwarded to GWRC.

Dulux New Zealand manufacturing plant, Upper HuttConsent Holder: Dulux New Zealand Limited

WGN0102231 discharge permit to air

Dulux New Zealand has not undertaken the annual emissions testing required bythe consent since December 2001. Dulux New Zealand have stated that testing will

Page 19: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

15

be carried out as soon as possible and the results will be submitted as soon as theybecome available.

Because the results of emissions testing for 2002/2003 have not been submitted,compliance with particulate emissions limits cannot be assessed.

Fulton Hogan asphalt plant, Belmont, Lower HuttConsent Holder: Fulton Hogan Limited

WGN9401301 discharge permit to air

Fulton Hogan submitted the results of only one of the two 6-monthly emissionstests required by the consent. According to Fulton Hogan this was due to theintermittent nature of operation.

Because one round of emissions testing was omitted, compliance with theparticulate emission limits cannot be fully assessed. The 6-monthly monitoringresults that were supplied, however, showed that particulate emissions were withinlimits at that time.

Nuplex Environmental Treatment Plant, Seaview, Lower HuttConsent Holder: Nuplex Environmental Limited

WGN0201791 discharge permit to air

Nuplex Environmental Ltd was issued with a replacement consent to discharge toair in October 2002.

Discharges of odour that were confirmed as offensive or objectionable beyond theboundary of the property occurred on two occasions in the 2002-2003 period. Theoffensive odours were in breach of the conditions of consent. An infringementnotice was issued for the first confirmed breach, while enforcement action for thesecond incident is under consideration.

Pacific Wallcoverings manufacturing plant, Elsdon, PoriruaConsent Holder: Pacific Wallcoverings Limited

WGN9401531 discharge permit to air

Pacific Wallcoverings Limited did not inform GWRC of the incidence of a fire inthe plant in late 2002. The notification of any incident that may result in adverseeffects beyond the boundary of the plant is required by a condition of the consent.Pacific Wallcoverings Limited have made assurances that notification of suchincidents will be made in the future.

Page 20: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

16

Pavements asphalt plant, Horokiwi Quarry, WellingtonConsent Holder: Pavements (Wellington) Ltd

WGN9500051 discharge permit to air

Pavements have not submitted the results of annual particulate emissions testingrequired by the consent. According to Pavements, this was due to the intermittentnature of the operation. Pavements have stated that the testing will be carried out assoon as possible

Because the results of emissions testing for 2002-2003 have not been submitted,compliance with particulate emissions limits cannot be assessed.

Abrasive Blasting Company, Wellington Region (global consent)Consent Holder: Steam and Sand

WGN9700291 discharge permit to air

Steam and Sand failed to provide GWRC and neighbouring property owners withnotification of works. Steam and Sand also failed to notify GWRC of complaintsthey received as required by the consent.

The site of works was inspected in response to a complaint on 22 April 2003 andconspicuous deposits of blast debris had not been collected and removed asrequired by the consent. A sample of the material was taken and analysed and wasshown to contain zinc and a smaller amount of lead.

The blasting operators did not understand and comply with the consent conditionson 22 April 2003, as required by the consent. The consent holder was charged forthe costs of investigations. No further action was taken.

Taylor Preston Limited Abattoir, Ngauranga Gorge, WellingtonConsent Holder: Taylor Preston Limited

WGN95015101 discharge permit to air

Discharges of odour that were confirmed as offensive or objectionable beyond theboundary of the property occurred on eight separate occasions in the 2002/2003period. The offensive odours were in breach of the conditions of consent and aninfringement notice was served for the first of the eight consent breaches. GWRCis assessing enforcement options with regard to the remaining breaches.

In response to the findings of an independent audit of odour abatement measuresemployed at the plant (commissioned by the council in 2001) Taylor PrestonLimited (TPL) implemented improvements to these measures in mid-2002.

Page 21: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

17

Following the series of breaches and an increase in complaints regarding odour inthe area in 2003, the council has commissioned the same independent consultant tore-audit the plant, assess compliance with the recommendations of the 2001 auditand to suggest further measures that may be taken to reduce odorous emissions.

Vita New Zealand manufacturing plant, Upper HuttConsent Holder: Vita New Zealand Limited

WGN0102231 discharge permit to air

Vita New Zealand did not submit their first annual discharge monitoring report(due 25 November 2002). This report requires testing of the discharges for certainHazardous Air Pollutants, while estimates of these discharges are sufficient insubsequent years. Vita New Zealand have acknowledged this oversight and is inthe process of commissioning consultants to undertake the required testing and willforward the results to GWRC as soon as they become available.

Page 22: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

18

Wairarapa discharges to airDuring this financial year:

A change to the Regional Air Quality Management Plan made discharges to airfrom piggeries and chicken farms permitted. To date, we have not cancelled anyexisting consents from these properties.

Apart from the discharges to air from landfills and sewage plants, no formalcompliance inspections were undertaken for air discharges in the Wairarapa.Discharges to air from the landfills and sewage plants are recorded in thoserespective sections of this report.

The Juken Nissho sawmill plant has been visited a number of times by staff todiscuss aspects of their discharge to air, and self-monitoring continues to bereported to GWRC. There were no complaints relating to air discharges for theyear.

Webstar Print, which has been the cause of numerous complaints in the past,installed a significant piece of pollution control equipment. It exploded on the firstday of use, but has now been repaired and reinstalled. The discharge from this siteis markedly improved as a result.

Page 23: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

19

Wellington wastewater treatment plantsFully Complying Mainly Complying Partially Complying Non-Complying

26 0 0 5

Note: These numbers are for individual resource consents for wastewater treatmentplants and any associated overflow provisions. They are not overall ratings forthe plants.

During this financial year:

There were no mainly or partially complying consents.

Consents were given non-complying ratings mainly for exceeding contaminantconcentration limits and failure to monitor designated parameters. Some non-complying ratings were also given as a result of unlawful discharges of effluent.

Wainuiomata Wastewater Treatment Plant no longer operates as a treatment plant,as it was decommissioned in December 2001 and replaced with a pump station.The pump station still has to comply with resource consents and the compliance isreported below.

Waikanae Wastewater Treatment Plant has also been decommissioned, and nocompliance inspections were required during the 2002/2003 year.

Wellington water treatment plants and water permits

84%

16%

Fully Complying

Non-Complying

Page 24: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

20

Commendable compliance

Porirua Wastewater Treatment PlantConsent Holder: Porirua City Council

WGN980083 (01-03)1 discharge to air permit1 discharge to water permit1 coastal permit

The first inspection was undertaken on 14 November 2002, and the consent holderwas fully complying with all applicable conditions of consent.

The second inspection for the 2002/03 compliance year was carried out on 9 May2003. Porirua City Council (PCC) has met all the requirements of the consents sofar during this year.

The ultra violet disinfection facility was completed and commissioned at the timeof the last inspection in November 2002. The inlet main weir under constructionduring the last inspection is now completed, but there have been few heavyrainfalls to test its efficiency.

PCC has been having trouble with its shellfish sampling, with shellfish mortalitydue to rough conditions, and cages being stolen. PCC may apply for a change inconsent condition after investigating alternative monitoring regimes.

Wainuiomata Wastewater Pumping StationConsent Holder: Hutt City Council

WGN9900841 discharge to air permit

WGN0201591 discharge to land and water permit

WGN9900841 discharge to water permit

The consent holder has fully complied with the conditions of the consents for the2002/2003 compliance year. A compliance inspection was not necessary ascompliance with the consent conditions is based on the supply of records andreports as opposed to an inspection of the activities. Three inspections were carriedout in the 2002/2003 compliance year during decommissioning of the WainuiomataWastewater Treatment Plant.

Significant measures have been undertaken to reduce the incidents of wet weatheroverflows. A future programme of works is also planned for stormwater inflowsurveys to further reduce wet weather overflows.

Page 25: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

21

Three wet weather overflow events to the Wainuiomata River have occurred duringthe compliance year on 15 July 2002, 17 November 2002 and 9-11 June 2003.

Western Wastewater Treatment PlantConsent Holder: Wellington City Council

WGN8900091 coastal discharge permit

WGN0101331 coastal discharge permit1 discharge permit to water

WGN9201381 discharge permit to air

WGN0202361 coastal permit

The Western Wastewater Treatment Plant operates under four discharge permits.Two of these, the coastal discharge permit (WGN890009) that authorises thecontinuous discharge of tertiary treated effluent to coastal waters and the dischargeto air permit (WGN920138) that authorises the continuous discharge of air througha soil filter, were in full compliance with consent conditions.

The remaining two resource consents are for the occasional discharge of sewageoverflows during significant wet weather events to both the coast and KaroriStream. WGN920134 authorises the intermittent discharge of tertiary treatedeffluent into Karori Stream, while WGN920135 provides for the intermittentdischarge of milli-screened effluent into the coastal waters. These consents bothexpired on the 30 June 2001. The hearing committee’s decision was appealed andthat appeal was not resolved until 5 May 2003. Greater Wellington received theMinister of Conservation’s recommendation on 26 June 2003. During mediation,however, it was agreed that the wet weather overflow discharges from theTreatment Plant would comply with the conditions of the permits underWGN010133.

The permits have been exercised twice during the 2002/2003 compliance year.Both permits under WGN010133 were judged to be fully complying.

Coastal permit WGN020236 permits the occupation of the coastal marine area inrespect of the Western Wastewater Treatment Plant outfall structure, and this wasin full compliance with consent conditions.

Page 26: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

22

Paraparaumu Wastewater Treatment PlantConsent Holder: Kapiti Coast District Council

WGN970255 (01-05)1 discharge to air permit3 discharge to land permits1 discharge to water permit

Throughout the 2002/2003 year the treatment plant continued to operate in itsupgraded mode, which included the new UV disinfection system and treatment ofall flows from Waikanae. Kapiti Coast District Council (KCDC) have progressedsome considerable way to completing the transfer of sludge for beneficial use as asoil cap on Otaihanga Landfill. There have been no confirmed incidents ofoffensive odour. It is expected that the sludge lagoons at Paraparaumu will be fullydecommissioned and rehabilitated in the next financial year.

The consent holder is partially complying because they failed to supply themonitoring results for the treatment plant effluent and they also failed to report onconsultation undertaken with the community liaison group by the end of the2002/2003 financial year.

AWI Wastewater Dewatering PlantConsent Holder: Anglian Water International/Wellington City Council

WGN9300691 discharge permit to air

WGN0000391 discharge permit to air

The de-watering plant at Carey’s Gully operates under two discharge permits.Both of these, the discharge to air permit (WGN000039) that authorises thedischarge of contaminants to air from the treatment of centrate and the discharge toair permit (WGN930069) that authorises the continuous discharge of air through asoil filter, were in full compliance with consent conditions.

Although there are on going complaints regarding odour from the Carey’s GullyLandfill complex, no noxious, dangerous, offensive or objectionable odours havebeen confirmed as originating from the de-watering plant or biofilter.

All the stakeholders at the site are currently considering their options with regard toodour issues related to the site. GWRC has requested a timeframe for the suggestedactions and will follow this up when the information is provided.

Page 27: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

23

Compliance requiring improvement

Hutt Valley Sewer OverflowsConsent Holder: Hutt City Council

WGN960002 (01-04), (07-08)6 discharge permits to water

WGN0101011 discharge permit to water

The permit holder was meeting all the requirements of most of the consents. At thetime of the inspection, a number of warning signs appeared to have been removedor destroyed by vandals and required replacing. The required reports continue tobe submitted in good time.

Three of the consents have been given compliance ratings of non-complying due todischarges during dry flow, discharges of above the consented flow rate, andfailure to monitor water quality following the discharge.

GWRC has required that the missing signs are replaced and that the consent holderchecks the design of Wellington Road Pump Station to ensure that debris will notcause overflows in the future.

Otaki Wastewater Treatment PlantConsent Holder: Kapiti Coast District Council

WGN950035 (01-03)1 discharge permit to land2 discharge permits to air

The plant was inspected on 13 June 2003. At that time the plant appeared to beoperating efficiently and in full compliance with operational conditions of theconsents.

The groundwater and effluent monitoring results required under conditions 13 and14 of consent WGN950035 (01) were not submitted during the 2002/2003 year andcould not be reviewed. The consent holder is therefore not complying with theconditions of this consent, allowing the discharge of effluent to land. The resultshave since been submitted and the results reviewed.

Page 28: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

24

Hutt Wastewater Treatment ProjectConsent Holder: Hutt City CouncilHutt Valley Water Services

WGN950162(01-03)1 discharge permit to air1 discharge permit to water1 coastal discharge permit

WGN950049(01)

1 discharge permit to air

WGN930193(01-02)

1 coastal discharge permit1 discharge permit to air

There have only been six odour complaints relating to the wastewater treatmentplant over the past compliance year. None of the complaints were confirmed. Thesmall number of complaints is a great improvement on the previous year. Hutt CityCouncil are complying with all aspects of the discharge to air permit.

There have been 2 discharges to the Waiwhetu Stream during the 2002/2003compliance year. One of these, on 8 August 2002, had a mean flow rate of 1,003L/sec. This was a breach of condition 13 of WGN950162 (02) and an infringementnotice was issued as a result of this breach. Hutt City Council is currentlyundertaking works to ensure that the incident that caused this overflow, does nothappen again. However, a grading of non-complying has been given because ofthis overflow.

A rating of non-complying has also been given for WGN950162 (03) because the80 percentile for faecal coliforms was breached in November and December 2002.Hutt City Council considers that the problems experienced at the plant in late 2002were due to trade waste received. In response to this problem, Hutt City Councilhas taken a successful prosecution against the parties they consider responsible.

Page 29: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

25

Moa Point Wastewater Treatment PlantConsent Holder: Wellington City CouncilAnglian Water International

WGN960094(01 )1 discharge permit to air

WGN9000251 coastal discharge permit to water

WGN0202451 coastal permit

WGN9100961 discharge permit to air

The consent holder has fully complied with conditions of the long outfall dischargepermit, the coastal occupation permit, and discharge to air from the plantventilation system during the 2002/2003 compliance year.

The consent holder is currently reporting against condition 7 (a) using thecarbonaceous, 5 day BOD test. The condition does not specify cBOD is theparameter to be monitored, but refers to BOD5 which refers to Total BOD. It isaccepted that cBOD is the accepted method for testing wastewater effluent.However it is of concern that the limits set in Condition 7 (a) were done so on thebasis of Total BOD not cBOD. This matter needs to be further discussed with theconsent holder.

A small milliscreened only discharge occurred on 8 December 2002, in conjunctionwith the discharge of Kaldness media. The milliscreened only discharge isunlawful. The permit holder is currently in the process of preparing a resourceconsent application to GWRC to authorise discharges of this nature.

Work is ongoing with Anglian Water Inc (AWI) and Wellington City Council(WCC) regarding measures to minimise discharges of sub-treated sewage, such asretention and storage with the treatment network, and elimination of stormwateringress into the sewers.

The consent limit of 0.05ppm total reduced sulphur compounds (TRS) wasexceeded during monitoring carried out on 23 October. This was the firstexceedence since monitoring began in September 1998. AWI have advised this isa sample error.

There were no odour complaints with respect to the treatment plant lodged with thepermit holder during the compliance year. A total of 12 odour complaints werelodged with GWRC. These complaints were not specific as to the source, that iswhether from the treatment plant or the pumping station. GWRC officers did notconfirm any odours originating from the plant ventilation system.

Page 30: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

26

A discernible odour was confirmed by GWRC officers on 12 June 2003. Thesource of this odour was determined not to be the plant ventilation system, but fromthe ventilation system of trucks carrying out maintenance on one of the 12 metrewells. As the odour was not offensive or objectionable no further action is beingtaken by GWRC.

The discharge from the short outfall consent expired on 31 December 2002. Thereis no longer a milliscreen in place at the short outfall. An unlawful discharge fromthe short outfall occurred on 9 June 2003. This matter is being investigated byGWRC Pollution Control.

Not all conditions of consent have been complied with during the 2002/2003compliance year for the discharge to air from the pumping station. The consentlimit for TRS was exceeded during monitoring on 29 August 2002 and 19December 2002. TRS was also exceeded on 16 April 2003, however, a repeatsample taken on 29 April 2003 complied with the consented limit of 0.05ppm.New sampling techniques have been investigated throughout the year.

The permit holder had a total of 8 complaints lodged with it during the complianceyear. Records of complainants are kept and forwarded quarterly. 12 complaintswere lodged with GWRC. These complaints were not specific as to the source, thatis whether from the treatment plant or the pumping station. GWRC officers did notconfirm any odours originating from the pump station.

Resealing of the wet wells has been completed. This upgrade means the pumps cannow be removed with minimal chance for odour escape.

The consent holder is fully complying with consent conditions for the short outfallto the coastal marine area, and was inspected by the permit holder on 24 January2003.

Page 31: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

27

Wairarapa wastewater treatment plantsFully Complying Mainly Complying Partially Complying Non-Complying

5 1 0 2

Note: These numbers are for individual resource consents for wastewater treatmentplants, not overall ratings for the plants.

During this financial year:

The Masterton sewage plant was granted consent to continue discharging sewage tothe Makoura Stream for a further seven years. Conditions include a requirement foran interim upgrade of the plant, increased monitoring, and the requirement todecide on a long term upgrade option within two years.

The Martinborough sewage consents were assessed for compliance for the firsttime since the granting of a renewed consent in 2001.

A deadline passed for the Carterton sewage discharge to be removed from the riverduring summer months. This requirement was not complied with. GWRC servedan infringement notice, along with an abatement notice requiring the discharge tothe river to stop during summer 2004.

The Featherston sewage plant continues to operate under the water right grantedunder the Water and Soil Conservation Act in 1987. GWRC had been expecting acompleted application for renewal of the consent for much of the year, but SouthWairarapa District Council have been continuing consultation with keystakeholders and assessment of alternative options to incorporate a land basedsystem. An ecologist has also been assessing the impacts of the current discharge.A complete assessment of effects is expected within the next two months.

The first full year’s monitoring data after improvements to Greytown sewage plantshow that, although an improvement has been made to effluent quality, the qualitydoes not meet the standard set under the consent. The consent holder was given anon complying report and advised to investigate further measures that can be takento improve effluent quality.

Wairarapa wastewater treatment plants

62%13%0%

25%Fully ComplyingMainly complyingPartially complyingNon-complying

Page 32: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

28

GWRC granted discharge permits to air to the Greytown and Carterton sewageplants, leaving only the Featherston sewage plant to be finalised.

Commendable compliance

Masterton sewage oxidation pondsConsent Holder: Masterton District Council

WAR0200741 discharge permit to air1 discharge permit to land1 discharge permit to water

GWRC is pleased with compliance during the financial year. The standard ofreporting has been excellent and several measures are being put in place to upgradethe treatment plant.

The Featherston treatment plant was also fully complying, though on an antiquatedconsent with minimal conditions.

Compliance requiring improvement

Carterton Municipal Sewage Treatment Plant, Dalefield Rd, CartertonConsent Holder: Carterton District Council

WAR 9501481 discharge permit to water

The Carterton plant failed to meet the requirement for no summer discharge to theriver by 1 January 2003. It also continued to exceed the bacterial limit placed onthe consent. This bacterial limit became even stricter by 31 December 2002.

Greytown oxidation ponds, Papawai Road, GreytownConsent Holder: South Wairarapa District Council

WAR 9602861 discharge permit to water

Although the required upgrading of the pond has been completed, the effluentquality has failed to meet the standard set by the consent.

Page 33: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

29

Wellington agricultural and miscellaneousdischargesFully Complying Mainly Complying Partially Complying Non-Complying

33 1 1 11

There are 35 current agricultural discharge permits in the western part of theWellington Region. Nineteen of these permits were inspected during the 2002/2003financial year. Of the permits inspected, 18 related to the discharge of effluent fromdairy farms and one related to a piggery operation. The remaining 16 operationswere not inspected as they had a history of three years good compliance and nowonly require inspections once every three years.

Twenty-seven miscellaneous discharge permits were inspected during the2002/2003 financial year. Of the permits inspected, 19 related to sewage dischargesfrom septic tanks and small community-based sewage treatment plants. Theremaining permits related to the discharge of agrichemicals, stormwater andindustrial wastes.

During this financial year:

There was an increase in the number of agricultural discharge permits that werenon-complying. (21% were in non-compliance compared to 15% in 2001/2002).

There was a decrease in the number of miscellaneous discharge permits that werenon-complying. (26% were in non-compliance compared to 30% in 2001/2002).

Fifty percent of the non-compliance for agricultural discharges was due to selfmonitoring not being carried out or submitted. The other half of agricultural non-compliance was caused as a result of ponding on pasture due to either mechanicalfailure or mismanagement of the system.

Agricultrual and miscellaneous dischargecompliance

24%

2%

72%

2%

Fully ComplyingPartially ComplyingNon ComplyingMainly Complying

Page 34: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

30

Of the miscellaneous discharge permits breached in the 2002/2003 financial year,one related to an unauthorised discharge, two related to samples exceeding therequirements stipulated in consent conditions, one to offensive and objectionableodour, and the remaining three non–complying miscellaneous discharges, relate tomonitoring not being carried out or submitted.

Commendable compliance

William Hunt, OtakiConsent Holder: William Hunt

WGN990017011 discharge permit to land

The consent holder was meeting all the requirements of the consent at the time ofthe inspection. The irrigation system was well maintained and operated. Excesseffluent is discharged to the two storage ponds, which are emptied once a year.

Wakapua Farm Limited, OtakiConsent Holder: Wakapua Farm Limited

WGN0001041 discharge permit to land

The consent holder was meeting all the requirements of the consent at the time ofinspection. The effluent irrigation system is well managed and maintained.

A herd of 260 cows are milked at the dairy shed, and the effluent system involves agrit trap with stormwater diversion, a sump, a reticulation system and travellingirrigator. Effluent that cannot be irrigated due to wet weather is pumped from thesump into the storage pond. The storage pond had a large volume of effluent in itat the time of inspection, but was not in danger of overflowing to Waitohu Stream.

Greater Wellington Regional Council, BiosecurityConsent Holder: Wellington Regional Council

WGN0001041 discharge permit to land

The 1080 operation was planned and executed very well and at the time ofinspection the consent holder was fully complying with the conditions of theconsent. A Navigational Guidance System (NGS) was used during the drop toensure that 1080 was distributed within the area specified in the consentapplication. The map of the flight path from the NGS, submitted to the Manager,Consents Management, verified that the discharge occurred only within theconsented area. A large hole was dug at the re-filling site to wash the bucket downafter the final drop and any 1080 dropped when re-filling the bucket was picked upby the ground personnel. The consent holder advised that on inspecting the Hutt

Page 35: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

31

River no dead carcasses were found. No kills of any non-target species werereported.

Meridian Energy Limited, Makara Radio VillageConsent Holder: Meridian Energy Limited

WGN990183031 discharge permit to land

The systems are very well maintained and as such appear to be operating very well.The consent holder was fully complying with the consent conditions on the day ofthe inspection.

Greater Wellington Regional Council, Parks and Forests, Queen Elizabeth ParkConsent Holder: Wellington Regional Council

WGN9501911 discharge permit to land

The consent holder was meeting all the requirements of the consents at the time ofthe inspection.

The Queen Elizabeth Park Ranger advised that there had been no problemsexperienced with the discharges since he took over the Ranger position earlier inthe year.

Compliance requiring improvement

Gabites Piggery, Maymorn Road, MangaroaConsent Holder: John Gabites

WGN9901041 discharge permit to land

The consent holder has sold the last of his pigs in about mid-May 2003, and is nowpumping the effluent through his pond system (as there is no inflow) to graduallyempty the ponds. The consent holder believes that he can run his ponds so thatthere is no discharge from the wetlands to the tributary of Blaikie Stream.

As part of the pond decommissioning, the consent holder also has a large amountof sludge to dispose of. A further resource consent will be required for the landdisposal of this sludge.

The consent holder has not sampled the discharge during the 2002/2003 year.Under condition 10 of the consent, sampling must be carried out when the treatedeffluent is discharging to the unnamed stream. Some sampling needs to be done toshow that the effluent quality criteria set out in condition 11 are being compliedwith.

Page 36: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

32

Sandyhill Partnership, Poplar Ave, RaumatiConsent Holder: Kerry Smith

WGN9800651 discharge permit to land

In general, the system appeared to be operating efficiently with no apparent adverseeffects. However, at the time of inspection, the consent holder had not submittedany groundwater quality monitoring results as required under conditions 13 and 14of the consent. Under these conditions, testing of groundwater (from each of thefour sampling bores) for faecal coliform, nitrate and pH levels must be undertakenevery four months, and the results must be submitted to the GWRC.

Since the inspection the consent holder has provided the most recent groundwatermonitoring results dated 22 May 2002. These results partly fulfil the requirementsfor the 2001/2002 compliance year, but do not fulfil the requirements for the2002/2003 year. This is of particular concern, as the consent holder has beeninstructed for the last three compliance years to supply the required information.Further, the consent holder has been warned in the last two compliance reports thatcontinued non-compliance could result in enforcement action. Despite this andverbal assurances from the consent holder, the non-compliance has continued. Noenforcement action will be undertaken at this stage.

The monitoring programme is an integral part of the consent. The monitoringrequirements were imposed because the system was not the best practicable option,and because of the need to monitor the effects of the system with a view toreviewing the conditions, or the consent itself, at a later date. The groundwatermonitoring results of 2 March 2001 showed that faecal coliform and nitrate levelshad increased significantly from 1998 levels. The latest monitoring results show afurther increase from the 2001 levels. These results reinforce the need for themonitoring programme to continue as set out in the consent.

