AUGUST 2003
Resource consent annualcompliance report 2003
FOR FURTHER INFORMATION
Contents
Introduction 1
Wellington landfills 4Commendable compliance 5Compliance requiring improvement 6Closed landfill compliance 10
Wairarapa landfills 12Compliance requiring improvement 12
Wellington discharges to air 13Compliance requiring improvement 14
Wairarapa discharges to air 18
Wellington wastewater treatment plants 19Commendable compliance 20Compliance requiring improvement 23
Wairarapa wastewater treatment plants 27Commendable compliance 28Compliance requiring improvement 28
Wellington agricultural and miscellaneous discharges 29Commendable compliance 30Compliance requiring improvement 30
Wairarapa agricultural and miscellaneous discharges 38Commendable compliance 38Compliance requiring improvement 38
Wellington water treatment plants and water permits 39Water Treatment Plants 40Commendable compliance 43Compliance requiring improvement 43
Wairarapa water permits 45
Wellington land use consents 47Commendable compliance 48
Wairarapa landuse consents 49Commendable compliance 50
Wellington major river works 51Commendable compliance 52
Wellington coastal 56Commendable compliance 58Compliance requiring improvement 59
Wairarapa coastal 60Commendable compliance 60
Wellington roading, forestry and subdivision 61Commendable compliance 62Compliance requiring improvement 63
Wellington enforcement summary 65
Wairarapa enforcement summary 67
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
1
Introduction
BackgroundThe annual resource consent compliance report is a summary of all compliancemonitoring undertaken in the 2002/2003 financial year on consents monitored by theGreater Wellington Regional Council (GWRC) from offices in both Wellington and theWairarapa.
This report is intended to provide a comprehensive background to compliance statusover the year for all on-going consented activities such as municipal sewage discharges,landfill operations, major river works and industrial air discharges, as well as smaller‘one-off’ activities and works such as those in the coastal marine area.
What is compliance monitoring and how do we measure it?The GWRC undertakes inspections on all consented activities, which have a potentialenvironmental impact. Depending on the scale and type of activity, compliancemonitoring may consist of a site visit and inspection, review of monitoring andreporting information, and the taking of samples and analysis for audit sampling.Inspections may take any of the following forms:
Routine inspections which have been pre-arranged with consent holders;Random inspections where the consent holder is not notified;Proactive surveillance inspections as a result of previous non-compliance at thesite; andInspections following a complaint about a consented activity.
In terms of measuring the compliance we undertake, the GWRC uses a four tieredsystem to classify consent holder compliance as shown below.
These are based on the financial year from 1 July to 30 June.
Fully complying 100% compliance with all consent conditions at alltimes.
Mainly complying Compliance with all conditions relating toenvironmental effects during the year. However, theremay be minor non-compliance with administrative-typeconditions, e.g., late (but by no more than one month)submission of management reports. All administrativeconditions are met at the end of the financial year.
Partially complying Compliance with all conditions relating toenvironmental effects during the year. However, theremay be non-compliance with administrative-typeconditions, e.g., late submission of managementreports. The consent holder needs to be prompted byGreater Wellington Regional Council before suchadministrative conditions are met at the end of the
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
2
financial year.
Non-Complying Non-compliance with condition(s) relating toenvironmental effects during the financial year (thisincludes any confirmed complaints) and/or not alladministrative-type conditions met at the end of thefinancial year.
Following annual inspections, a compliance report is prepared by GWRC and providedto the consent holder showing the consent compliance ratings. Operations such asWastewater Treatment Plants, Landfills, and larger Industrial Plants may receive severalinspections during the year. Inspection reports may be issued after each inspectionnoting the compliance and operation issues for that inspection but a final compliancerating is not given until the final end of year inspection report is completed.
How does this year compare to the previous year?
Some prominent aspects of this year’s compliance monitoring are:
The percentage of overall fully complying consents has decreased from 77% lastyear to 69% this year.
The percentage of overall non-complying consents has increased from 13.3% lastyear to 15% this year.
The percentage of both mainly complying and partially complying consents hasincreased this year.
0%
10%
20%
30%
40%
50%
60%
70%
80%
FullyComplying
MainlyComplying
PartiallyComplying
NonComplying
Combined Wellington/Wairarapa compliancesummary
2001/20022002/2003
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
3
Some prominent aspects of formal enforcement taken compared to last year is asfollows:
AbatementNotices
Infringementnotices
Enforcementorders
Prosecutions
2001/02 2002/03 2001/02 2002/03 2001/02 2002/03 2001/02 2002/03
Wairarapa 9 10 3 4 0 0 2 1
Wellington 2 10 11 8 1 0 3 0
TOTAL 11 20 14 12 1 0 5 1
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
4
Wellington landfillsFully Complying Mainly Complying Partially Complying Non-Complying
51 1 1 15
Note: These numbers are for individual resource consents for all landfills (open andclosed), not overall ratings.
During this financial year:
Overall, fully complying consents remained exactly the same as last year.
The percentage of non-compliance also remained exactly the same.
The number of municipal landfills that are fully complying with all their consentsremains at three. Although, two of the three are different from two that were fullycomplying last year.
In general, non-compliance was either due to failure to comply with administrativeconditions, such as the late submission of reports, or failure to meet certain limitsfor monitoring parameters. GWRC is currently working with a number of consentholders to resolve these issues.
There continues to be ongoing issues of non-compliance with the conditions ofcleanfill and demolition fill consents. There is outstanding legal action against oneof the consent holders, which we anticipate should be resolved in the 2003/2004year. Other non-compliance should be resolved by a variation, which was appliedfor in December 2002, but that is on hold while the consent holder obtains writtenapprovals. These matters are discussed in more detail below.
GWRC currently monitors three closed landfills. The results for these are reportedseparately from the operating landfills. There are several outstanding complianceissues with two of the closed landfills and these are discussed in more detail below.
Landfill compliance
76%
22%1%
Fully ComplyingMainly ComplyingNon Complying
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
5
Commendable compliance
Southern Landfill, Carey’s Gully, Landfill Road, WellingtonConsent Holder: Wellington City Council
WGN940045 (01)-(04)1 discharge permit to land1 discharge permit to air2 land use consents
WGN970233 (01) & (02)1 discharge permit to land1 discharge permit to air
WGN970254 (01) & (02)1 discharge permit to land1 discharge permit to air
The only issue identified during the compliance inspection was the provision ofreports on the nature and volume of waste deposited at the site. GWRC is satisfiedthat detailed information is held at the landfill. However, we have requested thatWellington City Council supply reports quarterly, rather than yearly, as is the caseat present.
The number of odour complaints from people living in the vicinity of Carey’sGully have remained high, although no odour incidents were confirmed that relatedto the operation of the landfill.
All the stakeholders at the site are currently considering their options with regard toodour issues related to the site. GW has requested a timeframe for the suggestedactions and will follow this up when the information is provided.
Otaki Landfill, Riverbank Road, OtakiConsent Holder: Kapiti Coast District Council
WGN930179 (02)-(06)1 discharge permit to air2 land use consents1 discharge permit to water1 water permit
The Otaki Landfill was closed in 1996 and now operates as a refuse transfer stationonly. Waste deposited here is compacted and transferred to Otaihanga Landfill.
Consents to take groundwater, discharge contaminants to air and groundwater,diversion of stormwater and discharge of stormwater are still operative.
Previous non-compliance at this site has been associated with the failure to providemonitoring results. GWRC is pleased to note that this issue has been resolved and
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
6
all data required by conditions of the consents has been provided in a timelymanner.
Silverstream Landfill, Reynold Bach Road, SilverstreamConsent Holder: Hutt City Council
WGN970164 (01)-(08)1 discharge permit to land2 discharge to water permits1 discharge permit to air4 water permits
WGN930165 (01)1 discharge to air permit
The landfill continues to be well maintained and operated. Full compliance wasachieved with all consent conditions.
There have been no confirmed offensive or objectionable odours at or beyond theboundary during the 2002/2003 compliance year.
Although fully complying with all consent conditions, guideline concentrations ofsome contaminants in surface water and groundwater were regularly exceededduring the year. These guidelines, based on the ANZECC irrigation water qualityguidelines, have been set as a point of comparison for the monitoring, and theconsents do not require the contaminant concentrations to be below the guidelinevalues. However, GWRC will be contacting the consent holder to discuss thesecontaminant levels, and determine what can be done to improve them.
Compliance requiring improvement
Waikanae Landfill, Park Avenue, WaikanaeConsent Holder: Kapiti Coast District Council
WGN930178 (01)-(06)1 discharge to land permit1 discharge to air permit1 land use consent1 discharge to water permit2 water permits
The landfill operates as a transfer station for green waste and recyclable material.
Monitoring of the Waimeha Stream has shown exceedences for faecal coliformsduring the 2002/2003 year. Monitoring of the bores has shown severalexceedences for ammonia during the 2002/2003 year. The landfill has a history ofexceedences at these points. However, the number of exceedences has dropped,compared to previous years.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
7
Further work is needed by the consent holder to avoid additional exceedences ofmonitoring limits imposed by the resource consents.
Northern Landfill, Westchester Drive, Grenada, WellingtonConsent Holder: Wellington City Council
WGN9301391 discharge permit to land
WGN9301401 discharge permit to air
WGN9301411 discharge permit to land
WGN9301421 discharge permit to land
WGN9301431 land use consent
WGN9301441 water permit
WGN9401241 water permit
Neither the discharge to land permit nor the discharge to air permit for thecomposting operation were exercised this year.
The diversion and discharge of stormwater permit, both water take permits and thedischarge of landfill gas to air were all assessed as fully complying.
The discharge to land permit, authorising the discharge of contaminants onto landfor the purpose of landfilling wastes was classified as mainly complying. Thisrelates to non-compliance with monitoring conditions in relation to bore hole 10.The consent holder recently submitted an application to vary this condition and thiswas granted in June 2003.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
8
T&T Landfills, Happy Valley Road, Happy Valley, WellingtonConsent Holder: T & T Landfills Limited
WGN970047 (01)-(06)1 discharge permit to water3 land use consents1 discharge permit to land1 discharge permit to air
The non-compliance at the site relates to the drainage network and the need toprovide GWRC with a $100,000 bond.
GWRC has received a number of complaints about this site during the 2002/2003compliance year. These all relate to the disposal of non-cleanfill waste. None ofthese complaints have been confirmed. However, GWRC has reiterated theimportance of only accepting cleanfill waste to the consent holder.
An application to vary conditions of the resource consents was lodged on 16December 2002. This is currently on hold while written approvals are obtainedfrom affected parties. If these approvals are not obtained, the application will bepublicly notified. GWRC continues to meet with the consent holder in order toresolve the outstanding issues.
C & D Demolition Landfill, Landfill Road, Happy Valley, WellingtonConsent Holder: Burrell Demolition Limited
WGN9400571 discharge permit to land
This landfill continues to have issues in relation to what can and cannot bedisposed of at the site.
A declaration concerning the nature of waste material allowed under the terms ofthe resource consent was heard in the Environment Court on 8 December 2000.On 30 April 2001, the High Court overturned the decision of the EnvironmentCourt not to make a declaration in respect to the Burrell consents. Subsequentlythe High Court granted Burrell Demolition Ltd and its director leave to appeal tothe Court of Appeal. The Court of Appeal has invited a joint memorandum fromCounsel to dispose of any variation that may be necessary to the High Court’sdeclaration.
The proceedings to hear the charges in the District Court are now expected in the2003/2004 financial year.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
9
Old and New Wainuiomata Landfill, Coast Road, WainuiomataConsent Holder: Hutt City Council
WGN0001821 discharge permit to water
WGN950052 (01)-(10)1 discharge permit to land2 discharge permits to water1 discharge permit to air4 water permits2 land use consents
The consent holder was fully complying with all consents except the consents forthe discharge of contaminated stormwater to surface water and for the discharge toland of contaminated stormwater from the old Wainuiomata Landfill.
Non-compliance at the old landfill was related to an absence of signage, monitoringresults not being submitted and a future management plan not being submitted.These matters are in the process of being rectified.
Non-compliance at the new landfill was associated with exceedence of severalmonitoring parameters. The consent holder has been asked to identify whatremedial action is proposed to ensure that this consent is not breached in the future.
Spicer Landfill, Broken Hill Road, PoriruaConsent Holder: Porirua City Council
WGN940046 (01)-(04)1 discharge permit to land1 discharge permit to air2 water permits
The discharge consents were classified as non-complying because the permitholder failed to fully cover refuse and waste at the landfill with suitable soil coverby day’s end (16 September 2002). An associated complaint of offensive odourcould not be confirmed but an infringement notice was issued for the failure tocover the landfill. Otherwise, good management practices have prevailed at thelandfill, whilst a weighbridge for commercial vehicles, a residential unloadingfacility, and ‘Trash Palace’ – the permit holder’s recycle and re-use centre, were allestablished at the landfill.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
10
Otaihanga Landfill, Otaihanga Road, ParaparaumuConsent Holder: Kapiti Coast District Council
WGN930177 (01-05, 07)
1 discharge permit to land1 discharge permit to air2 discharge permits to water2 water permits
The discharge consents were found to be non-complying because the permit holderfailed to fully cover refuse and waste at the landfill with suitable soil cover byday’s end (incidents of 5 March 2003 and 12 March 2003). A complaint ofoffensive odour was also confirmed on 12 March 2003, and the landfill’scomposting operation was found to be expanded well beyond what GWRC hadpreviously certified. Otherwise, good management practices have prevailed at thelandfill, with the application of lagooned sludge from Paraparaumu wastewatertreatment plant as a final cover. This soil rehabilitation has been successfullyapplied to the completed south-east cell of the landfill without any odour incidentsor vector control problems.
Monitoring results for the period up to March 2003 indicate that the groundwatermoving away from the site towards the eastern branch of the Mazengarb Streamcontinued to be of poor background quality and with possible leachatecontamination. However, the area also contains abundant low permeability peatsoils, which are commonly associated with naturally elevated ammonia and ironlevels in groundwater. No significant landfill gas has been detected in anymonitoring bores.
Surface water monitoring has continued to show that ammonia, a key leachateindicator, has declined sharply in the eastern branch of Mazengarb Stream thisyear. However, the western branch of Mazengarb Stream shows elevatedconcentrations of ammonia, BOD, boron, iron and manganese, all of which indicatesignificant leachate contamination. Leachate is currently collected in a drain alongthe western side of the landfill and passed to Paraparaumu Sewage TreatmentPlant.
Closed landfill compliance
Old Fort Dorset landfill, Ludlum Street, Seatoun, WellingtonConsent Holder: Seaside Haven Limited
WGN0200841 discharge permit to land
The works were inspected on three occasions during the 2002/2003 complianceyear. On all occasions the site appeared to be well maintained and tidy.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
11
The permit holder is non-complying with the resource consent because nomonitoring data was collected from bore 2 during the June 2002 sampling roundand was not provided to GWRC until this compliance year. The bore has sincebeen reinstated so that sampling can be undertaken.
Southgate Landfill, Southgate Park, WellingtonConsent Holder: Wellington City Council
WGN950140 (01)-(03)3 discharge to air permits
The consents relate to the discharge of landfill gas from the site. Landfill gas isactively discharged and flared from one point. There is also a passive dischargepoint and one consent relates to potential fugitive discharges.
The operations were all well maintained and assessed as fully complying during the2002/2003 compliance year. There have been no odour complaints about this siteduring the 2002/2003 year.
Horokiwi Closed Landfill, Horokiwi, WellingtonConsent Holder: Wellington City Council
WGN0000481 discharge to water permit
The permit holder is non-complying because samples for lead and zinc haveexceeded limits specified in the resource consent. This may be because the on-sitewetland has only recently been commissioned.
GWRC are investigating the exceedences and will continue to monitor this site inthe future.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
12
Wairarapa landfillsFully Complying Mainly Complying Partially Complying Non-Complying
5 1 1 1
Note: These numbers are for individual landfill consents, not overall ratings.
During this financial year:
Compliance of Masterton District Council’s (MDC) landfills was unable to beassessed by the time this annual compliance report was due. An agreed timeframebetween MDC and GWRC means the annual report on the landfills is due by theend of July each year, which coincides with this annual report.
A new area of Martinborough landfill was opened up, and is operating generallyaccording to the consent conditions.
Groundwater contamination continues to be detected around the Carterton landfill.
Compliance requiring improvement
Carterton District Landfill, Dalefield Road, CartertonConsent Holder: Carterton District Council
WAR 940047 (01)-(03)1 discharge permit of solid waste to land1 discharge permit for leachate to land and water1 discharge permit to air
The non-compliance at this landfill relates to the groundwater contamination that isbeing detected in monitoring bores around the site. This has been an on-goingissue. The Carterton District Council has completed a certain amount ofinvestigation work and more is planned.
Wairarapa landfills
62%
12.6%12.6%
12.6%
Fully ComplyingMainly complyingPartially complyingNon-complying
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
13
Wellington discharges to airFully Complying Mainly Complying Partially Complying Non-Complying
39 5 1 9
During the 2002-2003 financial year, 54 discharge to air permits were inspected inthe western section of the Wellington Region (not including Wastewater and WaterTreatment Plants, Landfills and Agricultural and Miscellaneous Discharges toLand, which are covered elsewhere in this report):
The overall compliance status of the consents inspected:
70% of consents were fully complying. This is a reduction from the 75% fullcompliance in the 2001/2002 financial year.
The cases where permit holders were partially or mainly complying were due toadministrative infringements such as the late submission of monitoring results,annual reports, maintenance records or operations manuals.
Of the ten consent-holders who were non-complying, three cases of non-compliance were due to offensive or objectionable discharges (e.g. odour) whilefour cases were due to non-submission of monitoring results.
Air discharge compliance
75%
14%2% 9%
Fully ComplyingMainly ComplyingPartially ComplyingNon Complying
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
14
Compliance requiring improvement
Chemwaste Liquid and Hazardous Waste Treatment Plant, Seaview, Lower HuttConsent Holder: Chemwaste Industries Limited
WGN9900471 discharge permit to air
Non-complying because offensive odour was confirmed beyond the site boundaryon 26 September 2002. An infringement notice was issued for this confirmedincident.
The permit holder continued its failure to operate in accordance with the plant’srisk management plan on 25 February 2003 by allowing the discharge of wastegalvanising acid into an open bunded area rather than directly into acid holdingtanks.
Cryovac extrusion and printing plant, Elsdon, PoriruaConsent Holder: Cryovac Sealed Air Corporation
WGN9701171 discharge permit to air
Cryovac have expanded their operation since the consent was granted in March1997. The expansion of operations was outside of the activities applied for, so theconsent holder was in breach of the consent. This was discovered by GWRCduring a compliance inspection on 5 November 2002.
Cryovac subsequently applied to vary the consent conditions to allow for theirexpanded operation. This variation was granted in December 2002.
The consent requires the submission of an annual monitoring report by 20 March2003. Cryovac submitted a draft of this report on 2 April 2002, however, the finalversion was not received until 2 July 2003, and therefore Cryovac was onlypartially complying with this condition.
Cryovac did not test ozone emissions in May 2003 as required by the consent. Thetesting has subsequently been carried out and the results forwarded to GWRC.
Dulux New Zealand manufacturing plant, Upper HuttConsent Holder: Dulux New Zealand Limited
WGN0102231 discharge permit to air
Dulux New Zealand has not undertaken the annual emissions testing required bythe consent since December 2001. Dulux New Zealand have stated that testing will
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
15
be carried out as soon as possible and the results will be submitted as soon as theybecome available.
Because the results of emissions testing for 2002/2003 have not been submitted,compliance with particulate emissions limits cannot be assessed.
Fulton Hogan asphalt plant, Belmont, Lower HuttConsent Holder: Fulton Hogan Limited
WGN9401301 discharge permit to air
Fulton Hogan submitted the results of only one of the two 6-monthly emissionstests required by the consent. According to Fulton Hogan this was due to theintermittent nature of operation.
Because one round of emissions testing was omitted, compliance with theparticulate emission limits cannot be fully assessed. The 6-monthly monitoringresults that were supplied, however, showed that particulate emissions were withinlimits at that time.
Nuplex Environmental Treatment Plant, Seaview, Lower HuttConsent Holder: Nuplex Environmental Limited
WGN0201791 discharge permit to air
Nuplex Environmental Ltd was issued with a replacement consent to discharge toair in October 2002.
Discharges of odour that were confirmed as offensive or objectionable beyond theboundary of the property occurred on two occasions in the 2002-2003 period. Theoffensive odours were in breach of the conditions of consent. An infringementnotice was issued for the first confirmed breach, while enforcement action for thesecond incident is under consideration.
Pacific Wallcoverings manufacturing plant, Elsdon, PoriruaConsent Holder: Pacific Wallcoverings Limited
WGN9401531 discharge permit to air
Pacific Wallcoverings Limited did not inform GWRC of the incidence of a fire inthe plant in late 2002. The notification of any incident that may result in adverseeffects beyond the boundary of the plant is required by a condition of the consent.Pacific Wallcoverings Limited have made assurances that notification of suchincidents will be made in the future.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
16
Pavements asphalt plant, Horokiwi Quarry, WellingtonConsent Holder: Pavements (Wellington) Ltd
WGN9500051 discharge permit to air
Pavements have not submitted the results of annual particulate emissions testingrequired by the consent. According to Pavements, this was due to the intermittentnature of the operation. Pavements have stated that the testing will be carried out assoon as possible
Because the results of emissions testing for 2002-2003 have not been submitted,compliance with particulate emissions limits cannot be assessed.
Abrasive Blasting Company, Wellington Region (global consent)Consent Holder: Steam and Sand
WGN9700291 discharge permit to air
Steam and Sand failed to provide GWRC and neighbouring property owners withnotification of works. Steam and Sand also failed to notify GWRC of complaintsthey received as required by the consent.
The site of works was inspected in response to a complaint on 22 April 2003 andconspicuous deposits of blast debris had not been collected and removed asrequired by the consent. A sample of the material was taken and analysed and wasshown to contain zinc and a smaller amount of lead.
The blasting operators did not understand and comply with the consent conditionson 22 April 2003, as required by the consent. The consent holder was charged forthe costs of investigations. No further action was taken.
Taylor Preston Limited Abattoir, Ngauranga Gorge, WellingtonConsent Holder: Taylor Preston Limited
WGN95015101 discharge permit to air
Discharges of odour that were confirmed as offensive or objectionable beyond theboundary of the property occurred on eight separate occasions in the 2002/2003period. The offensive odours were in breach of the conditions of consent and aninfringement notice was served for the first of the eight consent breaches. GWRCis assessing enforcement options with regard to the remaining breaches.
In response to the findings of an independent audit of odour abatement measuresemployed at the plant (commissioned by the council in 2001) Taylor PrestonLimited (TPL) implemented improvements to these measures in mid-2002.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
17
Following the series of breaches and an increase in complaints regarding odour inthe area in 2003, the council has commissioned the same independent consultant tore-audit the plant, assess compliance with the recommendations of the 2001 auditand to suggest further measures that may be taken to reduce odorous emissions.
Vita New Zealand manufacturing plant, Upper HuttConsent Holder: Vita New Zealand Limited
WGN0102231 discharge permit to air
Vita New Zealand did not submit their first annual discharge monitoring report(due 25 November 2002). This report requires testing of the discharges for certainHazardous Air Pollutants, while estimates of these discharges are sufficient insubsequent years. Vita New Zealand have acknowledged this oversight and is inthe process of commissioning consultants to undertake the required testing and willforward the results to GWRC as soon as they become available.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
18
Wairarapa discharges to airDuring this financial year:
A change to the Regional Air Quality Management Plan made discharges to airfrom piggeries and chicken farms permitted. To date, we have not cancelled anyexisting consents from these properties.
Apart from the discharges to air from landfills and sewage plants, no formalcompliance inspections were undertaken for air discharges in the Wairarapa.Discharges to air from the landfills and sewage plants are recorded in thoserespective sections of this report.
The Juken Nissho sawmill plant has been visited a number of times by staff todiscuss aspects of their discharge to air, and self-monitoring continues to bereported to GWRC. There were no complaints relating to air discharges for theyear.
Webstar Print, which has been the cause of numerous complaints in the past,installed a significant piece of pollution control equipment. It exploded on the firstday of use, but has now been repaired and reinstalled. The discharge from this siteis markedly improved as a result.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
19
Wellington wastewater treatment plantsFully Complying Mainly Complying Partially Complying Non-Complying
26 0 0 5
Note: These numbers are for individual resource consents for wastewater treatmentplants and any associated overflow provisions. They are not overall ratings forthe plants.