NB & C Everton, Rahui Road, OtakiConsent Holder: NB & C Everton

WGN0102031 discharge permit to land

From the compliance inspection it was apparent that the previous sharemilker hadnot been managing the dairy shed or effluent disposal system in accordance withthe resource consent. A number of areas of non-compliance were identified,including the reliability of the effluent pump, a broken spreader and rusted fittings,punctured hoses, and insufficient hose length to achieve the required irrigationarea. The effluent spreader had been stuck in the same place for some time,leading to ponding and the buildup of effluent on the surrounding paddock. It wasuncertain where the dairy shed effluent had been disposed of during the time thatthe pump and spreader had not been working properly, as the dairy shed hadremained in operation throughout. The sharemilkers could not identify an overflow

Page 37: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

33

point or a contingency measure for treating the effluent in the event of mechanicalfailure.

There are also issues with the overall design and functioning of the dairy shed yardand race. In particular, the yard and race surfaces only channel part of the totaldairy effluent to the collection sump where it can be pumped out to the spreader.The remainder of the effluent, of which there was a significant amount, runs offdirectly into the nearby stream.

The consent holder is undertaking remedial works, and GWRC are consideringwhether to take further enforcement action.

PC & H Wilson, Swamp Road, Te HoroConsent Holder: PC & H Wilson

WGN0102031 discharge permit to land

Dairy effluent from the travelling irrigator had ponded on an area of pastureapproximately 5m x 10m. The consent holder advised that this ponding of effluenthad occurred as a result of a broken pipe that had since been repaired. The areawhere the irrigator was located at the time of the inspection showed no signs ofponding of effluent on pasture.

The travelling irrigator was located within 20 metres of a drain containing waterand in this position, the effluent discharge from the irrigator would fall within 20metres of this surface water body.

Corner of Grays Road and Paekakariki Hill Road, PauatahanuiConsent Holder: Rushes Restaurant

WGN9701091 discharge permit to land

Monitoring results for the 2001/2002 compliance year showed non-compliancewith the contaminant limits set by condition 15 of the consent, which relate toBOD, and suspended solids. As a result, a further round of monitoring wasrequired to corroborate the results and identify the source of the problem.

The required monitoring round, conducted on 22 July 2002, confirmed non-compliance with Condition 15. Ongoing non-compliance with conditions 12, 1417, 18, 19 and 21 of the consent was also identified. These compliance issues,combined with the history of non-compliance for the consent, culminated in anabatement notice dated 13 September 2002 being issued to the consent holder. Theabatement notice required the consent holder to investigate the operation of themounds to determine the effectiveness of the treatment system (such investigationto be provided in a report); advise the Medical Officer of Health and the PoriruaCity Council’s Environmental Health Officer; and submit an annual compliancereport.

Page 38: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

34

The consent holder’s response to the abatement notice was not satisfactory, and soa second abatement notice, dated 27 November 2002, was issued. This abatementnotice required the consent holder to immediately cease the discharge of any“biochemical additives” into the wastewater treatment system; investigate theoperation of the mounds to determine the effectiveness of the treatment system(such investigation to be provided in a report); and submit an annual compliancereport.

The consent holder failed to meet the timeframes set down in the second abatementnotice, but did engage New Zealand Environmental Technologies Ltd (NZET) toinvestigate the disposal system and address the compliance issues.

NZET have since identified a number of problems with the disposal system,including the lack of a filter on the first tank, a buildup of solids in the second tankand an inadequate grease trap arrangement. A new filter was installed, the secondtank was cleaned out and NZET and the consent holder are currently investigatingthe options with regard to installing a new grease trap. NZET have also carried outfurther monitoring of the system.

In regard to compliance with the consent conditions in the 2002/2003 complianceyear, the consent holder is clearly non-complying, despite some efforts to addressthe problems with the system.

Nikau Valley, Maui Pomare RoadConsent Holder: Mahaki Holdings Ltd

WGN0001851 discharge permit to land

The treatment plant appeared to be well managed with no discernible discharges toland or air. The disposal field also appeared to be operating effectively, with noponding or other adverse effects, although stock had access to the field and therequired signage was not evident. Also of concern was the fact that the operationsand maintenance manual had not been submitted as required.

Hutt River Mouth, Point HowardConsent Holder: Winstone Aggregates

WGN9802401 discharge permit to land

During the inspection on 27 June 2003 a significant area of ponding of washwaterwas evident in the vicinity of the washer. This washwater was discharging directlyinto the Hutt River mouth. Additionally, during a site inspection on 30 June 2003,another GWRC officer, noted a discharge of washwater, from the tower adjacent tothe washer, directly into the Hutt River mouth.

Page 39: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

35

The permit holder intends to upgrade the washing plant within the next threemonths. The design of the plant shall be such that all washwater will be directedthrough the settling ponds prior to discharging to the Petone foreshore.

The monthly monitoring of turbidity is required by condition 11 of consentWGN980240 [20832]. Therefore the permit holder must ensure monthly samplesare taken and analysed. Winstone’s staff need to be proactive about ensuringmonitoring is undertaken, rather than relying on the GWRC Laboratory staff.

Kiwi Point Quarry, Ngauranga GorgeConsent Holder: Wellington City Council

WGN950173(01)1 discharge permit to water

Wellington City Council has a discharge consent to discharge stormwater andwashwater to the Ngauranga Stream at Kiwi Point Quarry.

The consent holder was meeting all requirements of the consent at the time of theinspection. However sampling results submitted on 27 June 2003 exceed the limitset in condition 8, which relates to the limit for suspended solids.

Lodge at the Inlet, Paekakariki Hill Road, PauatahanuiConsent Holder: Brendan Spencer

WGN960074(01)1 discharge permit to water

The consent holder currently discharges treated sewage to the Horokiri Stream.The operator appears to be well informed about the system in place, however, theconsent holder advised that the UV filtration system had not been workingproperly.

Quarterly sampling was carried out by the consent holder on 21 November 2002.Analysis of the results show that the faecal coliform levels are well in exceedenceof the limit set. This is indicative of the UV filtration system not workingefficiently.

Miramar Golf Club, Stewart Duff Drive, MiramarConsent Holder: Miramar Golf Club

WGN9801891 discharge permit to land

Miramar Golf Club operates a wastewater treatment facility. Wastewater isreceived from Moa Point Wastewater Treatment Plant where it is filtered and UVtreated before it enters the aeration lagoon. The wastewater is pumped from thelagoon to a sprinkler system around the Golf Course.

Page 40: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

36

Faecal coliform results for February exceeded the limit of 10 CFU/100 mL (themean of 3 samples was 18 CFU/100 mL). All other results were below this limit.Due to pump failure, tests from September to December were not carried out. Thepump was repaired in December 2002, as no effluent was received from Moa Pointduring these months.

Living Earth Limited, Southern Landfill, Landfill Road

WGN990044 (01-06)I discharge permit to air1 water permit2 land use consents1 discharge permit to water1 discharge permit to land

The main compliance issue with respect to the Living Earth Limited (LEL)operation in this compliance year has been the three separate alleged breaches ofair discharge consent WGN990044(06). The 8 May 2003 breach was offensive andobjectionable odour beyond the boundary of the site, which was attributable to theoperation of the plant and more particularly the biofilter. The 24 May 2003 breachwas an offensive and objectionable odour event beyond the boundary of the sitethat was considered to be partially, but not solely, attributable to the plant. Duringthe investigation of the latter incident, several other areas of non-compliance wereidentified.

Three separate “please explain” letters were sent to LEL regarding the abovebreaches. After considering the letters of response, it was decided not to pursueany enforcement action against LEL. This was primarily because LEL has alreadyundertaken, at an Odour Workshop held on 12 June 2003, to actively engage in athorough review of its systems (including its biofilter). It was not considered thatthere would be any value in imposing an additional layer of punitive action on LELat this stage, given that a satisfactory range of voluntary actions have beenproposed.

The Odour Workshop, organised by Wellington City Council, involved the threemain Carey’s Gully businesses as well as GWRC staff and an odour expert. Theobjective of the Workshop was to develop a strategy for reducing odour complaintsassociated with the Carey’s Gully Complex.

Timeframes for the above actions have not been finalised. The number ofcomplaints from people living in the vicinity of Carey’s Gully has remained high,and LEL has been asked to confirm timeframes so that these can be communicatedto complainants.

Consents WGN990044 (01) and (01) have not been given a rating because they areconstruction-related consents that are no longer applicable. Water permitWGN990044 (03) has not been given a rating because it is not being exercised. Nosurface or ground water is being used for the operation. Water is instead beingobtained from the main tank supply at the Carey’s Gully Complex.

Page 41: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

37

Consents WGN990044 (04) and (05) have been given a rating of fully complyingfor the 2002/2003 compliance year.

As there have been three confirmed breaches of discharge to air permitWGN990044 (06), relating to several different consent conditions, that consent hasbeen given a rating of non-complying for the 2002/2003 compliance year.

Page 42: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

38

Wairarapa agricultural and miscellaneousdischargesFully Complying Mainly Complying Partially Complying Non-Complying

36 12 7 5

During this financial year:

The number of inspections was down on previous years. The majority of Wairarapadairy farms are on a three-yearly inspection, so the number of farms inspected eachyear fluctuates.

The number of dairy farms discharging to water in Wairarapa continues to drop. Bythe end of the 2002/2003 season, only two farms held consent to discharge towater.

GWRC staff were relatively pleased overall with farmers’ management of effluent,with 80% of farms either fully or mainly complying.

There were four discharge to land consents for aerial discharge of 1080 forbiosecurity operations. They all complied fully with consent conditions.

Commendable compliance

Those dairy farms that were given a fully complying rating all had automatedeffluent irrigation systems, which were actively managed.

Wairarapa agricultural and miscellaneouscompliance

60%

20%12%8%

Fully Complying

MainlyComplyingPartiallyComplyingNon Complying

Page 43: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

39

Compliance requiring improvement

Only two farms received abatement or infringement notices this year. This issignificantly less than in previous years. In most previous years, Wairarapa dairyfarmers received most of the notices served throughout the Region.

Page 44: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

40

Wellington water treatment plants and waterpermitsFully Complying Mainly Complying Partially Complying Non-Complying

85 15 8 9

Note: These numbers include individual resource consents for wastewater treatmentplants, not overall ratings for the plants.

During this financial year:

Compared to last year, there was a decrease in fully complying consents (83% for2002/2003).

There has been a slight increase in the proportion of consents, which were mainlyand partially complying (11% and 4% respectively for 2002/2003).

The most common reason for consents receiving mainly and partially complyingratings was the late submission of administrative and reporting requirements.

There has been an increase in the proportion of consents which were non-complying (2% for 2002/2003).

Exceedences in abstraction limits were recorded at three of the six water treatmentplants. The most significant non-compliance relates to the breaches recorded at theWaikanae Water Treatment Plant.

The most common reasons for consents receiving non-complying ratings include,not giving notification of commencement of works, exceedences in abstractionrates or volumes, and works not being carried out in accordance with consentconditions.

Water permit and water treatment plantcompliance

72%

8% 13%7%

Fully Complying

Mainly Complying

Partially Complying

Non Complying

Page 45: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

41

Water treatment plants

Wainuiomata Water Treatment PlantConsent Holder: Wellington Regional Council, Water Group

WGN9801531 discharge permit to air1 discharge permit to water

WGN0000711 discharge permit to water

WGN0002004 land use consents4 water permits3 discharge permits to water

WGN0002011 land use consent3 water permits4 discharge permits to water

WGN0201512 discharge permits to water

The supernatant discharge permit is mainly complying due to a breach of condition2, which stipulates the limitations on the discharge rate. The monitoring report wasreceived on 28 July 2003.

The water permit to take, use and dam water from the Orongorongo River and itstributaries was mainly complying due to one breach on 11 February 2003 whenwater was abstracted from the Orongorongo River when the daily minimum flow atTruss Bridge was less than 100L/sec.

The water permit to take, use and dam water from the Wainuiomata River and itstributaries, and to discharge water, and water containing sand and gravels to theWainuiomata River and its tributaries was fully complying. All reportingrequirements were met. Abstraction rates were not exceeded.

The discharge permit to discharge water and water containing sand and gravel tothe Orongorongo River and George Creek was fully complying. All reportingrequirements were met.

The discharge permit to discharge filtered air from the lime transfer blowers wasfully complying, as was the discharge permit to discharge partly treated river waterto the Wainuiomata River.

Page 46: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

42

Te Marua Water Treatment Plant, SH2, Te MaruaConsent Holder: Wellington Regional Council, Water Group

WGN9700413 discharge permits to water1 discharge permit to air

WGN0001991 water permit2 discharge permits to water

All discharge permits were fully complying. The reporting requirements for thedischarge permits were met.

The water permit to abstract water from the Hutt River was mainly complying.Several months of abstraction records were submitted late. During the last week inMarch 2003, the flow over the Kaitoke weir was reduced to 400L/sec, which is200L/sec below the minimum flow, so the weir could be photographed. On 19December 2002 the maximum abstraction rate was exceeded, due to a powerfailure.

Gear Island and Waterloo Water Treatment Plants, Jackson St Petone, and OxfordSt Lower HuttConsent Holder: Wellington Regional Council, Water Group

WGN9700362 water permits

These consents continue to be fully complying and all efforts are made to onlyabstract from these bores when necessary, to avoid risks of saline intrusion. This isparticularly so for the Gear Island Water Treatment Plant.

Waikanae Water Treatment Plant, Akatarawa Road, WaikanaeConsent Holder: Kapiti Coast District Council

WGN9801631 water permit

WGN9901711 water permit1 land use consent1 discharge permit to land

WGN0201051 land use consent

Maintenance works were carried out once during the compliance year on the scourhole below in the intake weir. The conditions of the consents relating to

Page 47: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

43

maintenance of the grade control structures and the scour hole were fullycomplying.

The maintenance works were carried out without the need to temporarily divert theriver. A fish spawning survey was carried out by Fish and Game and the resultssubmitted as required by the consent conditions.

Based on information supplied to GWRC by the consent holder, the consentWGN980163 was breached 44 times during the compliance year. It has not yetbeen determined what further action, if any, will be taken in response to thesebreaches. However, irrespective of any action, the consent was given a compliancerating of non-complying.

Waitohu Water Treatment Plant, Valley Road, OtakiConsent Holder: Kapiti Coast District Council

WGN9802631 water permit2 discharge permits to water1 discharge permit to land

The Waitohu Water Treatment Plant was shut down in late March 2003 due to verylow flows in the Waitohu Stream. It is the consent holder’s intention todecommission the plant, at which time the consents will be surrendered.

Paekakariki Water Treatment Plant, SH1, PaekakarikiConsent Holder: Kapiti Coast District Council

WGN9902092 water permits1 land use consent

Water is abstracted from the upper intake only on the Wainui Stream, as the streamgenerally disappears below ground before it reaches the lower intake. Theconditions of consent for the upper intake have been fully complied with.

The land use consent has not been used and as such has lapsed.

Page 48: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

44

Commendable compliance

Ohariu Stream, Ohariu Valley Road, JohnsonvilleConsent Holder: Craig Shepherd

WGN0201991 water permit

All works were completed to a very high standard. The consent holder is to becommended on his efforts to enhance the quality of the Ohariu Stream where itpasses through his property.

Awamutu Stream, between Awamutu Grove and Leighton Ave, Lower HuttConsent Holder: Hutt City Council

WGN0201161 water permit

Several inspections were made throughout the construction period and oncompletion of the works. The consent holder was meeting all conditions of theconsent at the times of the inspections. Sediment loading and turbidity were wellmanaged. Works in the streambed were avoided wherever possible.

Opau Stream, Quartz Hill, Makara Radio Village, MakaraConsent Holder: Meridian Energy LtdSite operator: Brian Drake

WGN9901831 water permit

The abstraction is very well managed and maintained by the site operator, BrianDrake.

Compliance requiring improvement

Fairway Drive, Lower HuttConsent Holder: Hutt City Council

WGN9802211 water permit

The maximum annual consented abstraction volume was significantly exceeded.Records of abstraction volumes were not kept and submitted in accordance withcondition 11 of the consent.

Page 49: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

45

Unnamed tributary of the Karori Stream, Friend Street, KaroriConsent Holder: Futuna Trust Ltd

WGN0100881 water permit

The works have not been in accordance with the consent application. Bankstabilisation work is to be carried out, and fish passage provided for.

Gear Island, PetoneConsent Holder: Shandon Golf Club

WGN9701461 water permit

Abstraction limits have been exceeded throughout the compliance year.

Porirua Stream, Middleton Road, JohnsonvilleConsent Holder: Middleton Developments Ltd.

WGN0300471 water permit

Notice of commencement of works not given, therefore an assessment could not bemade of compliance with consent conditions.

Page 50: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

46

Wairarapa water permitsFully Complying Mainly Complying Partially Complying Non-Complying

64 26 2 14

During this financial year:

There was a decrease in the proportion of consents that were fully complying.There was a big increase in consents that were mainly complying. This change ismainly due to a number of consent holders not submitting information requiredunder their consent conditions.

Most non-compliance was due to a combination of maximum take limits beingexceeded and water meters not being installed as required. Nearly half of the non-complying consents were from the three local authorities in the Wairarapa.

Eight abatement notices were issued in relation to water take activities. Five ofthese notices require consent holders to install water meters on irrigation takes.These consent holders will be checked for compliance before the next irrigationseason. The remaining three abatement notices related to unconsented takes forirrigation. These cases will be closely monitored during the next irrigation season.One abatement notice has been appealed and is currently being considered by theEnvironment Court.

A number of informal inspections were completed for existing consents, but nocompliance report was sent out. As such, they have not been included in thisannual compliance report. These inspections were mainly to check installation ofwater meters on existing irrigation takes. Some takes were inspected but noreading was gained because the pipe material or pipe configuration impeded theflow meter’s ability to read the flow.

Particularly dry conditions during the summer of 2002/2003 caused low flowconditions in Wairarapa rivers and streams. As such, many of the consents to takesurface water were subject to water restrictions. In a number of cases, fullirrigation bans were imposed. This involved considerable work – GWRC officershad to make contact with and notify consent holders of water restrictions, as well as

Wairarapa water permit compliance

60%

2%13%

25%

Fully Com plying

Mainly Com plying

PartiallyCom plyingNon Com plying

Page 51: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

47

check compliance with the restrictions. Again, these inspections are not recorded inthe figures presented.

Page 52: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

48

Wellington land use consentsFully Complying Mainly Complying Partially Complying Non-Complying

141 40 20 19

Note: These numbers are for individual resource consents, not overall ratings forparticular developments.

During this financial year:

There was a significant increase in the number of land use consents requiringinspection (220 in 2002/2003 compared to 147 in 2001/2002).

There was a decrease in the percentage of land use consents that were fullycomplying (64% in 2002/2003 compared to 77% in 2001/2002).

There was also a decrease in the percentage of land use consents that were non-complying (9% in 2002/2003 compared to 12% in 2001/2002).

Mainly complying or partially complying ratings were given mostly because 48hours notice prior to works commencing was not provided or because reports (e.g.,bore logs) were submitted late.

Non-complying ratings were given mostly because of works not being carried outin accordance with the consent application or because reports (e.g., bore logs) werenot submitted as required.

92 new bores were inspected, with 45 being fully complying, 22 mainly complying,17 partially complying and 8 non-complying. This compares to a total of 22 newbores in 2001/2002.

Land use compliance

64%

18%9%

9%

Fully ComplyingMainly ComplyingPartially ComplyingNon Complying

Page 53: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

49

Commendable compliance

141 land use consents were categorised as fully complying in the 2002/2003compliance year. These consents and consent holders are listed in Appendix 1

A full list of consent holders and their compliance ratings for land use consents canbe found in Appendix 1.

Page 54: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

50

Wairarapa land use consentsFully Complying Mainly Complying Partially Complying Non-Complying

44 6 0 2

During this financial year:

Few land use consents caused compliance issues. The main reason for consentsreceiving a mainly complying rating was that 48 hours notice of the works was notgiven. Despite a large number of contractors not notifying us before undertakingwork, routine inspections revealed that work was generally of a high standard andin accordance with consent conditions.

River works inspections showed a good level of compliance. Bank protectionworks and channel realignments mostly appeared to be functioning well andculverts were mostly installed correctly.

Compliance with gravel extraction consents has generally been very good withsites left tidy and well rehabilitated. Although most achieved a fully complyingrating, some were downgraded to mainly complying due to their failure to notifyGWRC before extracting. Most of these were contractors with one-off consents toextract small amounts.

Only two gravel extraction consents were mainly complying. One is the globalRuamahanga gravel consent. This is a consent to take gravel from the wholeRuamahanga River system. There are many rivers and extraction sites under thisconsent, with at least 20 operators licensed to extract. Even though the wholeconsent was mainly complying, many of the extraction sites would have been fullycomplying.

Inspections of earth dams not subject to the consent process (permitted activities)indicated a poor standard of construction. Some of these dams were relativelylarge structures. Poor construction included over-steep batter slopes, poor/non-verified compaction, overflow pipelines installed near the crest of the structures,

Landuse compliance summary

84%

12%0%4%

Fully ComplyingMainly ComplyingPartially ComplyingNon Complying

Page 55: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

51

unlined receiving outflow channels, no flow attenuation downstream of theoutflows, and significant vegetation clearance around the impounding lakemargins.

Commendable compliance

Earth dam construction, tributary of Dry River, South WairarapaConsent Holder: J Stewart

WAR0200081 land use consent1 water permit

The earth dam walls were well shaped and contoured. The emergency overflowspillway had been well designed, and incised into natural (undisturbed) groundadjacent to the earth dam. The completed works were very tidy, with topsoil evenlyspread across the structure for oversowing with grass seed.

Page 56: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

52

Wellington major river worksFully Complying Mainly Complying Partially Complying Non-Complying

23 0 0 0

During this financial year:

There are 36 current major river works consents in the western part of theWellington Region. In the last compliance year, 23 of these consents wereinspected. The 13 consents not inspected were not exercised during the 2002/2003compliance year. They were the consents associated with global maintenance ofthe Wainuiomata River, and the consents for the Hutt River Ava Rail Bridge toEwen Bridge River Realignment Project. The consent holder has encountered adelay in the latter project, which means that works are now due to commence inMarch 2004.

All of the major river work global maintenance consents have been issued toGreater Wellington - Flood Protection. These consents allow routine operationsand maintenance to be carried out on the Otaki River, Hutt River, Waikanae Riverand Waitohu Stream. Typical operations include bank protection, gravelextraction, cross-blading, berm spraying, tree planting and discharge of silt.

There are three consents associated with gravel extraction from the WaikanaeRiver.

There is an overall increase in the number of major river work consents (up 14from 2001/2002). This financial year all of the inspected consents were 100% fullycomplying.

River works compliance

100%

FullyComplying

Page 57: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

53

Commendable compliance

Otaki RiverConsent Holder: Flood Protection Group, Greater Wellington Regional Council

WGN980254 (01-06)2 land use consents1 discharge permit to air1 discharge permit to water1 water permit1 coastal permit

According to the annual report prepared by Garry Baker, construction activity onthe Otaki River in this compliance year has been quite significant. Work hasfocussed largely on channel reconfiguration to effect rock line extensions andmajor repairs to the frontages of rail iron debris fencing. The Otaki Riverexperienced four “freshes” during the year, and although no serious damage wassustained, some extra work was necessary to secure work sites for subsequentconstruction.

Works of note on the Otaki River during this compliance year include constructionof impermeable erosion control structures (e.g., rock groynes, gabion baskets,driven rail and willow revetments); construction of permeable erosion controlstructures (e.g., debris fences and permeable groynes); vegetative bank protection(e.g., tree planting, layering and tethering, tree groynes); maintenance of existingstructures (e.g., existing rip rap and groynes); channel maintenance (e.g., removalof vegetation and flood debris); channel shaping (e.g., beach recontouring, cross-blading, flood relief cuts and gravel extraction); berm and stopbank maintenance(e.g., mowing and spraying); and, river mouth management (e.g., river mouthrealignment and maintenance of structures in the coastal marine area). In additionto the above, there has been environmental enhancement, including the planting ofnatives.

An annual walkover inspection, attended by interested or affected parties, was heldon 23 October 2003.

No complaints have been received regarding the exercise of the above consents.Most issues or enquiries are dealt with directly by the Kapiti Area of FloodProtection.

The quarterly and annual reports have been received on time and all otherconditions of consent have been fully complied with.

Page 58: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

54

Hutt RiverConsent Holder: Flood Protection Group, Greater Wellington Regional Council

WGN9802552 land use consents1 discharge permit to air1 discharge permit to water1 water permit

Notice was given prior to works commencing during the year, which allowed forobservation of permanent and maintenance works in progress. For example, on 11December 2002, Mike Jensen showed me the nearly completed rock line works atMaoribank. The rock line is about 60 metres in length. The contractor cross-bladed the river, then constructed a bund to protect the area of work and structureuntil the works were completed. A completed rock line at Meadowbank wasinspected, which completed two existing rock lines to either side. The two existingrock lines were at different levels, and the new rock line has been blended in verywell.

The consent holder did not undertake any agrichemical spraying under thedischarge permit to air. However, spraying was undertaken in accordance with thepermitted activity Rule 1 of the Regional Air Quality Management Plan for theWellington Region.

All quarterly reports were submitted on or before the due date, and the annualreport for 2001-2002 was submitted before the due date on 14 August 2002. Theconsent holder was fully complying with all the criteria outlined in the variousconsents.

Waikanae RiverConsent Holder: Flood Protection Group, Greater Wellington Regional Council

WGN980256 (01-06)2 land use consents1 discharge permit to air1 discharge permit to water1 coastal permit1 water permit

All flood and river protection works have been carried out in full accordance withconsent conditions. During this financial year the works undertaken included 1,672cubic metres of gravel was extracted from Jim Cooke Park; 190 lineal metres ofcross blading at Walnut Grove and Pylon Corner; 280 meters of layering andtethering at Jim Cooke Park; 90 willow poles were planted along the right bankedge below Jim Cooke Park; and, 120 tonnes of rock was used to maintainstructures at Kebbells Rock.