During this financial year:
There were no mainly or partially complying consents.
Consents were given non-complying ratings mainly for exceeding contaminantconcentration limits and failure to monitor designated parameters. Some non-complying ratings were also given as a result of unlawful discharges of effluent.
Wainuiomata Wastewater Treatment Plant no longer operates as a treatment plant,as it was decommissioned in December 2001 and replaced with a pump station.The pump station still has to comply with resource consents and the compliance isreported below.
Waikanae Wastewater Treatment Plant has also been decommissioned, and nocompliance inspections were required during the 2002/2003 year.
Wellington water treatment plants and water permits
84%
16%
Fully Complying
Non-Complying
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
20
Commendable compliance
Porirua Wastewater Treatment PlantConsent Holder: Porirua City Council
WGN980083 (01-03)1 discharge to air permit1 discharge to water permit1 coastal permit
The first inspection was undertaken on 14 November 2002, and the consent holderwas fully complying with all applicable conditions of consent.
The second inspection for the 2002/03 compliance year was carried out on 9 May2003. Porirua City Council (PCC) has met all the requirements of the consents sofar during this year.
The ultra violet disinfection facility was completed and commissioned at the timeof the last inspection in November 2002. The inlet main weir under constructionduring the last inspection is now completed, but there have been few heavyrainfalls to test its efficiency.
PCC has been having trouble with its shellfish sampling, with shellfish mortalitydue to rough conditions, and cages being stolen. PCC may apply for a change inconsent condition after investigating alternative monitoring regimes.
Wainuiomata Wastewater Pumping StationConsent Holder: Hutt City Council
WGN9900841 discharge to air permit
WGN0201591 discharge to land and water permit
WGN9900841 discharge to water permit
The consent holder has fully complied with the conditions of the consents for the2002/2003 compliance year. A compliance inspection was not necessary ascompliance with the consent conditions is based on the supply of records andreports as opposed to an inspection of the activities. Three inspections were carriedout in the 2002/2003 compliance year during decommissioning of the WainuiomataWastewater Treatment Plant.
Significant measures have been undertaken to reduce the incidents of wet weatheroverflows. A future programme of works is also planned for stormwater inflowsurveys to further reduce wet weather overflows.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
21
Three wet weather overflow events to the Wainuiomata River have occurred duringthe compliance year on 15 July 2002, 17 November 2002 and 9-11 June 2003.
Western Wastewater Treatment PlantConsent Holder: Wellington City Council
WGN8900091 coastal discharge permit
WGN0101331 coastal discharge permit1 discharge permit to water
WGN9201381 discharge permit to air
WGN0202361 coastal permit
The Western Wastewater Treatment Plant operates under four discharge permits.Two of these, the coastal discharge permit (WGN890009) that authorises thecontinuous discharge of tertiary treated effluent to coastal waters and the dischargeto air permit (WGN920138) that authorises the continuous discharge of air througha soil filter, were in full compliance with consent conditions.
The remaining two resource consents are for the occasional discharge of sewageoverflows during significant wet weather events to both the coast and KaroriStream. WGN920134 authorises the intermittent discharge of tertiary treatedeffluent into Karori Stream, while WGN920135 provides for the intermittentdischarge of milli-screened effluent into the coastal waters. These consents bothexpired on the 30 June 2001. The hearing committee’s decision was appealed andthat appeal was not resolved until 5 May 2003. Greater Wellington received theMinister of Conservation’s recommendation on 26 June 2003. During mediation,however, it was agreed that the wet weather overflow discharges from theTreatment Plant would comply with the conditions of the permits underWGN010133.
The permits have been exercised twice during the 2002/2003 compliance year.Both permits under WGN010133 were judged to be fully complying.
Coastal permit WGN020236 permits the occupation of the coastal marine area inrespect of the Western Wastewater Treatment Plant outfall structure, and this wasin full compliance with consent conditions.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
22
Paraparaumu Wastewater Treatment PlantConsent Holder: Kapiti Coast District Council
WGN970255 (01-05)1 discharge to air permit3 discharge to land permits1 discharge to water permit
Throughout the 2002/2003 year the treatment plant continued to operate in itsupgraded mode, which included the new UV disinfection system and treatment ofall flows from Waikanae. Kapiti Coast District Council (KCDC) have progressedsome considerable way to completing the transfer of sludge for beneficial use as asoil cap on Otaihanga Landfill. There have been no confirmed incidents ofoffensive odour. It is expected that the sludge lagoons at Paraparaumu will be fullydecommissioned and rehabilitated in the next financial year.
The consent holder is partially complying because they failed to supply themonitoring results for the treatment plant effluent and they also failed to report onconsultation undertaken with the community liaison group by the end of the2002/2003 financial year.
AWI Wastewater Dewatering PlantConsent Holder: Anglian Water International/Wellington City Council
WGN9300691 discharge permit to air
WGN0000391 discharge permit to air
The de-watering plant at Carey’s Gully operates under two discharge permits.Both of these, the discharge to air permit (WGN000039) that authorises thedischarge of contaminants to air from the treatment of centrate and the discharge toair permit (WGN930069) that authorises the continuous discharge of air through asoil filter, were in full compliance with consent conditions.
Although there are on going complaints regarding odour from the Carey’s GullyLandfill complex, no noxious, dangerous, offensive or objectionable odours havebeen confirmed as originating from the de-watering plant or biofilter.
All the stakeholders at the site are currently considering their options with regard toodour issues related to the site. GWRC has requested a timeframe for the suggestedactions and will follow this up when the information is provided.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
23
Compliance requiring improvement
Hutt Valley Sewer OverflowsConsent Holder: Hutt City Council
WGN960002 (01-04), (07-08)6 discharge permits to water
WGN0101011 discharge permit to water
The permit holder was meeting all the requirements of most of the consents. At thetime of the inspection, a number of warning signs appeared to have been removedor destroyed by vandals and required replacing. The required reports continue tobe submitted in good time.
Three of the consents have been given compliance ratings of non-complying due todischarges during dry flow, discharges of above the consented flow rate, andfailure to monitor water quality following the discharge.
GWRC has required that the missing signs are replaced and that the consent holderchecks the design of Wellington Road Pump Station to ensure that debris will notcause overflows in the future.
Otaki Wastewater Treatment PlantConsent Holder: Kapiti Coast District Council
WGN950035 (01-03)1 discharge permit to land2 discharge permits to air
The plant was inspected on 13 June 2003. At that time the plant appeared to beoperating efficiently and in full compliance with operational conditions of theconsents.
The groundwater and effluent monitoring results required under conditions 13 and14 of consent WGN950035 (01) were not submitted during the 2002/2003 year andcould not be reviewed. The consent holder is therefore not complying with theconditions of this consent, allowing the discharge of effluent to land. The resultshave since been submitted and the results reviewed.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
24
Hutt Wastewater Treatment ProjectConsent Holder: Hutt City CouncilHutt Valley Water Services
WGN950162(01-03)1 discharge permit to air1 discharge permit to water1 coastal discharge permit
WGN950049(01)
1 discharge permit to air
WGN930193(01-02)
1 coastal discharge permit1 discharge permit to air
There have only been six odour complaints relating to the wastewater treatmentplant over the past compliance year. None of the complaints were confirmed. Thesmall number of complaints is a great improvement on the previous year. Hutt CityCouncil are complying with all aspects of the discharge to air permit.
There have been 2 discharges to the Waiwhetu Stream during the 2002/2003compliance year. One of these, on 8 August 2002, had a mean flow rate of 1,003L/sec. This was a breach of condition 13 of WGN950162 (02) and an infringementnotice was issued as a result of this breach. Hutt City Council is currentlyundertaking works to ensure that the incident that caused this overflow, does nothappen again. However, a grading of non-complying has been given because ofthis overflow.
A rating of non-complying has also been given for WGN950162 (03) because the80 percentile for faecal coliforms was breached in November and December 2002.Hutt City Council considers that the problems experienced at the plant in late 2002were due to trade waste received. In response to this problem, Hutt City Councilhas taken a successful prosecution against the parties they consider responsible.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
25
Moa Point Wastewater Treatment PlantConsent Holder: Wellington City CouncilAnglian Water International
WGN960094(01 )1 discharge permit to air
WGN9000251 coastal discharge permit to water
WGN0202451 coastal permit
WGN9100961 discharge permit to air
The consent holder has fully complied with conditions of the long outfall dischargepermit, the coastal occupation permit, and discharge to air from the plantventilation system during the 2002/2003 compliance year.
The consent holder is currently reporting against condition 7 (a) using thecarbonaceous, 5 day BOD test. The condition does not specify cBOD is theparameter to be monitored, but refers to BOD5 which refers to Total BOD. It isaccepted that cBOD is the accepted method for testing wastewater effluent.However it is of concern that the limits set in Condition 7 (a) were done so on thebasis of Total BOD not cBOD. This matter needs to be further discussed with theconsent holder.
A small milliscreened only discharge occurred on 8 December 2002, in conjunctionwith the discharge of Kaldness media. The milliscreened only discharge isunlawful. The permit holder is currently in the process of preparing a resourceconsent application to GWRC to authorise discharges of this nature.
Work is ongoing with Anglian Water Inc (AWI) and Wellington City Council(WCC) regarding measures to minimise discharges of sub-treated sewage, such asretention and storage with the treatment network, and elimination of stormwateringress into the sewers.
The consent limit of 0.05ppm total reduced sulphur compounds (TRS) wasexceeded during monitoring carried out on 23 October. This was the firstexceedence since monitoring began in September 1998. AWI have advised this isa sample error.
There were no odour complaints with respect to the treatment plant lodged with thepermit holder during the compliance year. A total of 12 odour complaints werelodged with GWRC. These complaints were not specific as to the source, that iswhether from the treatment plant or the pumping station. GWRC officers did notconfirm any odours originating from the plant ventilation system.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
26
A discernible odour was confirmed by GWRC officers on 12 June 2003. Thesource of this odour was determined not to be the plant ventilation system, but fromthe ventilation system of trucks carrying out maintenance on one of the 12 metrewells. As the odour was not offensive or objectionable no further action is beingtaken by GWRC.
The discharge from the short outfall consent expired on 31 December 2002. Thereis no longer a milliscreen in place at the short outfall. An unlawful discharge fromthe short outfall occurred on 9 June 2003. This matter is being investigated byGWRC Pollution Control.
Not all conditions of consent have been complied with during the 2002/2003compliance year for the discharge to air from the pumping station. The consentlimit for TRS was exceeded during monitoring on 29 August 2002 and 19December 2002. TRS was also exceeded on 16 April 2003, however, a repeatsample taken on 29 April 2003 complied with the consented limit of 0.05ppm.New sampling techniques have been investigated throughout the year.
The permit holder had a total of 8 complaints lodged with it during the complianceyear. Records of complainants are kept and forwarded quarterly. 12 complaintswere lodged with GWRC. These complaints were not specific as to the source, thatis whether from the treatment plant or the pumping station. GWRC officers did notconfirm any odours originating from the pump station.
Resealing of the wet wells has been completed. This upgrade means the pumps cannow be removed with minimal chance for odour escape.
The consent holder is fully complying with consent conditions for the short outfallto the coastal marine area, and was inspected by the permit holder on 24 January2003.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
27
Wairarapa wastewater treatment plantsFully Complying Mainly Complying Partially Complying Non-Complying
5 1 0 2
Note: These numbers are for individual resource consents for wastewater treatmentplants, not overall ratings for the plants.
During this financial year:
The Masterton sewage plant was granted consent to continue discharging sewage tothe Makoura Stream for a further seven years. Conditions include a requirement foran interim upgrade of the plant, increased monitoring, and the requirement todecide on a long term upgrade option within two years.
The Martinborough sewage consents were assessed for compliance for the firsttime since the granting of a renewed consent in 2001.
A deadline passed for the Carterton sewage discharge to be removed from the riverduring summer months. This requirement was not complied with. GWRC servedan infringement notice, along with an abatement notice requiring the discharge tothe river to stop during summer 2004.
The Featherston sewage plant continues to operate under the water right grantedunder the Water and Soil Conservation Act in 1987. GWRC had been expecting acompleted application for renewal of the consent for much of the year, but SouthWairarapa District Council have been continuing consultation with keystakeholders and assessment of alternative options to incorporate a land basedsystem. An ecologist has also been assessing the impacts of the current discharge.A complete assessment of effects is expected within the next two months.
The first full year’s monitoring data after improvements to Greytown sewage plantshow that, although an improvement has been made to effluent quality, the qualitydoes not meet the standard set under the consent. The consent holder was given anon complying report and advised to investigate further measures that can be takento improve effluent quality.
Wairarapa wastewater treatment plants
62%13%0%
25%Fully ComplyingMainly complyingPartially complyingNon-complying
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
28
GWRC granted discharge permits to air to the Greytown and Carterton sewageplants, leaving only the Featherston sewage plant to be finalised.
Commendable compliance
Masterton sewage oxidation pondsConsent Holder: Masterton District Council
WAR0200741 discharge permit to air1 discharge permit to land1 discharge permit to water
GWRC is pleased with compliance during the financial year. The standard ofreporting has been excellent and several measures are being put in place to upgradethe treatment plant.
The Featherston treatment plant was also fully complying, though on an antiquatedconsent with minimal conditions.
Compliance requiring improvement
Carterton Municipal Sewage Treatment Plant, Dalefield Rd, CartertonConsent Holder: Carterton District Council
WAR 9501481 discharge permit to water
The Carterton plant failed to meet the requirement for no summer discharge to theriver by 1 January 2003. It also continued to exceed the bacterial limit placed onthe consent. This bacterial limit became even stricter by 31 December 2002.
Greytown oxidation ponds, Papawai Road, GreytownConsent Holder: South Wairarapa District Council
WAR 9602861 discharge permit to water
Although the required upgrading of the pond has been completed, the effluentquality has failed to meet the standard set by the consent.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
29
Wellington agricultural and miscellaneousdischargesFully Complying Mainly Complying Partially Complying Non-Complying
33 1 1 11
There are 35 current agricultural discharge permits in the western part of theWellington Region. Nineteen of these permits were inspected during the 2002/2003financial year. Of the permits inspected, 18 related to the discharge of effluent fromdairy farms and one related to a piggery operation. The remaining 16 operationswere not inspected as they had a history of three years good compliance and nowonly require inspections once every three years.
Twenty-seven miscellaneous discharge permits were inspected during the2002/2003 financial year. Of the permits inspected, 19 related to sewage dischargesfrom septic tanks and small community-based sewage treatment plants. Theremaining permits related to the discharge of agrichemicals, stormwater andindustrial wastes.
During this financial year:
There was an increase in the number of agricultural discharge permits that werenon-complying. (21% were in non-compliance compared to 15% in 2001/2002).
There was a decrease in the number of miscellaneous discharge permits that werenon-complying. (26% were in non-compliance compared to 30% in 2001/2002).
Fifty percent of the non-compliance for agricultural discharges was due to selfmonitoring not being carried out or submitted. The other half of agricultural non-compliance was caused as a result of ponding on pasture due to either mechanicalfailure or mismanagement of the system.
Agricultrual and miscellaneous dischargecompliance
24%
2%
72%
2%
Fully ComplyingPartially ComplyingNon ComplyingMainly Complying
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
30
Of the miscellaneous discharge permits breached in the 2002/2003 financial year,one related to an unauthorised discharge, two related to samples exceeding therequirements stipulated in consent conditions, one to offensive and objectionableodour, and the remaining three non–complying miscellaneous discharges, relate tomonitoring not being carried out or submitted.
Commendable compliance
William Hunt, OtakiConsent Holder: William Hunt
WGN990017011 discharge permit to land
The consent holder was meeting all the requirements of the consent at the time ofthe inspection. The irrigation system was well maintained and operated. Excesseffluent is discharged to the two storage ponds, which are emptied once a year.
Wakapua Farm Limited, OtakiConsent Holder: Wakapua Farm Limited
WGN0001041 discharge permit to land
The consent holder was meeting all the requirements of the consent at the time ofinspection. The effluent irrigation system is well managed and maintained.
A herd of 260 cows are milked at the dairy shed, and the effluent system involves agrit trap with stormwater diversion, a sump, a reticulation system and travellingirrigator. Effluent that cannot be irrigated due to wet weather is pumped from thesump into the storage pond. The storage pond had a large volume of effluent in itat the time of inspection, but was not in danger of overflowing to Waitohu Stream.
Greater Wellington Regional Council, BiosecurityConsent Holder: Wellington Regional Council
WGN0001041 discharge permit to land
The 1080 operation was planned and executed very well and at the time ofinspection the consent holder was fully complying with the conditions of theconsent. A Navigational Guidance System (NGS) was used during the drop toensure that 1080 was distributed within the area specified in the consentapplication. The map of the flight path from the NGS, submitted to the Manager,Consents Management, verified that the discharge occurred only within theconsented area. A large hole was dug at the re-filling site to wash the bucket downafter the final drop and any 1080 dropped when re-filling the bucket was picked upby the ground personnel. The consent holder advised that on inspecting the Hutt
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
31
River no dead carcasses were found. No kills of any non-target species werereported.
Meridian Energy Limited, Makara Radio VillageConsent Holder: Meridian Energy Limited
WGN990183031 discharge permit to land
The systems are very well maintained and as such appear to be operating very well.The consent holder was fully complying with the consent conditions on the day ofthe inspection.
Greater Wellington Regional Council, Parks and Forests, Queen Elizabeth ParkConsent Holder: Wellington Regional Council
WGN9501911 discharge permit to land
The consent holder was meeting all the requirements of the consents at the time ofthe inspection.
The Queen Elizabeth Park Ranger advised that there had been no problemsexperienced with the discharges since he took over the Ranger position earlier inthe year.
Compliance requiring improvement
Gabites Piggery, Maymorn Road, MangaroaConsent Holder: John Gabites
WGN9901041 discharge permit to land
The consent holder has sold the last of his pigs in about mid-May 2003, and is nowpumping the effluent through his pond system (as there is no inflow) to graduallyempty the ponds. The consent holder believes that he can run his ponds so thatthere is no discharge from the wetlands to the tributary of Blaikie Stream.
As part of the pond decommissioning, the consent holder also has a large amountof sludge to dispose of. A further resource consent will be required for the landdisposal of this sludge.
The consent holder has not sampled the discharge during the 2002/2003 year.Under condition 10 of the consent, sampling must be carried out when the treatedeffluent is discharging to the unnamed stream. Some sampling needs to be done toshow that the effluent quality criteria set out in condition 11 are being compliedwith.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
32
Sandyhill Partnership, Poplar Ave, RaumatiConsent Holder: Kerry Smith
WGN9800651 discharge permit to land
In general, the system appeared to be operating efficiently with no apparent adverseeffects. However, at the time of inspection, the consent holder had not submittedany groundwater quality monitoring results as required under conditions 13 and 14of the consent. Under these conditions, testing of groundwater (from each of thefour sampling bores) for faecal coliform, nitrate and pH levels must be undertakenevery four months, and the results must be submitted to the GWRC.
Since the inspection the consent holder has provided the most recent groundwatermonitoring results dated 22 May 2002. These results partly fulfil the requirementsfor the 2001/2002 compliance year, but do not fulfil the requirements for the2002/2003 year. This is of particular concern, as the consent holder has beeninstructed for the last three compliance years to supply the required information.Further, the consent holder has been warned in the last two compliance reports thatcontinued non-compliance could result in enforcement action. Despite this andverbal assurances from the consent holder, the non-compliance has continued. Noenforcement action will be undertaken at this stage.
The monitoring programme is an integral part of the consent. The monitoringrequirements were imposed because the system was not the best practicable option,and because of the need to monitor the effects of the system with a view toreviewing the conditions, or the consent itself, at a later date. The groundwatermonitoring results of 2 March 2001 showed that faecal coliform and nitrate levelshad increased significantly from 1998 levels. The latest monitoring results show afurther increase from the 2001 levels. These results reinforce the need for themonitoring programme to continue as set out in the consent.
NB & C Everton, Rahui Road, OtakiConsent Holder: NB & C Everton
WGN0102031 discharge permit to land
From the compliance inspection it was apparent that the previous sharemilker hadnot been managing the dairy shed or effluent disposal system in accordance withthe resource consent. A number of areas of non-compliance were identified,including the reliability of the effluent pump, a broken spreader and rusted fittings,punctured hoses, and insufficient hose length to achieve the required irrigationarea. The effluent spreader had been stuck in the same place for some time,leading to ponding and the buildup of effluent on the surrounding paddock. It wasuncertain where the dairy shed effluent had been disposed of during the time thatthe pump and spreader had not been working properly, as the dairy shed hadremained in operation throughout. The sharemilkers could not identify an overflow
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
33
point or a contingency measure for treating the effluent in the event of mechanicalfailure.
There are also issues with the overall design and functioning of the dairy shed yardand race. In particular, the yard and race surfaces only channel part of the totaldairy effluent to the collection sump where it can be pumped out to the spreader.The remainder of the effluent, of which there was a significant amount, runs offdirectly into the nearby stream.
The consent holder is undertaking remedial works, and GWRC are consideringwhether to take further enforcement action.
PC & H Wilson, Swamp Road, Te HoroConsent Holder: PC & H Wilson
WGN0102031 discharge permit to land
Dairy effluent from the travelling irrigator had ponded on an area of pastureapproximately 5m x 10m. The consent holder advised that this ponding of effluenthad occurred as a result of a broken pipe that had since been repaired. The areawhere the irrigator was located at the time of the inspection showed no signs ofponding of effluent on pasture.
The travelling irrigator was located within 20 metres of a drain containing waterand in this position, the effluent discharge from the irrigator would fall within 20metres of this surface water body.
Corner of Grays Road and Paekakariki Hill Road, PauatahanuiConsent Holder: Rushes Restaurant
WGN9701091 discharge permit to land
Monitoring results for the 2001/2002 compliance year showed non-compliancewith the contaminant limits set by condition 15 of the consent, which relate toBOD, and suspended solids. As a result, a further round of monitoring wasrequired to corroborate the results and identify the source of the problem.
The required monitoring round, conducted on 22 July 2002, confirmed non-compliance with Condition 15. Ongoing non-compliance with conditions 12, 1417, 18, 19 and 21 of the consent was also identified. These compliance issues,combined with the history of non-compliance for the consent, culminated in anabatement notice dated 13 September 2002 being issued to the consent holder. Theabatement notice required the consent holder to investigate the operation of themounds to determine the effectiveness of the treatment system (such investigationto be provided in a report); advise the Medical Officer of Health and the PoriruaCity Council’s Environmental Health Officer; and submit an annual compliancereport.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
34
The consent holder’s response to the abatement notice was not satisfactory, and soa second abatement notice, dated 27 November 2002, was issued. This abatementnotice required the consent holder to immediately cease the discharge of any“biochemical additives” into the wastewater treatment system; investigate theoperation of the mounds to determine the effectiveness of the treatment system(such investigation to be provided in a report); and submit an annual compliancereport.
The consent holder failed to meet the timeframes set down in the second abatementnotice, but did engage New Zealand Environmental Technologies Ltd (NZET) toinvestigate the disposal system and address the compliance issues.
NZET have since identified a number of problems with the disposal system,including the lack of a filter on the first tank, a buildup of solids in the second tankand an inadequate grease trap arrangement. A new filter was installed, the secondtank was cleaned out and NZET and the consent holder are currently investigatingthe options with regard to installing a new grease trap. NZET have also carried outfurther monitoring of the system.
In regard to compliance with the consent conditions in the 2002/2003 complianceyear, the consent holder is clearly non-complying, despite some efforts to addressthe problems with the system.
Nikau Valley, Maui Pomare RoadConsent Holder: Mahaki Holdings Ltd
WGN0001851 discharge permit to land
The treatment plant appeared to be well managed with no discernible discharges toland or air. The disposal field also appeared to be operating effectively, with noponding or other adverse effects, although stock had access to the field and therequired signage was not evident. Also of concern was the fact that the operationsand maintenance manual had not been submitted as required.