Page 59: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

55

Six-monthly beach cross section surveys were carried out by Cuttriss ConsultantsLimited in December 2002 and June 2003. No physical works were carried out atthe mouth of the Waikanae River.

Waitohu StreamConsent Holder: Flood Protection Group, Greater Wellington Regional Council

WGN0102201 land use consent1 discharge permit to water1 water permit

The consent holder was fully complying with all consents at the time of theinspection. Works carried out at four sites were inspected for the 2002-2003compliance year. At Site One, willow trees have been planted on the true righthand side of the streambed to prevent further erosion of the stream banks and thesubsequent encroachment of the stream onto farmland. The stream channel hasbeen realigned so it is more centred in the streambed to prevent encroachment ontofarmland. Approximately 40 metres of cross-blading has occurred during 2002-2003.

At Site Two, the main works involved the removal of stray willow trees that occurwithin the boundaries of the main bands of willows located on either side of thestream. Site Three is at the steepest section of the stream. A stream diversion hasoccurred at this site to ensure the stream does not further encroach upon thefarmland on the true right hand side of the stream. A series of three small weirs andholding ponds have been formed. The middle of each of these weirs is lower toprovide fish passage. The area in which these works has occurred along the streamis approximately 100 metres.

Site Four is a gravel collection pit. It is ephemeral as it dries up in summer. Workshave occurred to deepen the channel and to collect gravel to reduce the amount ofgravel moving downstream to the silt area.

Waikanae River Gravel ExtractionConsent Holder: Flood Protection Group, Greater Wellington Regional Council

WGN0201061 land use consent1 discharge permit to water1 water permit

Extraction took place between cross section W0200 and W0230, and between crosssection W0110 and W0125 during February 2003. Extraction also took placebetween cross section W0175 and W0200 during May 2003. The river wasinspected on four occasions.

Page 60: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

56

The consent holder was fully complying with the conditions of the consents at thetime of the inspections. A copy of the extraction record for this compliance yearwas e-mailed through on 6 June 2003.

GWRC received one query during February 2003 relating to the presence of deepholes along the section of river that forms the boundary of the Otaihanga Domain.The situation was resolved prior to the complaint coming to the attention ofConsents Management through the prompt actions of Garry Baker and thecontractor.

The summer was exceptionally dry with river flows dropping below 700 L/s at theWaikanae Treatment Plant. The contractor was therefore unable to reinstate thenatural bed profile between cross section W0110 and W0125 at the end of February2003 without causing further distress to fish that were already under pressure dueto low flows. The natural bed profile has since been reinstated through naturalprocesses.

A variation to condition 11 of land use consent WGN020106 [21756] was soughtto change the extraction methodology in the Pukekawas reach (cross sectionW0200 and W0155) to ensure that fish are not distressed unnecessarily duringperiods of low flow. When river flow drops below 900 L/s at the WaikanaeTreatment Plant, gravel will only be extracted from existing beaches to a minimumof 100 mm above the active channel’s water level. The variation was granted on11 April 2003.

Page 61: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

57

Wellington coastalFully Complying Mainly Complying Partially Complying Non-Complying

266 34 10 89

Note: These numbers include permits for swing moorings, boatsheds and othercoastal and restricted coastal activities. These numbers do not include thosecoastal permits, which form part of a suite of consents for various projects,wastewater treatment plants, or global river consents.

During this financial year:

There were 399 coastal permits inspected in 2002/2003 (including the self-monitoring compliance of 162 swing moorings). In addition to this, 101 internalinspections of boatsheds were undertaken as well as external inspections of all 133boatsheds.

There was an increase in the percentage of coastal permits that were non-complying (up 8% from 2001/2002).

There was a decrease in the percentage of coastal permits that were fullycomplying (down 18% from 2001/2002).

Consents were given mainly complying due to late administration requirements andboatsheds that were unable to be internally inspected.

Non-compliance was issued primarily for swing mooring holders not submitting aninspection report (78 incidents) and boatshed owners (9 incidents) not using theirboatsheds for storing boats and ancillary equipment only.

Coastal compliance

66%9%

3%

22%

Fully Com plyingMainly ComplyingPartially Com plyingNon Com plying

Page 62: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

58

Swing mooring permit holders

There are currently 162 installed swing moorings in the Wellington region.Individual swing mooring owners are required to send the GWRC confirmation oftheir annual swing mooring inspection. This year 48% of swing mooring owners (71in total) sent us confirmation of their annual inspection and were fully complying,compared with the previous three years, where, 10% complied (in 1999/2000), and90% (in 2000/2001), and 70% complied (in 2001/2002).

52% of swing mooring holders (78 in total) did not submit confirmation of theirannual inspection, despite a reminder letter being sent.

*A list of all fully complying and non-complying swing mooring holders is set out in the attachedappendix 1.

Boatshed owners

There are 133 boatsheds in the Wellington region. This year, internal inspections ofthe boatsheds was carried out, in light of the Council’s decision to decline overnightstays, on 19 September 2000. Out of the 133 boatsheds, 32 were not able to beinspected internally, as owners were unable to be contacted. These boatsheds wererated mainly complying. From the 101 internal inspections completed, 91 were fullycomplying and 9 were non-complying. Those non-complying were owners not usingtheir boatsheds for storing boats and ancillary equipment.

External inspections, however, were carried out on all boatsheds to ensure that theyappeared in sound condition, that there were no apparent discharges to the coastalmarine area (CMA), and that public access was not impeded.

Swing mooring compliance

48%

52% Fully Complying

Non Complying

Page 63: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

59

Commendable compliance

Pauatahanui InletConsent Holder: Transit New Zealand Limited, Wellington Regional Office

WGN0100243 coastal permits

The construction of four seawalls along SH58, Pauatahanui Inlet, was completed inJune 2003.

At the time of the inspection, the consent holder was carrying out the works withminimal disturbance to the coastal marine area and was fully complying with allapplicable conditions of consent.

Whitireia ParkConsent Holder: Department of Conservation

WGN0200741 coastal permit

Erosion protection works were completed in August 2002. The works were carriedout in one day and all steps were taken to minimise any sedimentation andturbidity.

All works were carried out in the dry (i.e. no machinery was used on theforeshore). Geotextile was placed behind the rock rip-rap, to ensure integrity of theworks upon completion. The completed works blend in well with the surroundingforeshore area.

Boatshed compliance

91%

9%

Fully Complying

Non Complying

Page 64: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

60

Seaview MarinaConsent Holder: CentrePort LimitedContractor: Construction Techniques Ltd

WGN0300651 coastal permit

Repair works on the wharf were completed by February 2003. Dropsheets wereused as a dust mitigation measure to prevent blasting material and concrete piecesdischarging into the coastal marine area. At the time of the inspection, the consentholder was fully complying with all applicable conditions of consent.

Days BayConsent Holder: Hutt City CouncilContractor: Civil Design Services

WGN0101781 coastal permit

The walkway and associated works were completed in August 2002. Works werecarried out with minimal disturbance of the coastal marine area and the site was leftlooking neat and tidy. At the time of the inspection, the consent holder was fullycomplying with all applicable conditions of consent.

Compliance requiring improvement

Cook StraitConsent Holder: Transpower New Zealand Limited

WGN0300453 coastal permits

The cables were laid in November 2002. The consent holder was not complyingwith the consent conditions because a copy of the plan showing the precise locationof the cable on the seabed through the Region was not submitted to the GWRCwithin 90 days, which is in breach of condition 5 of each consent.

The first two quarterly visual inspection records of the coastal landing area had notbeen submitted in accordance with condition 16 of each consent.

Page 65: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

61

Wairarapa coastalFully Complying Mainly Complying Partially Complying Non-Complying

4 2 0 1

During this financial year:

Site inspections confirmed that most work was carried out in accordance with theconditions of consent. Construction processes were carried out in accordance withthe plans and as explained in assessment of environmental effects reports.

Commendable compliance

Palliser Bay RoadConsent Holder: South Wairarapa District Council

WAR0201414 coastal permits

For a boulder beach constructed to provide protection to the Palliser Bay Roadfrom southerly storms. A high standard of construction, and a well-managed sitethroughout the construction process.

Wairarapa coastal compliance

29%

14%57%

Fully ComplyingMainly ComplyingPartially ComplyingNon Complying

Page 66: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

62

Wellington roading, forestry and subdivisionFully Complying Mainly Complying Partially Complying Non-Complying

29 1 3 3

This section only covers compliance for the western part of the Region. Roading andforestry for the Wairarapa is included in their land use section. These numbersrepresent individual resource consents, not an overall rating for each project.

During this financial year:

There were more consents inspected this year compared to the 2001/2002compliance year (36 compared to 10 last year). The increase was due to severalmajor roading projects commencing during the 2002/2003 compliance year. Inaddition, a discharge permit is now required if an operator wishes to discharge thestorm water runoff from any area of bulk earthworks, which exceeds 0.3 hectares,into water (Regional Freshwater Plan change became operative on 9 February2002).

Consents were generally given mainly or partially complying due to lateadministration requirements, or a failure to notify GWRC of their intention tocommence work.

Non-complying ratings were issued mainly for breaches in conditions relating tosedimentation of streams and works not being in accordance with the application.

Roading, forestry and subdivision compliance

81%

3%8%8%

Fully Complying

Mainly Complying

Partially Complying

Non Complying

Page 67: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

63

Commendable compliance

Rimutaka Forest Park, 1025 Coast Road, Catchpool ValleyConsent Holder: Department of ConservationContractor: Rayonier New Zealand Limited

WGN0100433 land use consents

No logging took place between December 2002 and April 2003.

The roading component of the operation has been completed. The re-vegetation ofthe margins of the access road and the deforested areas are progressing nicely.

A small section of up slope batter had failed on the mid-level access road. TheDepartment of Conservation is aware of the instability of this section of road and istaking all practical steps to ensure no sediment enters the adjacent watercourse.

The Department of Conservation has complied with all its consents for theRimutaka Forest Park.

Kaitoke to Te Marua construction of State Highway 2Consent Holder: Transit New ZealandContractors: Higgins Contractors Ltd.Principal sub-contractor: Rick Goodman & Sons Ltd (bulk earthworks)Engineering consultant: Opus International Consultants

WGN0200181 water permit1 discharge permit to water and land2 land use consent

Construction of the new section of SH2 just north of Upper Hutt began in October2002 and is expected to be finished by spring 2004. A pivotal environmentalchallenge has been to prevent excess sediment and soil being washed from the siteand thence into valued receiving environments of Kaitoke Stream, and tributariesto the Hutt and Mangaroa Rivers. To protect the streams from silted runoff, thecontractors have created specifically designed silt ponds from which clean, silt-freewater is slowly siphoned off through a decanting structure at outlet of the pond.Extensive silt fences have also been installed at key locations. The stream diversionworks were installed in a manner to ensure passage for our native species of fish isoptimised.

The contractors have been proactive towards their environmental obligations, usedan independent environment consultant to monitor their compliance, and haveadopted a careful and well thought-out strategy to deal with erosion and sedimentcontrol issues. The contractors and the engineering consultants have made everyeffort to fully comply with the terms of Transit’s consents, and their degree ofcompliance to date is exemplary.

Page 68: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

64

Plimmerton to Paremata Upgrade of State Highway 1Consent Holder: Transit New ZealandContractors: Juno Civil Ltd – Paremata Bridge construction Higgins Contracting – Northern section construction.Engineering consultant: Beca Carter Hollings & Ferner Ltd

WGN970226 (01)-(15)3 water permits5 discharge permits to water and land1 discharge permit to air5 land use consents1 land use consent

WGN970226 (16)-(20)5 coastal permits

Paremata Bridge duplication (Stage 1) included constructing a new bridge acrossthe Pauatahanui inlet to carry northbound traffic, and building a new walkway andcycleway underneath each end of the two bridges. Four of the seven bridge spanswere completed in the 2002/2003 year with all the consented works completed to ahigh environmental standard. Non-compliance was issued for one breach inconditions relating to a silt discharge incident to Pauatahanui inlet. Furthermoreseveral small areas of reclamation that formed the new walkway and gabionprotection for the northern bridge abutments were, in GWRC’s opinion, outside thescope of the granted resource consents.

Works commenced on the Northern section (Stage 2) with about half of thedrainage works and widening on the eastern side of the highway completed. Thecontractor has fully complied with the terms of these consents.

Compliance requiring improvement

904 Grays Road, CamborneConsent Holder: Sunlink Development LimitedContractor: Hamish Wells Limited

WGN980081 (01)-(03)3 land use consents

During an investigation into an increase in the sediment loading of the TaupoStream following a complaint, it was found that the sediment and erosion controlmeasures deployed at the Grays Road site were inadequate.

The contractor undertaking the works altered the existing sediment retentionmeasures and took further precautions against the release of sediment from the siteinto Taupo Stream. The effectiveness of these measures had not been determinedprior to the end of the 2002/2003 compliance year.

Page 69: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

65

In addition, by 25 June 2003, the majority of the site had been seeded with areasonable take. This should minimise the entrainment of sediment into stormwater run-off from the site. The placement of fill in an ephemeral and permanentwetland, and the reclamation of an ephemeral stream are largely complete. Onlycleanup and maintenance requirements remain.

Page 70: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

66

Wellington enforcement summary

Prosecutions and enforcement ordersThere were no prosecutions or enforcement orders made during the 2002/2003compliance year.

Infringement noticesJuly 2002 - Infringement notice issued to a property owner on Akatarawa Road forplacing pipes and installing structures in the beds of two unnamed tributaries of theAkatarawa River.

August 2002 - Infringement notice issued to the Director of a hazardous wasteprocessing plant in Seaview for confirmed discharge of lime dust beyond theboundary of the property.

September 2002 - Infringement notice issued to a consultancy in Johnsonville forexcavating and disturbing an unnamed tributary of Pauatahanui Stream andinstalling a culvert extension and depositing cleanfill.

October 2002 - Infringement notice issued to a fish rendering company inGracefield for the generation of an odour confirmed offensive beyond the boundaryof the plant.

November 2002 - Infringement notice issued to a local authority for the dischargeof sewage effluent into the Waiwhetu Stream.

December 2002 - Infringement notice issued to a chemical waste disposal companyin Seaview, Lower Hutt for an offensive/objectionable odour confirmed beyond thesite boundary.

December 2002 - Infringement notice issued to a local authority for failing to coverthe refuse and waste at the Spicer Landfill with a suitable soil cover.

02468

10

AbatementNotices

InfringementNotices

Wellington enforcement action summary

Abatement NoticesInfringement Notices

Page 71: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

67

February 2003 - Infringement notice issued to a meat rendering company,Ngaraunga Gorge for an offensive/ objectionable odour beyond the boundary of theplant.

All of the above infringement notices have been paid. None of the notices wereappealed or objected to.

Abatement noticesJuly 2002 - Abatement notice served to a property owner in the Mangaroa Valleyfor the placement of a number of concrete blocks along the true right bank of theManagaroa River.

August 2002 - Abatement notices were served to four Camborne boatshed ownersfor the placement of an illegal structure in the coastal marine area.

August 2002 - Abatement notice served to a Camborne contractor for theconstruction of an illegal structure in the coastal marine area.

September 2002 - Abatement notice served to a restaurant in Pauatahanui forongoing non-compliance with consent conditions.

September 2002 - Abatement notice served to the Director of a plasticsmanufacturing plant in Porirua, for non-complying with condition 8 of its resourceconsent because the plant had expanded beyond the scope of which the consent wasoriginally authorised.

November 2002 - Abatement notice served to the Director of a landfill in HappyValley for failing to provide a required performance bond.

November 2002 Abatement notice served to a restaurant in Pauatahanui for anunsatisfactory response to the first abatement notice.

All, except for 2, of the above abatement notices issued were complied with. None ofthe abatement notices were appealed or objected to.

Page 72: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

68

Wairarapa enforcement summary

ProsecutionsOne prosecution was taken against a Carterton timber company for the discharge oftimber treatment chemical into a water body. The company was fined $12,000 pluscosts of $1,240.

Infringement noticesSeptember 2002, infringement notice served to a Carterton gravel company forexceeding the consented amount of gravel extracted from the Waingawa river. Thecompany paid the fee in September.

December 2002, two South Wairarapa dairy farmers were served infringementnotices for failing to manage their dairy effluent according to the consent. Theconsent covered two large herds being milked through the same shed, and involvedover 1500 cows. The farm had a history of non-compliance. The fees were paid inJanuary and February respectively.

April 2003, a Carterton dairy farmer was served an infringement notice for toppingup his groundwater irrigation take with surface water. The fee was paid in May.

May 2003, Carterton District Council was served an infringement notice for notcomplying with its resource consent for the discharge of sewage to the Mangatarerestream. The consent required that the discharge to water was to stop during summermonths. The fee was paid in May.

None of the notices were appealed or objected to.

Abatement noticesNote: All abatement notices stand (unless otherwise indicated).

November 2002, an abatement notice was served to a Carterton dairy farmer forfailing to comply with the consent to discharge dairy effluent. The consent was

0

2

4

6

8

10

Abat

emen

tN

otic

es

Infri

ngem

ent

Not

ices

Enfo

rcem

ent

Ord

ers

Pros

ecut

ions

Wairarapa enforcement action summary

Abatement NoticesInfringement NoticesEnforcement OrdersProsecutions

Page 73: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003

69

recently changed to a discharge to land, and when checked, there was still a minoroverflow to water. The problem has since been fixed.

December 2002, three abatement notices were served to three parties involved in aSouth Wairarapa dairy farm. The parties were two share milkers and the owner.The farm is an unusual situation, with two large herds being milked through thesame shed. The farm has subsequently been checked twice, and was complyingduring those visits.

March 2003, a notice was served on a South Wairarapa dairy farmer to requireinstallation of a water meter on the irrigation system.

March 2003, a notice was served on a Carterton dairy farmer to require installationof a water meter on the irrigation system.

March 2003, a notice was served on a Carterton dairy farmer to require installationof a water meter on the irrigation system.

March 2003 a notice was served on a Carterton dairy farmer to require installationof a water meter on the irrigation system.

March 2003, a notice was served on a South Wairarapa dairy farmer to requireinstallation of a water meter on the irrigation system.

April 2003 a notice was served on a South Wairarapa dairy farmer to requireinstallation of a water meter on the irrigation system.

April 2003, a Carterton dairy farmer was served a notice requiring the connectionof surface water to the groundwater irrigation to be removed. The channelconnecting the water systems has been blocked to prevent surface water beingtaken.

May 2003, notice issued to Carterton District Council giving until 1 January 2004to comply with the requirement under the consent to remove the discharge from theriver during summer months.

The suite of abatement notices served to dairy farmers requiring water meters wasGWRC’s last resort after repeated written and verbal requests failed to result in metersbeing installed. Follow up of these notices is still occurring.

None of these notices served during the year were appealed or objected to.

Page 74: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

App

endi

x 1

- Wel

lingt

on c

ompl

ianc

eLa

ndfil

ls

File

Ref

eren

ceC

onse

nt H

olde

rA

ctiv

ity T

ype

Com

plia

nce

Rat

ing

Proj

ect T

itle

WG

N94

0057

01Bu

rrell

Dem

oliti

on L

tdLa

ndfil

l Dis

char

gePa

rtial

ly C

ompl

ying

Burre

lls L

andf

illW

GN

9501

4003

Wel

lingt

on C

ity C

ounc

ilD

isch

arge

To

Air

Fully

Com

plyi

ngC

lose

d La

ndfil

lW

GN

0200

84Se

asid

e H

aven

Lim

ited

Land

fill D

isch

arge

Non

Com

plyi

ngC

lose

d La

ndfil

lW

GN

9501

4002

Wel

lingt

on C

ity C

ounc

ilD

isch

arge

To

Air

Fully

Com

plyi

ngC

lose

d La

ndfil

lW

GN

9501

4001

Wel

lingt

on C

ity C

ounc

ilD

isch

arge

To

Air

Fully

Com

plyi

ngC

lose

d La

ndfil

lW

GN

0000

48W

ellin

gton

City

Cou

ncil

Land

fill D

isch

arge

Non

Com

plyi

ngC

lose

d La

ndfil

lW

GN

9301

4001

Wel

lingt

on C

ity C

ounc

ilD

isch

arge

To

Air

Fully

Com

plyi

ngN

orth

ern

Land

fill

WG

N93

0143

01W

ellin

gton

City

Cou

ncil

Riv

er/S

tream

Div

ersi

onFu

lly C

ompl

ying

Nor

ther

n La

ndfil

lW

GN

9301

4201

Wel

lingt

on C

ity C

ounc

ilD

isch

arge

To

Air

Mai

nly

Com

plyi

ngN

orth

ern

Land

fill

WG

N94

0124

01W

ellin

gton

City

Cou

ncil

Take

Fully

Com

plyi

ngN

orth

ern

Land

fill

WG

N93

0144

01W

ellin

gton

City

Cou

ncil

Take

Fully

Com

plyi

ngN

orth

ern

Land

fill

WG

N93

0177

04Ka

piti

Coa

st D

istri

ct C

ounc

ilR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngO

taih

anga

Lan

dfill

WG

N93

0177

02Ka

piti

Coa

st D

istri

ct C

ounc

ilD

isch

arge

To

Air

Non

Com

plyi

ngO

taih

anga

Lan

dfill

WG

N93

0177

01Ka

piti

Coa

st D

istri

ct C

ounc

ilLa

ndfil

l Dis

char

geN

on C

ompl

ying

Ota

ihan

ga L

andf

illW

GN

9301

7707

Kapi

ti C

oast

Dis

trict

Cou

ncil

Take

Fully

Com

plyi

ngO

taih

anga

Lan

dfill

WG

N93

0177

05Ka

piti

Coa

st D

istri

ct C

ounc

ilLa

ndfil

l Dis

char

geFu

lly C

ompl

ying

Ota

ihan

ga L

andf

illW

GN

9301

7703

Kapi

ti C

oast

Dis

trict

Cou

ncil

Land

fill D

isch

arge

Fully

Com

plyi

ngO

taih

anga

Lan

dfill

WG

N93

0179

02Ka

piti

Coa

st D

istri

ct C

ounc

ilD

isch

arge

To

Air

Fully

Com

plyi

ngO

taki

Lan

dfill

WG

N93

0179

05Ka

piti

Coa

st D

istri

ct C

ounc

ilLa

ndfil

l Dis

char

geFu

lly C

ompl

ying

Ota

ki L

andf

illW

GN

9301

7904

Kapi

ti C

oast

Dis

trict

Cou

ncil

Land

fill D

isch

arge

Fully

Com

plyi

ngO

taki

Lan

dfill

WG

N93

0179

03Ka

piti

Coa

st D

istri

ct C

ounc

ilR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngO

taki

Lan

dfill

WG

N93

0165

01M

ight

y R

iver

Pow

erD

isch

arge

To

Air

Fully

Com

plyi

ngSi

lver

stre

am L

andf

illW

GN

9701

6404

The

Hut

t City

Cou

ncil

Dis

char

ge T

o Ai

rFu

lly C

ompl

ying

Silv

erst

ream

Lan

dfill

WG

N97

0164

02Th

e H

utt C

ity C

ounc

ilLa

ndfil

l Dis

char

geFu

lly C

ompl

ying

Silv

erst

ream

Lan

dfill

WG

N97

0164

01Th

e H

utt C

ity C

ounc

ilLa

ndfil

l Dis

char

geFu

lly C

ompl

ying

Silv

erst

ream

Lan

dfill

WG

N97

0164

08Th

e H

utt C

ity C

ounc

ilD

amFu

lly C

ompl

ying

Silv

erst

ream

Lan

dfill

WG

N98

0122

01Th

e H

utt C

ity C

ounc

ilEa

rthw

ork

Fully

Com

plyi

ngSi

lver

stre

am L

andf

illW

GN

9701

6403

The

Hut

t City

Cou

ncil

Land

fill D

isch

arge

Fully

Com

plyi

ngSi

lver

stre

am L

andf

illW

GN

9701

6405

The

Hut

t City

Cou

ncil

Riv

er/S

tream

Div

ersi

onFu

lly C

ompl

ying

Silv

erst

ream

Lan

dfill

WG

N97

0164

06Th

e H

utt C

ity C

ounc

ilR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngSi

lver

stre

am L

andf

illW

GN

9701

6407

The

Hut

t City

Cou

ncil

Take

Fully

Com

plyi

ngSi

lver

stre

am L

andf

illW

GN

9400

4503

Wel

lingt

on C

ity C

ounc

ilR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngSo

uthe

rn L

andf

illW

GN

9401

1201

Nov

a G

as L

tdD

isch

arge

To

Air

Fully

Com

plyi

ngSo

uthe

rn L

andf

illW

GN

9400

4501

Wel

lingt

on C

ity C

ounc

ilLa

ndfil

l Dis

char

geFu

lly C

ompl

ying

Sout

hern

Lan

dfill

WG

N94

0045

02W

ellin

gton

City

Cou

ncil

Dis

char

ge T

o Ai

rFu

lly C

ompl

ying

Sout

hern

Lan

dfill

WG

N94

0045

04W

ellin

gton

City

Cou

ncil

Take

Fully

Com

plyi

ngSo

uthe

rn L

andf

illW

GN

9702

5402

Wel

lingt

on C

ity C

ounc

ilD

isch

arge

To

Air

Fully

Com

plyi

ngSo

uthe

rn L

andf

illW

GN

9702

5401

Wel

lingt

on C

ity C

ounc

ilSe

wag

e D

isch

arge

Fully

Com

plyi

ngSo

uthe

rn L

andf

illW

GN

9702

3301

Wel

lingt

on C

ity C

ounc

ilIn

dust

rial W

aste

Dis

char

geFu

lly C

ompl

ying

Sout

hern

Lan

dfill

WG

N96

0003

01N

ova

Gas

Ltd

Dis

char

ge T

o Ai

rFu

lly C

ompl

ying

Spic

er L

andf

illW

GN

9400

4604

Porir

ua C

ity C

ounc

ilTa

keFu

lly C

ompl

ying

Spic

er L

andf

illW

GN

9400

4603

Porir

ua C

ity C

ounc

ilR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngSp

icer

Lan

dfill

Page 75: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

WG

N94

0046

02Po

rirua

City

Cou

ncil

Dis

char

ge T

o Ai

rN

on C

ompl

ying

Spic

er L

andf

illW

GN

9400

4601

Porir

ua C

ity C

ounc

ilLa

ndfil

l Dis

char

geN

on C

ompl

ying

Spic

er L

andf

illW

GN

9900

1601

T &

T La

ndfil

ls L

imite

dEa

rthw

ork

Fully

Com

plyi

ngT

& T

Land

fill

WG

N97

0047

04T

& T

Land

fills

Lim

ited

Dam

Non

Com

plyi

ngT

& T

Land

fill

WG

N97

0047

05T

& T

Land

fills

Lim

ited

Land

fill D

isch

arge

Non

Com

plyi

ngT

& T

Land

fill

WG

N97

0047

01T

& T

Land

fills

Lim

ited

Land

fill D

isch

arge

Fully

Com

plyi

ngT

& T

Land

fill

WG

N99

0016

02T

& T

Land

fills

Lim

ited

Earth

wor

kFu

lly C

ompl

ying

T &

T La

ndfil

lW

GN

9700

4706

T &

T La

ndfil

ls L

imite

dD

isch

arge

To

Air

Fully

Com

plyi

ngT

& T

Land

fill

WG

N97

0047

02T

& T

Land

fills

Lim

ited

Riv

er/S

tream

Div

ersi

onN

on C

ompl

ying

T &

T La

ndfil

lW

GN

9900

1603

T &

T La

ndfil

ls L

imite

dVe

geta

tion

Rem

oval

Fully

Com

plyi

ngT

& T

Land

fill

WG

N97

0047

03T

& T

Land

fills

Lim

ited

Dam

Non

Com

plyi

ngT

& T

Land

fill

WG

N02

0073

T &

T La

ndfil

ls L

imite

dD

isch

arge

To

Air

Fully

Com

plyi

ngT

& T

Land

fill

WG

N93

0178

02Ka

piti

Coa

st D

istri

ct C

ounc

ilD

isch

arge

To

Air

Fully

Com

plyi

ngW

aika

nae

Land

fill

WG

N93

0178

01Ka

piti

Coa

st D

istri

ct C

ounc

ilLa

ndfil

l Dis

char

geN

on C

ompl

ying

Wai

kana

e La

ndfil

lW

GN

9301

7803

Kapi

ti C

oast

Dis

trict

Cou

ncil

Riv

er/S

tream

Div

ersi

onFu

lly C

ompl

ying

Wai

kana

e La

ndfil

lW

GN

9301

7806

Kapi

ti C

oast

Dis

trict

Cou

ncil

Take

Non

Com

plyi

ngW

aika

nae

Land

fill

WG

N93

0178

04Ka

piti

Coa

st D

istri

ct C

ounc

ilLa

ndfil

l Dis

char

geFu

lly C

ompl

ying

Wai

kana

e La

ndfil

lW

GN

9301

7805

Kapi

ti C

oast

Dis

trict

Cou

ncil

Land

fill D

isch

arge

Non

Com

plyi

ngW

aika

nae

Land

fill

WG

N95

0052

10Th

e H

utt C

ity C

ounc

ilSt

ream

Wor

kFu

lly C

ompl

ying

Wai

nuio

mat

a La

ndfil

lW

GN

9500

5203

The

Hut

t City

Cou

ncil

Land

fill D

isch

arge

Fully

Com

plyi

ngW

ainu

iom

ata

Land

fill

WG

N95

0052

02Th

e H

utt C

ity C

ounc

ilLa

ndfil

l Dis

char

geN

on C

ompl

ying

Wai

nuio

mat

a La

ndfil

lW

GN

9500

5204

The

Hut

t City

Cou

ncil

Dis

char

ge T

o Ai

rFu

lly C

ompl

ying

Wai

nuio

mat

a La

ndfil

lW

GN

9500

5205

The

Hut

t City

Cou

ncil

Riv

er/S

tream

Div

ersi

onFu

lly C

ompl

ying

Wai

nuio

mat

a La

ndfil

lW

GN

9500

5206

The

Hut

t City

Cou

ncil

Riv

er/S

tream

Div

ersi

onFu

lly C

ompl

ying

Wai

nuio

mat

a La

ndfil

lW

GN

9500

5208

The

Hut

t City

Cou

ncil

Take

Fully

Com

plyi

ngW

ainu

iom

ata

Land

fill

WG

N00

0182

The

Hut

t City

Cou

ncil

Land

fill D

isch

arge

Non

Com

plyi

ngW

ainu

iom

ata

Land

fill

WG

N95

0052

07Th

e H

utt C

ity C

ounc

ilD

amFu

lly C

ompl

ying

Wai

nuio

mat

a La

ndfil

lW

GN

9500

5201

The

Hut

t City

Cou

ncil

Land

fill D

isch

arge

Fully

Com

plyi

ngW

ainu

iom

ata

Land

fill

WG

N95

0052

09Th

e H

utt C

ity C

ounc

ilEa

rthw

ork

Fully

Com

plyi

ngW

ainu

iom

ata

Land

fill

Page 76: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

Dis

char

ges

to a

ir

File

Ref

eren

ceC

onse

nt H

olde

rA

ctiv

ity T

ype

Com

plia

nce

Rat

ing

Proj

ect T

itle

WG

N00

0004

Allie

d M

ilbur

n Lt

dM

iner

al P

roce

sses

Fully

Com

plyi

ngW

GN

0000

43Se

rco

Proj

ect E

ngin

eerin

g Lt

d.Ab

rasi

ve B

last

ing

Fully

Com

plyi

ngW

GN

0001

10N

Z G

alva

nisi

ng L

imite

dM

anuf

actu

ring

Fully

Com

plyi

ngW

GN

0001

28Ex

ide

New

Zea

land

Lim

ited

Man

ufac

turin

gPa

rtial

ly C

ompl

ying

WG

N00

0185

Mah

aki H

oldi

ngs

Ltd

Was

te D

ispo

sal

Fully

Com

plyi

ngW

GN

0001

89Ex

ide

New

Zea

land

Lim

ited

Man

ufac

turin

gM

ainl

y C

ompl

ying

WG

N00

0196

Tele

com

New

Zea

land

Ltd

Inci

nera

tor

Fully

Com

plyi

ngW

GN

0100

19H

arbo

ur C

ity F

uner

al H

ome

Lim

ited

Inci

nera

tor

Fully

Com

plyi

ngW

GN

0100

39Al

lied

Milb

urn

Ltd

Min

eral

Pro

cess

esFu

lly C

ompl

ying

WG

N01

0064

Col

gate

-Pal

mol

ive

Lim

ited

Man

ufac

turin

gFu

lly C

ompl

ying

WG

N01

0067

Build

ing

Res

earc

h As

sn o

f NZ

Inci

nera

tor

Fully

Com

plyi

ngW

GN

0100

91G

ee a

nd H

ickt

on L

tdIn

cine

rato

rFu

lly C

ompl

ying

WG

N01

0111

Wel

lingt

on C

ity C

ounc

ilIn

cine

rato

rFu

lly C

ompl

ying

WG

N01

0137

Porir

ua C

ity C

ounc

ilIn

cine

rato

rFu

lly C

ompl

ying

WG

N01

0163

Wel

lingt

on R

egio

nal C

ounc

ilM

isce

llane

ous

Fully

Com

plyi

ngW

GN

0102

23Vi

ta N

ew Z

eala

nd L

imite

dM

anuf

actu

ring

Non

Com

plyi

ngW

GN

0102

26Ly

chga

te F

uner

al s

ervi

ce L

imite

dIn

cine

rato

rFu

lly C

ompl

ying

WG

N02

0118

Gol

den

Bay

Cem

ent

Min

eral

Pro

cess

esFu

lly C

ompl

ying

WG

N02

0179

Uni

ted

Envi

ronm

enta

l Ltd

Mis

cella

neou

sN

on C

ompl

ying

WG

N02

0182

Alst

om H

utt W

orks

hop

Abra

sive

Bla

stin

gFu

lly C

ompl

ying

WG

N03

0002

Firth

Indu

strie

sM

anuf

actu

ring

Fully

Com

plyi

ngW

GN

0300

35M

& M

Con

stru

ctio

nM

isce

llane

ous

Fully

Com

plyi

ngW

GN

0300

44Br

oadc

ast C

omm

unic

atio

ns L

tdAb

rasi

ve B

last

ing

Fully

Com

plyi

ngW

GN

0300

60N

Z Fi

sh P

rodu

cts

Anim

al a

nd P

lant

Fully

Com

plyi

ngW

GN

9300

8701

Hut

t Val

ley

Hea

lthIn

cine

rato

rFu

lly C

ompl

ying

WG

N94

0116

01G

race

field

Man

ufac

turin

g Pl

ant

Man

ufac

turin

gFu

lly C

ompl

ying

WG

N94

0127

01M

obil

Oil

(NZ)

Lim

ited

Abra

sive

Bla

stin

gFu

lly C

ompl

ying

WG

N94

0128

01Fe

ltex

Rub

ber L

imite

dM

anuf

actu

ring

Fully

Com

plyi

ngW

GN

9401

3001

Fulto

n H

ogan

Wel

lingt

onM

iner

al P

roce

sses

Non

Com

plyi

ngW

GN

9401

53Pa

cific

Wal

lcov

erin

g Lt

dM

anuf

actu

ring

Non

Com

plyi

ngW

GN

9500

0501

Pave

men

ts (W

gtn)