Hutt River Mouth, Point HowardConsent Holder: Winstone Aggregates
WGN9802401 discharge permit to land
During the inspection on 27 June 2003 a significant area of ponding of washwaterwas evident in the vicinity of the washer. This washwater was discharging directlyinto the Hutt River mouth. Additionally, during a site inspection on 30 June 2003,another GWRC officer, noted a discharge of washwater, from the tower adjacent tothe washer, directly into the Hutt River mouth.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
35
The permit holder intends to upgrade the washing plant within the next threemonths. The design of the plant shall be such that all washwater will be directedthrough the settling ponds prior to discharging to the Petone foreshore.
The monthly monitoring of turbidity is required by condition 11 of consentWGN980240 [20832]. Therefore the permit holder must ensure monthly samplesare taken and analysed. Winstone’s staff need to be proactive about ensuringmonitoring is undertaken, rather than relying on the GWRC Laboratory staff.
Kiwi Point Quarry, Ngauranga GorgeConsent Holder: Wellington City Council
WGN950173(01)1 discharge permit to water
Wellington City Council has a discharge consent to discharge stormwater andwashwater to the Ngauranga Stream at Kiwi Point Quarry.
The consent holder was meeting all requirements of the consent at the time of theinspection. However sampling results submitted on 27 June 2003 exceed the limitset in condition 8, which relates to the limit for suspended solids.
Lodge at the Inlet, Paekakariki Hill Road, PauatahanuiConsent Holder: Brendan Spencer
WGN960074(01)1 discharge permit to water
The consent holder currently discharges treated sewage to the Horokiri Stream.The operator appears to be well informed about the system in place, however, theconsent holder advised that the UV filtration system had not been workingproperly.
Quarterly sampling was carried out by the consent holder on 21 November 2002.Analysis of the results show that the faecal coliform levels are well in exceedenceof the limit set. This is indicative of the UV filtration system not workingefficiently.
Miramar Golf Club, Stewart Duff Drive, MiramarConsent Holder: Miramar Golf Club
WGN9801891 discharge permit to land
Miramar Golf Club operates a wastewater treatment facility. Wastewater isreceived from Moa Point Wastewater Treatment Plant where it is filtered and UVtreated before it enters the aeration lagoon. The wastewater is pumped from thelagoon to a sprinkler system around the Golf Course.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
36
Faecal coliform results for February exceeded the limit of 10 CFU/100 mL (themean of 3 samples was 18 CFU/100 mL). All other results were below this limit.Due to pump failure, tests from September to December were not carried out. Thepump was repaired in December 2002, as no effluent was received from Moa Pointduring these months.
Living Earth Limited, Southern Landfill, Landfill Road
WGN990044 (01-06)I discharge permit to air1 water permit2 land use consents1 discharge permit to water1 discharge permit to land
The main compliance issue with respect to the Living Earth Limited (LEL)operation in this compliance year has been the three separate alleged breaches ofair discharge consent WGN990044(06). The 8 May 2003 breach was offensive andobjectionable odour beyond the boundary of the site, which was attributable to theoperation of the plant and more particularly the biofilter. The 24 May 2003 breachwas an offensive and objectionable odour event beyond the boundary of the sitethat was considered to be partially, but not solely, attributable to the plant. Duringthe investigation of the latter incident, several other areas of non-compliance wereidentified.
Three separate “please explain” letters were sent to LEL regarding the abovebreaches. After considering the letters of response, it was decided not to pursueany enforcement action against LEL. This was primarily because LEL has alreadyundertaken, at an Odour Workshop held on 12 June 2003, to actively engage in athorough review of its systems (including its biofilter). It was not considered thatthere would be any value in imposing an additional layer of punitive action on LELat this stage, given that a satisfactory range of voluntary actions have beenproposed.
The Odour Workshop, organised by Wellington City Council, involved the threemain Carey’s Gully businesses as well as GWRC staff and an odour expert. Theobjective of the Workshop was to develop a strategy for reducing odour complaintsassociated with the Carey’s Gully Complex.
Timeframes for the above actions have not been finalised. The number ofcomplaints from people living in the vicinity of Carey’s Gully has remained high,and LEL has been asked to confirm timeframes so that these can be communicatedto complainants.
Consents WGN990044 (01) and (01) have not been given a rating because they areconstruction-related consents that are no longer applicable. Water permitWGN990044 (03) has not been given a rating because it is not being exercised. Nosurface or ground water is being used for the operation. Water is instead beingobtained from the main tank supply at the Carey’s Gully Complex.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
37
Consents WGN990044 (04) and (05) have been given a rating of fully complyingfor the 2002/2003 compliance year.
As there have been three confirmed breaches of discharge to air permitWGN990044 (06), relating to several different consent conditions, that consent hasbeen given a rating of non-complying for the 2002/2003 compliance year.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
38
Wairarapa agricultural and miscellaneousdischargesFully Complying Mainly Complying Partially Complying Non-Complying
36 12 7 5
During this financial year:
The number of inspections was down on previous years. The majority of Wairarapadairy farms are on a three-yearly inspection, so the number of farms inspected eachyear fluctuates.
The number of dairy farms discharging to water in Wairarapa continues to drop. Bythe end of the 2002/2003 season, only two farms held consent to discharge towater.
GWRC staff were relatively pleased overall with farmers’ management of effluent,with 80% of farms either fully or mainly complying.
There were four discharge to land consents for aerial discharge of 1080 forbiosecurity operations. They all complied fully with consent conditions.
Commendable compliance
Those dairy farms that were given a fully complying rating all had automatedeffluent irrigation systems, which were actively managed.
Wairarapa agricultural and miscellaneouscompliance
60%
20%12%8%
Fully Complying
MainlyComplyingPartiallyComplyingNon Complying
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
39
Compliance requiring improvement
Only two farms received abatement or infringement notices this year. This issignificantly less than in previous years. In most previous years, Wairarapa dairyfarmers received most of the notices served throughout the Region.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
40
Wellington water treatment plants and waterpermitsFully Complying Mainly Complying Partially Complying Non-Complying
85 15 8 9
Note: These numbers include individual resource consents for wastewater treatmentplants, not overall ratings for the plants.
During this financial year:
Compared to last year, there was a decrease in fully complying consents (83% for2002/2003).
There has been a slight increase in the proportion of consents, which were mainlyand partially complying (11% and 4% respectively for 2002/2003).
The most common reason for consents receiving mainly and partially complyingratings was the late submission of administrative and reporting requirements.
There has been an increase in the proportion of consents which were non-complying (2% for 2002/2003).
Exceedences in abstraction limits were recorded at three of the six water treatmentplants. The most significant non-compliance relates to the breaches recorded at theWaikanae Water Treatment Plant.
The most common reasons for consents receiving non-complying ratings include,not giving notification of commencement of works, exceedences in abstractionrates or volumes, and works not being carried out in accordance with consentconditions.
Water permit and water treatment plantcompliance
72%
8% 13%7%
Fully Complying
Mainly Complying
Partially Complying
Non Complying
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
41
Water treatment plants
Wainuiomata Water Treatment PlantConsent Holder: Wellington Regional Council, Water Group
WGN9801531 discharge permit to air1 discharge permit to water
WGN0000711 discharge permit to water
WGN0002004 land use consents4 water permits3 discharge permits to water
WGN0002011 land use consent3 water permits4 discharge permits to water
WGN0201512 discharge permits to water
The supernatant discharge permit is mainly complying due to a breach of condition2, which stipulates the limitations on the discharge rate. The monitoring report wasreceived on 28 July 2003.
The water permit to take, use and dam water from the Orongorongo River and itstributaries was mainly complying due to one breach on 11 February 2003 whenwater was abstracted from the Orongorongo River when the daily minimum flow atTruss Bridge was less than 100L/sec.
The water permit to take, use and dam water from the Wainuiomata River and itstributaries, and to discharge water, and water containing sand and gravels to theWainuiomata River and its tributaries was fully complying. All reportingrequirements were met. Abstraction rates were not exceeded.
The discharge permit to discharge water and water containing sand and gravel tothe Orongorongo River and George Creek was fully complying. All reportingrequirements were met.
The discharge permit to discharge filtered air from the lime transfer blowers wasfully complying, as was the discharge permit to discharge partly treated river waterto the Wainuiomata River.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
42
Te Marua Water Treatment Plant, SH2, Te MaruaConsent Holder: Wellington Regional Council, Water Group
WGN9700413 discharge permits to water1 discharge permit to air
WGN0001991 water permit2 discharge permits to water
All discharge permits were fully complying. The reporting requirements for thedischarge permits were met.
The water permit to abstract water from the Hutt River was mainly complying.Several months of abstraction records were submitted late. During the last week inMarch 2003, the flow over the Kaitoke weir was reduced to 400L/sec, which is200L/sec below the minimum flow, so the weir could be photographed. On 19December 2002 the maximum abstraction rate was exceeded, due to a powerfailure.
Gear Island and Waterloo Water Treatment Plants, Jackson St Petone, and OxfordSt Lower HuttConsent Holder: Wellington Regional Council, Water Group
WGN9700362 water permits
These consents continue to be fully complying and all efforts are made to onlyabstract from these bores when necessary, to avoid risks of saline intrusion. This isparticularly so for the Gear Island Water Treatment Plant.
Waikanae Water Treatment Plant, Akatarawa Road, WaikanaeConsent Holder: Kapiti Coast District Council
WGN9801631 water permit
WGN9901711 water permit1 land use consent1 discharge permit to land
WGN0201051 land use consent
Maintenance works were carried out once during the compliance year on the scourhole below in the intake weir. The conditions of the consents relating to
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
43
maintenance of the grade control structures and the scour hole were fullycomplying.
The maintenance works were carried out without the need to temporarily divert theriver. A fish spawning survey was carried out by Fish and Game and the resultssubmitted as required by the consent conditions.
Based on information supplied to GWRC by the consent holder, the consentWGN980163 was breached 44 times during the compliance year. It has not yetbeen determined what further action, if any, will be taken in response to thesebreaches. However, irrespective of any action, the consent was given a compliancerating of non-complying.
Waitohu Water Treatment Plant, Valley Road, OtakiConsent Holder: Kapiti Coast District Council
WGN9802631 water permit2 discharge permits to water1 discharge permit to land
The Waitohu Water Treatment Plant was shut down in late March 2003 due to verylow flows in the Waitohu Stream. It is the consent holder’s intention todecommission the plant, at which time the consents will be surrendered.
Paekakariki Water Treatment Plant, SH1, PaekakarikiConsent Holder: Kapiti Coast District Council
WGN9902092 water permits1 land use consent
Water is abstracted from the upper intake only on the Wainui Stream, as the streamgenerally disappears below ground before it reaches the lower intake. Theconditions of consent for the upper intake have been fully complied with.
The land use consent has not been used and as such has lapsed.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
44
Commendable compliance
Ohariu Stream, Ohariu Valley Road, JohnsonvilleConsent Holder: Craig Shepherd
WGN0201991 water permit
All works were completed to a very high standard. The consent holder is to becommended on his efforts to enhance the quality of the Ohariu Stream where itpasses through his property.
Awamutu Stream, between Awamutu Grove and Leighton Ave, Lower HuttConsent Holder: Hutt City Council
WGN0201161 water permit
Several inspections were made throughout the construction period and oncompletion of the works. The consent holder was meeting all conditions of theconsent at the times of the inspections. Sediment loading and turbidity were wellmanaged. Works in the streambed were avoided wherever possible.
Opau Stream, Quartz Hill, Makara Radio Village, MakaraConsent Holder: Meridian Energy LtdSite operator: Brian Drake
WGN9901831 water permit
The abstraction is very well managed and maintained by the site operator, BrianDrake.
Compliance requiring improvement
Fairway Drive, Lower HuttConsent Holder: Hutt City Council
WGN9802211 water permit
The maximum annual consented abstraction volume was significantly exceeded.Records of abstraction volumes were not kept and submitted in accordance withcondition 11 of the consent.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
45
Unnamed tributary of the Karori Stream, Friend Street, KaroriConsent Holder: Futuna Trust Ltd
WGN0100881 water permit
The works have not been in accordance with the consent application. Bankstabilisation work is to be carried out, and fish passage provided for.
Gear Island, PetoneConsent Holder: Shandon Golf Club
WGN9701461 water permit
Abstraction limits have been exceeded throughout the compliance year.
Porirua Stream, Middleton Road, JohnsonvilleConsent Holder: Middleton Developments Ltd.
WGN0300471 water permit
Notice of commencement of works not given, therefore an assessment could not bemade of compliance with consent conditions.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
46
Wairarapa water permitsFully Complying Mainly Complying Partially Complying Non-Complying
64 26 2 14
During this financial year:
There was a decrease in the proportion of consents that were fully complying.There was a big increase in consents that were mainly complying. This change ismainly due to a number of consent holders not submitting information requiredunder their consent conditions.
Most non-compliance was due to a combination of maximum take limits beingexceeded and water meters not being installed as required. Nearly half of the non-complying consents were from the three local authorities in the Wairarapa.
Eight abatement notices were issued in relation to water take activities. Five ofthese notices require consent holders to install water meters on irrigation takes.These consent holders will be checked for compliance before the next irrigationseason. The remaining three abatement notices related to unconsented takes forirrigation. These cases will be closely monitored during the next irrigation season.One abatement notice has been appealed and is currently being considered by theEnvironment Court.
A number of informal inspections were completed for existing consents, but nocompliance report was sent out. As such, they have not been included in thisannual compliance report. These inspections were mainly to check installation ofwater meters on existing irrigation takes. Some takes were inspected but noreading was gained because the pipe material or pipe configuration impeded theflow meter’s ability to read the flow.
Particularly dry conditions during the summer of 2002/2003 caused low flowconditions in Wairarapa rivers and streams. As such, many of the consents to takesurface water were subject to water restrictions. In a number of cases, fullirrigation bans were imposed. This involved considerable work – GWRC officershad to make contact with and notify consent holders of water restrictions, as well as
Wairarapa water permit compliance
60%
2%13%
25%
Fully Com plying
Mainly Com plying
PartiallyCom plyingNon Com plying
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
47
check compliance with the restrictions. Again, these inspections are not recorded inthe figures presented.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
48
Wellington land use consentsFully Complying Mainly Complying Partially Complying Non-Complying
141 40 20 19
Note: These numbers are for individual resource consents, not overall ratings forparticular developments.
During this financial year:
There was a significant increase in the number of land use consents requiringinspection (220 in 2002/2003 compared to 147 in 2001/2002).
There was a decrease in the percentage of land use consents that were fullycomplying (64% in 2002/2003 compared to 77% in 2001/2002).
There was also a decrease in the percentage of land use consents that were non-complying (9% in 2002/2003 compared to 12% in 2001/2002).
Mainly complying or partially complying ratings were given mostly because 48hours notice prior to works commencing was not provided or because reports (e.g.,bore logs) were submitted late.
Non-complying ratings were given mostly because of works not being carried outin accordance with the consent application or because reports (e.g., bore logs) werenot submitted as required.
92 new bores were inspected, with 45 being fully complying, 22 mainly complying,17 partially complying and 8 non-complying. This compares to a total of 22 newbores in 2001/2002.
Land use compliance
64%
18%9%
9%
Fully ComplyingMainly ComplyingPartially ComplyingNon Complying
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
49
Commendable compliance
141 land use consents were categorised as fully complying in the 2002/2003compliance year. These consents and consent holders are listed in Appendix 1
A full list of consent holders and their compliance ratings for land use consents canbe found in Appendix 1.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
50
Wairarapa land use consentsFully Complying Mainly Complying Partially Complying Non-Complying
44 6 0 2
During this financial year:
Few land use consents caused compliance issues. The main reason for consentsreceiving a mainly complying rating was that 48 hours notice of the works was notgiven. Despite a large number of contractors not notifying us before undertakingwork, routine inspections revealed that work was generally of a high standard andin accordance with consent conditions.
River works inspections showed a good level of compliance. Bank protectionworks and channel realignments mostly appeared to be functioning well andculverts were mostly installed correctly.
Compliance with gravel extraction consents has generally been very good withsites left tidy and well rehabilitated. Although most achieved a fully complyingrating, some were downgraded to mainly complying due to their failure to notifyGWRC before extracting. Most of these were contractors with one-off consents toextract small amounts.
Only two gravel extraction consents were mainly complying. One is the globalRuamahanga gravel consent. This is a consent to take gravel from the wholeRuamahanga River system. There are many rivers and extraction sites under thisconsent, with at least 20 operators licensed to extract. Even though the wholeconsent was mainly complying, many of the extraction sites would have been fullycomplying.
Inspections of earth dams not subject to the consent process (permitted activities)indicated a poor standard of construction. Some of these dams were relativelylarge structures. Poor construction included over-steep batter slopes, poor/non-verified compaction, overflow pipelines installed near the crest of the structures,
Landuse compliance summary
84%
12%0%4%
Fully ComplyingMainly ComplyingPartially ComplyingNon Complying
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
51
unlined receiving outflow channels, no flow attenuation downstream of theoutflows, and significant vegetation clearance around the impounding lakemargins.
Commendable compliance
Earth dam construction, tributary of Dry River, South WairarapaConsent Holder: J Stewart
WAR0200081 land use consent1 water permit
The earth dam walls were well shaped and contoured. The emergency overflowspillway had been well designed, and incised into natural (undisturbed) groundadjacent to the earth dam. The completed works were very tidy, with topsoil evenlyspread across the structure for oversowing with grass seed.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
52
Wellington major river worksFully Complying Mainly Complying Partially Complying Non-Complying
23 0 0 0
During this financial year:
There are 36 current major river works consents in the western part of theWellington Region. In the last compliance year, 23 of these consents wereinspected. The 13 consents not inspected were not exercised during the 2002/2003compliance year. They were the consents associated with global maintenance ofthe Wainuiomata River, and the consents for the Hutt River Ava Rail Bridge toEwen Bridge River Realignment Project. The consent holder has encountered adelay in the latter project, which means that works are now due to commence inMarch 2004.
All of the major river work global maintenance consents have been issued toGreater Wellington - Flood Protection. These consents allow routine operationsand maintenance to be carried out on the Otaki River, Hutt River, Waikanae Riverand Waitohu Stream. Typical operations include bank protection, gravelextraction, cross-blading, berm spraying, tree planting and discharge of silt.
There are three consents associated with gravel extraction from the WaikanaeRiver.
There is an overall increase in the number of major river work consents (up 14from 2001/2002). This financial year all of the inspected consents were 100% fullycomplying.
River works compliance
100%
FullyComplying
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
53
Commendable compliance
Otaki RiverConsent Holder: Flood Protection Group, Greater Wellington Regional Council
WGN980254 (01-06)2 land use consents1 discharge permit to air1 discharge permit to water1 water permit1 coastal permit
According to the annual report prepared by Garry Baker, construction activity onthe Otaki River in this compliance year has been quite significant. Work hasfocussed largely on channel reconfiguration to effect rock line extensions andmajor repairs to the frontages of rail iron debris fencing. The Otaki Riverexperienced four “freshes” during the year, and although no serious damage wassustained, some extra work was necessary to secure work sites for subsequentconstruction.
Works of note on the Otaki River during this compliance year include constructionof impermeable erosion control structures (e.g., rock groynes, gabion baskets,driven rail and willow revetments); construction of permeable erosion controlstructures (e.g., debris fences and permeable groynes); vegetative bank protection(e.g., tree planting, layering and tethering, tree groynes); maintenance of existingstructures (e.g., existing rip rap and groynes); channel maintenance (e.g., removalof vegetation and flood debris); channel shaping (e.g., beach recontouring, cross-blading, flood relief cuts and gravel extraction); berm and stopbank maintenance(e.g., mowing and spraying); and, river mouth management (e.g., river mouthrealignment and maintenance of structures in the coastal marine area). In additionto the above, there has been environmental enhancement, including the planting ofnatives.
An annual walkover inspection, attended by interested or affected parties, was heldon 23 October 2003.
No complaints have been received regarding the exercise of the above consents.Most issues or enquiries are dealt with directly by the Kapiti Area of FloodProtection.
The quarterly and annual reports have been received on time and all otherconditions of consent have been fully complied with.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
54
Hutt RiverConsent Holder: Flood Protection Group, Greater Wellington Regional Council
WGN9802552 land use consents1 discharge permit to air1 discharge permit to water1 water permit
Notice was given prior to works commencing during the year, which allowed forobservation of permanent and maintenance works in progress. For example, on 11December 2002, Mike Jensen showed me the nearly completed rock line works atMaoribank. The rock line is about 60 metres in length. The contractor cross-bladed the river, then constructed a bund to protect the area of work and structureuntil the works were completed. A completed rock line at Meadowbank wasinspected, which completed two existing rock lines to either side. The two existingrock lines were at different levels, and the new rock line has been blended in verywell.
The consent holder did not undertake any agrichemical spraying under thedischarge permit to air. However, spraying was undertaken in accordance with thepermitted activity Rule 1 of the Regional Air Quality Management Plan for theWellington Region.
All quarterly reports were submitted on or before the due date, and the annualreport for 2001-2002 was submitted before the due date on 14 August 2002. Theconsent holder was fully complying with all the criteria outlined in the variousconsents.
Waikanae RiverConsent Holder: Flood Protection Group, Greater Wellington Regional Council
WGN980256 (01-06)2 land use consents1 discharge permit to air1 discharge permit to water1 coastal permit1 water permit
All flood and river protection works have been carried out in full accordance withconsent conditions. During this financial year the works undertaken included 1,672cubic metres of gravel was extracted from Jim Cooke Park; 190 lineal metres ofcross blading at Walnut Grove and Pylon Corner; 280 meters of layering andtethering at Jim Cooke Park; 90 willow poles were planted along the right bankedge below Jim Cooke Park; and, 120 tonnes of rock was used to maintainstructures at Kebbells Rock.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
55
Six-monthly beach cross section surveys were carried out by Cuttriss ConsultantsLimited in December 2002 and June 2003. No physical works were carried out atthe mouth of the Waikanae River.
Waitohu StreamConsent Holder: Flood Protection Group, Greater Wellington Regional Council
WGN0102201 land use consent1 discharge permit to water1 water permit
The consent holder was fully complying with all consents at the time of theinspection. Works carried out at four sites were inspected for the 2002-2003compliance year. At Site One, willow trees have been planted on the true righthand side of the streambed to prevent further erosion of the stream banks and thesubsequent encroachment of the stream onto farmland. The stream channel hasbeen realigned so it is more centred in the streambed to prevent encroachment ontofarmland. Approximately 40 metres of cross-blading has occurred during 2002-2003.
At Site Two, the main works involved the removal of stray willow trees that occurwithin the boundaries of the main bands of willows located on either side of thestream. Site Three is at the steepest section of the stream. A stream diversion hasoccurred at this site to ensure the stream does not further encroach upon thefarmland on the true right hand side of the stream. A series of three small weirs andholding ponds have been formed. The middle of each of these weirs is lower toprovide fish passage. The area in which these works has occurred along the streamis approximately 100 metres.
Site Four is a gravel collection pit. It is ephemeral as it dries up in summer. Workshave occurred to deepen the channel and to collect gravel to reduce the amount ofgravel moving downstream to the silt area.
Waikanae River Gravel ExtractionConsent Holder: Flood Protection Group, Greater Wellington Regional Council
WGN0201061 land use consent1 discharge permit to water1 water permit
Extraction took place between cross section W0200 and W0230, and between crosssection W0110 and W0125 during February 2003. Extraction also took placebetween cross section W0175 and W0200 during May 2003. The river wasinspected on four occasions.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
56
The consent holder was fully complying with the conditions of the consents at thetime of the inspections. A copy of the extraction record for this compliance yearwas e-mailed through on 6 June 2003.
GWRC received one query during February 2003 relating to the presence of deepholes along the section of river that forms the boundary of the Otaihanga Domain.The situation was resolved prior to the complaint coming to the attention ofConsents Management through the prompt actions of Garry Baker and thecontractor.
The summer was exceptionally dry with river flows dropping below 700 L/s at theWaikanae Treatment Plant. The contractor was therefore unable to reinstate thenatural bed profile between cross section W0110 and W0125 at the end of February2003 without causing further distress to fish that were already under pressure dueto low flows. The natural bed profile has since been reinstated through naturalprocesses.