Lim

ited

Min

eral

Pro

cess

esN

on C

ompl

ying

WG

N95

0150

01Ta

ylor

Pre

ston

Ltd

Anim

al a

nd P

lant

Non

Com

plyi

ngW

GN

9501

5601

Dul

ux N

ew Z

eala

ndM

anuf

actu

ring

Non

Com

plyi

ngW

GN

9501

5701

Uni

leve

r New

Zea

land

Ltd

Man

ufac

turin

gM

ainl

y C

ompl

ying

WG

N96

0025

01H

orok

iwi Q

uarri

es L

imite

dM

iner

al P

roce

sses

Fully

Com

plyi

ngW

GN

9600

2701

Firth

Indu

strie

s Li

mite

d Be

lmon

tM

iner

al P

roce

sses

Fully

Com

plyi

ngW

GN

9600

4801

Sche

ring-

Plou

gh A

nim

al H

ealth

Inci

nera

tor

Fully

Com

plyi

ngW

GN

9600

6601

Win

ston

e Ag

greg

ates

Min

eral

Pro

cess

esFu

lly C

ompl

ying

WG

N96

0069

Sout

h Pa

cific

Tyr

esM

anuf

actu

ring

Mai

nly

Com

plyi

ngW

GN

9600

8701

Sche

ring-

Plou

gh A

nim

al H

ealth

Anim

al a

nd P

lant

Mai

nly

Com

plyi

ngW

GN

9700

2901

Stea

m &

San

d Li

mite

dAb

rasi

ve B

last

ing

Non

Com

plyi

ngW

GN

9700

3801

New

Zea

land

Pas

tora

l Agr

icul

ture

Inci

nera

tor

Fully

Com

plyi

ngW

GN

9701

17C

ryov

ac/S

eale

d Ai

r (N

Z) L

imite

dM

anuf

actu

ring

Non

Com

plyi

ngW

GN

9800

3001

Hol

cim

New

Zea

land

Ltd

Min

eral

Pro

cess

esFu

lly C

ompl

ying

WG

N98

0086

01Fi

rth In

dust

ries

Lim

ited

Min

eral

Pro

cess

esFu

lly C

ompl

ying

Page 77: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

WG

N98

0198

02M

iram

ar G

olf C

lub

Was

te D

ispo

sal

Fully

Com

plyi

ngW

GN

9900

47C

hem

was

te In

dust

ries(

Wel

lingt

on)L

tdW

aste

Dis

posa

lN

on C

ompl

ying

WG

N99

0211

01Ac

me

Engi

neer

ing

Lim

ited

Abra

sive

Bla

stin

gFu

lly C

ompl

ying

WG

N99

0213

03H

orok

iwi Q

uarri

es L

imite

dM

iner

al P

roce

sses

Fully

Com

plyi

ngW

GN

9902

4201

Kapi

ti C

oast

Dis

trict

Cou

ncil

Was

te D

ispo

sal

Mai

nly

Com

plyi

ngW

GN

9902

4301

Mon

roe

Sprin

gs (N

Z) L

tdM

anuf

actu

ring

Fully

Com

plyi

ng

Page 78: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

Was

tew

ater

trea

tmen

t pla

nts

File

Ref

eren

ceC

onse

nt H

olde

rA

ctiv

ity T

ype

Com

plia

nce

Rat

ing

Proj

ect T

itle

WG

N00

0039

Angl

ian

Wat

er In

tern

atio

nal

Dis

char

ge to

Air

Fully

Com

plyi

ngAW

I Was

tew

ater

Dew

ater

ing

Plan

tW

GN

9300

69W

ellin

gton

City

Cou

ncil

Dis

char

ge to

Air

Fully

Com

plyi

ngAW

I Was

tew

ater

Dew

ater

ing

Plan

tW

GN

9600

0208

The

Hut

t City

Cou

ncil

Sew

age

Dis

char

geN

on C

ompl

ying

Hut

t Was

tew

ater

Tre

atm

ent P

roje

ctW

GN

9600

0203

The

Hut

t City

Cou

ncil

Sew

age

Dis

char

geFu

lly C

ompl

ying

Hut

t Was

tew

ater

Tre

atm

ent P

roje

ctW

GN

9600

0207

The

Hut

t City

Cou

ncil

Sew

age

Dis

char

geFu

lly C

ompl

ying

Hut

t Was

tew

ater

Tre

atm

ent P

roje

ctW

GN

9600

0204

The

Hut

t City

Cou

ncil

Sew

age

Dis

char

geN

on C

ompl

ying

Hut

t Was

tew

ater

Tre

atm

ent P

roje

ctW

GN

0101

01H

utt C

ity C

ounc

ilSe

wag

e D

isch

arge

Non

Com

plyi

ngH

utt W

aste

wat

er T

reat

men

t Pro

ject

WG

N96

0002

01Th

e H

utt C

ity C

ounc

ilSe

wag

e D

isch

arge

Fully

Com

plyi

ngH

utt W

aste

wat

er T

reat

men

t Pro

ject

WG

N96

0002

02Th

e H

utt C

ity C

ounc

ilSe

wag

e D

isch

arge

Fully

Com

plyi

ngH

utt W

aste

wat

er T

reat

men

t Pro

ject

WG

N93

0193

01Th

e H

utt C

ity C

ounc

ilD

isch

arge

to A

irFu

lly C

ompl

ying

Hut

t Was

tew

ater

Tre

atm

ent P

roje

ctW

GN

9501

6202

Hut

t City

Cou

ncil

Dis

char

ge to

Air

Non

Com

plyi

ngH

utt W

aste

wat

er T

reat

men

t Pro

ject

WG

N95

0049

01Th

e H

utt C

ity C

ounc

ilD

isch

arge

to A

irFu

lly C

ompl

ying

Hut

t Was

tew

ater

Tre

atm

ent P

roje

ctW

GN

9301

9302

The

Hut

t City

Cou

ncil

Dis

char

ge to

Air

Fully

Com

plyi

ngH

utt W

aste

wat

er T

reat

men

t Pro

ject

WG

N95

0162

01Th

e H

utt C

ity C

ounc

ilD

isch

arge

to A

irFu

lly C

ompl

ying

Hut

t Was

tew

ater

Tre

atm

ent P

roje

ctW

GN

9501

6203

Hut

t City

Cou

ncil

Sew

age

Dis

char

geN

on C

ompl

ying

Hut

t Was

tew

ater

Tre

atm

ent P

roje

ctW

GN

9600

9401

Angl

ian

Wat

er In

tern

atio

nal

Dis

char

ge to

Air

Non

Com

plyi

ngM

oa P

oint

Was

tew

ater

Tre

atm

ent P

lant

WG

N91

0096

Wel

lingt

on C

ity C

ounc

ilD

isch

arge

to A

irFu

lly C

ompl

ying

Moa

Poi

nt W

aste

wat

er T

reat

men

t Pla

ntW

GN

9000

25W

ellin

gton

City

Cou

ncil

Sew

age

Dis

char

geFu

lly C

ompl

ying

Moa

Poi

nt W

aste

wat

er T

reat

men

t Pla

ntW

GN

9500

3502

Kapi

ti C

oast

Dis

trict

Cou

ncil

Dis

char

ge to

Air

Fully

Com

plyi

ngO

taki

Was

tew

ater

Tre

atm

ent P

lant

WG

N95

0035

03Ka

piti

Coa

st D

istri

ct C

ounc

ilD

isch

arge

to A

irFu

lly C

ompl

ying

Ota

ki W

aste

wat

er T

reat

men

t Pla

ntW

GN

9500

3501

Kapi

ti C

oast

Dis

trict

Cou

ncil

Sew

age

Dis

char

geN

on C

ompl

ying

Ota

ki W

aste

wat

er T

reat

men

t Pla

ntW

GN

9702

5502

Kapi

ti C

oast

Dis

trict

Cou

ncil

Dis

char

ge to

Air

Fully

Com

plyi

ngPa

rapa

raum

u W

aste

wat

er T

reat

men

t Pla

ntW

GN

9702

5504

Kapi

ti C

oast

Dis

trict

Cou

ncil

Sew

age

Dis

char

geFu

lly C

ompl

ying

Para

para

umu

Was

tew

ater

Tre

atm

ent P

lant

WG

N97

0255

05Ka

piti

Coa

st D

istri

ct C

ounc

ilSe

wag

e D

isch

arge

Fully

Com

plyi

ngPa

rapa

raum

u W

aste

wat

er T

reat

men

t Pla

ntW

GN

9702

5503

Kapi

ti C

oast

Dis

trict

Cou

ncil

Sew

age

Dis

char

geFu

lly C

ompl

ying

Para

para

umu

Was

tew

ater

Tre

atm

ent P

lant

WG

N98

0083

03Po

rirua

City

Cou

ncil

Out

fall/

Inta

ke S

truct

ure

Fully

Com

plyi

ngPo

rirua

Was

tew

ater

Tre

atm

ent P

lant

WG

N98

0083

02Po

rirua

City

Cou

ncil

Dis

char

ge to

Air

Fully

Com

plyi

ngPo

rirua

Was

tew

ater

Tre

atm

ent P

lant

WG

N98

0083

01Po

rirua

City

Cou

ncil

Sew

age

Dis

char

geFu

lly C

ompl

ying

Porir

ua W

aste

wat

er T

reat

men

t Pla

ntW

GN

0201

59H

utt C

ity C

ounc

ilC

onta

min

ated

Site

Dis

char

geFu

lly C

ompl

ying

Wai

nuio

mat

a W

aste

wat

er T

reat

men

t Pla

ntW

GN

9900

8402

Hut

t City

Cou

ncil

Dis

char

ge to

Air

Fully

Com

plyi

ngW

ainu

iom

ata

Was

tew

ater

Tre

atm

ent P

lant

WG

N99

0084

03Th

e H

utt C

ity C

ounc

ilSe

wag

e D

isch

arge

Fully

Com

plyi

ngW

ainu

iom

ata

Was

tew

ater

Tre

atm

ent P

lant

WG

N02

0236

Wel

lingt

on C

ity C

ounc

ilO

utfa

ll/In

take

Stru

ctur

eFu

lly C

ompl

ying

Wes

tern

Was

tew

ater

Tre

atm

ent P

lant

WG

N89

0009

01W

ellin

gton

City

Cou

ncil

Sew

age

Dis

char

geFu

lly C

ompl

ying

Wes

tern

Was

tew

ater

Tre

atm

ent P

lant

WG

N01

0133

Wel

lingt

on C

ity C

ounc

ilSe

wag

e D

isch

arge

Fully

Com

plyi

ngW

este

rn W

aste

wat

er T

reat

men

t Pla

ntW

GN

9201

3801

Wel

lingt

on C

ity C

ounc

ilD

isch

arge

to A

irFu

lly C

ompl

ying

Wes

tern

Was

tew

ater

Tre

atm

ent P

lant

Page 79: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

Agr

icul

tura

l dis

char

ges

File

Ref

eren

ceC

onse

nt H

olde

rA

ctiv

ity T

ype

Com

plia

nce

Rat

ing

Proj

ect T

itle

WG

N98

0064

01K

J W

alke

rD

airy

Fully

Com

plyi

ngW

GN

9800

6501

Sand

yhill

Partn

ersh

ipD

airy

Non

Com

plyi

ngW

GN

9900

5801

Tom

A E

mps

onD

airy

Fully

Com

plyi

ngW

GN

9901

0101

Ian

Hut

ton

Dai

ryFu

lly C

ompl

ying

WG

N01

0203

NB

and

C E

verto

nD

airy

Non

Com

plyi

ngW

GN

0200

79Ai

leen

Ram

sbot

tom

Dai

ryFu

lly C

ompl

ying

WG

N00

0136

E W

& J

Sim

sD

airy

Fully

Com

plyi

ngW

GN

9901

0401

Gab

ites

Pigs

Far

ms

Ltd

Pigg

ery

Non

Com

plyi

ngW

GN

9900

1701

Willi

am H

unt

Dai

ryFu

lly C

ompl

ying

WG

N00

0104

Wak

apua

Far

m L

imite

dD

airy

Fully

Com

plyi

ngW

GN

9902

0401

B G

Tur

ksm

aD

airy

Fully

Com

plyi

ngW

GN

9900

6101

P C

& H

Wils

onD

airy

Non

Com

plyi

ngW

GN

0001

75O

taki

& P

oriru

a Tr

ust B

oard

Dai

ryFu

lly C

ompl

ying

WG

N99

0031

01D

H R

obin

son

Dai

ryFu

lly C

ompl

ying

WG

N99

0157

01J

Spie

rsD

airy

Fully

Com

plyi

ngW

GN

0200

50M

ourie

s M

eado

ws

Lim

ited

Dai

ryPa

rtial

ly C

ompl

ying

WG

N00

0031

Tini

No2

Tru

stD

airy

Fully

Com

plyi

ngW

GN

9900

5901

Ow

en &

Chr

istin

e Bu

rrell

Dai

ryFu

lly C

ompl

ying

WG

N98

0095

Ota

ki &

Por

irua

Trus

t Boa

rdD

airy

Non

Com

plyi

ng

Page 80: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

Mis

cella

neou

s di

scha

rges

File

Ref

eren

ceC

onse

nt H

olde

rA

ctiv

ity T

ype

Com

plia

nce

Rat

ing

Proj

ect T

itle

WG

N02

0197

Wel

lingt

on R

egio

nal C

ounc

ilAg

riche

mic

al D

isch

arge

Fully

Com

plyi

ngW

GN

0102

27W

ellin

gton

Reg

iona

l Cou

ncil

Indu

stria

l Was

te D

isch

arge

Fully

Com

plyi

ngW

GN

9600

6102

Stre

sscr

ete

Ota

kiSe

wag

e D

isch

arge

Fully

Com

plyi

ngW

GN

9701

0901

Rus

hes

Lim

ited

Sew

age

Dis

char

geN

on C

ompl

ying

WG

N00

0185

Mah

aki H

oldi

ngs

Ltd

Sew

age

Dis

char

geN

on C

ompl

ying

WG

N03

0091

Livi

ng E

arth

Lim

ited

Sew

age

Dis

char

geFu

lly C

ompl

ying

WG

N95

0191

01W

ellin

gton

Reg

iona

l Cou

ncil

Sew

age

Dis

char

geFu

lly C

ompl

ying

WG

N95

0191

02W

ellin

gton

Reg

iona

l Cou

ncil

Sew

age

Dis

char

geFu

lly C

ompl

ying

WG

N95

0191

05W

ellin

gton

Reg

iona

l Cou

ncil

Sew

age

Dis

char

geFu

lly C

ompl

ying

WG

N95

0191

06W

ellin

gton

Reg

iona

l Cou

ncil

Sew

age

Dis

char

geFu

lly C

ompl

ying

WG

N95

0191

07W

ellin

gton

Reg

iona

l Cou

ncil

Sew

age

Dis

char

geFu

lly C

ompl

ying

WG

N98

0248

01W

ellin

gton

Reg

iona

l Cou

ncil

Sew

age

Dis

char

geFu

lly C

ompl

ying

WG

N97

0121

02Sa

lvat

ion

Arm

y Pr

oper

ty T

rust

Sew

age

Dis

char

geM

ainl

y C

ompl

ying

WG

N99

0248

01B

Van

De

Wer

ffSe

wag

e D

isch

arge

Fully

Com

plyi

ngW

GN

9901

8303

Mer

idia

n En

ergy

Ltd

Sew

age

Dis

char

geFu

lly C

ompl

ying

WG

N00

0005

Mar

k &

Fion

a R

amm

ell

Sew

age

Dis

char

geFu

lly C

ompl

ying

WG

N98

0240

Win

ston

e Ag

greg

ates

Sew

age

Dis

char

geN

on C

ompl

ying

WG

N02

0159

Hut

t City

Cou

ncil

Sew

age

Dis

char

geFu

lly C

ompl

ying

WG

N95

0173

01W

ellin

gton

City

Cou

ncil

Sew

age

Dis

char

geN

on C

ompl

ying

WG

N96

0074

01Br

enda

n Sp

ence

rSe

wag

e D

isch

arge

Non

Com

plyi

ngW

GN

9900

1501

Jenn

y Le

eSe

wag

e D

isch

arge

Fully

Com

plyi

ngW

GN

9801

98M

iram

ar G

olf C

lub

Sew

age

Dis

char

geN

on C

ompl

ying

WG

N01

0202

Build

ing

Res

earc

h As

sn o

f NZ

Sew

age

Dis

char

geFu

lly C

ompl

ying

WG

N95

0164

01W

inst

one

Aggr

egat

esSe

wag

e D

isch

arge

Fully

Com

plyi

ngW

GN

9902

1301

Hor

okiw

i Qua

rries

Lim

ited

Sew

age

Dis

char

geFu

lly C

ompl

ying

WG

N01

0150

Wel

lingt

on R

egio

nal C

ounc

ilSe

wag

e D

isch

arge

Non

Com

plyi

ngW

GN

9501

0102

Kapi

ti C

oast

Dis

trict

Cou

ncil

Indu

stria

l Was

te D

isch

arge

Fully

Com

plyi

ng

Page 81: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

Wat

er tr

eatm

ent p

lant

s an

d w

ater

per

mits

File

Ref

eren

ceC

onse

nt H

olde

rA

ctiv

ity T

ype

Com

plia

nce

Rat

ing

Proj

ect T

itle

WG

N02

0178

Eber

hard

Deu

ssD

amFu

lly C

ompl

ying

WG

N03

0046

Hut

t City

Cou

ncil

Riv

er/S

tream

Div

ersi

onFu

lly C

ompl

ying

WG

N03

0074

Wel

lingt

on R

egio

nal C

ounc

ilR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngW

GN

0200

98H

utt C

ity C

ounc

ilR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngW

GN

0301

08Se

lwyn

Fea

ryR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngW

GN

0301

15W

ellin

gton

City

Cou

ncil

Riv

er/S

tream

Div

ersi

onM

ainl

y C

ompl

ying

WG

N01

0088

Futu

na T

rust

Lim

ited

Riv

er/S

tream

Div

ersi

onFu

lly C

ompl

ying

WG

N01

0088

Futu

na T

rust

Lim

ited

Riv

er/S

tream

Div

ersi

onN

on C

ompl

ying

WG

N02

0081

Law

ton

Fina

ncia

l Ser

vice

sR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngW

GN

0201

19C

raig

She

pher

dR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngW

GN

0201

16H

utt C

ity C

ounc

ilR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngW

GN

0301

31G

abite

s Pi

gs F

arm

s Lt

dR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngW

GN

0201

78Eb

erha

rd D

euss

Riv

er/S

tream

Div

ersi

onFu

lly C

ompl

ying

WG

N03

0023

Broo

klyn

Hol

ding

s Lt

dR

iver

/Stre

am D

iver

sion

Non

Com

plyi

ngW

GN

0300

23Br

ookl

yn H

oldi

ngs

Ltd

Riv

er/S

tream

Div

ersi

onN

on C

ompl

ying

WG

N01

0229

Anth

ony

War

ren

Mor

risse

yR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngW

GN

0302

61W

RC

Inte

rnal

Riv

er/S

tream

Div

ersi

onFu

lly C

ompl

ying

WG

N03

0261

Wel

lingt

on R

egio

nal C

ounc

ilR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngW

GN

0202

06Po

rirua

City

Cou

ncil

Riv

er/S

tream

Div

ersi

onFu

lly C

ompl

ying

WG

N01

0012

Pritc

hard

Gro

up L

imite

dR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngW

GN

0300

47M

iddl

eton

Dev

elop

men

ts L

tdR

iver

/Stre

am D

iver

sion

Non

Com

plyi

ngW

GN

0302

71Pe

ter S

alm

onR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngW

GN

0001

55Ka

rori

Wild

life

Sanc

tuar

y Tr

ust

Riv

er/S

tream

Div

ersi

onFu

lly C

ompl

ying

WG

N03

0016

Deb

way

Hol

ding

s Li

mite

dR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngW

GN

9902

1304

Hor

okiw

i Qua

rries

Lim

ited

Riv

er/S

tream

Div

ersi

onFu

lly C

ompl

ying

WG

N00

0069

Whi

tby

Coa

stal

Est

ates

Riv

er/S

tream

Div

ersi

onM

ainl

y C

ompl

ying

WG

N03

0034

Wel

lingt

on C

ity C

ounc

ilR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngW

GN

0300

88W

hitb

y C

oast

al E

stat

esR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngW

GN

0201

13Tr

ansp

ower

New

Zea

land

Ltd

Riv

er/S

tream

Div

ersi

onFu

lly C

ompl

ying

WG

N02

0123

Pritc

hard

Gro

up L

imite

dR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngW

GN

0201

35W

ellin

gton

Reg

iona

l Cou

ncil

Riv

er/S

tream

Div

ersi

onFu

lly C

ompl

ying

WG

N98

0056

01U

nile

ver N

ew Z

eala

nd L

tdTa

keFu

lly C

ompl

ying

WG

N01

0213

Wai

nuio

mat

a G

olf C

lub

Take

Mai

nly

Com

plyi

ngW

GN

9802

21H

utt C

ity C

ounc

ilTa

keN

on C

ompl

ying

WG

N99

0142

02Th

e H

utt C

ity C

ounc

ilTa

keFu

lly C

ompl

ying

WG

N02

0042

Exid

e N

ew Z

eala

nd L

imite

dTa

keM

ainl

y C

ompl

ying

WG

N98

0054

01Fe

ltex

Car

pets

Ltd

Take

Fully

Com

plyi

ngW

GN

9900

0601

Woo

lyar

ns L

tdTa

keFu

lly C

ompl

ying

WG

N00

0051

Car

l Lut

zTa

kePa

rtial

ly C

ompl

ying

WG

N01

0129

Wai

kana

e G

olf C

lub

Take

Fully

Com

plyi

ngW

GN

0101

73P

R K

idd

Take

Fully

Com

plyi

ngW

GN

0200

46O

taki

Gol

f Clu

b In

cTa

keM

ainl

y C

ompl

ying

WG

N02

0076

War

ren

Aust

adTa

keM

ainl

y C

ompl

ying

WG

N02

0114

J H

& K

M S

imco

xTa

keFu

lly C

ompl

ying

WG

N02

0153

Upp

er H

utt B

owlin

g C

lub

Take

Mai

nly

Com

plyi

ng

Page 82: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

WG

N97

0262

01Ka

piti

Coa

st D

istri

ct C

ounc

ilTa

keM

ainl

y C

ompl

ying

WG

N97

0262

02Ka

piti

Coa

st D

istri

ct C

ounc

ilTa

kePa

rtial

ly C

ompl

ying

WG

N97

0002

Kapi

ti C

oast

Dis

trict

Cou

ncil

Take

Fully

Com

plyi

ngW

GN

9700

02Ka

piti

Coa

st D

istri

ct C

ounc

ilTa

keFu

lly C

ompl

ying

WG

N01

0125

Kapi

ti C

oast

Dis

trict

Cou

ncil

Take

Parti

ally

Com

plyi

ngW

GN

0200

16W

ellin

gton

Rac

ing

Clu

b (In

c)Ta

kePa

rtial

ly C

ompl

ying

WG

N02

0027

Wel

lingt

on G

olf C

lub

Take

Mai

nly

Com

plyi

ngW

GN

0200

93Ka

rori

Gol

f Clu

b In

cTa

keFu

lly C

ompl

ying

WG

N00

0020

Hut

t Val

ley

Hea

lthTa

keFu

lly C

ompl

ying

WG

N97

0002

01Ka

piti

Coa

st D

istri

ct C

ounc

ilTa

keFu

lly C

ompl

ying

WG

N97

0002

02Ka

piti

Coa

st D

istri

ct C

ounc

ilTa

keFu

lly C

ompl

ying

WG

N96

0017

Kapi

ti C

oast

Dis

trict

Cou

ncil

Take

Fully

Com

plyi

ngW

GN

9701

4601

Shan

don

Gol

f Clu

bTa

keN

on C

ompl

ying

WG

N98

0052

01N

ZTS

Serv

ices

Lim

ited

Take

Mai

nly

Com

plyi

ngW

GN

9800

5501

Impe

rial T

obac

co N

ew Z

eala

ndTa

keFu

lly C

ompl

ying

WG

N98

0186

01H

utt G

olf C

lub

Take

Mai

nly

Com

plyi

ngW

GN

9901

8302

Mer

idia

n En

ergy

Ltd

Take

Fully

Com

plyi

ngW

GN

0102

08Pr

itcha

rd G

roup

Lim

ited

Take

Non

Com

plyi

ngW

GN

0201

04Sh

ell N

ew Z

eala

nd L

imite

dTa

keFu

lly C

ompl

ying

WG

N97

0036

Wel

lingt

on R

egio

nal C

ounc

ilTa

keFu

lly C

ompl

ying

WG

N97

0036

Wel

lingt

on R

egio

nal C

ounc

ilTa

keFu

lly C

ompl

ying

WG

N00

0051

Car

l Lut

zTa

kePa

rtial

ly C

ompl

ying

WG

N01

0047

P Pr

etty

Take

Parti

ally

Com

plyi

ngW

GN

0200

38Te

Mar

ua G

olf C

lub

Inco

rpor

ated

Take

Fully

Com

plyi

ngW

GN

0201

07Ad

rian

and

Rob

yn M

ourie

Take

Parti

ally

Com

plyi

ngW

GN

9600

54Ad

rian

and

Rob

yn M

ourie

Take

Fully

Com

plyi

ngW

GN

0101

72Ad

rian

and

Rob

yn M

ourie

Take

Fully

Com

plyi

ngW

GN

0201

32Ju

dgef

ord

Gol

f Cou

rse

Take

Fully

Com

plyi

ngW

GN

0201

45Ka

piti

Gol

f Clu

bTa

keFu

lly C

ompl

ying

WG

N02

0170

Whi

tby

Coa

stal

Est

ates

Take

Fully

Com

plyi

ngW

GN

0300

13Ad

rian

and

Rob

yn M

ourie

Take

Fully

Com

plyi

ngW

GN

0300

11W

aika

nae

Chr

istia

n H

olid

ayTa

keFu

lly C

ompl

ying

WG

N03

0170

Wel

lingt

on C

ity C

ounc

ilTa

keFu

lly C

ompl

ying

WG

N99

0213

02H

orok

iwi Q

uarri

es L

imite

dTa

keFu

lly C

ompl

ying

WG

N01

0186

Win

ston

e Ag

greg

ates

Take

Fully

Com

plyi

ngW

GN

9502

26W

inst

one

Aggr

egat

esTa

keFu

lly C

ompl

ying

WG

N02

0011

Sout

h Pa

cific

Tyr

esTa

keFu

lly C

ompl

ying

WG

N00

0143

Win

ston

e Ag

greg

ates

Take

Fully

Com

plyi

ngW

GN

9502

26W

inst

one

Aggr

egat

esTa

keFu

lly C

ompl

ying

Page 83: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

Land

use

con

sent

s

File

Ref

eren

ceC

onse

nt H

olde

rA

ctiv

ity T

ype

Com

plia

nce

Rat

ing

Proj

ect T

itle

WG

N02

0047

Kapi

ti C

oast

Dis

trict

Cou

ncil

Stre

am W

ork

Non

Com

plyi

ngW

GN

0200

41M

ahak

i Hol

ding

s Lt

dSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0200

98H

utt C

ity C

ounc

ilSt

ruct

ure:

Haz

ard

Miti

gatio

nFu

lly C

ompl

ying

WG

N03

0051

Gra

ham

Wils

onBo

reM

ainl

y C

ompl

ying

WG

N03

0052

Food

stuf

fs (W

ellin

gton

) Coo

pera

tive

Bore

Fully

Com

plyi

ngW

GN

0300

71M

iss

J Sc

hum

ache

rBo

reM

ainl

y C

ompl

ying

WG

N03

0077

Hug

h St

anle

yBo

reM

ainl

y C

ompl

ying

WG

N03

0084

Upp

er H

utt D

evel

opm

ents

Ltd

Stru

ctur

e: H

azar

d M

itiga

tion

Non

Com

plyi

ngW

GN

0300

86M

artin

Rob

ins

Bore

Fully

Com

plyi

ngW

GN

0301

05Fo

odst

uffs

(Wel

lingt

on) C

oope

rativ

eBo

reM

ainl

y C

ompl

ying

WG

N03

0108

Selw

yn F

eary

Stre

am W

ork

Parti

ally

Com

plyi

ngW

GN

0301

11Tr

ansi

t New

Zea

land

Bore

Fully

Com

plyi

ngW

GN

0301

15W

ellin

gton

City

Cou

ncil

Stre

am W

ork

Mai

nly

Com

plyi

ngW

GN

0301

24C

alte

x N

ew Z

eala

nd L

imite

dBo

reM

ainl

y C

ompl

ying

WG

N03

0125

Kapi

ti C

oast

Dis

trict

Cou

ncil

Out

fall/

Inta

ke S

truct

ure

Fully

Com

plyi

ngW

GN

0301

39G

raha

m &

Virg

inia

Ram

say

Bore

Fully

Com

plyi

ngW

GN

0301

47D

epar

tmen

t of C

orre

ctio

nsSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0301

57LM

Mor

gan

Bore

Fully

Com

plyi

ngW

GN

0301

75G

rego

ry B

isho

pBo

reFu

lly C

ompl

ying

WG

N03

0185

Prop

erty

for I

ndus

try L

imite

dBo

rePa

rtial

ly C

ompl

ying

WG

N99

0096

01BE

& C

F Le

win

Stru

ctur

e: H

azar

d M

itiga

tion

Mai

nly

Com

plyi

ngW

GN

9900

9602

BE &

CF

Lew

inPl

antin

gM

ainl

y C

ompl

ying

WG

N00

0094

The

Hut

t City

Cou

ncil

Out

fall/

Inta

ke S

truct

ure

Fully

Com

plyi

ngW

GN

0001

11D

Sod

erbe

rg &

M O

wen

sSt

ream

Wor

kFu

lly C

ompl

ying

WG

N00

0157

P.J.

& D

.C. N

elso

n Lt

d.Ea

rthw

ork

Fully

Com

plyi

ngW

GN

0100

88Fu

tuna

Tru

st L

imite

dSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0100

88Fu

tuna

Tru

st L

imite

dBr

idge

Non

Com

plyi

ngW

GN

0200

96G

ordo

n Te

war

dBo

reM

ainl

y C

ompl

ying

WG

N01

0123

Hut

t City

Cou

ncil

Out

fall/

Inta

ke S

truct

ure

Fully

Com

plyi

ngW

GN

0201

01M

urra

y Pi

erce

Bore

Fully

Com

plyi

ngW

GN

0201

08W

ellin

gton

Reg

iona

l Cou

ncil

Pipe

line/

Cab

leFu

lly C

ompl

ying

WG

N02

0119

Cra

ig S

heph

erd

Stru

ctur

e: H

azar

d M

itiga

tion

Mai

nly

Com

plyi

ngW

GN

0201

19C

raig

She

pher

dR

ecla

mat

ion

Fully

Com

plyi

ngW

GN

0201

47Tr

ansi

t New

Zea

land

Stru

ctur

e: G

ener

alM

ainl

y C

ompl

ying

WG

N02

0167

Ron

Joh

nson

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N02

0177

Belv

ista

Sub

divi

sion

s Li

mte

dSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0201

87H

utt C

ity C

ounc

ilPi

pelin

e/C

able

Mai

nly

Com

plyi

ngW

GN

0201

90M

ike

Rya

nSt

ruct

ure:

Haz

ard

Miti

gatio

nFu

lly C

ompl

ying

WG

N02

0089

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Haz

ard

Miti

gatio

nN

on C

ompl

ying

WG

N02

0205

Ron

Joh

nson

Stru

ctur

e: H

azar

d M

itiga

tion

Mai

nly

Com

plyi

ngW

GN

0201

74Br

uce

Ingo

ePi

pelin

e/C

able

Mai

nly

Com

plyi

ngW

GN

0202

46C

raig

She

pher

dPi

pelin

e/C

able

Fully

Com

plyi

ngW

GN

0300

05W

ellin

gton

City

Cou

ncil

Out

fall/

Inta

ke S

truct

ure

Fully

Com

plyi

ngW

GN

0300

39H

arve

y N

orm

anBo

reM

ainl

y C

ompl

ying

WG

N03

0062

Dav

id In

nes

Stru

ctur

e: H

azar

d M

itiga

tion

Fully

Com

plyi

ng

Page 84: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

WG

N03

0068

Nga

toto

Inve

stm

ents

Ltd

Stru

ctur

e: G

ener

alM

ainl

y C

ompl

ying

WG

N03

0074

Wel

lingt

on R

egio

nal C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0201

16H

utt C

ity C

ounc

ilR

ecla

mat

ion

Fully

Com

plyi

ngW

GN

0201

16H

utt C

ity C

ounc

ilSt

ream

Wor

kFu

lly C

ompl

ying

WG

N03

0121

RAB

Des

ign

Stru

ctur

e: G

ener

alN

on C

ompl

ying

WG

N03

0127

Jenn

i and

Dav

id B

enne

tBo

reM

ainl

y C

ompl

ying

WG

N03

0131

Gab

ites

Pigs

Far

ms

Ltd

Rec

lam

atio

nFu

lly C

ompl

ying

WG

N03

0133

Hut

t City

Cou

ncil

Rec

lam

atio

nFu

lly C

ompl

ying

WG

N03

0144

Tonc

hi B

egov

ich

Bore

Fully

Com

plyi

ngW

GN

0301

77Ph

ilip &

Wen

dy E

glin

gton

Bore

Mai

nly

Com

plyi

ngW

GN

0201

40Tr

ansi

t New

Zea

land

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N02

0178

Eber

hard

Deu

ssSt

ream

Wor

kFu

lly C

ompl

ying

WG

N02

0227

Rut

h an

d Al

an H

umph

ries

Bore

Non

Com

plyi

ngW

GN

0300

06W

ellin

gton

City

Cou

ncil

Bore

Non

Com

plyi

ngW

GN

0300

10C

olin

Har

risBo

reN

on C

ompl

ying

WG

N03

0023

Broo

klyn

Hol

ding

s Lt

dSt

ruct

ure:

Gen

eral

Non

Com

plyi

ngW

GN

0301

18G

eoff

and

Rob

yn C

otto

nBo

reN

on C

ompl

ying

WG

N03

0135

Civ

il D

esig

n Se

rvic

esSt

ruct

ure:

Gen

eral

Mai

nly

Com

plyi

ngW

GN

0301

38TC

Hen

ders

onBo

reN

on C

ompl

ying

WG

N03

0143

Fras

er M

cDou

gall

Bore

Fully

Com

plyi

ngW

GN

0301

45R

obyn

Nev

illeBo

reFu

lly C

ompl

ying

WG

N03

0155

Betty

Nor

man

Bore

Fully

Com

plyi

ngW

GN

0301

99Ba

rry S

cott

Bore

Fully

Com

plyi

ngW

GN

0302

18M

itche

ll Ba

nks

Bore

Fully

Com

plyi

ngW

GN

0302

40W

ellin

gton

Wat

erfro

nt L

tdBo

reN

on C

ompl

ying

WG

N03

0259

Ric

hmon

d Le

eBo

reFu

lly C

ompl

ying

WG

N01

0229

Anth

ony

War

ren

Mor

risse

ySt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0102

29An

thon

y W

arre

n M

orris

sey

Stre

am W

ork

Fully

Com

plyi

ngW

GN

0200

45Ph

ilip M

artin

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N02

0013

Tran

spow

er N

ew Z

eala

nd L

tdSt

ruct

ure:

Haz

ard

Miti

gatio

nFu

lly C

ompl

ying

WG

N02

0162

Tree

men

dous

Stre

am W

ork

Fully

Com

plyi

ngW

GN

0201

95Po

rirua

City

Cou

ncil

Rec

lam

atio

nM

ainl

y C

ompl

ying

WG

N02

0195

Porir

ua C

ity C

ounc

ilBr

idge

Mai

nly

Com

plyi

ngW

GN

0300

12C

apita

l Pro

ject

s Li

mite

dO

utfa

ll/In

take

Stru

ctur

eFu

lly C

ompl

ying

WG

N03

0019

N a

nd D

Kan

eBo

reFu

lly C

ompl

ying

WG

N03

0028

Dou

glas

and

Daw

n La

mb

Bore

Mai

nly

Com

plyi

ngW

GN

0300

43H

utt V

alle

y Pr

esbe

taria

n Sc

hool

Bore

Fully

Com

plyi

ngW

GN

0300

50W

Sol

omon

Bore

Mai

nly

Com

plyi

ngW

GN

0300

82Po

rirua

City

Cou

ncil

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N03

0092

Pine

hill

Hol

ding

s Li

mite

dSt

ruct

ure:

Haz

ard

Miti

gatio

nFu

lly C

ompl

ying

WG

N03

0095

Keith

Rat

cliff

eBo

reM

ainl

y C

ompl

ying

WG

N03

0120

Step

hen

Cla

rke

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N03

0129

Wel

lingt

on R

egio

nal C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0301

32Je

ffrey

Lew

isBo

reFu

lly C

ompl

ying

WG

N03

0146

Wel

lingt

on R

egio

nal C

ounc

ilSt

ream

Wor

kFu

lly C

ompl

ying

WG

N03

0151

J &

M A

llan

Bore

Mai

nly

Com

plyi

ngW

GN

0301

53B

ridge

t Firm

inBo

rePa

rtial

ly C

ompl

ying

WG

N03

0163

Ric

hard

and

Fra

nces

Cat

hie

Bore

Parti

ally

Com

plyi

ng

Page 85: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

WG

N03

0181

R.E

. Prid

dle

Bore

Fully

Com

plyi

ngW

GN

0301

82W

ellin

gton

Reg

iona

l Cou

ncil

Stre

am W

ork

Fully

Com

plyi

ngW

GN

0301

88Be

lvis

ta S

ubdi

visi

ons

Lim

ted

Pipe

line/

Cab

leFu

lly C

ompl

ying

WG

N03

0188

Belv

ista

Sub

divi

sion

s Li

mte

dSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0301

93R

oy &

Sal

ly T

aylo

rBo

rePa

rtial

ly C

ompl

ying

WG

N03

0194

John

McG

owan

Mag

eeBo

reFu

lly C

ompl

ying

WG

N03

0196

G &

J O

'Brie

nBo

reM

ainl

y C

ompl

ying

WG

N03

0267

Alan

& R

uth

Hum

phrie

sBo

reFu

lly C

ompl

ying

WG

N02

0113

Tran

spow

er N

ew Z

eala

nd L

tdSt

ream

Wor

kFu

lly C

ompl

ying

WG

N03

0183

J.B.

L O

gilv

ieBo

reFu

lly C

ompl

ying

WG

N03

0184

R J

Den

ison

Bore

Parti

ally

Com

plyi

ngW

GN

0301

89R

obin

Dou

ghty

Bore

Parti

ally

Com

plyi

ngW

GN

0301

90G

reig

& M

iche

lle H

ayw

ard

Bore

Parti

ally

Com

plyi

ngW

GN

0301

92Jo

hn S

chiff

& S

arah

Whi

ten

Bore

Fully

Com

plyi

ngW

GN

0302

07G

ary

John

son

Bore

Fully

Com

plyi

ngW

GN

0302

19W

RC

Inte

rnal

Bore

Parti

ally

Com

plyi

ngW

GN

0302

20Ja

ck &

Pat

Man

ders

onBo

reFu

lly C

ompl

ying

WG

N03

0221

The

Mea

dow

s C

hurc

hBo

rePa

rtial

ly C

ompl

ying

WG

N03

0224

Con

nell

Wag

ner

Bore

Mai

nly

Com

plyi

ngW

GN

0302

26D

avid

& R

hond

a H

eath

erBo

rePa

rtial

ly C

ompl

ying

WG

N03

0227

Con

nell

Wag

ner

Bore

Mai

nly

Com

plyi

ngW

GN

0302

29C

J &

DL

Brya

nt F

amily

Tru

stBo

reFu

lly C

ompl

ying

WG

N03

0234

A R

itchi

eBo

reFu

lly C

ompl

ying

WG

N03

0235

A &

M K

eay

Bore

Fully

Com

plyi

ngW

GN

0302

39C

hels

ea H

ouse

Ear

ly C

hild

hood

Cen

trBo

rePa

rtial

ly C

ompl

ying

WG

N03

0243

A &

E H

arco

urt

Bore

Fully

Com

plyi

ngW

GN

0302

48D

esm

ond

& M

arga

ret C

roth

ers

Bore

Fully

Com

plyi

ngW

GN

0302

52G

raha

m a

nd F

ranc

es B

oyd

Bore

Mai

nly

Com

plyi

ngW

GN

0302

53Th

omas

For

rest

alBo

reFu

lly C

ompl

ying

WG

N03

0257

Gra

eme

& Lo

ris R

olst

onBo

reFu

lly C

ompl

ying

WG

N03

0260

John

& R

obyn

Din

een

Bore

Fully

Com

plyi

ngW

GN

0302

61W

RC

Inte

rnal

Stre

am W

ork

Fully

Com

plyi

ngW

GN

0302

64R

oss

& El

aine

Cre

edBo

rePa

rtial

ly C

ompl

ying

WG

N00

0007

Mar

atho

n D

evel

opm

ents

and

Rec

lam

atio

nFu

lly C

ompl

ying

WG

N00

0007

Mar

atho

n D

evel

opm

ents

and

Stre

am W

ork

Fully

Com

plyi

ngW

GN

0200

77Ka

piti

Coa

st D

istri

ct C

ounc

ilSt

ruct

ure:

Haz

ard

Miti

gatio

nFu

lly C

ompl

ying

WG

N02

0180

Wel

lingt

on R

egio

nal C

ounc

ilSt

ruct

ure:

Haz

ard

Miti

gatio

nFu

lly C

ompl

ying

WG

N02

0186

M J

acom

bSt

ruct

ure:

Gen

eral

Mai

nly

Com

plyi

ngW

GN

0201

92K

Men

chi

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N02

0206

Porir

ua C

ity C

ounc

ilSt

ream

Wor

kFu

lly C

ompl

ying

WG

N02

0206

Porir

ua C

ity C

ounc

ilSt

ream

Wor

kFu

lly C

ompl

ying

WG

N03

0003

Hut

t City

Cou

ncil

Stru

ctur

e: H

azar

d M

itiga

tion

Non

Com

plyi

ngW

GN

0300

09Pa

rapa

raum

u Be

ach

Gol

f Clu

bO

utfa

ll/In

take

Stru

ctur

eM

ainl

y C

ompl

ying

WG

N03

0021

Woo

drid

ge E

stat

es L

tdR

ecla

mat

ion

Fully

Com

plyi

ngW

GN

0300

21W

oodr

idge

Est

ates

Ltd

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N03

0114

WR

C In

tern

alSt

ream

Wor

kFu

lly C

ompl

ying

WG

N03

0114

WR

C In

tern

alSt

ream

Wor

kFu

lly C

ompl

ying

WG

N03

0171

Mic

hael

She

rlock

Bore

Mai

nly

Com

plyi

ng

Page 86: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

WG

N03

0180

Ray

mon

d &

Mar

ie W

ellg

reen

Bore

Fully

Com

plyi

ngW

GN

0301

97Ia

n W

eble

yBo

reM

ainl

y C

ompl

ying

WG

N03

0281

Kapi

ti C

oast

Dis

trict

Cou

ncil

Bore

Fully

Com

plyi

ngW

GN

9901

8301

Mer

idia

n En

ergy

Ltd

Dam

Fully

Com

plyi

ngW

GN

0100

12Pr

itcha

rd G

roup

Lim

ited

Stre

am W

ork

Fully

Com

plyi

ngW

GN

0101

56P

Salm

on &

L B

amfo

rdSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0201

23Ar

chy

Hol

ding

sSt

ream

Wor

kFu

lly C

ompl

ying

WG

N02

0123

Pritc

hard

Gro

up L

imite

dSt

ream

Wor

kFu

lly C

ompl

ying

WG

N02

0123

Pritc

hard

Gro

up L

imite

dR

ecla

mat

ion

Fully

Com

plyi

ngW

GN

0201

35W

ellin

gton

Reg

iona

l Cou

ncil

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N02

0135

Wel

lingt

on R

egio

nal C

ounc

ilD

amFu

lly C

ompl

ying

WG

N03

0026

Shel

l New

Zea

land

Lim

ited

Bore

Parti

ally

Com

plyi

ngW

GN

0300

47M

iddl

eton

Dev

elop

men

ts L

tdO

utfa

ll/In

take

Stru

ctur

ePa

rtial

ly C

ompl

ying

WG

N03

0201

A W

atm

ough

Bore

Fully

Com

plyi

ngW

GN

0302

02H

enry

Cha

rles

Osb

orn

Bore

Fully

Com

plyi

ngW

GN

0302

03An

thon

y Jo

hn W

alde

grav

eBo

reM

ainl

y C

ompl

ying

WG

N03

0204

BGC

Elw

ood

Fam

ily T

rust

Bore

Fully

Com

plyi

ngW

GN

0302

05D

M M

athe

son

Bore

Fully

Com

plyi

ngW

GN

0302

10Te

renc

e &

Anne

McB

eth

Bore

Fully

Com

plyi

ngW

GN

0302

25Pa

ul d

e Be

rnad

oBo

reFu

lly C

ompl

ying

WG

N03

0230

Car

l Van

der

Mee

rBo

reM

ainl

y C

ompl

ying

WG

N03

0271

Pete

r Sal

mon

Stre

am W

ork

Fully

Com

plyi

ngW

GN

9800

3301

Wel

lingt

on R

egio

nal C

ounc

ilVe

geta

tion

Rem

oval

Fully

Com

plyi

ngW

GN

0001

55Ka

rori

Wild

life

Sanc

tuar

y Tr

ust

Stre

am W

ork

Fully

Com

plyi

ngW

GN

0001

55Ka

rori

Wild

life

Sanc

tuar

y Tr

ust

Stre

am W

ork

Fully

Com

plyi

ngW

GN

0001

55Ka

rori

Wild

life

Sanc

tuar

y Tr

ust

Stre

am W

ork

Fully

Com

plyi

ngW

GN

0001

55Ka

rori

Wild

life

Sanc

tuar

y Tr

ust

Dam

Fully

Com

plyi

ngW

GN

0001

55Ka

rori

Wild

life

Sanc

tuar

y Tr

ust

Stru

ctur

e: H

azar

d M

itiga

tion

Fully

Com

plyi

ngW

GN

0100

02Pu

kena

mu

Esta

tes

Ltd

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N01

0120

Wel

lingt

on R

egio

nal C

ounc

ilSt

ream

Wor

kFu

lly C

ompl

ying

WG

N02

0128

Gra

eme

Hug

hson

Bore

Non

Com

plyi

ngW

GN

0201

66Te

Mar

ua G

olf C

lub

Inco

rpor

ated

Rec

lam

atio

nFu

lly C

ompl

ying

WG

N02

0226

Activ

e In

vest

men

ts L

imite

dSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0300

16D

ebw

ay H

oldi

ngs

Lim

ited

Stre

am W

ork

Fully

Com

plyi

ngW

GN

0300

16D

ebw

ay H

oldi

ngs

Lim

ited

Rec

lam

atio

nFu

lly C

ompl

ying

WG

N03

0029

Kapi

ti C

oast

Dis

trict

Cou

ncil

Stru

ctur

e: H

azar

d M

itiga

tion

Parti

ally

Com

plyi

ngW

GN

0300

37M

rs P

E B

aile

yBo

reN

on C

ompl

ying

WG

N03

0042

Hut

t City

Cou

ncil

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N03

0064

Shel

l NZ

Ltd

Bore

Fully

Com

plyi

ngW

GN

0300

90K

J C

ress

wel

lBo

rePa

rtial

ly C

ompl

ying

WG

N03

0112

Gar

th H

arris

onBo

reFu

lly C

ompl

ying

WG

N03

0128

Bill

Har

per

Bore

Parti

ally

Com

plyi

ngW

GN

0301

37JW

& B

A M

ilne

Bore

Fully

Com

plyi

ngW

GN

0301

42U

pper

Hut

t City

Cou

ncil

Stru

ctur

e: H

azar

d M

itiga

tion

Fully

Com

plyi

ngW

GN

0301

56Ph

ilippa

Bro

wBo

reFu

lly C

ompl

ying

WG

N03

0161

Bruc

e C

halc

raft

Bore

Mai

nly

Com

plyi

ngW

GN

0301

68R

uth

Philp

ott $

Mar

gare

t Dix

onBo

reM

ainl

y C

ompl

ying

WG

N03

0195

Chr

istin

e H

atfie

ldBo

reFu

lly C

ompl

ying

Page 87: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

WG

N98

0178

02W

inst

one

Aggr

egat

esR

ecla

mat

ion

Fully

Com

plyi

ngW

GN

9802

1201

Keith

Ada

mso

nSt

ream

Wor

kN

on C

ompl

ying

WG

N99

0121

01W

ellin

gton

Reg

iona

l Cou

ncil

Stre

am W

ork

Mai

nly

Com

plyi

ngW

GN

9801

7801

Win

ston

e Ag

greg

ates

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N00

0021

Hor

okiw

i Qua

rries

Lim

ited

Earth

wor

kFu

lly C

ompl

ying

WG

N00

0021

Hor

okiw

i Qua

rries

Lim

ited

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N00

0021

Hor

okiw

i Qua

rries

Lim

ited

Out

fall/

Inta

ke S

truct

ure

Fully

Com

plyi

ngW

GN

0101

45W

ellin

gton

City

Cou

ncil

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N02

0069

Dav

id B

row

nSt

ruct

ure:

Gen

eral

Mai

nly

Com

plyi

ngW

GN

0200

88R

ober

t Rod

eric

k an

dSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0201

37Te

d H

inde

Stru

ctur

e: G

ener

alM

ainl

y C

ompl

ying

WG

N02

0237

Ove

rton

Scot

tBr

idge

Non

Com

plyi

ngW

GN

0202

38W

ellin

gton

Reg

iona

l Cou

ncil

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N03

0018

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0300

41Te

Mar

ua G

olf C

lub

Inco

rpor

ated

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N03

0046

Hut

t City

Cou

ncil

Stru

ctur

e: H

azar

d M

itiga

tion

Fully

Com

plyi

ngW

GN

0300

73H

orok

iwi Q

uarri

es L

imite

dSt

ruct

ure:

Gen

eral

Non

Com

plyi

ngW

GN

0301

54H

utt C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0301

73W

ellin

gton

Reg

iona

l Cou

ncil

Brid

geFu

lly C

ompl

ying

WG

N00

0069

Whi

tby

Coa

stal

Est

ates

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N02

0017

Kapi

ti C

oast

Dis

trict

Cou

ncil

Stre

am W

ork

Fully

Com

plyi

ngW

GN

0001

66M

illwoo

d Jo

int V

entu

reSt

ruct

ure:

Haz

ard

Miti

gatio

nFu

lly C

ompl

ying

WG

N03

0034

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Haz

ard

Miti

gatio

nFu

lly C

ompl

ying

WG

N03

0088

Whi

tby

Coa

stal

Est

ates

Stru

ctur

e: G

ener

alM

ainl

y C

ompl

ying

WG

N03

0023

Broo

klyn

Hol

ding

s Lt

dR

ecla

mat

ion

Non

Com

plyi

ng

Page 88: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

Maj

or ri

ver w

orks

File

Ref

eren

ceC

onse

nt H

olde

rA

ctiv

ity T

ype

Com

plia

nce

Rat

ing

Proj

ect T

itle

WG

N98

0255

01W

ellin

gton

Reg

iona

l Cou

ncil

Stre

am W

ork

Fully

Com

plyi

ngH

utt R

iver

- G

loba

lW

GN

9802

5502

Wel

lingt

on R

egio

nal C

ounc

ilSt

ream

Wor

kFu

lly C

ompl

ying

Hut

t Riv

er g

loba

lW

GN

9802

5503

Wel

lingt

on R

egio

nal C

ounc

ilR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngH

utt R

iver

glo

bal

WG

N98

0255

05W

ellin

gton

Reg

iona

l Cou

ncil

Dis

char

ge to

Air

Fully

Com

plyi

ngH

utt R

iver

Glo

bal

WG

N98

0255

04W

ellin

gton

Reg

iona

l Cou

ncil

Indu

stria

l Was

te D

isch

arge

Fully

Com

plyi

ngH

utt R

iver

Glo

bal

WG

N98

0254

06W

ellin

gton

Reg

iona

l Cou

ncil

Coa

stal

Wor

k/D

istu

rban

ceFu

lly C

ompl

ying

Ota

ki R

iver

glo

bal

WG

N98

0254

03W

ellin

gton

Reg

iona

l Cou

ncil

Riv

er/S

tream

Div

ersi

onFu

lly C

ompl

ying

Ota

ki R

iver

glo

bal

WG

N98

0254

01W

ellin

gton

Reg

iona

l Cou

ncil

Stre

am W

ork

Fully

Com

plyi

ngO

taki

Riv

er g

loba

lW

GN

9802

5402

Wel

lingt

on R

egio

nal C

ounc

ilSt

ruct

ure:

Haz

ard

Miti

gatio

nFu

lly C

ompl

ying

Ota

ki R

iver

glo

bal

WG

N98

0254

04W

ellin

gton

Reg

iona

l Cou

ncil

Indu

stria

l Was

te D

isch

arge

Fully

Com

plyi

ngO

taki

Riv

er g

loba

lW

GN

9802

5405

Wel

lingt

on R

egio

nal C

ounc

ilD

isch

arge

to A

irFu

lly C

ompl

ying

Ota

ki R

iver

glo

bal

WG

N98

0256

06W

ellin

gton

Reg

iona

l Cou

ncil

Coa

stal

Wor

k/D

istu

rban

ceFu

lly C

ompl

ying

Wai

kana

e R

iver

glo

bal

WG

N98

0256

02W

ellin

gton

Reg

iona

l Cou

ncil

Stre

am W

ork

Fully

Com

plyi

ngW

aika

nae

Riv

er g

loba

lW

GN

9802

5603

Wel

lingt

on R

egio

nal C

ounc

ilR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngW

aika

nae

Riv

er g

loba

lW

GN

0201

06W

ellin

gton

Reg

iona

l Cou

ncil

Indu

stria

l Was

te D

isch

arge

Fully

Com

plyi

ngW

aika

nae

Riv

erW

GN

0201

06W

ellin

gton

Reg

iona

l Cou

ncil

Riv

er/S

tream

Div

ersi

onFu

lly C

ompl

ying

Wai

kana

e R

iver

WG

N02

0106

Wel

lingt

on R

egio

nal C

ounc

ilSt

ream

Wor

kFu

lly C

ompl

ying

Wai

kana

e R

iver

WG

N98

0256

01W

ellin

gton

Reg

iona

l Cou

ncil

Stre

am W

ork

Fully

Com

plyi

ngW

aika

nae

Riv

er g

loba

lW

GN

9802

5605

Wel

lingt

on R

egio

nal C

ounc

ilD

isch

arge

to A

irFu

lly C

ompl

ying

Wai

kana

e R

iver

glo

bal

WG

N98

0256

04W

ellin

gton

Reg

iona

l Cou

ncil

Indu

stria

l Was

te D

isch

arge

Fully

Com

plyi

ngW

aika

nae

Riv

er g

loba

lW

GN

0201

43W

ellin

gton

Reg

iona

l Cou

ncil

Stre

am W

ork

Fully

Com

plyi

ngW

ainu

iom

ata

Riv

erW

GN

0201

43W

ellin

gton

Reg

iona

l Cou

ncil

Riv

er/S

tream

Div

ersi

onFu

lly C

ompl

ying

Wai

nuio

mat

a R

iver

WG

N01

0220

Wel

lingt

on R

egio

nal C

ounc

ilSt

ream

Wor

kFu

lly C

ompl

ying

Wai

tohu

Stre

amW

GN

0102

20W

ellin

gton

Reg

iona

l Cou

ncil

Indu

stria

l Was

te D

isch

arge

Fully

Com

plyi

ngW

aito

hu S

tream

WG

N01

0220

Wel

lingt

on R

egio

nal C

ounc

ilR

iver

/Stre

am D

iver

sion

Fully

Com

plyi

ngW

aito

hu S

tream

Page 89: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

Coa

stal

File

Ref

eren

ceC

onse

nt H

olde

rA

ctiv

ity T

ype

Com

plia

nce

Rat

ing

Proj

ect T

itle

WG

N00

0178

Tels

traC

lear

Lim

ited

Pipe

line/

Cab

leFu

lly C

ompl

ying

WG

N00

0178

Tels

traC

lear

Lim

ited

Occ

upat

ion

Fully

Com

plyi

ngW

GN

0001

78Te

lstra

Cle

ar L

imite

dPi

pelin

e/C

able

Fully

Com

plyi

ngW

GN

0100

03Te

lstra

Cle

ar L

imite

dPi

pelin

e/C

able

Fully

Com

plyi

ngW

GN

0100

03Te

lstra

Cle

ar L

imite

dO

ccup

atio

nFu

lly C

ompl

ying

WG

N01

0003

Tels

traC

lear

Lim

ited

Pipe

line/

Cab

leFu

lly C

ompl

ying

WG

N01

0003

Tels

traC

lear

Lim

ited

Pipe

line/

Cab

leFu

lly C

ompl

ying

WG

N01

0003

Tels

traC

lear

Lim

ited

Occ

upat

ion

Fully

Com

plyi

ngW

GN

0100

03Te

lstra

Cle

ar L

imite

dPi

pelin

e/C

able

Fully

Com

plyi

ngW

GN

0300

94Ka

ren

Mos

es a

nd E

ve T

rege

rthan

Coa

stal

Wor

k/D

istu

rban

ceFu

lly C

ompl

ying

WG

N03

0169

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Haz

ard

Miti

gatio

nFu

lly C

ompl

ying

WG

N96

0590

01Po

rirua

City

Cou

ncil

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0590

02Po

rirua

City

Cou

ncil

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0590

03Po

rirua

City

Cou

ncil

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0683

01M

ana

Cru

isin

g C

lub

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0683

02M

ana

Cru

isin

g C

lub

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0709

01J

R P

ohat

uSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9700

1501

Man

a M

arin

a (P

arem

ata)

Lim

ited

Mar

ina

Fully

Com

plyi

ngW

GN

9801

3901

Wel

lingt

on P

ower

Boa

t Clu

bSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9802

3501

Man

a M

arin

a (P

arem

ata)

Lim

ited

Dre

dgin

gFu

lly C

ompl

ying

WG

N99

0200

01W

illiam

J C

ollin

sSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9902

5301

Wat

ers

Edge

Res

iden

t Ass

ocSt

ruct

ure:

Haz

ard

Miti

gatio

nFu

lly C

ompl

ying

WG

N02

0173

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0300

45Tr

ansp

ower

New

Zea

land

Ltd

Pipe

line/

Cab

leN

on C

ompl

ying

WG

N03

0045

Tran

spow

er N

ew Z

eala

nd L

tdC

oast

al W

ork/

Dis

turb

ance

Non

Com

plyi

ngW

GN

9605

0201

B J

O'S

ulliv

anSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9605

6603

Pare

mat

a Bo

atin

g C

lub

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0590

04Po

rirua

City

Cou

ncil

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0590

06Po

rirua

City

Cou

ncil

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N98

0217

01W

ellin

gton

City

Cou

ncil

Mar

ina

Fully

Com

plyi

ngW

GN

0101

16N

ew Z

eala

nd D

ivin

g an

d Sa

lvag

e Lt

dIn

dust

rial W

aste

Dis

char

gePa

rtial

ly C

ompl

ying

WG

N02

0022

Plim

mer

ton

Boat

ing

Clu

bIn

dust

rial W

aste

Dis

char

geFu

lly C

ompl

ying

WG

N02

0036

Wel

lingt

on C

ity C

ounc

ilBe

ach

Rep

leni

shm

ent

Parti

ally

Com

plyi

ngW

GN

0200

36W

ellin

gton

City

Cou

ncil

Stru

ctur

e: G

ener

alPa

rtial

ly C

ompl

ying

WG

N02

0036

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Parti

ally

Com

plyi

ngW

GN

0200

36W

ellin

gton

City

Cou

ncil

Stru

ctur

e: G

ener

alPa

rtial

ly C

ompl

ying

WG

N02

0036

Wel

lingt

on C

ity C

ounc

ilC

oast

al W

ork/

Dis

turb

ance

Parti

ally

Com

plyi

ngW

GN

0200

36W

ellin

gton

City

Cou

ncil

Coa

stal

Wor

k/D

istu

rban

cePa

rtial

ly C

ompl

ying

WG

N02

0036

Wel

lingt

on C

ity C

ounc

ilO

ccup

atio

nPa

rtial

ly C

ompl

ying

WG

N02

0036

Wel

lingt

on C

ity C

ounc

ilD

ispo

sal

Parti

ally

Com

plyi

ngW

GN

0200

36W

ellin

gton

City

Cou

ncil

Coa

stal

Wor

k/D

istu

rban

cePa

rtial

ly C

ompl

ying

WG

N02

0061

Roy

al P

ort N

icho

lson

Yac

ht C

lub

Indu

stria

l Was

te D

isch

arge

Fully

Com

plyi

ngW

GN

0200

74D

epar

tmen

t of C

onse

rvat

ion

Stru

ctur

e: H

azar

d M

itiga

tion

Fully

Com

plyi

ngW

GN

0300

27Bl

ackb

ridge

Tru

stSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0300

27Le

slie

, Mar

y &

Mar

tin M

ason

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

Page 90: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

WG

N03

0027

Mar

ilyn

God

dard

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N03

0027

Pete

r J K

eena

nSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0302

49C

lem

& P

atric

ia G

riffit

hsO

ccup

atio

nFu

lly C

ompl

ying

WG

N96

0533

01M

Am

bros

eSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9605

6301

War

ren

Gilla

nSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9605

8701

R J

oyce

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0599

01Pl

imm

erto

n Bo

atin

g C

lub

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N99

0145

01Pl

imm

erto

n Bo

atin

g C

lub

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N99

0145

03Pl

imm

erto

n Bo

atin

g C

lub

Stru

ctur

e: H

azar

d M

itiga

tion

Fully

Com

plyi

ngW

GN

0100

36W

ellin

gton

Reg

iona

l Cou

ncil

Stru

ctur

e: H

azar

d M

itiga

tion

Mai

nly

Com

plyi

ngW

GN

0100

80W

ellin

gton

City

Cou

ncil

Out

fall/

Inta

ke S

truct

ure

Mai

nly

Com

plyi

ngW

GN

0100

80W

ellin

gton

City

Cou

ncil

Stor

mw

ater

Dis

char

geFu

lly C

ompl

ying

WG

N01

0080

Wel

lingt

on C

ity C

ounc

ilD

ispo

sal

Fully

Com

plyi

ngW

GN

9802

40W

inst

one

Aggr

egat

esTa

keFu

lly C

ompl

ying

WG

N00

0122

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0001

23W

ellin

gton

City

Cou

ncil

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N01

0176

Wel

lingt

on R

adio

Yac

ht C

lub

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N01

0178

Hut

t City

Cou

ncil

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N02

0015

Tele

com

New

Zea

land

Ltd

Pipe

line/

Cab

leFu

lly C

ompl

ying

WG

N02

0082

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0201

65H

utt C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0201

93W

ellin

gton

City

Cou

ncil

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N03

0053

Col

in D

alla

sC

oast

al W

ork/

Dis

turb

ance

Fully

Com

plyi

ngW

GN

0300

65C

onst

ruct

ion

Tech

niqu

es L

tdIn

dust

rial W

aste

Dis

char

geFu

lly C

ompl

ying

WG

N92

0026

01Th

e H

utt C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9201

1501

The

Hut

t City

Cou

ncil

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0102

Lam

bton

Har

bour

Man

agem

ent

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N97

0044

01R

oger

Dou

glas

Bea

ttie

Mar

ine

Farm

Fully

Com

plyi

ngW

GN

9801

5502

Brita

nia

Sea

Scou

t Gro

upSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9802

1501

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9802

1502

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9802

1503

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9802

1504

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9802

1505

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9802

1506

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9802

1507

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9802

1508

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9802

1509

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9802

1510

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9802

1601

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9802

1602

CAS

Pro

perti

es L

tdSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9802

1603

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9802

1604

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9802

1605

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9802

1606

Wel

lingt

on C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9901

5301

CAS

Pro

perti

es L

tdSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0101

99Tr

ansi

t New

Zea

land

Brid

geFu

lly C

ompl

ying

WG

N01

0225

Tran

sit N

ew Z

eala

ndSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ng

Page 91: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

WG

N93

0531

Cen

trePo

rt Li

mite

dO

ccup

atio

nFu

lly C

ompl

ying

WG

N93

0532

01La

mbt

on H

arbo

ur M

anag

emen

tSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9600

1001

NIW

A G

reta

Poi

ntAn

imal

Was

te D

isch

arge

Fully

Com

plyi

ngW

GN

9701

04O

K Se

away

s Lt

dSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9900

1201

Wel

lingt

on R

egio

nal C

ounc

ilD

ispo

sal

Fully

Com

plyi

ngW

GN

9900

1202

Wel

lingt

on R

egio

nal C

ounc

ilD

ispo

sal

Fully

Com

plyi

ng

Boa

t she

ds

File

Ref

eren

ceC

onse

nt H

olde

rA

ctiv

ity T

ype

Com

plia

nce

Rat

ing

Proj

ect T

itle

WG

N00

0006

Seat

oun

Boat

ing

Clu

bSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0000

08W

orse

r Bay

Boa

ting

Clu

bSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0000

17KG

H T

rust

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N00

0204

Paul

Ben

sem

ann

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N01

0005

Step

hen

Bruc

e Ba

ylis

sSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0100

13W

este

rn B

ays

Stre

et R

odde

rs In

cSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0100

13W

este

rn B

ays

Stre

et R

odde

rs In

cSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0100

56Th

e H

utt C

ity C

ounc

ilSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0200

90Ju

lian

Rus

sell

Pars

ons

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N02

0229

B G

atfie

ldSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

0202

30T

Ros

e &

G M

arsl

and

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N02

0232

K O

Mur

ray

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N02

0235

Don

ald

Thom

as E

vans

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N03

0004

Step

hen

Bruc

e Ba

ylis

sSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9600

1901

W J

Tho

mso

n an

d S

M M

cRae

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0501

01Pe

ter D

onal

dSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9605

0301

The

2883

Tru

stSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9605

0901

Rua

pehu

Ren

tals

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0511

01Ja

nice

Feu

tzSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9605

1301

B C

Rig

arls

ford

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0514

01B

H S

mith

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0517

01S

Bank

sSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9605

1801

Julia

n R

usse

ll Pa

rson

sSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9605

1901

Pare

mat

a W

ater

& S

ki C

lub

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0522

01R

icha

rds

Fam

ily T

rust

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0523

01D

arry

l Wal

ker

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0528

01P

Rob

erts

onSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9605

2901

J M

Goo

dwin

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0534

01O

riel R

and

Ker

rie M

artin

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0536

01K

R B

est &

G A

dela

ide

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0539

01M

R T

urne

rSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9605

4001

D W

Rya

nSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9605

4401

Beau

cham

p A

PSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9605

4501

Mar

ilyn

God

dard

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0546

01J

N R

attra

ySt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9605

5101

Blac

kbrid

ge T

rust

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0554

01M

& D

Cou

ttsSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ng

Page 92: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

WG

N96

0556

01M

aure

en S

mith

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0559

01G

raha

m a

nd M

arily

n H

olla

ndSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9605

6201

How

ard

and

Lynn

Cha

pman

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0564

01P

Jagg

ard

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0565

01D

epar

tmen

t of C

onse

rvat

ion

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0566

04Pa

rem

ata

Boat

ing

Clu

bSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9605

6901

P C

ossa

rSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9605

7101

B D

Pid

ford

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0572

01R

oss

Gib

linSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9605

7501

Nic

ola

Edw

ards

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0576

01Ed

die

Youn

g an

d Yu

ping

Li

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0578

01P

Sout

hee

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0579

01J.