A variation to condition 11 of land use consent WGN020106 [21756] was soughtto change the extraction methodology in the Pukekawas reach (cross sectionW0200 and W0155) to ensure that fish are not distressed unnecessarily duringperiods of low flow. When river flow drops below 900 L/s at the WaikanaeTreatment Plant, gravel will only be extracted from existing beaches to a minimumof 100 mm above the active channel’s water level. The variation was granted on11 April 2003.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
57
Wellington coastalFully Complying Mainly Complying Partially Complying Non-Complying
266 34 10 89
Note: These numbers include permits for swing moorings, boatsheds and othercoastal and restricted coastal activities. These numbers do not include thosecoastal permits, which form part of a suite of consents for various projects,wastewater treatment plants, or global river consents.
During this financial year:
There were 399 coastal permits inspected in 2002/2003 (including the self-monitoring compliance of 162 swing moorings). In addition to this, 101 internalinspections of boatsheds were undertaken as well as external inspections of all 133boatsheds.
There was an increase in the percentage of coastal permits that were non-complying (up 8% from 2001/2002).
There was a decrease in the percentage of coastal permits that were fullycomplying (down 18% from 2001/2002).
Consents were given mainly complying due to late administration requirements andboatsheds that were unable to be internally inspected.
Non-compliance was issued primarily for swing mooring holders not submitting aninspection report (78 incidents) and boatshed owners (9 incidents) not using theirboatsheds for storing boats and ancillary equipment only.
Coastal compliance
66%9%
3%
22%
Fully Com plyingMainly ComplyingPartially Com plyingNon Com plying
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
58
Swing mooring permit holders
There are currently 162 installed swing moorings in the Wellington region.Individual swing mooring owners are required to send the GWRC confirmation oftheir annual swing mooring inspection. This year 48% of swing mooring owners (71in total) sent us confirmation of their annual inspection and were fully complying,compared with the previous three years, where, 10% complied (in 1999/2000), and90% (in 2000/2001), and 70% complied (in 2001/2002).
52% of swing mooring holders (78 in total) did not submit confirmation of theirannual inspection, despite a reminder letter being sent.
*A list of all fully complying and non-complying swing mooring holders is set out in the attachedappendix 1.
Boatshed owners
There are 133 boatsheds in the Wellington region. This year, internal inspections ofthe boatsheds was carried out, in light of the Council’s decision to decline overnightstays, on 19 September 2000. Out of the 133 boatsheds, 32 were not able to beinspected internally, as owners were unable to be contacted. These boatsheds wererated mainly complying. From the 101 internal inspections completed, 91 were fullycomplying and 9 were non-complying. Those non-complying were owners not usingtheir boatsheds for storing boats and ancillary equipment.
External inspections, however, were carried out on all boatsheds to ensure that theyappeared in sound condition, that there were no apparent discharges to the coastalmarine area (CMA), and that public access was not impeded.
Swing mooring compliance
48%
52% Fully Complying
Non Complying
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
59
Commendable compliance
Pauatahanui InletConsent Holder: Transit New Zealand Limited, Wellington Regional Office
WGN0100243 coastal permits
The construction of four seawalls along SH58, Pauatahanui Inlet, was completed inJune 2003.
At the time of the inspection, the consent holder was carrying out the works withminimal disturbance to the coastal marine area and was fully complying with allapplicable conditions of consent.
Whitireia ParkConsent Holder: Department of Conservation
WGN0200741 coastal permit
Erosion protection works were completed in August 2002. The works were carriedout in one day and all steps were taken to minimise any sedimentation andturbidity.
All works were carried out in the dry (i.e. no machinery was used on theforeshore). Geotextile was placed behind the rock rip-rap, to ensure integrity of theworks upon completion. The completed works blend in well with the surroundingforeshore area.
Boatshed compliance
91%
9%
Fully Complying
Non Complying
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
60
Seaview MarinaConsent Holder: CentrePort LimitedContractor: Construction Techniques Ltd
WGN0300651 coastal permit
Repair works on the wharf were completed by February 2003. Dropsheets wereused as a dust mitigation measure to prevent blasting material and concrete piecesdischarging into the coastal marine area. At the time of the inspection, the consentholder was fully complying with all applicable conditions of consent.
Days BayConsent Holder: Hutt City CouncilContractor: Civil Design Services
WGN0101781 coastal permit
The walkway and associated works were completed in August 2002. Works werecarried out with minimal disturbance of the coastal marine area and the site was leftlooking neat and tidy. At the time of the inspection, the consent holder was fullycomplying with all applicable conditions of consent.
Compliance requiring improvement
Cook StraitConsent Holder: Transpower New Zealand Limited
WGN0300453 coastal permits
The cables were laid in November 2002. The consent holder was not complyingwith the consent conditions because a copy of the plan showing the precise locationof the cable on the seabed through the Region was not submitted to the GWRCwithin 90 days, which is in breach of condition 5 of each consent.
The first two quarterly visual inspection records of the coastal landing area had notbeen submitted in accordance with condition 16 of each consent.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
61
Wairarapa coastalFully Complying Mainly Complying Partially Complying Non-Complying
4 2 0 1
During this financial year:
Site inspections confirmed that most work was carried out in accordance with theconditions of consent. Construction processes were carried out in accordance withthe plans and as explained in assessment of environmental effects reports.
Commendable compliance
Palliser Bay RoadConsent Holder: South Wairarapa District Council
WAR0201414 coastal permits
For a boulder beach constructed to provide protection to the Palliser Bay Roadfrom southerly storms. A high standard of construction, and a well-managed sitethroughout the construction process.
Wairarapa coastal compliance
29%
14%57%
Fully ComplyingMainly ComplyingPartially ComplyingNon Complying
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
62
Wellington roading, forestry and subdivisionFully Complying Mainly Complying Partially Complying Non-Complying
29 1 3 3
This section only covers compliance for the western part of the Region. Roading andforestry for the Wairarapa is included in their land use section. These numbersrepresent individual resource consents, not an overall rating for each project.
During this financial year:
There were more consents inspected this year compared to the 2001/2002compliance year (36 compared to 10 last year). The increase was due to severalmajor roading projects commencing during the 2002/2003 compliance year. Inaddition, a discharge permit is now required if an operator wishes to discharge thestorm water runoff from any area of bulk earthworks, which exceeds 0.3 hectares,into water (Regional Freshwater Plan change became operative on 9 February2002).
Consents were generally given mainly or partially complying due to lateadministration requirements, or a failure to notify GWRC of their intention tocommence work.
Non-complying ratings were issued mainly for breaches in conditions relating tosedimentation of streams and works not being in accordance with the application.
Roading, forestry and subdivision compliance
81%
3%8%8%
Fully Complying
Mainly Complying
Partially Complying
Non Complying
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
63
Commendable compliance
Rimutaka Forest Park, 1025 Coast Road, Catchpool ValleyConsent Holder: Department of ConservationContractor: Rayonier New Zealand Limited
WGN0100433 land use consents
No logging took place between December 2002 and April 2003.
The roading component of the operation has been completed. The re-vegetation ofthe margins of the access road and the deforested areas are progressing nicely.
A small section of up slope batter had failed on the mid-level access road. TheDepartment of Conservation is aware of the instability of this section of road and istaking all practical steps to ensure no sediment enters the adjacent watercourse.
The Department of Conservation has complied with all its consents for theRimutaka Forest Park.
Kaitoke to Te Marua construction of State Highway 2Consent Holder: Transit New ZealandContractors: Higgins Contractors Ltd.Principal sub-contractor: Rick Goodman & Sons Ltd (bulk earthworks)Engineering consultant: Opus International Consultants
WGN0200181 water permit1 discharge permit to water and land2 land use consent
Construction of the new section of SH2 just north of Upper Hutt began in October2002 and is expected to be finished by spring 2004. A pivotal environmentalchallenge has been to prevent excess sediment and soil being washed from the siteand thence into valued receiving environments of Kaitoke Stream, and tributariesto the Hutt and Mangaroa Rivers. To protect the streams from silted runoff, thecontractors have created specifically designed silt ponds from which clean, silt-freewater is slowly siphoned off through a decanting structure at outlet of the pond.Extensive silt fences have also been installed at key locations. The stream diversionworks were installed in a manner to ensure passage for our native species of fish isoptimised.
The contractors have been proactive towards their environmental obligations, usedan independent environment consultant to monitor their compliance, and haveadopted a careful and well thought-out strategy to deal with erosion and sedimentcontrol issues. The contractors and the engineering consultants have made everyeffort to fully comply with the terms of Transit’s consents, and their degree ofcompliance to date is exemplary.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
64
Plimmerton to Paremata Upgrade of State Highway 1Consent Holder: Transit New ZealandContractors: Juno Civil Ltd – Paremata Bridge construction Higgins Contracting – Northern section construction.Engineering consultant: Beca Carter Hollings & Ferner Ltd
WGN970226 (01)-(15)3 water permits5 discharge permits to water and land1 discharge permit to air5 land use consents1 land use consent
WGN970226 (16)-(20)5 coastal permits
Paremata Bridge duplication (Stage 1) included constructing a new bridge acrossthe Pauatahanui inlet to carry northbound traffic, and building a new walkway andcycleway underneath each end of the two bridges. Four of the seven bridge spanswere completed in the 2002/2003 year with all the consented works completed to ahigh environmental standard. Non-compliance was issued for one breach inconditions relating to a silt discharge incident to Pauatahanui inlet. Furthermoreseveral small areas of reclamation that formed the new walkway and gabionprotection for the northern bridge abutments were, in GWRC’s opinion, outside thescope of the granted resource consents.
Works commenced on the Northern section (Stage 2) with about half of thedrainage works and widening on the eastern side of the highway completed. Thecontractor has fully complied with the terms of these consents.
Compliance requiring improvement
904 Grays Road, CamborneConsent Holder: Sunlink Development LimitedContractor: Hamish Wells Limited
WGN980081 (01)-(03)3 land use consents
During an investigation into an increase in the sediment loading of the TaupoStream following a complaint, it was found that the sediment and erosion controlmeasures deployed at the Grays Road site were inadequate.
The contractor undertaking the works altered the existing sediment retentionmeasures and took further precautions against the release of sediment from the siteinto Taupo Stream. The effectiveness of these measures had not been determinedprior to the end of the 2002/2003 compliance year.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
65
In addition, by 25 June 2003, the majority of the site had been seeded with areasonable take. This should minimise the entrainment of sediment into stormwater run-off from the site. The placement of fill in an ephemeral and permanentwetland, and the reclamation of an ephemeral stream are largely complete. Onlycleanup and maintenance requirements remain.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
66
Wellington enforcement summary
Prosecutions and enforcement ordersThere were no prosecutions or enforcement orders made during the 2002/2003compliance year.
Infringement noticesJuly 2002 - Infringement notice issued to a property owner on Akatarawa Road forplacing pipes and installing structures in the beds of two unnamed tributaries of theAkatarawa River.
August 2002 - Infringement notice issued to the Director of a hazardous wasteprocessing plant in Seaview for confirmed discharge of lime dust beyond theboundary of the property.
September 2002 - Infringement notice issued to a consultancy in Johnsonville forexcavating and disturbing an unnamed tributary of Pauatahanui Stream andinstalling a culvert extension and depositing cleanfill.
October 2002 - Infringement notice issued to a fish rendering company inGracefield for the generation of an odour confirmed offensive beyond the boundaryof the plant.
November 2002 - Infringement notice issued to a local authority for the dischargeof sewage effluent into the Waiwhetu Stream.
December 2002 - Infringement notice issued to a chemical waste disposal companyin Seaview, Lower Hutt for an offensive/objectionable odour confirmed beyond thesite boundary.
December 2002 - Infringement notice issued to a local authority for failing to coverthe refuse and waste at the Spicer Landfill with a suitable soil cover.
02468
10
AbatementNotices
InfringementNotices
Wellington enforcement action summary
Abatement NoticesInfringement Notices
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
67
February 2003 - Infringement notice issued to a meat rendering company,Ngaraunga Gorge for an offensive/ objectionable odour beyond the boundary of theplant.
All of the above infringement notices have been paid. None of the notices wereappealed or objected to.
Abatement noticesJuly 2002 - Abatement notice served to a property owner in the Mangaroa Valleyfor the placement of a number of concrete blocks along the true right bank of theManagaroa River.
August 2002 - Abatement notices were served to four Camborne boatshed ownersfor the placement of an illegal structure in the coastal marine area.
August 2002 - Abatement notice served to a Camborne contractor for theconstruction of an illegal structure in the coastal marine area.
September 2002 - Abatement notice served to a restaurant in Pauatahanui forongoing non-compliance with consent conditions.
September 2002 - Abatement notice served to the Director of a plasticsmanufacturing plant in Porirua, for non-complying with condition 8 of its resourceconsent because the plant had expanded beyond the scope of which the consent wasoriginally authorised.
November 2002 - Abatement notice served to the Director of a landfill in HappyValley for failing to provide a required performance bond.
November 2002 Abatement notice served to a restaurant in Pauatahanui for anunsatisfactory response to the first abatement notice.
All, except for 2, of the above abatement notices issued were complied with. None ofthe abatement notices were appealed or objected to.
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
68
Wairarapa enforcement summary
ProsecutionsOne prosecution was taken against a Carterton timber company for the discharge oftimber treatment chemical into a water body. The company was fined $12,000 pluscosts of $1,240.
Infringement noticesSeptember 2002, infringement notice served to a Carterton gravel company forexceeding the consented amount of gravel extracted from the Waingawa river. Thecompany paid the fee in September.
December 2002, two South Wairarapa dairy farmers were served infringementnotices for failing to manage their dairy effluent according to the consent. Theconsent covered two large herds being milked through the same shed, and involvedover 1500 cows. The farm had a history of non-compliance. The fees were paid inJanuary and February respectively.
April 2003, a Carterton dairy farmer was served an infringement notice for toppingup his groundwater irrigation take with surface water. The fee was paid in May.
May 2003, Carterton District Council was served an infringement notice for notcomplying with its resource consent for the discharge of sewage to the Mangatarerestream. The consent required that the discharge to water was to stop during summermonths. The fee was paid in May.
None of the notices were appealed or objected to.
Abatement noticesNote: All abatement notices stand (unless otherwise indicated).