Sha

rp &

Les

ley

Slop

erSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9605

8001

Cra

ig A

nder

son

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0581

01W

ayne

Ian

Cha

ppel

lSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9605

8501

I Woo

dSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9606

0301

P C

Mar

men

tSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9606

0401

Cha

rles

Mar

shal

lSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9606

1501

Alan

Stu

art H

unte

rSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9606

1601

Mic

hael

L D

on &

Mar

ia M

anue

lSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9606

1801

Stik

a As

soci

ates

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0634

01Am

anda

Mcm

urdo

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0635

01Sc

otso

n Fa

mily

Tru

stSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9606

4001

Don

Pea

t & R

obyn

Sha

wSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9606

4201

S R

Gid

dens

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0644

01W

ayne

Dav

ies

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0646

01Ji

ll D

owni

eSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9606

4701

John

R A

Pop

plet

onSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9606

5301

K M

Hol

lisSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9606

5401

Mer

vyn

& Le

sley

Aitk

enSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9606

5901

G F

alla

ize

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0664

01Pe

ter J

Kee

nan

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0668

01J

Lidd

ell

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0676

01Al

lan

Pete

r Hud

son

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0677

01C

E B

est

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0688

01Al

ice

Eliz

abet

h W

hite

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0689

01Ke

vin

Bush

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0692

01D

ebor

ah H

erd

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0693

01Je

nnife

r May

Too

good

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0694

01J

W C

hest

erSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9606

9501

W J

Rya

nSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9606

9801

I H B

urge

ssSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9606

9901

D L

Gilb

erts

onSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9607

0201

Ian

T M

cMan

away

& S

usan

E G

ray

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0704

01O

nepo

to C

ruis

ing

Clu

bSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9607

0501

One

poto

Cru

isin

g C

lub

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N96

0706

01L

T M

erso

nSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9607

1201

G H

alvo

rsen

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

Page 93: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

WG

N96

0713

01M

arie

Pur

dom

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N97

0217

02N

Joh

nsSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9702

6301

WG

& H

M S

cott

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N97

0269

01O

nepo

to C

ruis

ing

Clu

bSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9800

2601

Gra

nt Y

oung

and

Mar

k Sh

erlo

ckSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9800

7701

Step

hen

Bruc

e Ba

ylis

sSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9800

9601

G C

Pow

ell &

R G

Lee

chSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9801

0401

Chr

isto

pher

Noe

l Pin

field

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N98

0139

02W

ellin

gton

Pow

er B

oat C

lub

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N98

0155

01Br

itani

a Se

a Sc

out G

roup

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N98

0199

01J

Spoo

ner

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N98

0258

01Se

awor

ks L

imite

dSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9900

0501

Ric

hard

A. B

lair

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N99

0147

01Su

san

Dem

psey

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N99

0172

01As

h Ar

ahia

Bai

ley

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WG

N99

0200

02W

illiam

J C

ollin

sSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9902

0801

Mur

ray

& Ji

ll Kn

owle

sSt

ruct

ure:

Gen

eral

Fully

Com

plyi

ngW

GN

9502

1401

Mic

hael

Fol

ster

Stru

ctur

e: G

ener

alM

ainl

y C

ompl

ying

WG

N96

0527

01Br

ian

L M

arks

Stru

ctur

e: G

ener

alM

ainl

y C

ompl

ying

WG

N96

0532

01M

Am

bros

eSt

ruct

ure:

Gen

eral

Mai

nly

Com

plyi

ngW

GN

9605

4801

M B

Par

ker

Stru

ctur

e: G

ener

alM

ainl

y C

ompl

ying

WG

N96

0586

01R

yan

Jack

son

Trus

t or N

omin

eeSt

ruct

ure:

Gen

eral

Mai

nly

Com

plyi

ngW

GN

9606

0101

Terri

e H

uege

de

Serv

illeSt

ruct

ure:

Gen

eral

Mai

nly

Com

plyi

ngW

GN

9606

0501

Paul

Ben

sem

ann

Stru

ctur

e: G

ener

alM

ainl

y C

ompl

ying

WG

N96

0607

01Ja

net A

nn W

ehip

eiha

naSt

ruct

ure:

Gen

eral

Mai

nly

Com

plyi

ngW

GN

9606

1101

Adria

ne M

cdon

ald

Stru

ctur

e: G

ener

alM

ainl

y C

ompl

ying

WG

N96

0633

01M

E B

eard

Stru

ctur

e: G

ener

alM

ainl

y C

ompl

ying

WG

N96

0637

01C

J F

east

Stru

ctur

e: G

ener

alM

ainl

y C

ompl

ying

WG

N96

0648

01M

r Sam

uel R

eiSt

ruct

ure:

Gen

eral

Mai

nly

Com

plyi

ngW

GN

9606

5201

Con

rad

J Ed

war

dsSt

ruct

ure:

Gen

eral

Mai

nly

Com

plyi

ngW

GN

9606

6001

D L

Gilb

erts

onSt

ruct

ure:

Gen

eral

Mai

nly

Com

plyi

ngW

GN

9606

7202

Mar

k &

Mar

garit

a O

wen

Stru

ctur

e: G

ener

alM

ainl

y C

ompl

ying

WG

N96

0673

01C

Dal

ton

Stru

ctur

e: G

ener

alM

ainl

y C

ompl

ying

WG

N96

0504

01Le

slie

, Mar

y &

Mar

tin M

ason

Stru

ctur

e: G

ener

alN

on C

ompl

ying

WG

N96

0505

01R

C &

AL

Palm

er F

amily

Tru

st &

Stru

ctur

e: G

ener

alN

on C

ompl

ying

WG

N96

0567

01H

elen

Buy

s an

d El

sie

Bram

ley

Stru

ctur

e: G

ener

alN

on C

ompl

ying

WG

N96

0568

01D

Sm

ithSt

ruct

ure:

Gen

eral

Non

Com

plyi

ngW

GN

9605

6802

D S

mith

Stru

ctur

e: G

ener

alN

on C

ompl

ying

WG

N96

0584

01Ja

mes

& P

atric

ia M

ckin

lay

Stru

ctur

e: G

ener

alN

on C

ompl

ying

WG

N96

0600

01K

S C

lule

e Pe

rrins

Stru

ctur

e: G

ener

alN

on C

ompl

ying

WG

N96

0610

01Ei

leen

She

pher

dSt

ruct

ure:

Gen

eral

Non

Com

plyi

ngW

GN

9606

3801

Leig

h R

amse

ySt

ruct

ure:

Gen

eral

Non

Com

plyi

ngW

GN

9606

3901

Julia

n Ba

rkha

mSt

ruct

ure:

Gen

eral

Non

Com

plyi

ngW

GN

9606

5001

M &

S J

ulia

nSt

ruct

ure:

Gen

eral

Non

Com

plyi

ngW

GN

9606

5101

Nic

hola

s Jo

hn F

arra

nce

Stru

ctur

e: G

ener

alN

on C

ompl

ying

WG

N96

0674

01O

riel R

and

Ker

rie M

artin

Stru

ctur

e: G

ener

alN

on C

ompl

ying

WG

N96

0656

01D

ayna

K R

Per

rot

Stru

ctur

e: G

ener

alPa

rtial

ly C

ompl

ying

Page 94: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

Swin

g m

oorin

gs

File

Ref

eren

ceC

onse

nt H

olde

rA

ctiv

ity T

ype

Com

plia

nce

Rat

ing

Proj

ect T

itle

WG

N00

0073

A D

Bro

wn

Moo

ring

Fully

Com

plyi

ngW

GN

0001

48Br

itani

a Se

a Sc

out G

roup

Moo

ring

Fully

Com

plyi

ngW

GN

0001

56G

reg

Nal

der

Moo

ring

Fully

Com

plyi

ngW

GN

0001

97Ju

stin

Ste

edM

oorin

gFu

lly C

ompl

ying

WG

N01

0026

Stev

e Pe

ther

ick

Moo

ring

Fully

Com

plyi

ngW

GN

0100

69Ti

m C

lear

yM

oorin

gFu

lly C

ompl

ying

WG

N01

0215

Jani

ce F

eutz

Moo

ring

Fully

Com

plyi

ngW

GN

0200

07N

icho

las

Jollif

feM

oorin

gFu

lly C

ompl

ying

WG

N02

0031

Ros

coM

oorin

gFu

lly C

ompl

ying

WG

N02

0078

Ger

ry P

eetz

Moo

ring

Fully

Com

plyi

ngW

GN

0201

25M

ark

Livi

ngst

on H

ulle

ttM

oorin

gFu

lly C

ompl

ying

WG

N02

0134

H &

M S

iljee-

Van

Bekk

Moo

ring

Fully

Com

plyi

ngW

GN

0201

41R

icha

rd G

Pag

eM

oorin

gFu

lly C

ompl

ying

WG

N02

0176

Bret

t Lon

gley

Moo

ring

Fully

Com

plyi

ngW

GN

0202

08G

ilber

t Bol

tM

oorin

gFu

lly C

ompl

ying

WG

N02

0209

Ted

Fran

klin

Moo

ring

Fully

Com

plyi

ngW

GN

0202

10G

len

Gre

coM

oorin

gFu

lly C

ompl

ying

WG

N02

0212

Philip

Haw

kins

Moo

ring

Fully

Com

plyi

ngW

GN

0202

24G

rant

Sto

ddar

dM

oorin

gFu

lly C

ompl

ying

WG

N02

0228

John

Bar

r-Bro

wn

Moo

ring

Fully

Com

plyi

ngW

GN

0202

33Bi

ll Ke

ddy

Moo

ring

Fully

Com

plyi

ngW

GN

9605

1201

B D

Pid

ford

Moo

ring

Fully

Com

plyi

ngW

GN

9605

1501

M B

lack

Moo

ring

Fully

Com

plyi

ngW

GN

9605

1601

McK

enzi

e Sh

ipw

right

sM

oorin

gFu

lly C

ompl

ying

WG

N96

0524

01R

Gay

Moo

ring

Fully

Com

plyi

ngW

GN

9605

3001

J J

Tayl

orM

oorin

gFu

lly C

ompl

ying

WG

N96

0531

01G

R W

ood

Moo

ring

Fully

Com

plyi

ngW

GN

9605

3501

Col

in M

erce

rM

oorin

gFu

lly C

ompl

ying

WG

N96

0538

01B

Sher

man

Moo

ring

Fully

Com

plyi

ngW

GN

9605

4101

R W

Sau

nder

sM

oorin

gFu

lly C

ompl

ying

WG

N96

0542

01Br

yan

John

Sul

livan

Moo

ring

Fully

Com

plyi

ngW

GN

9605

5201

R D

Sau

nder

sM

oorin

gFu

lly C

ompl

ying

WG

N96

0553

01B

J O

'Sul

livan

Moo

ring

Fully

Com

plyi

ngW

GN

9605

5501

R W

Sau

nder

sM

oorin

gFu

lly C

ompl

ying

WG

N96

0561

01An

thon

y D

J M

arm

ent

Moo

ring

Fully

Com

plyi

ngW

GN

9605

7001

N E

Wils

onM

oorin

gFu

lly C

ompl

ying

WG

N96

0573

01M

H G

raha

mM

oorin

gFu

lly C

ompl

ying

WG

N96

0574

01P

Sout

hee

Moo

ring

Fully

Com

plyi

ngW

GN

9605

9301

Ric

hard

Opp

att

Moo

ring

Fully

Com

plyi

ngW

GN

9605

9801

D O

wen

Moo

ring

Fully

Com

plyi

ngW

GN

9606

0601

Reg

inal

d Fo

wle

sM

oorin

gFu

lly C

ompl

ying

WG

N96

0621

01Ti

mot

hy K

ings

ton

Gas

coig

neM

oorin

gFu

lly C

ompl

ying

WG

N96

0622

01A

H H

erm

ans

Moo

ring

Fully

Com

plyi

ngW

GN

9606

2301

Stua

rt R

icha

rd H

olfo

rdM

oorin

gFu

lly C

ompl

ying

Page 95: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

WG

N96

0627

01Pe

ter H

oran

Moo

ring

Fully

Com

plyi

ngW

GN

9606

3601

B D

owric

kM

oorin

gFu

lly C

ompl

ying

WG

N96

0643

01S

R G

idde

nsM

oorin

gFu

lly C

ompl

ying

WG

N96

0649

01J

E W

eir

Moo

ring

Fully

Com

plyi

ngW

GN

9606

5501

C W

Tie

rney

Moo

ring

Fully

Com

plyi

ngW

GN

9606

5701

G F

alla

ize

Moo

ring

Fully

Com

plyi

ngW

GN

9606

6101

R J

Llo

ydM

oorin

gFu

lly C

ompl

ying

WG

N96

0663

01Al

an D

enni

s C

odyr

eM

oorin

gFu

lly C

ompl

ying

WG

N96

0667

01Jo

hn C

owie

Moo

ring

Fully

Com

plyi

ngW

GN

9606

7001

Alla

n Jo

hn P

ettig

rew

Moo

ring

Fully

Com

plyi

ngW

GN

9606

7901

Ray

mon

d C

Willi

ams

Moo

ring

Fully

Com

plyi

ngW

GN

9606

8001

P R

ober

tson

Moo

ring

Fully

Com

plyi

ngW

GN

9606

8101

Tuffe

y Tr

ust

Moo

ring

Fully

Com

plyi

ngW

GN

9606

8201

D F

Pag

eM

oorin

gFu

lly C

ompl

ying

WG

N96

0685

0140

Deg

ree

Sout

h Bo

at B

uild

ing

Clu

bM

oorin

gFu

lly C

ompl

ying

WG

N96

0687

01D

arre

n Au

stin

Luk

eM

oorin

gFu

lly C

ompl

ying

WG

N96

0708

01P

McM

illan

Moo

ring

Fully

Com

plyi

ngW

GN

9800

0301

R R

G U

ivel

Moo

ring

Fully

Com

plyi

ngW

GN

9800

5801

Paul

Edw

ard

Beau

mon

tM

oorin

gFu

lly C

ompl

ying

WG

N98

0188

01R

R H

Uiv

elM

oorin

gFu

lly C

ompl

ying

WG

N98

0209

01K

R B

est &

G A

dela

ide

Moo

ring

Fully

Com

plyi

ngW

GN

9802

1901

Jan

R N

auta

Moo

ring

Fully

Com

plyi

ngW

GN

9900

8001

G B

Rid

ding

Moo

ring

Fully

Com

plyi

ngW

GN

9901

0001

Blac

kbrid

ge T

rust

Moo

ring

Fully

Com

plyi

ngW

GN

9901

5501

Len

Woo

dman

Moo

ring

Fully

Com

plyi

ngW

GN

9901

8401

Ral

ph H

enri

Kraa

yvan

ger

Moo

ring

Fully

Com

plyi

ngW

GN

9902

3201

T R

ose

& G

Mar

slan

dM

oorin

gFu

lly C

ompl

ying

WG

N99

0235

01D

Pet

erse

n &

G M

ckee

Moo

ring

Fully

Com

plyi

ngW

GN

0000

12To

tally

Mar

ine

Moo

ring

Non

Com

plyi

ngW

GN

0000

33La

mbt

on H

arbo

ur M

anag

emen

tM

oorin

gN

on C

ompl

ying

WG

N00

0095

Blue

Chi

p En

terta

inm

ent L

imite

dM

oorin

gN

on C

ompl

ying

WG

N00

0118

Mic

hael

Bro

wn

Moo

ring

Non

Com

plyi

ngW

GN

0001

77G

eoffr

ey D

olan

Moo

ring

Non

Com

plyi

ngW

GN

0100

62Pe

ter B

eer

Moo

ring

Non

Com

plyi

ngW

GN

0100

63J

John

ston

Moo

ring

Non

Com

plyi

ngW

GN

0101

93W

ee G

eord

ie F

ishe

rM

oorin

gN

on C

ompl

ying

WG

N02

0091

Mat

thew

Pric

eM

oorin

gN

on C

ompl

ying

WG

N02

0127

Nei

l Arn

old

Moo

ring

Non

Com

plyi

ngW

GN

0201

33Pe

ter V

ande

wie

lM

oorin

gN

on C

ompl

ying

WG

N02

0142

Dav

id L

eeM

oorin

gN

on C

ompl

ying

WG

N02

0168

Jan

R N

auta

Moo

ring

Non

Com

plyi

ngW

GN

0201

83Jo

hn V

an d

er S

man

Moo

ring

Non

Com

plyi

ngW

GN

0201

89C

harle

s An

ders

onM

oorin

gN

on C

ompl

ying

WG

N02

0207

Vinc

e Ba

sile

Moo

ring

Non

Com

plyi

ngW

GN

0202

11Te

rry G

ray

Moo

ring

Non

Com

plyi

ngW

GN

0202

13Jo

e Jo

hnso

nM

oorin

gN

on C

ompl

ying

WG

N02

0214

Tony

Muo

lloM

oorin

gN

on C

ompl

ying

WG

N02

0215

Car

l Muo

lloM

oorin

gN

on C

ompl

ying

Page 96: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

WG

N02

0216

Tony

Car

l Muo

lloM

oorin

gN

on C

ompl

ying

WG

N02

0217

Geo

ff M

arsl

and

Moo

ring

Non

Com

plyi

ngW

GN

0202

18Jo

hnny

Per

sico

Moo

ring

Non

Com

plyi

ngW

GN

0202

20G

rant

Rob

inso

nM

oorin

gN

on C

ompl

ying

WG

N02

0221

Gra

nt R

obin

son

and

Pete

r Gre

coM

oorin

gN

on C

ompl

ying

WG

N02

0222

Philip

Rob

inso

nM

oorin

gN

on C

ompl

ying

WG

N02

0223

Salv

ator

e R

uocc

oM

oorin

gN

on C

ompl

ying

WG

N02

0225

Dav

id W

ood

Moo

ring

Non

Com

plyi

ngW

GN

9600

3701

Rog

er B

Wils

on a

nd L

ynle

y M

Man

ning

Moo

ring

Non

Com

plyi

ngW

GN

9605

0601

Chr

istia

n Sp

icer

Moo

ring

Non

Com

plyi

ngW

GN

9605

0701

Mic

hael

J T

aylo

rM

oorin

gN

on C

ompl

ying

WG

N96

0510

01Ke

ri W

illiam

Dow

nM

oorin

gN

on C

ompl

ying

WG

N96

0525

01A

J Sa

unde

rsM

oorin

gN

on C

ompl

ying

WG

N96

0526

01Al

iste

r Don

ald

Mac

doug

all

Moo

ring

Non

Com

plyi

ngW

GN

9605

2601

Willi

am J

Col

lins

Moo

ring

Non

Com

plyi

ngW

GN

9605

3701

R D

Bra

dey

Moo

ring

Non

Com

plyi

ngW

GN

9605

4301

N M

cFar

lane

Moo

ring

Non

Com

plyi

ngW

GN

9605

4701

K M

cMilla

nM

oorin

gN

on C

ompl

ying

WG

N96

0549

01An

drew

Dav

id W

hite

Moo

ring

Non

Com

plyi

ngW

GN

9605

5701

F A

Falc

oner

Moo

ring

Non

Com

plyi

ngW

GN

9605

6601

Pare

mat

a Bo

atin

g C

lub

Moo

ring

Non

Com

plyi

ngW

GN

9605

7701

K H

McM

illan

Moo

ring

Non

Com

plyi

ngW

GN

9605

8201

Willi

am J

Col

lins

Moo

ring

Non

Com

plyi

ngW

GN

9605

8301

Chr

isto

pher

Orm

Rig

arls

ford

Moo

ring

Non

Com

plyi

ngW

GN

9605

9201

Tom

Ker

rM

oorin

gN

on C

ompl

ying

WG

N96

0595

01Br

enda

n R

oach

Moo

ring

Non

Com

plyi

ngW

GN

9605

9701

Edw

ard

Kerri

son

Saul

Moo

ring

Non

Com

plyi

ngW

GN

9606

0201

P C

Mar

men

tM

oorin

gN

on C

ompl

ying

WG

N96

0609

01St

even

J B

urrid

geM

oorin

gN

on C

ompl

ying

WG

N96

0617

01Tr

evor

Joh

n Ba

llinge

rM

oorin

gN

on C

ompl

ying

WG

N96

0619

01R

H L

ivin

gsto

nM

oorin

gN

on C

ompl

ying

WG

N96

0628

01D

Mui

rM

oorin

gN

on C

ompl

ying

WG

N96

0641

01R

icha

rd L

ane

Moo

ring

Non

Com

plyi

ngW

GN

9606

4501

Way

ne D

avie

sM

oorin

gN

on C

ompl

ying

WG

N96

0658

01L

Mor

rison

Moo

ring

Non

Com

plyi

ngW

GN

9606

6501

Lanc

elot

t Dav

id P

ayne

Moo

ring

Non

Com

plyi

ngW

GN

9606

7101

R S

Kin

gM

oorin

gN

on C

ompl

ying

WG

N96

0672

01Le

igh

Ram

sey

Moo

ring

Non

Com

plyi

ngW

GN

9606

7402

Orie

l R a

nd K

errie

Mar

tinM

oorin

gN

on C

ompl

ying

WG

N96

0678

01J

Luke

Moo

ring

Non

Com

plyi

ngW

GN

9606

7802

J Lu

keM

oorin

gN

on C

ompl

ying

Page 97: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

App

endi

x 2

- Wai

rara

pa c

ompl

ianc

e

Agr

icul

tura

l dis

char

ges

File

Ref

eren

ceC

onse

nt H

olde

rA

ctiv

ity T

ype

Com

plia

nce

Rat

ing

WAR

9400

6801

Mao

ri Ed

ucat

ion

Foun

datio

nD

airy

Fully

Com

plyi

ngW

AR94

0038

01Bo

sch

Flor

us a

nd C

oD

airy

Mai

nly

Com

plyi

ngW

AR95

0044

01F

des

Tom

be a

nd S

Cra

wfo

rdD

airy

Mai

nly

Com

plyi

ngW

AR95

0067

01M

A an

d R

G L

ovet

tD

airy

Fully

Com

plyi

ngW

AR96

0206

01D

D B

erry

Ltd

Dai

ryM

ainl

y C

ompl

ying

WAR

9602

0501

JA B

ickn

all

Dai

ryFu

lly C

ompl

ying

WAR

9600

0301

Sayw

ell B

roth

ers

Dai

ryM

ainl

y C

ompl

ying

WAR

9502

3401

AGC

Bid

wel

lD

airy

Mai

nly

Com

plyi

ngW

AR01

0135

KGS

Feas

tD

airy

Fully

Com

plyi

ngW

AR01

0129

Wes

tern

Lak

e R

oad

Dai

ryM

ainl

y C

ompl

ying

WAR

0101

28R

and

D C

alve

rtD

airy

Mai

nly

Com

plyi

ngW

AR01

0104

JL a

nd V

A W

illis

Dai

ryFu

lly C

ompl

ying

WAR

9901

1301

RT

McK

enzi

eD

airy

Mai

nly

Com

plyi

ngW

AR98

0134

01LF

Fle

tche

'Muh

unui

'D

airy

Parti

ally

Com

plyi

ngW

AR98

0130

01La

ke M

eado

ws

Partn

ersh

ipD

airy

Non

Com

plyi

ngW

AR98

0090

01TR

McC

rear

yD

airy

Fully

Com

plyi

ngW

AR97

0212

01B

Gea

nge

Dai

ryFu

lly C

ompl

ying

WAR

9701

4701

Pete

r Lov

ett

Dai

ryFu

lly C

ompl

ying

WAR

0102

18P

& V

Farri

erD

airy

Parti

ally

Com

plyi

ngW

AR01

0206

VG &

JA

Bras

sel a

nd B

& G

Far

ms

Dai

ryFu

lly C

ompl

ying

WAR

0101

62H

and

M B

ell

Dai

ryFu

lly C

ompl

ying

WAR

0101

46H

amm

ond

and

Co

Dai

ryPa

rtial

ly C

ompl

ying

WAR

0100

94Pa

haut

ea R

oad

Dai

ryN

on C

ompl

ying

WAR

0003

10C

olin

Hod

der

Dai

ryN

on C

ompl

ying

WAR

0103

23TJ

Her

rick

Dai

ryFu

lly C

ompl

ying

WAR

9700

5101

Hillv

iew

Par

tner

ship

Dai

ryN

on C

ompl

ying

WAR

9700

5001

B L

Geo

rge

Dai

ryFu

lly C

ompl

ying

WAR

9602

3801

Con

wel

l Far

mD

airy

Mai

nly

Com

plyi

ngW

AR95

0031

01P

J an

d K

M S

ayw

ell

Dai

ryFu

lly C

ompl

ying

WAR

9200

2501

Bosc

h Fl

orus

and

Com

pany

Dai

ryFu

lly C

ompl

ying

WAR

9201

7401

GC

War

ren

Dai

ryFu

lly C

ompl

ying

WAR

9400

4601

WE

Osb

ourn

eD

airy

Mai

nly

Com

plyi

ngW

AR03

0083

Dea

n Bi

rcha

llD

airy

Fully

Com

plyi

ngW

AR03

0079

EP &

PW

H W

atki

nson

Dai

ryFu

lly C

ompl

ying

WAR

0300

60H

arry

Bos

chD

airy

Fully

Com

plyi

ngW

AR03

0067

HL

and

ML

McL

enna

nD

airy

Fully

Com

plyi

ngW

AR03

0057

Kenn

eth

and

Atha

lie S

age

Dai

ryFu

lly C

ompl

ying

WAR

0300

56G

D F

airb

roth

erD

airy

Fully

Com

plyi

ngW

AR02

0133

Andr

ew W

harri

eD

airy

Fully

Com

plyi

ngW

AR02

0106

Gar

y J

Birc

hall

Dai

ryFu

lly C

ompl

ying

WAR

0201

03Er

ic S

noek

Dai

ryFu

lly C

ompl

ying

Page 98: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

WAR

0200

73D

S an

d JJ

Ros

eD

airy

Fully

Com

plyi

ngW

AR02

0065

DW

Woo

dD

airy

Fully

Com

plyi

ngW

AR02

0046

Div

ersi

on P

artn

ersh

ipD

airy

Fully

Com

plyi

ngW

AR01

0331

LJ a

nd C

A Si

gver

tsen

Dai

ryFu

lly C

ompl

ying

WAR

0103

30D

B O

sbou

rne

Dai

ryPa

rtial

ly C

ompl

ying

WAR

0102

93N

H a

nd B

A W

adha

mD

airy

Fully

Com

plyi

ngW

AR01

0292

P &

K Vo

llebr

egt

Dai

ryN

on C

ompl

ying

WAR

0102

74JD

& D

J Sa

ywel

lD

airy

Fully

Com

plyi

ngW

AR01

0276

J Fo

rem

anD

airy

Fully

Com

plyi

ngW

AR01

0267

NR

Ter

ryD

airy

Fully

Com

plyi

ngW

AR01

0263

AH &

AC

Web

ster

Dai

ryFu

lly C

ompl

ying

WAR

0102

19W

& K

Goo

din

Dai

ryFu

lly C

ompl

ying

WAR

0102

10Po

uaw

ha R

oad

Dai

ryFu

lly C

ompl

ying

WAR

0101

92U

pper

Bel

vede

re R

oad

Dai

ryFu

lly C

ompl

ying

WAR

0101

91N

oel E

Sm

allw

ood

Dai

ryFu

lly C

ompl

ying

WAR

0101

80R

W W

ilmhu

rst

Dai

ryFu

lly C

ompl

ying

WAR

0101

74AK

Gat

esD

airy

Mai

nly

Com

plyi

ngW

AR01

0168

Lars

en E

stat

eD

airy

Fully

Com

plyi

ngW

AR01

0152

N &

J F

ishe

rD

airy

Fully

Com

plyi

ngW

AR01

0147

VJ Z

abel

lD

airy

Fully

Com

plyi

ngW

AR01

0097

Burt

and

Co

Dai

ryM

ainl

y C

ompl

ying

WAR

0100

62Ku

men

ga R

oad,

Fea

ther

ston

Dai

ryFu

lly C

ompl

ying

WAR

0003

66G

J S

tuar

tD

airy

Fully

Com

plyi

ngW

AR00

0357

AP B

row

neD

airy

Fully

Com

plyi

ngW

AR00

0349

I R W

ither

Dai

ryFu

lly C

ompl

ying

WAR

9701

7901

DF

and

FA F

uge

Dai

ryFu

lly C

ompl

ying

WAR

9701

7801

AB Z

wag

erm

anD

airy

Fully

Com

plyi

ngW

AR97

0177

01M

E D

anie

ll "A

kour

a".