November 2002, an abatement notice was served to a Carterton dairy farmer forfailing to comply with the consent to discharge dairy effluent. The consent was
0
2
4
6
8
10
Abat
emen
tN
otic
es
Infri
ngem
ent
Not
ices
Enfo
rcem
ent
Ord
ers
Pros
ecut
ions
Wairarapa enforcement action summary
Abatement NoticesInfringement NoticesEnforcement OrdersProsecutions
RESOURCE CONSENT ANNUAL COMPLIANCE REPORT 2003
69
recently changed to a discharge to land, and when checked, there was still a minoroverflow to water. The problem has since been fixed.
December 2002, three abatement notices were served to three parties involved in aSouth Wairarapa dairy farm. The parties were two share milkers and the owner.The farm is an unusual situation, with two large herds being milked through thesame shed. The farm has subsequently been checked twice, and was complyingduring those visits.
March 2003, a notice was served on a South Wairarapa dairy farmer to requireinstallation of a water meter on the irrigation system.
March 2003, a notice was served on a Carterton dairy farmer to require installationof a water meter on the irrigation system.
March 2003, a notice was served on a Carterton dairy farmer to require installationof a water meter on the irrigation system.
March 2003 a notice was served on a Carterton dairy farmer to require installationof a water meter on the irrigation system.
March 2003, a notice was served on a South Wairarapa dairy farmer to requireinstallation of a water meter on the irrigation system.
April 2003 a notice was served on a South Wairarapa dairy farmer to requireinstallation of a water meter on the irrigation system.
April 2003, a Carterton dairy farmer was served a notice requiring the connectionof surface water to the groundwater irrigation to be removed. The channelconnecting the water systems has been blocked to prevent surface water beingtaken.
May 2003, notice issued to Carterton District Council giving until 1 January 2004to comply with the requirement under the consent to remove the discharge from theriver during summer months.
The suite of abatement notices served to dairy farmers requiring water meters wasGWRC’s last resort after repeated written and verbal requests failed to result in metersbeing installed. Follow up of these notices is still occurring.
None of these notices served during the year were appealed or objected to.
App
endi
x 1
- Wel
lingt
on c
ompl
ianc
eLa
ndfil
ls
File
Ref
eren
ceC
onse
nt H
olde
rA
ctiv
ity T
ype
Com
plia
nce
Rat
ing
Proj
ect T
itle
WG
N94
0057
01Bu
rrell
Dem
oliti
on L
tdLa
ndfil
l Dis
char
gePa
rtial
ly C
ompl
ying
Burre
lls L
andf
illW
GN
9501
4003
Wel
lingt
on C
ity C
ounc
ilD
isch
arge
To
Air
Fully
Com
plyi
ngC
lose
d La
ndfil
lW
GN
0200
84Se
asid
e H
aven
Lim
ited
Land
fill D
isch
arge
Non
Com
plyi
ngC
lose
d La
ndfil
lW
GN
9501
4002
Wel
lingt
on C
ity C
ounc
ilD
isch
arge
To
Air
Fully
Com
plyi
ngC
lose
d La
ndfil
lW
GN
9501
4001
Wel
lingt
on C
ity C
ounc
ilD
isch
arge
To
Air
Fully
Com
plyi
ngC
lose
d La
ndfil
lW
GN
0000
48W
ellin
gton
City
Cou
ncil
Land
fill D
isch
arge
Non
Com
plyi
ngC
lose
d La
ndfil
lW
GN
9301
4001
Wel
lingt
on C
ity C
ounc
ilD
isch
arge
To
Air
Fully
Com
plyi
ngN
orth
ern
Land
fill
WG
N93
0143
01W
ellin
gton
City
Cou
ncil
Riv
er/S
tream
Div
ersi
onFu
lly C
ompl
ying
Nor
ther
n La
ndfil
lW
GN
9301
4201
Wel
lingt
on C
ity C
ounc
ilD
isch
arge
To
Air
Mai
nly
Com
plyi
ngN
orth
ern
Land
fill
WG
N94
0124
01W
ellin
gton
City
Cou
ncil
Take
Fully
Com
plyi
ngN
orth
ern
Land
fill
WG
N93
0144
01W
ellin
gton
City
Cou
ncil
Take
Fully
Com
plyi
ngN
orth
ern
Land
fill
WG
N93
0177
04Ka
piti
Coa
st D
istri
ct C
ounc
ilR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngO
taih
anga
Lan
dfill
WG
N93
0177
02Ka
piti
Coa
st D
istri
ct C
ounc
ilD
isch
arge
To
Air
Non
Com
plyi
ngO
taih
anga
Lan
dfill
WG
N93
0177
01Ka
piti
Coa
st D
istri
ct C
ounc
ilLa
ndfil
l Dis
char
geN
on C
ompl
ying
Ota
ihan
ga L
andf
illW
GN
9301
7707
Kapi
ti C
oast
Dis
trict
Cou
ncil
Take
Fully
Com
plyi
ngO
taih
anga
Lan
dfill
WG
N93
0177
05Ka
piti
Coa
st D
istri
ct C
ounc
ilLa
ndfil
l Dis
char
geFu
lly C
ompl
ying
Ota
ihan
ga L
andf
illW
GN
9301
7703
Kapi
ti C
oast
Dis
trict
Cou
ncil
Land
fill D
isch
arge
Fully
Com
plyi
ngO
taih
anga
Lan
dfill
WG
N93
0179
02Ka
piti
Coa
st D
istri
ct C
ounc
ilD
isch
arge
To
Air
Fully
Com
plyi
ngO
taki
Lan
dfill
WG
N93
0179
05Ka
piti
Coa
st D
istri
ct C
ounc
ilLa
ndfil
l Dis
char
geFu
lly C
ompl
ying
Ota
ki L
andf
illW
GN
9301
7904
Kapi
ti C
oast
Dis
trict
Cou
ncil
Land
fill D
isch
arge
Fully
Com
plyi
ngO
taki
Lan
dfill
WG
N93
0179
03Ka
piti
Coa
st D
istri
ct C
ounc
ilR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngO
taki
Lan
dfill
WG
N93
0165
01M
ight
y R
iver
Pow
erD
isch
arge
To
Air
Fully
Com
plyi
ngSi
lver
stre
am L
andf
illW
GN
9701
6404
The
Hut
t City
Cou
ncil
Dis
char
ge T
o Ai
rFu
lly C
ompl
ying
Silv
erst
ream
Lan
dfill
WG
N97
0164
02Th
e H
utt C
ity C
ounc
ilLa
ndfil
l Dis
char
geFu
lly C
ompl
ying
Silv
erst
ream
Lan
dfill
WG
N97
0164
01Th
e H
utt C
ity C
ounc
ilLa
ndfil
l Dis
char
geFu
lly C
ompl
ying
Silv
erst
ream
Lan
dfill
WG
N97
0164
08Th
e H
utt C
ity C
ounc
ilD
amFu
lly C
ompl
ying
Silv
erst
ream
Lan
dfill
WG
N98
0122
01Th
e H
utt C
ity C
ounc
ilEa
rthw
ork
Fully
Com
plyi
ngSi
lver
stre
am L
andf
illW
GN
9701
6403
The
Hut
t City
Cou
ncil
Land
fill D
isch
arge
Fully
Com
plyi
ngSi
lver
stre
am L
andf
illW
GN
9701
6405
The
Hut
t City
Cou
ncil
Riv
er/S
tream
Div
ersi
onFu
lly C
ompl
ying
Silv
erst
ream
Lan
dfill
WG
N97
0164
06Th
e H
utt C
ity C
ounc
ilR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngSi
lver
stre
am L
andf
illW
GN
9701
6407
The
Hut
t City
Cou
ncil
Take
Fully
Com
plyi
ngSi
lver
stre
am L
andf
illW
GN
9400
4503
Wel
lingt
on C
ity C
ounc
ilR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngSo
uthe
rn L
andf
illW
GN
9401
1201
Nov
a G
as L
tdD
isch
arge
To
Air
Fully
Com
plyi
ngSo
uthe
rn L
andf
illW
GN
9400
4501
Wel
lingt
on C
ity C
ounc
ilLa
ndfil
l Dis
char
geFu
lly C
ompl
ying
Sout
hern
Lan
dfill
WG
N94
0045
02W
ellin
gton
City
Cou
ncil
Dis
char
ge T
o Ai
rFu
lly C
ompl
ying
Sout
hern
Lan
dfill
WG
N94
0045
04W
ellin
gton
City
Cou
ncil
Take
Fully
Com
plyi
ngSo
uthe
rn L
andf
illW
GN
9702
5402
Wel
lingt
on C
ity C
ounc
ilD
isch
arge
To
Air
Fully
Com
plyi
ngSo
uthe
rn L
andf
illW
GN
9702
5401
Wel
lingt
on C
ity C
ounc
ilSe
wag
e D
isch
arge
Fully
Com
plyi
ngSo
uthe
rn L
andf
illW
GN
9702
3301
Wel
lingt
on C
ity C
ounc
ilIn
dust
rial W
aste
Dis
char
geFu
lly C
ompl
ying
Sout
hern
Lan
dfill
WG
N96
0003
01N
ova
Gas
Ltd
Dis
char
ge T
o Ai
rFu
lly C
ompl
ying
Spic
er L
andf
illW
GN
9400
4604
Porir
ua C
ity C
ounc
ilTa
keFu
lly C
ompl
ying
Spic
er L
andf
illW
GN
9400
4603
Porir
ua C
ity C
ounc
ilR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngSp
icer
Lan
dfill
WG
N94
0046
02Po
rirua
City
Cou
ncil
Dis
char
ge T
o Ai
rN
on C
ompl
ying
Spic
er L
andf
illW
GN
9400
4601
Porir
ua C
ity C
ounc
ilLa
ndfil
l Dis
char
geN
on C
ompl
ying
Spic
er L
andf
illW
GN
9900
1601
T &
T La
ndfil
ls L
imite
dEa
rthw
ork
Fully
Com
plyi
ngT
& T
Land
fill
WG
N97
0047
04T
& T
Land
fills
Lim
ited
Dam
Non
Com
plyi
ngT
& T
Land
fill
WG
N97
0047
05T
& T
Land
fills
Lim
ited
Land
fill D
isch
arge
Non
Com
plyi
ngT
& T
Land
fill
WG
N97
0047
01T
& T
Land
fills
Lim
ited
Land
fill D
isch
arge
Fully
Com
plyi
ngT
& T
Land
fill
WG
N99
0016
02T
& T
Land
fills
Lim
ited
Earth
wor
kFu
lly C
ompl
ying
T &
T La
ndfil
lW
GN
9700
4706
T &
T La
ndfil
ls L
imite
dD
isch
arge
To
Air
Fully
Com
plyi
ngT
& T
Land
fill
WG
N97
0047
02T
& T
Land
fills
Lim
ited
Riv
er/S
tream
Div
ersi
onN
on C
ompl
ying
T &
T La
ndfil
lW
GN
9900
1603
T &
T La
ndfil
ls L
imite
dVe
geta
tion
Rem
oval
Fully
Com
plyi
ngT
& T
Land
fill
WG
N97
0047
03T
& T
Land
fills
Lim
ited
Dam
Non
Com
plyi
ngT
& T
Land
fill
WG
N02
0073
T &
T La
ndfil
ls L
imite
dD
isch
arge
To
Air
Fully
Com
plyi
ngT
& T
Land
fill
WG
N93
0178
02Ka
piti
Coa
st D
istri
ct C
ounc
ilD
isch
arge
To
Air
Fully
Com
plyi
ngW
aika
nae
Land
fill
WG
N93
0178
01Ka
piti
Coa
st D
istri
ct C
ounc
ilLa
ndfil
l Dis
char
geN
on C
ompl
ying
Wai
kana
e La
ndfil
lW
GN
9301
7803
Kapi
ti C
oast
Dis
trict
Cou
ncil
Riv
er/S
tream
Div
ersi
onFu
lly C
ompl
ying
Wai
kana
e La
ndfil
lW
GN
9301
7806
Kapi
ti C
oast
Dis
trict
Cou
ncil
Take
Non
Com
plyi
ngW
aika
nae
Land
fill
WG
N93
0178
04Ka
piti
Coa
st D
istri
ct C
ounc
ilLa
ndfil
l Dis
char
geFu
lly C
ompl
ying
Wai
kana
e La
ndfil
lW
GN
9301
7805
Kapi
ti C
oast
Dis
trict
Cou
ncil
Land
fill D
isch
arge
Non
Com
plyi
ngW
aika
nae
Land
fill
WG
N95
0052
10Th
e H
utt C
ity C
ounc
ilSt
ream
Wor
kFu
lly C
ompl
ying
Wai
nuio
mat
a La
ndfil
lW
GN
9500
5203
The
Hut
t City
Cou
ncil
Land
fill D
isch
arge
Fully
Com
plyi
ngW
ainu
iom
ata
Land
fill
WG
N95
0052
02Th
e H
utt C
ity C
ounc
ilLa
ndfil
l Dis
char
geN
on C
ompl
ying
Wai
nuio
mat
a La
ndfil
lW
GN
9500
5204
The
Hut
t City
Cou
ncil
Dis
char
ge T
o Ai
rFu
lly C
ompl
ying
Wai
nuio
mat
a La
ndfil
lW
GN
9500
5205
The
Hut
t City
Cou
ncil
Riv
er/S
tream
Div
ersi
onFu
lly C
ompl
ying
Wai
nuio
mat
a La
ndfil
lW
GN
9500
5206
The
Hut
t City
Cou
ncil
Riv
er/S
tream
Div
ersi
onFu
lly C
ompl
ying
Wai
nuio
mat
a La
ndfil
lW
GN
9500
5208
The
Hut
t City
Cou
ncil
Take
Fully
Com
plyi
ngW
ainu
iom
ata
Land
fill
WG
N00
0182
The
Hut
t City
Cou
ncil
Land
fill D
isch
arge
Non
Com
plyi
ngW
ainu
iom
ata
Land
fill
WG
N95
0052
07Th
e H
utt C
ity C
ounc
ilD
amFu
lly C
ompl
ying
Wai
nuio
mat
a La
ndfil
lW
GN
9500
5201
The
Hut
t City
Cou
ncil
Land
fill D
isch
arge
Fully
Com
plyi
ngW
ainu
iom
ata
Land
fill
WG
N95
0052
09Th
e H
utt C
ity C
ounc
ilEa
rthw
ork
Fully
Com
plyi
ngW
ainu
iom
ata
Land
fill
Dis
char
ges
to a
ir
File
Ref
eren
ceC
onse
nt H
olde
rA
ctiv
ity T
ype
Com
plia
nce
Rat
ing
Proj
ect T
itle
WG
N00
0004
Allie
d M
ilbur
n Lt
dM
iner
al P
roce
sses
Fully
Com
plyi
ngW
GN
0000
43Se
rco
Proj
ect E
ngin
eerin
g Lt
d.Ab
rasi
ve B
last
ing
Fully
Com
plyi
ngW
GN
0001
10N
Z G
alva
nisi
ng L
imite
dM
anuf
actu
ring
Fully
Com
plyi
ngW
GN
0001
28Ex
ide
New
Zea
land
Lim
ited
Man
ufac
turin
gPa
rtial
ly C
ompl
ying
WG
N00
0185
Mah
aki H
oldi
ngs
Ltd
Was
te D
ispo
sal
Fully
Com
plyi
ngW
GN
0001
89Ex
ide
New
Zea
land
Lim
ited
Man
ufac
turin
gM
ainl
y C
ompl
ying
WG
N00
0196
Tele
com
New
Zea
land
Ltd
Inci
nera
tor
Fully
Com
plyi
ngW
GN
0100
19H
arbo
ur C
ity F
uner
al H
ome
Lim
ited
Inci
nera
tor
Fully
Com
plyi
ngW
GN
0100
39Al
lied
Milb
urn
Ltd
Min
eral
Pro
cess
esFu
lly C
ompl
ying
WG
N01
0064
Col
gate
-Pal
mol
ive
Lim
ited
Man
ufac
turin
gFu
lly C
ompl
ying
WG
N01
0067
Build
ing
Res
earc
h As
sn o
f NZ
Inci
nera
tor
Fully
Com
plyi
ngW
GN
0100
91G
ee a
nd H
ickt
on L
tdIn
cine
rato
rFu
lly C
ompl
ying
WG
N01
0111
Wel
lingt
on C
ity C
ounc
ilIn
cine
rato
rFu
lly C
ompl
ying
WG
N01
0137
Porir
ua C
ity C
ounc
ilIn
cine
rato
rFu
lly C
ompl
ying
WG
N01
0163
Wel
lingt
on R
egio
nal C
ounc
ilM
isce
llane
ous
Fully
Com
plyi
ngW
GN
0102
23Vi
ta N
ew Z
eala
nd L
imite
dM
anuf
actu
ring
Non
Com
plyi
ngW
GN
0102
26Ly
chga
te F
uner
al s
ervi
ce L
imite
dIn
cine
rato
rFu
lly C
ompl
ying
WG
N02
0118
Gol
den
Bay
Cem
ent
Min
eral
Pro
cess
esFu
lly C
ompl
ying
WG
N02
0179
Uni
ted
Envi
ronm
enta
l Ltd
Mis
cella
neou
sN
on C
ompl
ying
WG
N02
0182
Alst
om H
utt W
orks
hop
Abra
sive
Bla
stin
gFu
lly C
ompl
ying
WG
N03
0002
Firth
Indu
strie
sM
anuf
actu
ring
Fully
Com
plyi
ngW
GN
0300
35M
& M
Con
stru
ctio
nM
isce
llane
ous
Fully
Com
plyi
ngW
GN
0300
44Br
oadc
ast C
omm
unic
atio
ns L
tdAb
rasi
ve B
last
ing
Fully
Com
plyi
ngW
GN
0300
60N
Z Fi
sh P
rodu
cts
Anim
al a
nd P
lant
Fully
Com
plyi
ngW
GN
9300
8701
Hut
t Val
ley
Hea
lthIn
cine
rato
rFu
lly C
ompl
ying
WG
N94
0116
01G
race
field
Man
ufac
turin
g Pl
ant
Man
ufac
turin
gFu
lly C
ompl
ying
WG
N94
0127
01M
obil
Oil
(NZ)
Lim
ited
Abra
sive
Bla
stin
gFu
lly C
ompl
ying
WG
N94
0128
01Fe
ltex
Rub
ber L
imite
dM
anuf
actu
ring
Fully
Com
plyi
ngW
GN
9401
3001
Fulto
n H
ogan
Wel
lingt
onM
iner
al P
roce
sses
Non
Com
plyi
ngW
GN
9401
53Pa
cific
Wal
lcov
erin
g Lt
dM
anuf
actu
ring
Non
Com
plyi
ngW
GN
9500
0501
Pave
men
ts (W
gtn)
Lim
ited
Min
eral
Pro
cess
esN
on C
ompl
ying
WG
N95
0150
01Ta
ylor
Pre
ston
Ltd
Anim
al a
nd P
lant
Non
Com
plyi
ngW
GN
9501
5601
Dul
ux N
ew Z
eala
ndM
anuf
actu
ring
Non
Com
plyi
ngW
GN
9501
5701
Uni
leve
r New
Zea
land
Ltd
Man
ufac
turin
gM
ainl
y C
ompl
ying
WG
N96
0025
01H
orok
iwi Q
uarri
es L
imite
dM
iner
al P
roce
sses
Fully
Com
plyi
ngW
GN
9600
2701
Firth
Indu
strie
s Li
mite
d Be
lmon
tM
iner
al P
roce
sses
Fully
Com
plyi
ngW
GN
9600
4801
Sche
ring-
Plou
gh A
nim
al H
ealth
Inci
nera
tor
Fully
Com
plyi
ngW
GN
9600
6601
Win
ston
e Ag
greg
ates
Min
eral
Pro
cess
esFu
lly C
ompl
ying
WG
N96
0069
Sout
h Pa
cific
Tyr
esM
anuf
actu
ring
Mai
nly
Com
plyi
ngW
GN
9600
8701
Sche
ring-
Plou
gh A
nim
al H
ealth
Anim
al a
nd P
lant
Mai
nly
Com
plyi
ngW
GN
9700
2901
Stea
m &
San
d Li
mite
dAb
rasi
ve B
last
ing
Non
Com
plyi
ngW
GN
9700
3801
New
Zea
land
Pas
tora
l Agr
icul
ture
Inci
nera
tor
Fully
Com
plyi
ngW
GN
9701
17C
ryov
ac/S
eale
d Ai
r (N
Z) L
imite
dM
anuf
actu
ring
Non
Com
plyi
ngW
GN
9800
3001
Hol
cim
New
Zea
land
Ltd
Min
eral
Pro
cess
esFu
lly C
ompl
ying
WG
N98
0086
01Fi
rth In
dust
ries
Lim
ited
Min
eral
Pro
cess
esFu
lly C
ompl
ying
WG
N98
0198
02M
iram
ar G
olf C
lub
Was
te D
ispo
sal
Fully
Com
plyi
ngW
GN
9900
47C
hem
was
te In
dust
ries(
Wel
lingt
on)L
tdW
aste
Dis
posa
lN
on C
ompl
ying
WG
N99
0211
01Ac
me
Engi
neer
ing
Lim
ited
Abra
sive
Bla
stin
gFu
lly C
ompl
ying
WG
N99
0213
03H
orok
iwi Q
uarri
es L
imite
dM
iner
al P
roce
sses
Fully
Com
plyi
ngW
GN
9902
4201
Kapi
ti C
oast
Dis
trict
Cou
ncil
Was
te D
ispo
sal
Mai
nly
Com
plyi
ngW
GN
9902
4301
Mon
roe
Sprin
gs (N
Z) L
tdM
anuf
actu
ring
Fully
Com
plyi
ng
Was
tew
ater
trea
tmen
t pla
nts
File
Ref
eren
ceC
onse
nt H
olde
rA
ctiv
ity T
ype
Com
plia
nce
Rat
ing
Proj
ect T
itle
WG
N00
0039
Angl
ian
Wat
er In
tern
atio
nal
Dis
char
ge to
Air
Fully
Com
plyi
ngAW
I Was
tew
ater
Dew
ater
ing
Plan
tW
GN
9300
69W
ellin
gton
City
Cou
ncil
Dis
char
ge to
Air
Fully
Com
plyi
ngAW
I Was
tew
ater
Dew
ater
ing
Plan
tW
GN
9600
0208
The
Hut
t City
Cou
ncil
Sew
age
Dis
char
geN
on C
ompl
ying
Hut
t Was
tew
ater
Tre
atm
ent P
roje
ctW
GN
9600
0203
The
Hut
t City
Cou
ncil
Sew
age
Dis
char
geFu
lly C
ompl
ying
Hut
t Was
tew
ater
Tre
atm
ent P
roje
ctW
GN
9600
0207
The
Hut
t City
Cou
ncil
Sew
age
Dis
char
geFu
lly C
ompl
ying
Hut
t Was
tew
ater
Tre
atm
ent P
roje
ctW
GN
9600
0204
The
Hut
t City
Cou
ncil
Sew
age
Dis
char
geN
on C
ompl
ying
Hut
t Was
tew
ater
Tre
atm
ent P
roje
ctW
GN
0101
01H
utt C
ity C
ounc
ilSe
wag
e D
isch
arge
Non
Com
plyi
ngH
utt W
aste
wat
er T
reat
men
t Pro
ject
WG
N96
0002
01Th
e H
utt C
ity C
ounc
ilSe
wag
e D
isch
arge
Fully
Com
plyi
ngH
utt W
aste
wat
er T
reat
men
t Pro
ject
WG
N96
0002
02Th
e H
utt C
ity C
ounc
ilSe
wag
e D
isch
arge
Fully
Com
plyi
ngH
utt W
aste
wat
er T
reat
men
t Pro
ject
WG
N93
0193
01Th
e H
utt C
ity C
ounc
ilD
isch
arge
to A
irFu
lly C
ompl
ying
Hut
t Was
tew
ater
Tre
atm
ent P
roje
ctW
GN
9501
6202
Hut
t City
Cou
ncil
Dis
char
ge to
Air
Non
Com
plyi
ngH
utt W
aste
wat
er T
reat
men
t Pro
ject
WG
N95
0049
01Th
e H
utt C
ity C
ounc
ilD
isch
arge
to A
irFu
lly C
ompl
ying
Hut
t Was
tew
ater
Tre
atm
ent P
roje
ctW
GN
9301
9302
The
Hut
t City
Cou
ncil
Dis
char
ge to
Air
Fully
Com
plyi
ngH
utt W
aste
wat
er T
reat
men
t Pro
ject
WG
N95
0162
01Th
e H
utt C
ity C
ounc
ilD
isch
arge
to A
irFu
lly C
ompl
ying
Hut
t Was
tew
ater
Tre
atm
ent P
roje
ctW
GN
9501
6203
Hut
t City
Cou
ncil
Sew
age
Dis
char
geN
on C
ompl
ying
Hut
t Was
tew
ater
Tre
atm
ent P
roje
ctW
GN
9600
9401
Angl
ian
Wat
er In
tern
atio
nal
Dis
char
ge to
Air
Non
Com
plyi
ngM
oa P
oint
Was
tew
ater
Tre
atm
ent P
lant
WG
N91
0096
Wel
lingt
on C
ity C
ounc
ilD
isch
arge
to A
irFu
lly C
ompl
ying
Moa
Poi
nt W
aste
wat
er T
reat
men
t Pla
ntW
GN
9000
25W
ellin
gton
City
Cou
ncil
Sew
age
Dis
char
geFu
lly C
ompl
ying
Moa
Poi
nt W
aste
wat
er T
reat
men
t Pla
ntW
GN
9500
3502
Kapi
ti C
oast
Dis
trict
Cou
ncil
Dis
char
ge to
Air
Fully
Com
plyi
ngO
taki
Was
tew
ater
Tre
atm
ent P
lant
WG
N95
0035
03Ka
piti
Coa
st D
istri
ct C
ounc
ilD
isch
arge
to A
irFu
lly C
ompl
ying
Ota
ki W
aste
wat
er T
reat
men
t Pla
ntW
GN
9500
3501
Kapi
ti C
oast
Dis
trict
Cou
ncil
Sew
age
Dis
char
geN
on C
ompl
ying
Ota
ki W
aste
wat
er T
reat
men
t Pla
ntW
GN
9702
5502
Kapi
ti C
oast
Dis
trict
Cou
ncil
Dis
char
ge to
Air
Fully
Com
plyi
ngPa
rapa
raum
u W
aste
wat
er T
reat
men
t Pla
ntW
GN
9702
5504
Kapi
ti C
oast
Dis
trict
Cou
ncil
Sew
age
Dis
char
geFu
lly C
ompl
ying
Para
para
umu
Was
tew
ater
Tre
atm
ent P
lant
WG
N97
0255
05Ka
piti
Coa
st D
istri
ct C
ounc
ilSe
wag
e D
isch
arge
Fully
Com
plyi
ngPa
rapa
raum
u W
aste
wat
er T
reat
men
t Pla
ntW
GN
9702
5503
Kapi
ti C
oast
Dis
trict
Cou
ncil
Sew
age
Dis
char
geFu
lly C
ompl
ying
Para
para
umu
Was
tew
ater
Tre
atm
ent P
lant
WG
N98
0083
03Po
rirua
City
Cou
ncil
Out
fall/
Inta
ke S
truct
ure
Fully
Com
plyi
ngPo
rirua
Was
tew
ater
Tre
atm
ent P
lant
WG
N98
0083
02Po
rirua
City
Cou
ncil
Dis
char
ge to
Air
Fully
Com
plyi
ngPo
rirua
Was
tew
ater
Tre
atm
ent P
lant
WG
N98
0083
01Po
rirua
City
Cou
ncil
Sew
age
Dis
char
geFu
lly C
ompl
ying
Porir
ua W
aste
wat
er T
reat
men
t Pla
ntW
GN
0201
59H
utt C
ity C
ounc
ilC
onta
min
ated
Site
Dis
char
geFu
lly C
ompl
ying
Wai
nuio
mat
a W
aste
wat
er T
reat
men
t Pla
ntW
GN
9900
8402
Hut
t City
Cou
ncil
Dis
char
ge to
Air
Fully
Com
plyi
ngW
ainu
iom
ata
Was
tew
ater
Tre
atm
ent P
lant
WG
N99
0084
03Th
e H
utt C
ity C
ounc
ilSe
wag
e D
isch
arge
Fully
Com
plyi
ngW
ainu
iom
ata
Was
tew
ater
Tre
atm
ent P
lant
WG
N02
0236
Wel
lingt
on C
ity C
ounc
ilO
utfa
ll/In
take
Stru
ctur
eFu
lly C
ompl
ying
Wes
tern
Was
tew
ater
Tre
atm
ent P
lant
WG
N89
0009
01W
ellin
gton
City
Cou
ncil
Sew
age
Dis
char
geFu
lly C
ompl
ying
Wes
tern
Was
tew
ater
Tre
atm
ent P
lant
WG
N01
0133
Wel
lingt
on C
ity C
ounc
ilSe
wag
e D
isch
arge
Fully
Com
plyi
ngW
este
rn W
aste
wat
er T
reat
men
t Pla
ntW
GN
9201
3801
Wel
lingt
on C
ity C
ounc
ilD
isch
arge
to A
irFu
lly C
ompl
ying
Wes
tern
Was
tew
ater
Tre
atm
ent P
lant
Agr
icul
tura
l dis
char
ges
File
Ref
eren
ceC
onse
nt H
olde
rA
ctiv
ity T
ype
Com
plia
nce
Rat
ing
Proj
ect T
itle
WG
N98
0064
01K
J W
alke
rD
airy
Fully
Com
plyi
ngW
GN
9800
6501
Sand
yhill
Partn
ersh
ipD
airy
Non
Com
plyi
ngW
GN
9900
5801
Tom
A E
mps
onD
airy
Fully
Com
plyi
ngW
GN
9901
0101
Ian
Hut
ton
Dai
ryFu
lly C
ompl
ying
WG
N01
0203
NB
and
C E
verto
nD
airy
Non
Com
plyi
ngW
GN
0200
79Ai
leen
Ram
sbot
tom
Dai
ryFu
lly C
ompl
ying
WG
N00
0136
E W
& J
Sim
sD
airy
Fully
Com
plyi
ngW
GN
9901
0401
Gab
ites
Pigs
Far
ms
Ltd
Pigg
ery
Non
Com
plyi
ngW
GN
9900
1701
Willi
am H
unt
Dai
ryFu
lly C
ompl
ying
WG
N00
0104
Wak
apua
Far
m L
imite
dD
airy
Fully
Com
plyi
ngW
GN
9902
0401
B G
Tur
ksm
aD
airy
Fully
Com
plyi
ngW
GN
9900
6101
P C
& H
Wils
onD
airy
Non
Com
plyi
ngW
GN
0001
75O
taki
& P
oriru
a Tr
ust B
oard
Dai
ryFu
lly C
ompl
ying
WG
N99
0031
01D
H R
obin
son
Dai
ryFu
lly C
ompl
ying
WG
N99
0157
01J
Spie
rsD
airy
Fully
Com
plyi
ngW
GN
0200
50M
ourie
s M
eado
ws
Lim
ited
Dai
ryPa
rtial
ly C
ompl
ying
WG
N00
0031
Tini
No2
Tru
stD
airy
Fully
Com
plyi
ngW
GN
9900
5901
Ow
en &
Chr
istin
e Bu
rrell
Dai
ryFu
lly C
ompl
ying
WG
N98
0095
Ota
ki &
Por
irua
Trus
t Boa
rdD
airy
Non
Com
plyi
ng
Mis
cella
neou
s di
scha
rges
File
Ref
eren
ceC
onse
nt H
olde
rA
ctiv
ity T
ype
Com
plia
nce
Rat
ing
Proj
ect T
itle
WG
N02
0197
Wel
lingt
on R
egio
nal C
ounc
ilAg
riche
mic
al D
isch
arge
Fully
Com
plyi
ngW
GN
0102
27W
ellin
gton
Reg
iona
l Cou
ncil
Indu
stria
l Was
te D
isch
arge
Fully
Com
plyi
ngW
GN
9600
6102
Stre
sscr
ete
Ota
kiSe
wag
e D
isch
arge
Fully
Com
plyi
ngW
GN
9701
0901
Rus
hes
Lim
ited
Sew
age
Dis
char
geN
on C
ompl
ying
WG
N00
0185
Mah
aki H
oldi
ngs
Ltd
Sew
age
Dis
char
geN
on C
ompl
ying
WG
N03
0091
Livi
ng E
arth
Lim
ited
Sew
age
Dis
char
geFu
lly C
ompl
ying
WG
N95
0191
01W
ellin
gton
Reg
iona
l Cou
ncil
Sew
age
Dis
char
geFu
lly C
ompl
ying
WG
N95
0191
02W
ellin
gton
Reg
iona
l Cou
ncil
Sew
age
Dis
char
geFu
lly C
ompl
ying
WG
N95
0191
05W
ellin
gton
Reg
iona
l Cou
ncil
Sew
age
Dis
char
geFu
lly C
ompl
ying
WG
N95
0191
06W
ellin
gton
Reg
iona
l Cou
ncil
Sew
age
Dis
char
geFu
lly C
ompl
ying
WG
N95
0191
07W
ellin
gton
Reg
iona
l Cou
ncil
Sew
age
Dis
char
geFu
lly C
ompl
ying
WG
N98
0248
01W
ellin
gton
Reg
iona
l Cou
ncil
Sew
age
Dis
char
geFu
lly C
ompl
ying
WG
N97
0121
02Sa
lvat
ion
Arm
y Pr
oper
ty T
rust
Sew
age
Dis
char
geM
ainl
y C
ompl
ying
WG
N99
0248
01B
Van
De
Wer
ffSe
wag
e D
isch
arge
Fully
Com
plyi
ngW
GN
9901
8303
Mer
idia
n En
ergy
Ltd
Sew
age
Dis
char
geFu
lly C
ompl
ying
WG
N00
0005
Mar
k &
Fion
a R
amm
ell
Sew
age
Dis
char
geFu
lly C
ompl
ying
WG
N98
0240
Win
ston
e Ag
greg
ates
Sew
age
Dis
char
geN
on C
ompl
ying
WG
N02
0159
Hut
t City
Cou
ncil
Sew
age
Dis
char
geFu
lly C
ompl
ying
WG
N95
0173
01W
ellin
gton
City
Cou
ncil
Sew
age
Dis
char
geN
on C
ompl
ying
WG
N96
0074
01Br
enda
n Sp
ence
rSe
wag
e D
isch
arge
Non
Com
plyi
ngW
GN
9900
1501
Jenn
y Le
eSe
wag
e D
isch
arge
Fully
Com
plyi
ngW
GN
9801
98M
iram
ar G
olf C
lub
Sew
age
Dis
char
geN
on C
ompl
ying
WG
N01
0202
Build
ing
Res
earc
h As
sn o
f NZ
Sew
age
Dis
char
geFu
lly C
ompl
ying
WG
N95
0164
01W
inst
one
Aggr
egat
esSe
wag
e D
isch
arge
Fully
Com
plyi
ngW
GN
9902
1301
Hor
okiw
i Qua
rries
Lim
ited
Sew
age
Dis
char
geFu
lly C
ompl
ying
WG
N01
0150
Wel
lingt
on R
egio
nal C
ounc
ilSe
wag
e D
isch
arge
Non
Com
plyi
ngW
GN
9501
0102
Kapi
ti C
oast
Dis
trict
Cou
ncil
Indu
stria
l Was
te D
isch
arge
Fully
Com
plyi
ng
Wat
er tr
eatm
ent p
lant
s an
d w
ater
per
mits
File
Ref
eren
ceC
onse
nt H
olde
rA
ctiv
ity T
ype
Com
plia
nce
Rat
ing
Proj
ect T
itle
WG
N02
0178
Eber
hard
Deu
ssD
amFu
lly C
ompl
ying
WG
N03
0046
Hut
t City
Cou
ncil
Riv
er/S
tream
Div
ersi
onFu
lly C
ompl
ying
WG
N03
0074
Wel
lingt
on R
egio
nal C
ounc
ilR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngW
GN
0200
98H
utt C
ity C
ounc
ilR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngW
GN
0301
08Se
lwyn
Fea
ryR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngW
GN
0301
15W
ellin
gton
City
Cou
ncil
Riv
er/S
tream
Div
ersi
onM
ainl
y C
ompl
ying
WG
N01
0088
Futu
na T
rust
Lim
ited
Riv
er/S
tream
Div
ersi
onFu
lly C
ompl
ying
WG
N01
0088
Futu
na T
rust
Lim
ited
Riv
er/S
tream
Div
ersi
onN
on C
ompl
ying
WG
N02
0081
Law
ton
Fina
ncia
l Ser
vice
sR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngW
GN
0201
19C
raig
She
pher
dR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngW
GN
0201
16H
utt C
ity C
ounc
ilR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngW
GN
0301
31G
abite
s Pi
gs F
arm
s Lt
dR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngW
GN
0201
78Eb
erha
rd D
euss
Riv
er/S
tream
Div
ersi
onFu
lly C
ompl
ying
WG
N03
0023
Broo
klyn
Hol
ding
s Lt
dR
iver
/Stre
am D
iver
sion
Non
Com
plyi
ngW
GN
0300
23Br
ookl
yn H
oldi
ngs
Ltd
Riv
er/S
tream
Div
ersi
onN
on C
ompl
ying
WG
N01
0229
Anth
ony
War
ren
Mor
risse
yR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngW
GN
0302
61W
RC
Inte
rnal
Riv
er/S
tream
Div
ersi
onFu
lly C
ompl
ying
WG
N03
0261
Wel
lingt
on R
egio
nal C
ounc
ilR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngW
GN
0202
06Po
rirua
City
Cou
ncil
Riv
er/S
tream
Div
ersi
onFu
lly C
ompl
ying
WG
N01
0012
Pritc
hard
Gro
up L
imite
dR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngW
GN
0300
47M
iddl
eton
Dev
elop
men
ts L
tdR
iver
/Stre
am D
iver
sion
Non
Com
plyi
ngW
GN
0302
71Pe
ter S
alm
onR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngW
GN
0001
55Ka
rori
Wild
life
Sanc
tuar
y Tr
ust
Riv
er/S
tream
Div
ersi
onFu
lly C
ompl
ying
WG
N03
0016
Deb
way
Hol
ding
s Li
mite
dR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngW
GN
9902
1304
Hor
okiw
i Qua
rries
Lim
ited
Riv
er/S
tream
Div
ersi
onFu
lly C
ompl
ying
WG
N00
0069
Whi
tby
Coa
stal
Est
ates
Riv
er/S
tream
Div
ersi
onM
ainl
y C
ompl
ying
WG
N03
0034
Wel
lingt
on C
ity C
ounc
ilR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngW
GN
0300
88W
hitb
y C
oast
al E
stat
esR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngW
GN
0201
13Tr
ansp
ower
New
Zea
land
Ltd
Riv
er/S
tream
Div
ersi
onFu
lly C
ompl
ying
WG
N02
0123
Pritc
hard
Gro
up L
imite
dR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngW
GN
0201
35W
ellin
gton
Reg
iona
l Cou
ncil
Riv
er/S
tream
Div
ersi
onFu
lly C
ompl
ying
WG
N98
0056
01U
nile
ver N
ew Z
eala
nd L
tdTa
keFu
lly C
ompl
ying
WG
N01
0213
Wai
nuio
mat
a G
olf C
lub
Take
Mai
nly
Com
plyi
ngW
GN
9802
21H
utt C
ity C
ounc
ilTa
keN
on C
ompl
ying
WG
N99
0142
02Th
e H
utt C
ity C
ounc
ilTa
keFu
lly C
ompl
ying
WG
N02
0042
Exid
e N
ew Z
eala
nd L
imite
dTa
keM
ainl
y C
ompl
ying
WG
N98
0054
01Fe
ltex
Car
pets
Ltd
Take
Fully
Com
plyi
ngW
GN
9900
0601
Woo
lyar
ns L
tdTa
keFu
lly C
ompl
ying
WG
N00
0051
Car
l Lut
zTa
kePa
rtial
ly C
ompl
ying
WG
N01
0129
Wai
kana
e G
olf C
lub
Take
Fully
Com
plyi
ngW
GN
0101
73P
R K
idd
Take
Fully
Com
plyi
ngW
GN
0200
46O
taki
Gol
f Clu
b In
cTa
keM
ainl
y C
ompl
ying
WG
N02
0076
War
ren
Aust
adTa
keM
ainl
y C
ompl
ying
WG
N02
0114
J H
& K
M S
imco
xTa
keFu
lly C
ompl
ying
WG
N02
0153
Upp
er H
utt B
owlin
g C
lub
Take
Mai
nly
Com
plyi
ng
WG
N97
0262
01Ka
piti
Coa
st D
istri
ct C
ounc
ilTa
keM
ainl
y C
ompl
ying
WG
N97
0262
02Ka
piti
Coa
st D
istri
ct C
ounc
ilTa
kePa
rtial
ly C
ompl
ying
WG
N97
0002
Kapi
ti C
oast
Dis
trict
Cou
ncil
Take
Fully
Com
plyi
ngW
GN
9700
02Ka
piti
Coa
st D
istri
ct C
ounc
ilTa
keFu
lly C
ompl
ying
WG
N01
0125
Kapi
ti C
oast
Dis
trict
Cou
ncil
Take
Parti
ally
Com
plyi
ngW
GN
0200
16W
ellin
gton
Rac
ing
Clu
b (In
c)Ta
kePa
rtial
ly C
ompl
ying
WG
N02
0027
Wel
lingt
on G
olf C
lub
Take
Mai
nly
Com
plyi
ngW
GN
0200
93Ka
rori
Gol
f Clu
b In
cTa
keFu
lly C
ompl
ying
WG
N00
0020
Hut
t Val
ley
Hea
lthTa
keFu
lly C
ompl
ying
WG
N97
0002
01Ka
piti
Coa
st D
istri
ct C
ounc
ilTa
keFu
lly C
ompl
ying
WG
N97
0002
02Ka
piti
Coa
st D
istri
ct C
ounc
ilTa
keFu
lly C
ompl
ying
WG
N96
0017
Kapi
ti C
oast
Dis
trict
Cou
ncil
Take
Fully
Com
plyi
ngW
GN
9701
4601
Shan
don
Gol
f Clu
bTa
keN
on C
ompl
ying
WG
N98
0052
01N
ZTS
Serv
ices
Lim
ited
Take
Mai
nly
Com
plyi
ngW
GN
9800
5501
Impe
rial T
obac
co N
ew Z
eala
ndTa
keFu
lly C
ompl
ying
WG
N98
0186
01H
utt G
olf C
lub
Take
Mai
nly
Com
plyi
ngW
GN
9901
8302
Mer
idia
n En
ergy
Ltd
Take
Fully
Com
plyi
ngW
GN
0102
08Pr
itcha
rd G
roup
Lim
ited
Take
Non
Com
plyi
ngW
GN
0201
04Sh
ell N
ew Z
eala
nd L
imite
dTa
keFu
lly C
ompl
ying
WG
N97
0036
Wel
lingt
on R
egio
nal C
ounc
ilTa
keFu
lly C
ompl
ying
WG
N97
0036
Wel
lingt
on R
egio
nal C
ounc
ilTa
keFu
lly C
ompl
ying
WG
N00
0051
Car
l Lut
zTa
kePa
rtial
ly C
ompl
ying
WG
N01
0047
P Pr
etty
Take
Parti
ally
Com
plyi
ngW
GN
0200
38Te
Mar
ua G
olf C
lub
Inco
rpor
ated
Take
Fully
Com
plyi
ngW
GN
0201
07Ad
rian
and
Rob
yn M
ourie
Take
Parti
ally
Com
plyi
ngW
GN
9600
54Ad
rian
and
Rob
yn M
ourie
Take
Fully
Com
plyi
ngW
GN
0101
72Ad
rian
and
Rob
yn M
ourie
Take
Fully
Com
plyi
ngW
GN
0201
32Ju
dgef
ord
Gol
f Cou
rse
Take
Fully
Com
plyi
ngW
GN
0201
45Ka
piti
Gol
f Clu
bTa
keFu
lly C
ompl
ying
WG
N02
0170
Whi
tby
Coa
stal
Est
ates
Take
Fully
Com
plyi
ngW
GN
0300
13Ad
rian
and
Rob
yn M
ourie
Take
Fully
Com
plyi
ngW
GN
0300
11W
aika
nae
Chr
istia
n H
olid
ayTa
keFu
lly C
ompl
ying
WG
N03
0170
Wel
lingt
on C
ity C
ounc
ilTa
keFu
lly C
ompl
ying
WG
N99
0213
02H
orok
iwi Q
uarri
es L
imite
dTa
keFu
lly C
ompl
ying
WG
N01
0186
Win
ston
e Ag
greg
ates
Take
Fully
Com
plyi
ngW
GN
9502
26W
inst
one
Aggr
egat
esTa
keFu
lly C
ompl
ying
WG
N02
0011
Sout
h Pa
cific
Tyr
esTa
keFu
lly C
ompl
ying
WG
N00
0143
Win
ston
e Ag
greg
ates
Take
Fully
Com
plyi
ngW
GN
9502
26W
inst
one
Aggr
egat
esTa
keFu
lly C
ompl
ying
Land
use
con
sent
s
File
Ref
eren
ceC
onse
nt H
olde
rA
ctiv
ity T
ype
Com
plia
nce
Rat
ing
Proj
ect T
itle
WG
N02
0047
Kapi
ti C
oast
Dis
trict
Cou
ncil
Stre
am W
ork
Non
Com
plyi
ngW
GN
0200
41M
ahak
i Hol
ding
s Lt
dSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0200
98H
utt C
ity C
ounc
ilSt
ruct
ure:
Haz
ard
Miti
gatio
nFu
lly C
ompl
ying
WG
N03
0051
Gra
ham
Wils
onBo
reM
ainl
y C
ompl
ying
WG
N03
0052
Food
stuf
fs (W
ellin
gton
) Coo
pera
tive
Bore
Fully
Com
plyi
ngW
GN
0300
71M
iss
J Sc
hum
ache
rBo
reM
ainl
y C
ompl
ying
WG
N03
0077
Hug
h St
anle
yBo
reM
ainl
y C
ompl
ying
WG
N03
0084
Upp
er H
utt D
evel
opm
ents
Ltd
Stru
ctur
e: H
azar
d M
itiga
tion
Non
Com
plyi
ngW
GN
0300
86M
artin
Rob
ins
Bore
Fully
Com
plyi
ngW
GN
0301
05Fo
odst
uffs
(Wel
lingt
on) C
oope
rativ
eBo
reM
ainl
y C
ompl
ying
WG
N03
0108
Selw
yn F
eary
Stre
am W
ork
Parti
ally
Com
plyi
ngW
GN
0301
11Tr
ansi
t New
Zea
land
Bore
Fully
Com
plyi
ngW
GN
0301
15W
ellin
gton
City
Cou
ncil
Stre
am W
ork
Mai
nly
Com
plyi
ngW
GN
0301
24C
alte
x N
ew Z
eala
nd L
imite
dBo
reM
ainl
y C
ompl
ying
WG
N03
0125
Kapi
ti C
oast
Dis
trict
Cou
ncil
Out
fall/
Inta
ke S
truct
ure
Fully
Com
plyi
ngW
GN
0301
39G
raha
m &
Virg
inia
Ram
say
Bore
Fully
Com
plyi
ngW
GN
0301
47D
epar
tmen
t of C
orre
ctio
nsSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0301
57LM
Mor
gan
Bore
Fully
Com
plyi
ngW
GN
0301
75G
rego
ry B
isho
pBo
reFu
lly C
ompl
ying
WG
N03
0185
Prop
erty
for I
ndus
try L
imite
dBo
rePa
rtial
ly C
ompl
ying
WG
N99
0096
01BE
& C
F Le
win
Stru
ctur
e: H
azar
d M
itiga
tion
Mai
nly
Com
plyi
ngW
GN
9900
9602
BE &
CF
Lew
inPl
antin
gM
ainl
y C
ompl
ying
WG
N00
0094
The
Hut
t City
Cou
ncil
Out
fall/
Inta
ke S
truct
ure
Fully
Com
plyi
ngW
GN
0001
11D
Sod
erbe
rg &
M O
wen
sSt
ream
Wor
kFu
lly C
ompl
ying
WG
N00
0157
P.J.
& D
.C. N
elso
n Lt
d.Ea
rthw
ork
Fully
Com
plyi
ngW
GN
0100
88Fu
tuna
Tru
st L
imite
dSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0100
88Fu
tuna
Tru
st L
imite
dBr
idge
Non
Com
plyi
ngW
GN
0200
96G
ordo
n Te
war
dBo
reM
ainl
y C
ompl
ying
WG
N01
0123
Hut
t City
Cou
ncil
Out
fall/
Inta
ke S
truct
ure
Fully
Com
plyi
ngW
GN
0201
01M
urra
y Pi
erce
Bore
Fully
Com
plyi
ngW
GN
0201
08W
ellin
gton
Reg
iona
l Cou
ncil
Pipe
line/
Cab
leFu
lly C
ompl
ying
WG
N02
0119
Cra
ig S
heph
erd
Stru
ctur
e: H
azar
d M
itiga
tion
Mai
nly
Com
plyi
ngW
GN
0201
19C
raig
She
pher
dR
ecla
mat
ion
Fully
Com
plyi
ngW
GN
0201
47Tr
ansi
t New
Zea
land
Stru
ctur
e: G
ener
alM
ainl
y C
ompl
ying
WG
N02
0167
Ron
Joh
nson
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N02
0177
Belv
ista
Sub
divi
sion
s Li
mte
dSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0201
87H
utt C
ity C
ounc
ilPi
pelin
e/C
able
Mai
nly
Com
plyi
ngW
GN
0201
90M
ike
Rya
nSt
ruct
ure:
Haz
ard
Miti
gatio
nFu
lly C
ompl
ying
WG
N02
0089
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Haz
ard
Miti
gatio
nN
on C
ompl
ying
WG
N02
0205
Ron
Joh
nson
Stru
ctur
e: H
azar
d M
itiga
tion
Mai
nly
Com
plyi
ngW
GN
0201
74Br
uce
Ingo
ePi
pelin
e/C
able
Mai
nly
Com
plyi
ngW
GN
0202
46C
raig
She
pher
dPi
pelin
e/C
able
Fully
Com
plyi
ngW
GN
0300
05W
ellin
gton
City
Cou
ncil
Out
fall/
Inta
ke S
truct
ure
Fully
Com
plyi
ngW
GN
0300
39H
arve
y N
orm
anBo
reM
ainl
y C
ompl
ying
WG
N03
0062
Dav
id In
nes
Stru
ctur
e: H
azar
d M
itiga
tion
Fully
Com
plyi
ng
WG
N03
0068
Nga
toto
Inve
stm
ents
Ltd
Stru
ctur
e: G
ener
alM
ainl
y C
ompl
ying
WG
N03
0074
Wel
lingt
on R
egio
nal C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0201
16H
utt C
ity C
ounc
ilR
ecla
mat
ion
Fully
Com
plyi
ngW
GN
0201
16H
utt C
ity C
ounc
ilSt
ream
Wor
kFu
lly C
ompl
ying
WG
N03
0121
RAB
Des
ign
Stru
ctur
e: G
ener
alN
on C
ompl
ying
WG
N03
0127
Jenn
i and
Dav
id B
enne
tBo
reM
ainl
y C
ompl
ying
WG
N03
0131
Gab
ites
Pigs
Far
ms
Ltd
Rec
lam
atio
nFu
lly C
ompl
ying
WG
N03
0133
Hut
t City
Cou
ncil
Rec
lam
atio
nFu
lly C
ompl
ying
WG
N03
0144
Tonc
hi B
egov
ich
Bore
Fully
Com
plyi
ngW
GN
0301
77Ph
ilip &
Wen
dy E
glin
gton
Bore
Mai
nly
Com
plyi
ngW
GN
0201
40Tr
ansi
t New
Zea
land
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N02
0178
Eber
hard
Deu
ssSt
ream
Wor
kFu
lly C
ompl
ying
WG
N02
0227
Rut
h an
d Al
an H
umph
ries
Bore
Non
Com
plyi
ngW
GN
0300
06W
ellin
gton
City
Cou
ncil
Bore
Non
Com
plyi
ngW
GN
0300
10C
olin
Har
risBo
reN
on C
ompl
ying
WG
N03
0023
Broo
klyn
Hol
ding
s Lt
dSt
ruct
ure:
Gen
eral
Non
Com
plyi
ngW
GN
0301
18G
eoff
and
Rob
yn C
otto
nBo
reN
on C
ompl
ying
WG
N03
0135
Civ
il D
esig
n Se
rvic
esSt
ruct
ure:
Gen
eral
Mai
nly
Com
plyi
ngW
GN
0301
38TC
Hen
ders
onBo
reN
on C
ompl
ying
WG
N03
0143
Fras
er M
cDou
gall
Bore
Fully
Com
plyi
ngW
GN
0301
45R
obyn
Nev
illeBo
reFu
lly C
ompl
ying
WG
N03
0155
Betty
Nor
man
Bore
Fully
Com
plyi
ngW
GN
0301
99Ba
rry S
cott
Bore
Fully
Com
plyi
ngW
GN
0302
18M
itche
ll Ba
nks
Bore
Fully
Com
plyi
ngW
GN
0302
40W
ellin
gton
Wat
erfro
nt L
tdBo
reN
on C
ompl
ying
WG
N03
0259
Ric
hmon
d Le
eBo
reFu
lly C
ompl
ying
WG
N01
0229
Anth
ony
War
ren
Mor
risse
ySt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0102
29An
thon
y W
arre
n M
orris
sey
Stre
am W
ork
Fully
Com
plyi
ngW
GN
0200
45Ph
ilip M
artin
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N02
0013
Tran
spow
er N
ew Z
eala
nd L
tdSt
ruct
ure:
Haz
ard
Miti
gatio
nFu
lly C
ompl
ying
WG
N02
0162
Tree
men
dous
Stre
am W
ork
Fully
Com
plyi
ngW
GN
0201
95Po
rirua
City
Cou
ncil
Rec
lam
atio
nM
ainl
y C
ompl
ying
WG
N02
0195
Porir
ua C
ity C
ounc
ilBr
idge
Mai
nly
Com
plyi
ngW
GN
0300
12C
apita
l Pro
ject
s Li
mite
dO
utfa
ll/In
take
Stru
ctur
eFu
lly C
ompl
ying
WG
N03
0019
N a
nd D
Kan
eBo
reFu
lly C
ompl
ying
WG
N03
0028
Dou
glas
and
Daw
n La
mb
Bore
Mai
nly
Com
plyi
ngW
GN
0300
43H
utt V
alle
y Pr
esbe
taria
n Sc
hool
Bore
Fully
Com
plyi
ngW
GN
0300
50W
Sol
omon
Bore
Mai
nly
Com
plyi
ngW
GN
0300
82Po
rirua
City
Cou
ncil
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N03
0092
Pine
hill
Hol
ding
s Li
mite
dSt
ruct
ure:
Haz
ard
Miti
gatio
nFu
lly C
ompl
ying
WG
N03
0095
Keith
Rat
cliff
eBo
reM
ainl
y C
ompl
ying
WG
N03
0120
Step
hen
Cla
rke
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N03
0129
Wel
lingt
on R
egio
nal C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0301
32Je
ffrey
Lew
isBo
reFu
lly C
ompl
ying
WG
N03
0146
Wel
lingt
on R
egio
nal C
ounc
ilSt
ream
Wor
kFu
lly C
ompl
ying
WG
N03
0151
J &
M A
llan
Bore
Mai
nly
Com
plyi
ngW
GN
0301
53B
ridge
t Firm
inBo
rePa
rtial
ly C
ompl
ying
WG
N03
0163
Ric
hard
and
Fra
nces
Cat
hie
Bore
Parti
ally
Com
plyi
ng
WG
N03
0181
R.E
. Prid
dle
Bore
Fully
Com
plyi
ngW
GN
0301
82W
ellin
gton
Reg
iona
l Cou
ncil
Stre
am W
ork
Fully
Com
plyi
ngW
GN
0301
88Be
lvis
ta S
ubdi
visi
ons
Lim
ted
Pipe
line/
Cab
leFu
lly C
ompl
ying
WG
N03
0188
Belv
ista
Sub
divi
sion
s Li
mte
dSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0301
93R
oy &
Sal
ly T
aylo
rBo
rePa
rtial
ly C
ompl
ying
WG
N03
0194
John
McG
owan
Mag
eeBo
reFu
lly C
ompl
ying
WG
N03
0196
G &
J O
'Brie
nBo
reM
ainl
y C
ompl
ying
WG
N03
0267
Alan
& R
uth
Hum
phrie
sBo
reFu
lly C
ompl
ying
WG
N02
0113
Tran
spow
er N
ew Z
eala
nd L
tdSt
ream
Wor
kFu
lly C
ompl
ying
WG
N03
0183
J.B.