Dai

ryFu

lly C

ompl

ying

WAR

9602

2001

GJ

Evan

sD

airy

Fully

Com

plyi

ngW

AR01

0120

A an

d L

Har

vey

Dai

ryFu

lly C

ompl

ying

WAR

0101

13H

A C

hris

tens

enD

airy

Fully

Com

plyi

ngW

AR01

0099

KM a

nd J

C G

ray

Dai

ryFu

lly C

ompl

ying

WAR

9601

1901

JA a

nd J

B R

ose

Dai

ryFu

lly C

ompl

ying

WAR

9601

0201

Lynx

Far

mD

airy

Fully

Com

plyi

ngW

AR96

0071

01Ko

kota

u Pa

rtner

ship

Dai

ryFu

lly C

ompl

ying

WAR

9501

2301

RE

Perc

yD

airy

Fully

Com

plyi

ngW

AR95

0222

01R

ylib

Tru

stD

airy

Mai

nly

Com

plyi

ngW

AR95

0177

01R

anga

taum

u Pa

rtner

ship

Dai

ryFu

lly C

ompl

ying

WAR

9501

6801

PJ a

nd G

M R

yan

Dai

ryFu

lly C

ompl

ying

WAR

9501

3601

A an

d P

Van

Barn

dale

Dai

ryFu

lly C

ompl

ying

WAR

9601

96PD

Bur

gess

Dai

ryFu

lly C

ompl

ying

WAR

9801

9501

EB G

awith

Dai

ryM

ainl

y C

ompl

ying

WAR

9801

5601

IR a

nd IM

Hic

ksD

airy

Fully

Com

plyi

ngW

AR98

0018

01BB

Pat

rick

Dai

ryFu

lly C

ompl

ying

WAR

9800

1701

AG a

nd D

M E

dwin

gton

Dai

ryFu

lly C

ompl

ying

WAR

9702

7201

J C

oven

ey a

nd A

Ham

mel

ehle

Dai

ryFu

lly C

ompl

ying

WAR

9702

5701

RD

and

LJ

Goo

dwin

Dai

ryFu

lly C

ompl

ying

Page 99: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

WAR

9700

8401

JF a

nd C

A Pe

rcy

Dai

ryFu

lly C

ompl

ying

WAR

9700

7301

S an

d W

Van

den

Bos

chD

airy

Fully

Com

plyi

ngW

AR97

0044

01W

oodl

eigh

Far

m T

rust

Dai

ryFu

lly C

ompl

ying

WAR

9602

8701

JC M

cNam

ara

Dai

ryFu

lly C

ompl

ying

WAR

9500

9801

S an

d L

forb

esD

airy

Fully

Com

plyi

ngW

AR95

0091

01D

R S

tuar

tD

airy

Parti

ally

Com

plyi

ngW

AR95

0089

01PH

McM

anaw

ayD

airy

Mai

nly

Com

plyi

ngW

AR95

0070

01L

A Ty

erD

airy

Fully

Com

plyi

ngW

AR95

0065

01JR

Dou

llD

airy

Fully

Com

plyi

ngW

AR95

0054

01BH

and

GJ

Farle

yD

airy

Fully

Com

plyi

ngW

AR94

0065

01C

A C

lark

e Es

tate

Dai

ryFu

lly C

ompl

ying

WAR

9400

0401

PS a

nd A

E Pa

lmer

Dai

ryFu

lly C

ompl

ying

WAR

9501

4401

Pinf

olds

Far

mD

airy

Fully

Com

plyi

ngW

AR95

0143

01PE

and

VL

Batc

helo

rD

airy

Fully

Com

plyi

ngW

AR94

0020

01R

A an

d G

YM S

mith

Dai

ryFu

lly C

ompl

ying

WAR

9200

2901

AL O

sbou

rne

Dai

ryFu

lly C

ompl

ying

Mis

cella

neou

s di

scha

rges

File

Ref

eren

ceC

onse

nt H

olde

r A

ctiv

ity T

ype

Com

plia

nce

Rat

ing

WAR

0103

06M

aste

rton

Dis

trict

Cou

ncil

Com

preh

ensi

ve S

torm

wat

er D

isch

arge

Fully

Com

plyi

ngW

AR01

0067

Gen

esis

Pow

er L

tdIn

dust

rial W

aste

Dis

char

geFu

lly C

ompl

ying

WAR

0100

68G

enes

is P

ower

Ltd

Indu

stria

l Was

te D

isch

arge

Fully

Com

plyi

ngW

AR01

0069

Gen

esis

Pow

er L

tdIn

dust

rial W

aste

Dis

char

geFu

lly C

ompl

ying

WAR

0300

30C

arte

rton

Dis

trict

Cou

ncil

Sew

age

Dis

char

geN

on C

ompl

ying

WAR

9501

4801

Car

terto

n D

istri

ct C

ounc

ilSe

wag

e D

isch

arge

Non

Com

plyi

ngW

AR96

0286

Sout

h W

aira

rapa

Dis

trict

Cou

ncil

Sew

age

Dis

char

geN

on C

ompl

ying

WAR

0200

74M

aste

rton

Dis

trict

Cou

ncil

Sew

age

Dis

char

geFu

lly C

ompl

ying

WAR

0200

74M

aste

rton

Dis

trict

Cou

ncil

Sew

age

Dis

char

geFu

lly C

ompl

ying

WAR

0103

48Le

arn

& Li

ve M

inis

trySe

wag

e D

isch

arge

Mai

nly

Com

plyi

ng

Wat

er p

erm

its

File

Ref

eren

ceC

onse

nt h

olde

r A

ctiv

ity T

ype

Com

plia

nce

Rat

ing

WAR

0002

93K

H &

A J

Sag

eTa

keM

ainl

y C

ompl

ying

WAR

0003

07Pa

ul C

ollin

s Fa

mily

Tru

stTa

keM

ainl

y C

ompl

ying

WAR

0003

08C

Eng

elTa

keFu

lly C

ompl

ying

WAR

0003

11J

Dou

glas

& K

Gou

ldst

one

Take

Mai

nly

Com

plyi

ngW

AR00

0348

I R W

ither

Take

Fully

Com

plyi

ngW

AR00

0352

Stua

rt Jo

hn D

enbe

eTa

keFu

lly C

ompl

ying

WAR

0003

75J

C M

cNam

ara

Take

Mai

nly

Com

plyi

ng

Page 100: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

WAR

0003

90R

ylib

Dai

ries

Ltd

Take

Mai

nly

Com

plyi

ngW

AR00

0419

RL

Gas

kell

Take

Mai

nly

Com

plyi

ngW

AR01

0041

C E

ngel

Take

Parti

ally

Com

plyi

ngW

AR01

0071

Les

Won

gTa

keFu

lly C

ompl

ying

WAR

0100

73BF

& J

Bos

chTa

keN

on C

ompl

ying

WAR

0101

05A

H W

ebst

erTa

keM

ainl

y C

ompl

ying

WAR

0101

26B

R O

'Nea

leTa

keFu

lly C

ompl

ying

WAR

0101

30La

ke M

eado

ws

Partn

ersh

ipTa

keM

ainl

y C

ompl

ying

WAR

0101

49N

D R

Dav

ies

Take

Fully

Com

plyi

ngW

AR01

0163

Pine

have

n O

rcha

rds

Ltd

Take

Fully

Com

plyi

ngW

AR01

0208

Mao

ri Ed

ucat

ion

Trus

tTa

keFu

lly C

ompl

ying

WAR

0102

37A

G &

H A

Mur

phy

Take

Fully

Com

plyi

ngW

AR01

0246

Ian

Lesl

ieTa

keFu

lly C

ompl

ying

WAR

0102

49R

F &

V L

Gre

enTa

keM

ainl

y C

ompl

ying

WAR

0102

60J

Clin

ton-

Bake

rTa

keFu

lly C

ompl

ying

WAR

0102

96W

aina

wa

Riv

er E

stat

e Lt

dTa

keFu

lly C

ompl

ying

WAR

0103

00Te

Par

e Fa

rm L

tdTa

keFu

lly C

ompl

ying

WAR

0103

03D

ryla

nds

Trus

tTa

keFu

lly C

ompl

ying

WAR

0103

15M

L M

oran

Take

Non

Com

plyi

ngW

AR01

0317

John

and

Mic

helle

Auc

hinc

loss

Take

Fully

Com

plyi

ngW

AR01

0321

Burn

t Spu

r Mar

tinbo

roug

h Li

mite

dTa

keFu

lly C

ompl

ying

WAR

0103

41R

otop

ai T

rust

Take

Fully

Com

plyi

ngW

AR01

0350

R H

War

ren

Take

Fully

Com

plyi

ngW

AR01

0351

W &

R S

tolte

Take

Parti

ally

Com

plyi

ngW

AR01

0354

B R

O'N

eale

Take

Fully

Com

plyi

ngW

AR01

0364

A J

C B

idw

illTa

keM

ainl

y C

ompl

ying

WAR

0103

65D

W W

ood

Take

Fully

Com

plyi

ngW

AR01

0375

I Fra

ser

Take

Fully

Com

plyi

ngW

AR02

0005

Pallis

er E

stat

e W

ines

Take

Fully

Com

plyi

ngW

AR02

0010

B R

O'N

eale

Take

Fully

Com

plyi

ngW

AR02

0022

Tota

ra G

rove

Far

mTa

keM

ainl

y C

ompl

ying

WAR

0200

26R

edba

nk E

stat

e Li

mite

dTa

keM

ainl

y C

ompl

ying

WAR

0200

40M

artin

boro

ugh

Cot

tage

Gro

ve L

tdTa

keFu

lly C

ompl

ying

WAR

0200

49R

W &

LE

Wilm

shur

st E

stat

eTa

keFu

lly C

ompl

ying

WAR

0200

54O

poru

a D

airy

Far

ms

Lim

ited

Take

Mai

nly

Com

plyi

ngW

AR02

0064

B R

O'N

eale

Take

Fully

Com

plyi

ngW

AR02

0072

Riv

ersi

de T

rust

Take

Fully

Com

plyi

ngW

AR02

0083

Phil

Gus

cott

Take

Fully

Com

plyi

ngW

AR02

0086

Pallis

er E

stat

e W

ines

Take

Fully

Com

plyi

ngW

AR02

0089

DB

Osb

orne

Tru

stTa

keFu

lly C

ompl

ying

WAR

0200

91Tu

rang

anui

Tru

stTa

keFu

lly C

ompl

ying

WAR

0200

92A

W T

hurs

ton

Take

Fully

Com

plyi

ngW

AR02

0093

A W

Thu

rsto

nTa

keFu

lly C

ompl

ying

WAR

0200

94Pr

esby

teria

n C

hurc

h of

Aot

earo

a N

ZTa

keM

ainl

y C

ompl

ying

WAR

0200

95T

R M

ccre

ary

Take

Non

Com

plyi

ngW

AR02

0098

Moy

ford

Lim

ited

Take

Fully

Com

plyi

ngW

AR02

0105

Lake

view

Tru

st P

artn

ersh

ipTa

keFu

lly C

ompl

ying

Page 101: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

WAR

0201

08J

W &

H M

Sho

tter

Take

Mai

nly

Com

plyi

ngW

AR02

0109

Cal

dwel

l Tru

stTa

keFu

lly C

ompl

ying

WAR

0201

10C

aldw

ell T

rust

Take

Non

Com

plyi

ngW

AR02

0112

Scot

t Sim

mon

dsTa

keFu

lly C

ompl

ying

WAR

0201

14N

M &

A C

Gra

yTa

keFu

lly C

ompl

ying

WAR

0201

16O

paki

Wat

er S

uppl

y As

sn In

cTa

keFu

lly C

ompl

ying

WAR

0201

17B

T Tu

cker

Take

Fully

Com

plyi

ngW

AR02

0126

Bruc

e Ja

mie

son

Take

Fully

Com

plyi

ngW

AR02

0138

Mar

tinbo

roug

h G

olf C

lub

Take

Fully

Com

plyi

ngW

AR02

0139

Step

hen

L W

hite

Take

Fully

Com

plyi

ngW

AR02

0143

J H

Sim

mon

dsTa

keFu

lly C

ompl

ying

WAR

0201

47Fe

athe

rsto

n G

olf C

lub

Take

Fully

Com

plyi

ngW

AR02

0155

S A

Barto

nTa

keM

ainl

y C

ompl

ying

WAR

0201

69Te

Kai

rang

a W

ines

Ltd

Take

Mai

nly

Com

plyi

ngW

AR02

0176

Shar

on T

oms

Take

Fully

Com

plyi

ngW

AR02

0184

Lind

say

Braz

enda

leTa

keFu

lly C

ompl

ying

WAR

0201

94B

B Pa

trick

Take

Fully

Com

plyi

ngW

AR92

0097

01G

H T

ullo

chTa

keFu

lly C

ompl

ying

WAR

9201

1501

J A

Bick

nell

Take

Mai

nly

Com

plyi

ngW

AR93

0058

01N

R T

erry

Take

Fully

Com

plyi

ngW

AR93

0087

01JR

's P

apaw

ai O

rcha

rds

Ltd

Take

Fully

Com

plyi

ngW

AR96

0165

01Lo

ch N

ess

Farm

Take

Fully

Com

plyi

ngW

AR97

0065

01M

ahun

ga G

olf C

lub

Take

Fully

Com

plyi

ngW

AR98

0071

01Th

e Tr

uste

esTa

keM

ainl

y C

ompl

ying

WAR

9800

9401

Mar

tinbo

roug

h Es

tate

Ltd

Take

Mai

nly

Com

plyi

ngW

AR99

0002

Div

ersi

on P

artn

ersh

ipTa

keM

ainl

y C

ompl

ying

WAR

9900

1001

M S

& G

Joh

nson

Take

Mai

nly

Com

plyi

ngW

AR99

0107

01A

G W

harri

eTa

keFu

lly C

ompl

ying

WAR

9902

27C

ragg

y R

ange

Vin

eyar

ds L

tdTa

keM

ainl

y C

ompl

ying

WAR

0200

18Pl

atfo

rm F

arm

Ltd

Take

Non

Com

plyi

ngW

AR02

0017

Taum

ata

Trus

tTa

keN

on C

ompl

ying

WAR

0200

90T

R M

ccre

ary

Take

Fully

Com

plyi

ngW

AR01

0067

Gen

esis

Pow

er L

tdD

amFu

lly C

ompl

ying

WAR

0100

68G

enes

is P

ower

Ltd

Dis

char

ge W

ater

Fully

Com

plyi

ngW

AR69

0393

Mas

terto

n D

istri

ct C

ounc

ilTa

keFu

lly C

ompl

ying

WAR

6903

92M

aste

rton

Dis

trict

Cou

ncil

Take

Non

Com

plyi

ngW

AR94

0080

Mas

terto

n D

istri

ct C

ounc

ilTa

keFu

lly C

ompl

ying

WAR

9902

22M

aori

Educ

atio

n Tr

ust

Take

Non

Com

plyi

ngW

AR95

0050

Car

terto

n D

istri

ct C

ounc

ilTa

keM

ainl

y C

ompl

ying

WAR

6905

06C

arte

rton

Dis

trict

Cou

ncil

Take

Non

Com

plyi

ngW

AR92

0103

Car

terto

n D

istri

ct C

ounc

ilTa

keN

on C

ompl

ying

WAR

9600

30So

uth

Wai

rara

pa D

istri

ct C

ounc

ilD

amM

ainl

y C

ompl

ying

WAR

9600

30So

uth

Wai

rara

pa D

istri

ct C

ounc

ilD

amM

ainl

y C

ompl

ying

WAR

9301

24So

uth

Wai

rara

pa D

istri

ct C

ounc

ilTa

keFu

lly C

ompl

ying

WAR

6904

25So

uth

Wai

rara

pa D

istri

ct C

ounc

ilTa

keN

on C

ompl

ying

WAR

9301

25So

uth

Wai

rara

pa D

istri

ct C

ounc

ilTa

keFu

lly C

ompl

ying

WAR

9901

42So

uth

Wai

rara

pa D

istri

ct C

ounc

ilTa

keFu

lly C

ompl

ying

Page 102: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

WAR

9900

01So

uth

Wai

rara

pa D

istri

ct C

ounc

ilTa

keFu

lly C

ompl

ying

WAR

0103

06M

aste

rton

Dis

trict

Cou

ncil

Take

Non

Com

plyi

ngW

AR01

0306

Mas

terto

n D

istri

ct C

ounc

ilTa

keFu

lly C

ompl

ying

WAR

0201

58D

Osb

orne

Take

Non

Com

plyi

ngW

AR01

0235

L Br

azen

dale

Take

Non

Com

plyi

ng

Land

use

con

sent

s

File

Ref

eren

ceC

onse

nt H

olde

rA

ctiv

ity T

ype

Com

plia

nce

Rat

ing

WAR

9802

1801

Fore

st E

nter

pris

esVe

geta

tion

Rem

oval

Fully

Com

plyi

ngW

AR02

0008

Jacq

uelin

e J.

Ste

war

tD

amFu

lly C

ompl

ying

WAR

0300

42A

A Bu

chan

anSt

ream

Wor

kFu

lly C

ompl

ying

WAR

0004

25D

epar

tmen

t Of C

onse

rvat

ion

Brid

geFu

lly C

ompl

ying

WAR

0004

27O

ldfie

ld A

ggre

gate

s Lt

dBr

idge

Fully

Com

plyi

ngW

AR01

0054

A K

Gat

esPl

antin

gFu

lly C

ompl

ying

war

0100

76C

arte

rton

Dis

trict

Cou

ncil

Stre

am W

ork

Fully

Com

plyi

ngw

ar01

0095

Te K

aira

nga

Win

es L

tdD

amFu

lly C

ompl

ying

WAR

0103

13Te

Wha

nga

Farm

Tru

stD

amM

ainl

y C

ompl

ying

WAR

0200

28M

aste

rton

Inte

rmed

iate

Sch

ool

Stre

am W

ork

Non

Com

plyi

ngW

AR02

0029

Mas

terto

n D

istri

ct C

ounc

ilBr

idge

Fully

Com

plyi

ngW

AR01

0376

A &

E C

rofo

otBr

idge

Fully

Com

plyi

ngW

AR02

0032

S J

Car

lsen

Qua

rryFu

lly C

ompl

ying

WAR

0200

34C

arte

rton

Dis

trict

Cou

ncil

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WAR

0200

36Ju

ken

Nis

sho

Lim

ited

Brid

geFu

lly C

ompl

ying

WAR

0200

33C

arte

rton

Dis

trict

Cou

ncil

Brid

geFu

lly C

ompl

ying

WAR

0201

22Ju

ken

Nis

sho

Lim

ited

Earth

wor

kFu

lly C

ompl

ying

WAR

0202

04R

iver

sdal

e Be

ach

Rat

epay

ers

Assn

.St

ream

Wor

kM

ainl

y C

ompl

ying

WAR

0103

51W

& R

Sto

lteSt

ream

Wor

kFu

lly C

ompl

ying

WAR

0003

99Ka

iroa

Trus

tSt

ream

Wor

kM

ainl

y C

ompl

ying

WAR

0200

60W

hitta

kers

Saw

milli

ngVe

geta

tion

Rem

oval

Non

Com

plyi

ngW

AR01

0216

Wel

ls In

vest

men

ts L

tdSt

ream

Wor

kM

ainl

y C

ompl

ying

WAR

9602

5218

Tran

sit

Brid

geFu

lly C

ompl

ying

WAR

9903

13O

pera

tions

Dep

tSt

ream

Wor

kFu

lly C

ompl

ying

WAR

0003

64O

pera

tions

Dep

tSt

ruct

ure:

Haz

ard

Miti

gatio

nFu

lly C

ompl

ying

WAR

0101

88Te

Kai

rang

a W

ines

Ltd

Stru

ctur

e: G

ener

alM

ainl

y C

ompl

ying

WAR

0002

24M

aste

rton

Dis

trict

Cou

ncil

Stre

am W

ork

Fully

Com

plyi

ngW

AR02

0014

Ope

ratio

ns D

ept

Stre

am W

ork

Fully

Com

plyi

ngW

AR02

0121

EP &

PW

Wat

kins

onSt

ream

Wor

kFu

lly C

ompl

ying

WAR

0201

34R

B &

L J

Cra

igSt

ream

Wor

kFu

lly C

ompl

ying

WAR

0201

90O

pera

tions

Dep

tSt

ream

Wor

kFu

lly C

ompl

ying

WAR

0300

02Br

uce

Buch

anan

Ltd

Stre

am W

ork

Fully

Com

plyi

ngW

AR03

0016

Col

in G

ooch

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WAR

0300

58D

anie

l Har

tBr

idge

Fully

Com

plyi

ngW

AR99

0288

Ope

ratio

ns D

ept

Stre

am W

ork

Fully

Com

plyi

ng

Page 103: Resource Consent Annual Complia - GW...RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003 5 Commendable compliance Southern Landfill, Carey’s Gully, Landfill Road, Wellington Consent

WAR

9903

14Ju

ken

Nis

sho

Lim

ited

Qua

rryFu

lly C

ompl

ying

WAR

0002

01Ju

ken

Nis

sho

Lim

ited

Earth

wor

kFu

lly C

ompl

ying

WAR

0002

24M

aste

rton

Dis

trict

Cou

ncil

Stre

am W

ork

Mai

nly

Com

plyi

ngW

AR00

0236

Juke

n N

issh

o Li

mite

dQ

uarry

Mai

nly

Com

plyi

ngW

AR00

0248

Ope

ratio

ns D

ept

Stru

ctur

e: G

ener

alFu

lly C

ompl

ying

WAR

0002

95W

ellin

gton

Reg

iona

l Cou

ncil

Earth

wor

kFu

lly C

ompl

ying

WAR

0003

37O

pera

tions

Dep

tEa

rthw

ork

Fully

Com

plyi

ngW

AR00

0342

Ope

ratio

ns D

ept

Stre

am W

ork

Fully

Com

plyi

ngW

AR00

0400

Dep

artm

ent O

f Con

serv

atio

nVe

geta

tion

Rem

oval

Fully

Com

plyi

ngW

AR00

0402

Juke

n N

issh

o Li

mite

dEa

rthw

ork

Fully

Com

plyi

ngw

ar00

0402

Juke

n N

issh

o Li

mite

dEa

rthw

ork

Fully

Com

plyi

ng