L O
gilv
ieBo
reFu
lly C
ompl
ying
WG
N03
0184
R J
Den
ison
Bore
Parti
ally
Com
plyi
ngW
GN
0301
89R
obin
Dou
ghty
Bore
Parti
ally
Com
plyi
ngW
GN
0301
90G
reig
& M
iche
lle H
ayw
ard
Bore
Parti
ally
Com
plyi
ngW
GN
0301
92Jo
hn S
chiff
& S
arah
Whi
ten
Bore
Fully
Com
plyi
ngW
GN
0302
07G
ary
John
son
Bore
Fully
Com
plyi
ngW
GN
0302
19W
RC
Inte
rnal
Bore
Parti
ally
Com
plyi
ngW
GN
0302
20Ja
ck &
Pat
Man
ders
onBo
reFu
lly C
ompl
ying
WG
N03
0221
The
Mea
dow
s C
hurc
hBo
rePa
rtial
ly C
ompl
ying
WG
N03
0224
Con
nell
Wag
ner
Bore
Mai
nly
Com
plyi
ngW
GN
0302
26D
avid
& R
hond
a H
eath
erBo
rePa
rtial
ly C
ompl
ying
WG
N03
0227
Con
nell
Wag
ner
Bore
Mai
nly
Com
plyi
ngW
GN
0302
29C
J &
DL
Brya
nt F
amily
Tru
stBo
reFu
lly C
ompl
ying
WG
N03
0234
A R
itchi
eBo
reFu
lly C
ompl
ying
WG
N03
0235
A &
M K
eay
Bore
Fully
Com
plyi
ngW
GN
0302
39C
hels
ea H
ouse
Ear
ly C
hild
hood
Cen
trBo
rePa
rtial
ly C
ompl
ying
WG
N03
0243
A &
E H
arco
urt
Bore
Fully
Com
plyi
ngW
GN
0302
48D
esm
ond
& M
arga
ret C
roth
ers
Bore
Fully
Com
plyi
ngW
GN
0302
52G
raha
m a
nd F
ranc
es B
oyd
Bore
Mai
nly
Com
plyi
ngW
GN
0302
53Th
omas
For
rest
alBo
reFu
lly C
ompl
ying
WG
N03
0257
Gra
eme
& Lo
ris R
olst
onBo
reFu
lly C
ompl
ying
WG
N03
0260
John
& R
obyn
Din
een
Bore
Fully
Com
plyi
ngW
GN
0302
61W
RC
Inte
rnal
Stre
am W
ork
Fully
Com
plyi
ngW
GN
0302
64R
oss
& El
aine
Cre
edBo
rePa
rtial
ly C
ompl
ying
WG
N00
0007
Mar
atho
n D
evel
opm
ents
and
Rec
lam
atio
nFu
lly C
ompl
ying
WG
N00
0007
Mar
atho
n D
evel
opm
ents
and
Stre
am W
ork
Fully
Com
plyi
ngW
GN
0200
77Ka
piti
Coa
st D
istri
ct C
ounc
ilSt
ruct
ure:
Haz
ard
Miti
gatio
nFu
lly C
ompl
ying
WG
N02
0180
Wel
lingt
on R
egio
nal C
ounc
ilSt
ruct
ure:
Haz
ard
Miti
gatio
nFu
lly C
ompl
ying
WG
N02
0186
M J
acom
bSt
ruct
ure:
Gen
eral
Mai
nly
Com
plyi
ngW
GN
0201
92K
Men
chi
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N02
0206
Porir
ua C
ity C
ounc
ilSt
ream
Wor
kFu
lly C
ompl
ying
WG
N02
0206
Porir
ua C
ity C
ounc
ilSt
ream
Wor
kFu
lly C
ompl
ying
WG
N03
0003
Hut
t City
Cou
ncil
Stru
ctur
e: H
azar
d M
itiga
tion
Non
Com
plyi
ngW
GN
0300
09Pa
rapa
raum
u Be
ach
Gol
f Clu
bO
utfa
ll/In
take
Stru
ctur
eM
ainl
y C
ompl
ying
WG
N03
0021
Woo
drid
ge E
stat
es L
tdR
ecla
mat
ion
Fully
Com
plyi
ngW
GN
0300
21W
oodr
idge
Est
ates
Ltd
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N03
0114
WR
C In
tern
alSt
ream
Wor
kFu
lly C
ompl
ying
WG
N03
0114
WR
C In
tern
alSt
ream
Wor
kFu
lly C
ompl
ying
WG
N03
0171
Mic
hael
She
rlock
Bore
Mai
nly
Com
plyi
ng
WG
N03
0180
Ray
mon
d &
Mar
ie W
ellg
reen
Bore
Fully
Com
plyi
ngW
GN
0301
97Ia
n W
eble
yBo
reM
ainl
y C
ompl
ying
WG
N03
0281
Kapi
ti C
oast
Dis
trict
Cou
ncil
Bore
Fully
Com
plyi
ngW
GN
9901
8301
Mer
idia
n En
ergy
Ltd
Dam
Fully
Com
plyi
ngW
GN
0100
12Pr
itcha
rd G
roup
Lim
ited
Stre
am W
ork
Fully
Com
plyi
ngW
GN
0101
56P
Salm
on &
L B
amfo
rdSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0201
23Ar
chy
Hol
ding
sSt
ream
Wor
kFu
lly C
ompl
ying
WG
N02
0123
Pritc
hard
Gro
up L
imite
dSt
ream
Wor
kFu
lly C
ompl
ying
WG
N02
0123
Pritc
hard
Gro
up L
imite
dR
ecla
mat
ion
Fully
Com
plyi
ngW
GN
0201
35W
ellin
gton
Reg
iona
l Cou
ncil
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N02
0135
Wel
lingt
on R
egio
nal C
ounc
ilD
amFu
lly C
ompl
ying
WG
N03
0026
Shel
l New
Zea
land
Lim
ited
Bore
Parti
ally
Com
plyi
ngW
GN
0300
47M
iddl
eton
Dev
elop
men
ts L
tdO
utfa
ll/In
take
Stru
ctur
ePa
rtial
ly C
ompl
ying
WG
N03
0201
A W
atm
ough
Bore
Fully
Com
plyi
ngW
GN
0302
02H
enry
Cha
rles
Osb
orn
Bore
Fully
Com
plyi
ngW
GN
0302
03An
thon
y Jo
hn W
alde
grav
eBo
reM
ainl
y C
ompl
ying
WG
N03
0204
BGC
Elw
ood
Fam
ily T
rust
Bore
Fully
Com
plyi
ngW
GN
0302
05D
M M
athe
son
Bore
Fully
Com
plyi
ngW
GN
0302
10Te
renc
e &
Anne
McB
eth
Bore
Fully
Com
plyi
ngW
GN
0302
25Pa
ul d
e Be
rnad
oBo
reFu
lly C
ompl
ying
WG
N03
0230
Car
l Van
der
Mee
rBo
reM
ainl
y C
ompl
ying
WG
N03
0271
Pete
r Sal
mon
Stre
am W
ork
Fully
Com
plyi
ngW
GN
9800
3301
Wel
lingt
on R
egio
nal C
ounc
ilVe
geta
tion
Rem
oval
Fully
Com
plyi
ngW
GN
0001
55Ka
rori
Wild
life
Sanc
tuar
y Tr
ust
Stre
am W
ork
Fully
Com
plyi
ngW
GN
0001
55Ka
rori
Wild
life
Sanc
tuar
y Tr
ust
Stre
am W
ork
Fully
Com
plyi
ngW
GN
0001
55Ka
rori
Wild
life
Sanc
tuar
y Tr
ust
Stre
am W
ork
Fully
Com
plyi
ngW
GN
0001
55Ka
rori
Wild
life
Sanc
tuar
y Tr
ust
Dam
Fully
Com
plyi
ngW
GN
0001
55Ka
rori
Wild
life
Sanc
tuar
y Tr
ust
Stru
ctur
e: H
azar
d M
itiga
tion
Fully
Com
plyi
ngW
GN
0100
02Pu
kena
mu
Esta
tes
Ltd
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N01
0120
Wel
lingt
on R
egio
nal C
ounc
ilSt
ream
Wor
kFu
lly C
ompl
ying
WG
N02
0128
Gra
eme
Hug
hson
Bore
Non
Com
plyi
ngW
GN
0201
66Te
Mar
ua G
olf C
lub
Inco
rpor
ated
Rec
lam
atio
nFu
lly C
ompl
ying
WG
N02
0226
Activ
e In
vest
men
ts L
imite
dSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0300
16D
ebw
ay H
oldi
ngs
Lim
ited
Stre
am W
ork
Fully
Com
plyi
ngW
GN
0300
16D
ebw
ay H
oldi
ngs
Lim
ited
Rec
lam
atio
nFu
lly C
ompl
ying
WG
N03
0029
Kapi
ti C
oast
Dis
trict
Cou
ncil
Stru
ctur
e: H
azar
d M
itiga
tion
Parti
ally
Com
plyi
ngW
GN
0300
37M
rs P
E B
aile
yBo
reN
on C
ompl
ying
WG
N03
0042
Hut
t City
Cou
ncil
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N03
0064
Shel
l NZ
Ltd
Bore
Fully
Com
plyi
ngW
GN
0300
90K
J C
ress
wel
lBo
rePa
rtial
ly C
ompl
ying
WG
N03
0112
Gar
th H
arris
onBo
reFu
lly C
ompl
ying
WG
N03
0128
Bill
Har
per
Bore
Parti
ally
Com
plyi
ngW
GN
0301
37JW
& B
A M
ilne
Bore
Fully
Com
plyi
ngW
GN
0301
42U
pper
Hut
t City
Cou
ncil
Stru
ctur
e: H
azar
d M
itiga
tion
Fully
Com
plyi
ngW
GN
0301
56Ph
ilippa
Bro
wBo
reFu
lly C
ompl
ying
WG
N03
0161
Bruc
e C
halc
raft
Bore
Mai
nly
Com
plyi
ngW
GN
0301
68R
uth
Philp
ott $
Mar
gare
t Dix
onBo
reM
ainl
y C
ompl
ying
WG
N03
0195
Chr
istin
e H
atfie
ldBo
reFu
lly C
ompl
ying
WG
N98
0178
02W
inst
one
Aggr
egat
esR
ecla
mat
ion
Fully
Com
plyi
ngW
GN
9802
1201
Keith
Ada
mso
nSt
ream
Wor
kN
on C
ompl
ying
WG
N99
0121
01W
ellin
gton
Reg
iona
l Cou
ncil
Stre
am W
ork
Mai
nly
Com
plyi
ngW
GN
9801
7801
Win
ston
e Ag
greg
ates
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N00
0021
Hor
okiw
i Qua
rries
Lim
ited
Earth
wor
kFu
lly C
ompl
ying
WG
N00
0021
Hor
okiw
i Qua
rries
Lim
ited
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N00
0021
Hor
okiw
i Qua
rries
Lim
ited
Out
fall/
Inta
ke S
truct
ure
Fully
Com
plyi
ngW
GN
0101
45W
ellin
gton
City
Cou
ncil
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N02
0069
Dav
id B
row
nSt
ruct
ure:
Gen
eral
Mai
nly
Com
plyi
ngW
GN
0200
88R
ober
t Rod
eric
k an
dSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0201
37Te
d H
inde
Stru
ctur
e: G
ener
alM
ainl
y C
ompl
ying
WG
N02
0237
Ove
rton
Scot
tBr
idge
Non
Com
plyi
ngW
GN
0202
38W
ellin
gton
Reg
iona
l Cou
ncil
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N03
0018
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0300
41Te
Mar
ua G
olf C
lub
Inco
rpor
ated
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N03
0046
Hut
t City
Cou
ncil
Stru
ctur
e: H
azar
d M
itiga
tion
Fully
Com
plyi
ngW
GN
0300
73H
orok
iwi Q
uarri
es L
imite
dSt
ruct
ure:
Gen
eral
Non
Com
plyi
ngW
GN
0301
54H
utt C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0301
73W
ellin
gton
Reg
iona
l Cou
ncil
Brid
geFu
lly C
ompl
ying
WG
N00
0069
Whi
tby
Coa
stal
Est
ates
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N02
0017
Kapi
ti C
oast
Dis
trict
Cou
ncil
Stre
am W
ork
Fully
Com
plyi
ngW
GN
0001
66M
illwoo
d Jo
int V
entu
reSt
ruct
ure:
Haz
ard
Miti
gatio
nFu
lly C
ompl
ying
WG
N03
0034
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Haz
ard
Miti
gatio
nFu
lly C
ompl
ying
WG
N03
0088
Whi
tby
Coa
stal
Est
ates
Stru
ctur
e: G
ener
alM
ainl
y C
ompl
ying
WG
N03
0023
Broo
klyn
Hol
ding
s Lt
dR
ecla
mat
ion
Non
Com
plyi
ng
Maj
or ri
ver w
orks
File
Ref
eren
ceC
onse
nt H
olde
rA
ctiv
ity T
ype
Com
plia
nce
Rat
ing
Proj
ect T
itle
WG
N98
0255
01W
ellin
gton
Reg
iona
l Cou
ncil
Stre
am W
ork
Fully
Com
plyi
ngH
utt R
iver
- G
loba
lW
GN
9802
5502
Wel
lingt
on R
egio
nal C
ounc
ilSt
ream
Wor
kFu
lly C
ompl
ying
Hut
t Riv
er g
loba
lW
GN
9802
5503
Wel
lingt
on R
egio
nal C
ounc
ilR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngH
utt R
iver
glo
bal
WG
N98
0255
05W
ellin
gton
Reg
iona
l Cou
ncil
Dis
char
ge to
Air
Fully
Com
plyi
ngH
utt R
iver
Glo
bal
WG
N98
0255
04W
ellin
gton
Reg
iona
l Cou
ncil
Indu
stria
l Was
te D
isch
arge
Fully
Com
plyi
ngH
utt R
iver
Glo
bal
WG
N98
0254
06W
ellin
gton
Reg
iona
l Cou
ncil
Coa
stal
Wor
k/D
istu
rban
ceFu
lly C
ompl
ying
Ota
ki R
iver
glo
bal
WG
N98
0254
03W
ellin
gton
Reg
iona
l Cou
ncil
Riv
er/S
tream
Div
ersi
onFu
lly C
ompl
ying
Ota
ki R
iver
glo
bal
WG
N98
0254
01W
ellin
gton
Reg
iona
l Cou
ncil
Stre
am W
ork
Fully
Com
plyi
ngO
taki
Riv
er g
loba
lW
GN
9802
5402
Wel
lingt
on R
egio
nal C
ounc
ilSt
ruct
ure:
Haz
ard
Miti
gatio
nFu
lly C
ompl
ying
Ota
ki R
iver
glo
bal
WG
N98
0254
04W
ellin
gton
Reg
iona
l Cou
ncil
Indu
stria
l Was
te D
isch
arge
Fully
Com
plyi
ngO
taki
Riv
er g
loba
lW
GN
9802
5405
Wel
lingt
on R
egio
nal C
ounc
ilD
isch
arge
to A
irFu
lly C
ompl
ying
Ota
ki R
iver
glo
bal
WG
N98
0256
06W
ellin
gton
Reg
iona
l Cou
ncil
Coa
stal
Wor
k/D
istu
rban
ceFu
lly C
ompl
ying
Wai
kana
e R
iver
glo
bal
WG
N98
0256
02W
ellin
gton
Reg
iona
l Cou
ncil
Stre
am W
ork
Fully
Com
plyi
ngW
aika
nae
Riv
er g
loba
lW
GN
9802
5603
Wel
lingt
on R
egio
nal C
ounc
ilR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngW
aika
nae
Riv
er g
loba
lW
GN
0201
06W
ellin
gton
Reg
iona
l Cou
ncil
Indu
stria
l Was
te D
isch
arge
Fully
Com
plyi
ngW
aika
nae
Riv
erW
GN
0201
06W
ellin
gton
Reg
iona
l Cou
ncil
Riv
er/S
tream
Div
ersi
onFu
lly C
ompl
ying
Wai
kana
e R
iver
WG
N02
0106
Wel
lingt
on R
egio
nal C
ounc
ilSt
ream
Wor
kFu
lly C
ompl
ying
Wai
kana
e R
iver
WG
N98
0256
01W
ellin
gton
Reg
iona
l Cou
ncil
Stre
am W
ork
Fully
Com
plyi
ngW
aika
nae
Riv
er g
loba
lW
GN
9802
5605
Wel
lingt
on R
egio
nal C
ounc
ilD
isch
arge
to A
irFu
lly C
ompl
ying
Wai
kana
e R
iver
glo
bal
WG
N98
0256
04W
ellin
gton
Reg
iona
l Cou
ncil
Indu
stria
l Was
te D
isch
arge
Fully
Com
plyi
ngW
aika
nae
Riv
er g
loba
lW
GN
0201
43W
ellin
gton
Reg
iona
l Cou
ncil
Stre
am W
ork
Fully
Com
plyi
ngW
ainu
iom
ata
Riv
erW
GN
0201
43W
ellin
gton
Reg
iona
l Cou
ncil
Riv
er/S
tream
Div
ersi
onFu
lly C
ompl
ying
Wai
nuio
mat
a R
iver
WG
N01
0220
Wel
lingt
on R
egio
nal C
ounc
ilSt
ream
Wor
kFu
lly C
ompl
ying
Wai
tohu
Stre
amW
GN
0102
20W
ellin
gton
Reg
iona
l Cou
ncil
Indu
stria
l Was
te D
isch
arge
Fully
Com
plyi
ngW
aito
hu S
tream
WG
N01
0220
Wel
lingt
on R
egio
nal C
ounc
ilR
iver
/Stre
am D
iver
sion
Fully
Com
plyi
ngW
aito
hu S
tream
Coa
stal
File
Ref
eren
ceC
onse
nt H
olde
rA
ctiv
ity T
ype
Com
plia
nce
Rat
ing
Proj
ect T
itle
WG
N00
0178
Tels
traC
lear
Lim
ited
Pipe
line/
Cab
leFu
lly C
ompl
ying
WG
N00
0178
Tels
traC
lear
Lim
ited
Occ
upat
ion
Fully
Com
plyi
ngW
GN
0001
78Te
lstra
Cle
ar L
imite
dPi
pelin
e/C
able
Fully
Com
plyi
ngW
GN
0100
03Te
lstra
Cle
ar L
imite
dPi
pelin
e/C
able
Fully
Com
plyi
ngW
GN
0100
03Te
lstra
Cle
ar L
imite
dO
ccup
atio
nFu
lly C
ompl
ying
WG
N01
0003
Tels
traC
lear
Lim
ited
Pipe
line/
Cab
leFu
lly C
ompl
ying
WG
N01
0003
Tels
traC
lear
Lim
ited
Pipe
line/
Cab
leFu
lly C
ompl
ying
WG
N01
0003
Tels
traC
lear
Lim
ited
Occ
upat
ion
Fully
Com
plyi
ngW
GN
0100
03Te
lstra
Cle
ar L
imite
dPi
pelin
e/C
able
Fully
Com
plyi
ngW
GN
0300
94Ka
ren
Mos
es a
nd E
ve T
rege
rthan
Coa
stal
Wor
k/D
istu
rban
ceFu
lly C
ompl
ying
WG
N03
0169
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Haz
ard
Miti
gatio
nFu
lly C
ompl
ying
WG
N96
0590
01Po
rirua
City
Cou
ncil
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0590
02Po
rirua
City
Cou
ncil
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0590
03Po
rirua
City
Cou
ncil
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0683
01M
ana
Cru
isin
g C
lub
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0683
02M
ana
Cru
isin
g C
lub
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0709
01J
R P
ohat
uSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9700
1501
Man
a M
arin
a (P
arem
ata)
Lim
ited
Mar
ina
Fully
Com
plyi
ngW
GN
9801
3901
Wel
lingt
on P
ower
Boa
t Clu
bSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9802
3501
Man
a M
arin
a (P
arem
ata)
Lim
ited
Dre
dgin
gFu
lly C
ompl
ying
WG
N99
0200
01W
illiam
J C
ollin
sSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9902
5301
Wat
ers
Edge
Res
iden
t Ass
ocSt
ruct
ure:
Haz
ard
Miti
gatio
nFu
lly C
ompl
ying
WG
N02
0173
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0300
45Tr
ansp
ower
New
Zea
land
Ltd
Pipe
line/
Cab
leN
on C
ompl
ying
WG
N03
0045
Tran
spow
er N
ew Z
eala
nd L
tdC
oast
al W
ork/
Dis
turb
ance
Non
Com
plyi
ngW
GN
9605
0201
B J
O'S
ulliv
anSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9605
6603
Pare
mat
a Bo
atin
g C
lub
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0590
04Po
rirua
City
Cou
ncil
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0590
06Po
rirua
City
Cou
ncil
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N98
0217
01W
ellin
gton
City
Cou
ncil
Mar
ina
Fully
Com
plyi
ngW
GN
0101
16N
ew Z
eala
nd D
ivin
g an
d Sa
lvag
e Lt
dIn
dust
rial W
aste
Dis
char
gePa
rtial
ly C
ompl
ying
WG
N02
0022
Plim
mer
ton
Boat
ing
Clu
bIn
dust
rial W
aste
Dis
char
geFu
lly C
ompl
ying
WG
N02
0036
Wel
lingt
on C
ity C
ounc
ilBe
ach
Rep
leni
shm
ent
Parti
ally
Com
plyi
ngW
GN
0200
36W
ellin
gton
City
Cou
ncil
Stru
ctur
e: G
ener
alPa
rtial
ly C
ompl
ying
WG
N02
0036
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Parti
ally
Com
plyi
ngW
GN
0200
36W
ellin
gton
City
Cou
ncil
Stru
ctur
e: G
ener
alPa
rtial
ly C
ompl
ying
WG
N02
0036
Wel
lingt
on C
ity C
ounc
ilC
oast
al W
ork/
Dis
turb
ance
Parti
ally
Com
plyi
ngW
GN
0200
36W
ellin
gton
City
Cou
ncil
Coa
stal
Wor
k/D
istu
rban
cePa
rtial
ly C
ompl
ying
WG
N02
0036
Wel
lingt
on C
ity C
ounc
ilO
ccup
atio
nPa
rtial
ly C
ompl
ying
WG
N02
0036
Wel
lingt
on C
ity C
ounc
ilD
ispo
sal
Parti
ally
Com
plyi
ngW
GN
0200
36W
ellin
gton
City
Cou
ncil
Coa
stal
Wor
k/D
istu
rban
cePa
rtial
ly C
ompl
ying
WG
N02
0061
Roy
al P
ort N
icho
lson
Yac
ht C
lub
Indu
stria
l Was
te D
isch
arge
Fully
Com
plyi
ngW
GN
0200
74D
epar
tmen
t of C
onse
rvat
ion
Stru
ctur
e: H
azar
d M
itiga
tion
Fully
Com
plyi
ngW
GN
0300
27Bl
ackb
ridge
Tru
stSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0300
27Le
slie
, Mar
y &
Mar
tin M
ason
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N03
0027
Mar
ilyn
God
dard
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N03
0027
Pete
r J K
eena
nSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0302
49C
lem
& P
atric
ia G
riffit
hsO
ccup
atio
nFu
lly C
ompl
ying
WG
N96
0533
01M
Am
bros
eSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9605
6301
War
ren
Gilla
nSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9605
8701
R J
oyce
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0599
01Pl
imm
erto
n Bo
atin
g C
lub
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N99
0145
01Pl
imm
erto
n Bo
atin
g C
lub
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N99
0145
03Pl
imm
erto
n Bo
atin
g C
lub
Stru
ctur
e: H
azar
d M
itiga
tion
Fully
Com
plyi
ngW
GN
0100
36W
ellin
gton
Reg
iona
l Cou
ncil
Stru
ctur
e: H
azar
d M
itiga
tion
Mai
nly
Com
plyi
ngW
GN
0100
80W
ellin
gton
City
Cou
ncil
Out
fall/
Inta
ke S
truct
ure
Mai
nly
Com
plyi
ngW
GN
0100
80W
ellin
gton
City
Cou
ncil
Stor
mw
ater
Dis
char
geFu
lly C
ompl
ying
WG
N01
0080
Wel
lingt
on C
ity C
ounc
ilD
ispo
sal
Fully
Com
plyi
ngW
GN
9802
40W
inst
one
Aggr
egat
esTa
keFu
lly C
ompl
ying
WG
N00
0122
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0001
23W
ellin
gton
City
Cou
ncil
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N01
0176
Wel
lingt
on R
adio
Yac
ht C
lub
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N01
0178
Hut
t City
Cou
ncil
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N02
0015
Tele
com
New
Zea
land
Ltd
Pipe
line/
Cab
leFu
lly C
ompl
ying
WG
N02
0082
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0201
65H
utt C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0201
93W
ellin
gton
City
Cou
ncil
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N03
0053
Col
in D
alla
sC
oast
al W
ork/
Dis
turb
ance
Fully
Com
plyi
ngW
GN
0300
65C
onst
ruct
ion
Tech
niqu
es L
tdIn
dust
rial W
aste
Dis
char
geFu
lly C
ompl
ying
WG
N92
0026
01Th
e H
utt C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9201
1501
The
Hut
t City
Cou
ncil
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0102
Lam
bton
Har
bour
Man
agem
ent
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N97
0044
01R
oger
Dou
glas
Bea
ttie
Mar
ine
Farm
Fully
Com
plyi
ngW
GN
9801
5502
Brita
nia
Sea
Scou
t Gro
upSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9802
1501
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9802
1502
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9802
1503
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9802
1504
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9802
1505
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9802
1506
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9802
1507
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9802
1508
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9802
1509
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9802
1510
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9802
1601
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9802
1602
CAS
Pro
perti
es L
tdSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9802
1603
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9802
1604
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9802
1605
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9802
1606
Wel
lingt
on C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9901
5301
CAS
Pro
perti
es L
tdSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0101
99Tr
ansi
t New
Zea
land
Brid
geFu
lly C
ompl
ying
WG
N01
0225
Tran
sit N
ew Z
eala
ndSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ng
WG
N93
0531
Cen
trePo
rt Li
mite
dO
ccup
atio
nFu
lly C
ompl
ying
WG
N93
0532
01La
mbt
on H
arbo
ur M
anag
emen
tSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9600
1001
NIW
A G
reta
Poi
ntAn
imal
Was
te D
isch
arge
Fully
Com
plyi
ngW
GN
9701
04O
K Se
away
s Lt
dSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9900
1201
Wel
lingt
on R
egio
nal C
ounc
ilD
ispo
sal
Fully
Com
plyi
ngW
GN
9900
1202
Wel
lingt
on R
egio
nal C
ounc
ilD
ispo
sal
Fully
Com
plyi
ng
Boa
t she
ds
File
Ref
eren
ceC
onse
nt H
olde
rA
ctiv
ity T
ype
Com
plia
nce
Rat
ing
Proj
ect T
itle
WG
N00
0006
Seat
oun
Boat
ing
Clu
bSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0000
08W
orse
r Bay
Boa
ting
Clu
bSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0000
17KG
H T
rust
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N00
0204
Paul
Ben
sem
ann
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N01
0005
Step
hen
Bruc
e Ba
ylis
sSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0100
13W
este
rn B
ays
Stre
et R
odde
rs In
cSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0100
13W
este
rn B
ays
Stre
et R
odde
rs In
cSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0100
56Th
e H
utt C
ity C
ounc
ilSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0200
90Ju
lian
Rus
sell
Pars
ons
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N02
0229
B G
atfie
ldSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
0202
30T
Ros
e &
G M
arsl
and
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N02
0232
K O
Mur
ray
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N02
0235
Don
ald
Thom
as E
vans
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N03
0004
Step
hen
Bruc
e Ba
ylis
sSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9600
1901
W J
Tho
mso
n an
d S
M M
cRae
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0501
01Pe
ter D
onal
dSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9605
0301
The
2883
Tru
stSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9605
0901
Rua
pehu
Ren
tals
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0511
01Ja
nice
Feu
tzSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9605
1301
B C
Rig
arls
ford
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0514
01B
H S
mith
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0517
01S
Bank
sSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9605
1801
Julia
n R
usse
ll Pa
rson
sSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9605
1901
Pare
mat
a W
ater
& S
ki C
lub
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0522
01R
icha
rds
Fam
ily T
rust
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0523
01D
arry
l Wal
ker
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0528
01P
Rob
erts
onSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9605
2901
J M
Goo
dwin
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0534
01O
riel R
and
Ker
rie M
artin
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0536
01K
R B
est &
G A
dela
ide
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0539
01M
R T
urne
rSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9605
4001
D W
Rya
nSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9605
4401
Beau
cham
p A
PSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9605
4501
Mar
ilyn
God
dard
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0546
01J
N R
attra
ySt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9605
5101
Blac
kbrid
ge T
rust
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0554
01M
& D
Cou
ttsSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ng
WG
N96
0556
01M
aure
en S
mith
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0559
01G
raha
m a
nd M
arily
n H
olla
ndSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9605
6201
How
ard
and
Lynn
Cha
pman
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0564
01P
Jagg
ard
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0565
01D
epar
tmen
t of C
onse
rvat
ion
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0566
04Pa
rem
ata
Boat
ing
Clu
bSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9605
6901
P C
ossa
rSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9605
7101
B D
Pid
ford
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0572
01R
oss
Gib
linSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9605
7501
Nic
ola
Edw
ards
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0576
01Ed
die
Youn
g an
d Yu
ping
Li
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0578
01P
Sout
hee
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0579
01J.
Sha
rp &
Les
ley
Slop
erSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9605
8001
Cra
ig A
nder
son
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0581
01W
ayne
Ian
Cha
ppel
lSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9605
8501
I Woo
dSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9606
0301
P C
Mar
men
tSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9606
0401
Cha
rles
Mar
shal
lSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9606
1501
Alan
Stu
art H
unte
rSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9606
1601
Mic
hael
L D
on &
Mar
ia M
anue
lSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9606
1801
Stik
a As
soci
ates
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0634
01Am
anda
Mcm
urdo
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0635
01Sc
otso
n Fa
mily
Tru
stSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9606
4001
Don
Pea
t & R
obyn
Sha
wSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9606
4201
S R
Gid
dens
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0644
01W
ayne
Dav
ies
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0646
01Ji
ll D
owni
eSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9606
4701
John
R A
Pop
plet
onSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9606
5301
K M
Hol
lisSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9606
5401
Mer
vyn
& Le
sley
Aitk
enSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9606
5901
G F
alla
ize
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0664
01Pe
ter J
Kee
nan
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0668
01J
Lidd
ell
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0676
01Al
lan
Pete
r Hud
son
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0677
01C
E B
est
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0688
01Al
ice
Eliz
abet
h W
hite
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0689
01Ke
vin
Bush
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0692
01D
ebor
ah H
erd
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0693
01Je
nnife
r May
Too
good
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0694
01J
W C
hest
erSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9606
9501
W J
Rya
nSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9606
9801
I H B
urge
ssSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9606
9901
D L
Gilb
erts
onSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9607
0201
Ian
T M
cMan
away
& S
usan
E G
ray
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0704
01O
nepo
to C
ruis
ing
Clu
bSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9607
0501
One
poto
Cru
isin
g C
lub
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0706
01L
T M
erso
nSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9607
1201
G H
alvo
rsen
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N96
0713
01M
arie
Pur
dom
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N97
0217
02N
Joh
nsSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9702
6301
WG
& H
M S
cott
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N97
0269
01O
nepo
to C
ruis
ing
Clu
bSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9800
2601
Gra
nt Y
oung
and
Mar
k Sh
erlo
ckSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9800
7701
Step
hen
Bruc
e Ba
ylis
sSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9800
9601
G C
Pow
ell &
R G
Lee
chSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9801
0401
Chr
isto
pher
Noe
l Pin
field
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N98
0139
02W
ellin
gton
Pow
er B
oat C
lub
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N98
0155
01Br
itani
a Se
a Sc
out G
roup
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N98
0199
01J
Spoo
ner
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N98
0258
01Se
awor
ks L
imite
dSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9900
0501
Ric
hard
A. B
lair
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N99
0147
01Su
san
Dem
psey
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N99
0172
01As
h Ar
ahia
Bai
ley
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WG
N99
0200
02W
illiam
J C
ollin
sSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9902
0801
Mur
ray
& Ji
ll Kn
owle
sSt
ruct
ure:
Gen
eral
Fully
Com
plyi
ngW
GN
9502
1401
Mic
hael
Fol
ster
Stru
ctur
e: G
ener
alM
ainl
y C
ompl
ying
WG
N96
0527
01Br
ian
L M
arks
Stru
ctur
e: G
ener
alM
ainl
y C
ompl
ying
WG
N96
0532
01M
Am
bros
eSt
ruct
ure:
Gen
eral
Mai
nly
Com
plyi
ngW
GN
9605
4801
M B
Par
ker
Stru
ctur
e: G
ener
alM
ainl
y C
ompl
ying
WG
N96
0586
01R
yan
Jack
son
Trus
t or N
omin
eeSt
ruct
ure:
Gen
eral
Mai
nly
Com
plyi
ngW
GN
9606
0101
Terri
e H
uege
de
Serv
illeSt
ruct
ure:
Gen
eral
Mai
nly
Com
plyi
ngW
GN
9606
0501
Paul
Ben
sem
ann
Stru
ctur
e: G
ener
alM
ainl
y C
ompl
ying
WG
N96
0607
01Ja
net A
nn W
ehip
eiha
naSt
ruct
ure:
Gen
eral
Mai
nly
Com
plyi
ngW
GN
9606
1101
Adria
ne M
cdon
ald
Stru
ctur
e: G
ener
alM
ainl
y C
ompl
ying
WG
N96
0633
01M
E B
eard
Stru
ctur
e: G
ener
alM
ainl
y C
ompl
ying
WG
N96
0637
01C
J F
east
Stru
ctur
e: G
ener
alM
ainl
y C
ompl
ying
WG
N96
0648
01M
r Sam
uel R
eiSt
ruct
ure:
Gen
eral
Mai
nly
Com
plyi
ngW
GN
9606
5201
Con
rad
J Ed
war
dsSt
ruct
ure:
Gen
eral
Mai
nly
Com
plyi
ngW
GN
9606
6001
D L
Gilb
erts
onSt
ruct
ure:
Gen
eral
Mai
nly
Com
plyi
ngW
GN
9606
7202
Mar
k &
Mar
garit
a O
wen
Stru
ctur
e: G
ener
alM
ainl
y C
ompl
ying
WG
N96
0673
01C
Dal
ton
Stru
ctur
e: G
ener
alM
ainl
y C
ompl
ying
WG
N96
0504
01Le
slie
, Mar
y &
Mar
tin M
ason
Stru
ctur
e: G
ener
alN
on C
ompl
ying
WG
N96
0505
01R
C &
AL
Palm
er F
amily
Tru
st &
Stru
ctur
e: G
ener
alN
on C
ompl
ying
WG
N96
0567
01H
elen
Buy
s an
d El
sie
Bram
ley
Stru
ctur
e: G
ener
alN
on C
ompl
ying
WG
N96
0568
01D
Sm
ithSt
ruct
ure:
Gen
eral
Non
Com
plyi
ngW
GN
9605
6802
D S
mith
Stru
ctur
e: G
ener
alN
on C
ompl
ying
WG
N96
0584
01Ja
mes
& P
atric
ia M
ckin
lay
Stru
ctur
e: G
ener
alN
on C
ompl
ying
WG
N96
0600
01K
S C
lule
e Pe
rrins
Stru
ctur
e: G
ener
alN
on C
ompl
ying
WG
N96
0610
01Ei
leen
She
pher
dSt
ruct
ure:
Gen
eral
Non
Com
plyi
ngW
GN
9606
3801
Leig
h R
amse
ySt
ruct
ure:
Gen
eral
Non
Com
plyi
ngW
GN
9606
3901
Julia
n Ba
rkha
mSt
ruct
ure:
Gen
eral
Non
Com
plyi
ngW
GN
9606
5001
M &
S J
ulia
nSt
ruct
ure:
Gen
eral
Non
Com
plyi
ngW
GN
9606
5101
Nic
hola
s Jo
hn F
arra
nce
Stru
ctur
e: G
ener
alN
on C
ompl
ying
WG
N96
0674
01O
riel R
and
Ker
rie M
artin
Stru
ctur
e: G
ener
alN
on C
ompl
ying
WG
N96
0656
01D
ayna
K R
Per
rot
Stru
ctur
e: G
ener
alPa
rtial
ly C
ompl
ying
Swin
g m
oorin
gs
File
Ref
eren
ceC
onse
nt H
olde
rA
ctiv
ity T
ype
Com
plia
nce
Rat
ing
Proj
ect T
itle
WG
N00
0073
A D
Bro
wn
Moo
ring
Fully
Com
plyi
ngW
GN
0001
48Br
itani
a Se
a Sc
out G
roup
Moo
ring
Fully
Com
plyi
ngW
GN
0001
56G
reg
Nal
der
Moo
ring
Fully
Com
plyi
ngW
GN
0001
97Ju
stin
Ste
edM
oorin
gFu
lly C
ompl
ying
WG
N01
0026
Stev
e Pe
ther
ick
Moo
ring
Fully
Com
plyi
ngW
GN
0100
69Ti
m C
lear
yM
oorin
gFu
lly C
ompl
ying
WG
N01
0215
Jani
ce F
eutz
Moo
ring
Fully
Com
plyi
ngW
GN
0200
07N
icho
las
Jollif
feM
oorin
gFu
lly C
ompl
ying
WG
N02
0031
Ros
coM
oorin
gFu
lly C
ompl
ying
WG
N02
0078
Ger
ry P
eetz
Moo
ring
Fully
Com
plyi
ngW
GN
0201
25M
ark
Livi
ngst
on H
ulle
ttM
oorin
gFu
lly C
ompl
ying
WG
N02
0134
H &
M S
iljee-
Van
Bekk
Moo
ring
Fully
Com
plyi
ngW
GN
0201
41R
icha
rd G
Pag
eM
oorin
gFu
lly C
ompl
ying
WG
N02
0176
Bret
t Lon
gley
Moo
ring
Fully
Com
plyi
ngW
GN
0202
08G
ilber
t Bol
tM
oorin
gFu
lly C
ompl
ying
WG
N02
0209
Ted
Fran
klin
Moo
ring
Fully
Com
plyi
ngW
GN
0202
10G
len
Gre
coM
oorin
gFu
lly C
ompl
ying
WG
N02
0212
Philip
Haw
kins
Moo
ring
Fully
Com
plyi
ngW
GN
0202
24G
rant
Sto
ddar
dM
oorin
gFu
lly C
ompl
ying
WG
N02
0228
John
Bar
r-Bro
wn
Moo
ring
Fully
Com
plyi
ngW
GN
0202
33Bi
ll Ke
ddy
Moo
ring
Fully
Com
plyi
ngW
GN
9605
1201
B D
Pid
ford
Moo
ring
Fully
Com
plyi
ngW
GN
9605
1501
M B
lack
Moo
ring
Fully
Com
plyi
ngW
GN
9605
1601
McK
enzi
e Sh
ipw
right
sM
oorin
gFu
lly C
ompl
ying
WG
N96
0524
01R
Gay
Moo
ring
Fully
Com
plyi
ngW
GN
9605
3001
J J
Tayl
orM
oorin
gFu
lly C
ompl
ying
WG
N96
0531
01G
R W
ood
Moo
ring
Fully
Com
plyi
ngW
GN
9605
3501
Col
in M
erce
rM
oorin
gFu
lly C
ompl
ying
WG
N96
0538
01B
Sher
man
Moo
ring
Fully
Com
plyi
ngW
GN
9605
4101
R W
Sau
nder
sM
oorin
gFu
lly C
ompl
ying
WG
N96
0542
01Br
yan
John
Sul
livan
Moo
ring
Fully
Com
plyi
ngW
GN
9605
5201
R D
Sau
nder
sM
oorin
gFu
lly C
ompl
ying
WG
N96
0553
01B
J O
'Sul
livan
Moo
ring
Fully
Com
plyi
ngW
GN
9605
5501
R W
Sau
nder
sM
oorin
gFu
lly C
ompl
ying
WG
N96
0561
01An
thon
y D
J M
arm
ent
Moo
ring
Fully
Com
plyi
ngW
GN
9605
7001
N E
Wils
onM
oorin
gFu
lly C
ompl
ying
WG
N96
0573
01M
H G
raha
mM
oorin
gFu
lly C
ompl
ying
WG
N96
0574
01P
Sout
hee
Moo
ring
Fully
Com
plyi
ngW
GN
9605
9301
Ric
hard
Opp
att
Moo
ring
Fully
Com
plyi
ngW
GN
9605
9801
D O
wen
Moo
ring
Fully
Com
plyi
ngW
GN
9606
0601
Reg
inal
d Fo
wle
sM
oorin
gFu
lly C
ompl
ying
WG
N96
0621
01Ti
mot
hy K
ings
ton
Gas
coig
neM
oorin
gFu
lly C
ompl
ying
WG
N96
0622
01A
H H
erm
ans
Moo
ring
Fully
Com
plyi
ngW
GN
9606
2301
Stua
rt R
icha
rd H
olfo
rdM
oorin
gFu
lly C
ompl
ying
WG
N96
0627
01Pe
ter H
oran
Moo
ring
Fully
Com
plyi
ngW
GN
9606
3601
B D
owric
kM
oorin
gFu
lly C
ompl
ying
WG
N96
0643
01S
R G
idde
nsM
oorin
gFu
lly C
ompl
ying
WG
N96
0649
01J
E W
eir
Moo
ring
Fully
Com
plyi
ngW
GN
9606
5501
C W
Tie
rney
Moo
ring
Fully
Com
plyi
ngW
GN
9606
5701
G F
alla
ize
Moo
ring
Fully
Com
plyi
ngW
GN
9606
6101
R J
Llo
ydM
oorin
gFu
lly C
ompl
ying
WG
N96
0663
01Al
an D
enni
s C
odyr
eM
oorin
gFu
lly C
ompl
ying
WG
N96
0667
01Jo
hn C
owie
Moo
ring
Fully
Com
plyi
ngW
GN
9606
7001
Alla
n Jo
hn P
ettig
rew
Moo
ring
Fully
Com
plyi
ngW
GN
9606
7901
Ray
mon
d C
Willi
ams
Moo
ring
Fully
Com
plyi
ngW
GN
9606
8001
P R
ober
tson
Moo
ring
Fully
Com
plyi
ngW
GN
9606
8101
Tuffe
y Tr
ust
Moo
ring
Fully
Com
plyi
ngW
GN
9606
8201
D F
Pag
eM
oorin
gFu
lly C
ompl
ying
WG
N96
0685
0140
Deg
ree
Sout
h Bo
at B
uild
ing
Clu
bM
oorin
gFu
lly C
ompl
ying
WG
N96
0687
01D
arre
n Au
stin
Luk
eM
oorin
gFu
lly C
ompl
ying
WG
N96
0708
01P
McM
illan
Moo
ring
Fully
Com
plyi
ngW
GN
9800
0301
R R
G U
ivel
Moo
ring
Fully
Com
plyi
ngW
GN
9800
5801
Paul
Edw
ard
Beau
mon
tM
oorin
gFu
lly C
ompl
ying
WG
N98
0188
01R
R H
Uiv
elM
oorin
gFu
lly C
ompl
ying
WG
N98
0209
01K
R B
est &
G A
dela
ide
Moo
ring
Fully
Com
plyi
ngW
GN
9802
1901
Jan
R N
auta
Moo
ring
Fully
Com
plyi
ngW
GN
9900
8001
G B
Rid
ding
Moo
ring
Fully
Com
plyi
ngW
GN
9901
0001
Blac
kbrid
ge T
rust
Moo
ring
Fully
Com
plyi
ngW
GN
9901
5501
Len
Woo
dman
Moo
ring
Fully
Com
plyi
ngW
GN
9901
8401
Ral
ph H
enri
Kraa
yvan
ger
Moo
ring
Fully
Com
plyi
ngW
GN
9902
3201
T R
ose
& G
Mar
slan
dM
oorin
gFu
lly C
ompl
ying
WG
N99
0235
01D
Pet
erse
n &
G M
ckee
Moo
ring
Fully
Com
plyi
ngW
GN
0000
12To
tally
Mar
ine
Moo
ring
Non
Com
plyi
ngW
GN
0000
33La
mbt
on H
arbo
ur M
anag
emen
tM
oorin
gN
on C
ompl
ying
WG
N00
0095
Blue
Chi
p En
terta
inm
ent L
imite
dM
oorin
gN
on C
ompl
ying
WG
N00
0118
Mic
hael
Bro
wn
Moo
ring
Non
Com
plyi
ngW
GN
0001
77G
eoffr
ey D
olan
Moo
ring
Non
Com
plyi
ngW
GN
0100
62Pe
ter B
eer
Moo
ring
Non
Com
plyi
ngW
GN
0100
63J
John
ston
Moo
ring
Non
Com
plyi
ngW
GN
0101
93W
ee G
eord
ie F
ishe
rM
oorin
gN
on C
ompl
ying
WG
N02
0091
Mat
thew
Pric
eM
oorin
gN
on C
ompl
ying
WG
N02
0127
Nei
l Arn
old
Moo
ring
Non
Com
plyi
ngW
GN
0201
33Pe
ter V
ande
wie
lM
oorin
gN
on C
ompl
ying
WG
N02
0142
Dav
id L
eeM
oorin
gN
on C
ompl
ying
WG
N02
0168
Jan
R N
auta
Moo
ring
Non
Com
plyi
ngW
GN
0201
83Jo
hn V
an d
er S
man
Moo
ring
Non
Com
plyi
ngW
GN
0201
89C
harle
s An
ders
onM
oorin
gN
on C
ompl
ying
WG
N02
0207
Vinc
e Ba
sile
Moo
ring
Non
Com
plyi
ngW
GN
0202
11Te
rry G
ray
Moo
ring
Non
Com
plyi
ngW
GN
0202
13Jo
e Jo
hnso
nM
oorin
gN
on C
ompl
ying
WG
N02
0214
Tony
Muo
lloM
oorin
gN
on C
ompl
ying
WG
N02
0215
Car
l Muo
lloM
oorin
gN
on C
ompl
ying
WG
N02
0216
Tony
Car
l Muo
lloM
oorin
gN
on C
ompl
ying
WG
N02
0217
Geo
ff M
arsl
and
Moo
ring
Non
Com
plyi
ngW
GN
0202
18Jo
hnny
Per
sico
Moo
ring
Non
Com
plyi
ngW
GN
0202
20G
rant
Rob
inso
nM
oorin
gN
on C
ompl
ying
WG
N02
0221
Gra
nt R
obin
son
and
Pete
r Gre
coM
oorin
gN
on C
ompl
ying
WG
N02
0222
Philip
Rob
inso
nM
oorin
gN
on C
ompl
ying
WG
N02
0223
Salv
ator
e R
uocc
oM
oorin
gN
on C
ompl
ying
WG
N02
0225
Dav
id W
ood
Moo
ring
Non
Com
plyi
ngW
GN
9600
3701
Rog
er B
Wils
on a
nd L
ynle
y M
Man
ning
Moo
ring
Non
Com
plyi
ngW
GN
9605
0601
Chr
istia
n Sp
icer
Moo
ring
Non
Com
plyi
ngW
GN
9605
0701
Mic
hael
J T
aylo
rM
oorin
gN
on C
ompl
ying
WG
N96
0510
01Ke
ri W
illiam
Dow
nM
oorin
gN
on C
ompl
ying
WG
N96
0525
01A
J Sa
unde
rsM
oorin
gN
on C
ompl
ying
WG
N96
0526
01Al
iste
r Don
ald
Mac
doug
all
Moo
ring
Non
Com
plyi
ngW
GN
9605
2601
Willi
am J
Col
lins
Moo
ring
Non
Com
plyi
ngW
GN
9605
3701
R D
Bra
dey
Moo
ring
Non
Com
plyi
ngW
GN
9605
4301
N M
cFar
lane
Moo
ring
Non
Com
plyi
ngW
GN
9605
4701
K M
cMilla
nM
oorin
gN
on C
ompl
ying
WG
N96
0549
01An
drew
Dav
id W
hite
Moo
ring
Non
Com
plyi
ngW
GN
9605
5701
F A
Falc
oner
Moo
ring
Non
Com
plyi
ngW
GN
9605
6601
Pare
mat
a Bo
atin
g C
lub
Moo
ring
Non
Com
plyi
ngW
GN
9605
7701
K H
McM
illan
Moo
ring
Non
Com
plyi
ngW
GN
9605
8201
Willi
am J
Col
lins
Moo
ring
Non
Com
plyi
ngW
GN
9605
8301
Chr
isto
pher
Orm
Rig
arls
ford
Moo
ring
Non
Com
plyi
ngW
GN
9605
9201
Tom
Ker
rM
oorin
gN
on C
ompl
ying
WG
N96
0595
01Br
enda
n R
oach
Moo
ring
Non
Com
plyi
ngW
GN
9605
9701
Edw
ard
Kerri
son
Saul
Moo
ring
Non
Com
plyi
ngW
GN
9606
0201
P C
Mar
men
tM
oorin
gN
on C
ompl
ying
WG
N96
0609
01St
even
J B
urrid
geM
oorin
gN
on C
ompl
ying
WG
N96
0617
01Tr
evor
Joh
n Ba
llinge
rM
oorin
gN
on C
ompl
ying
WG
N96
0619
01R
H L
ivin
gsto
nM
oorin
gN
on C
ompl
ying
WG
N96
0628
01D
Mui
rM
oorin
gN
on C
ompl
ying
WG
N96
0641
01R
icha
rd L
ane
Moo
ring
Non
Com
plyi
ngW
GN
9606
4501
Way
ne D
avie
sM
oorin
gN
on C
ompl
ying
WG
N96
0658
01L
Mor
rison
Moo
ring
Non
Com
plyi
ngW
GN
9606
6501
Lanc
elot
t Dav
id P
ayne
Moo
ring
Non
Com
plyi
ngW
GN
9606
7101
R S
Kin
gM
oorin
gN
on C
ompl
ying
WG
N96
0672
01Le
igh
Ram
sey
Moo
ring
Non
Com
plyi
ngW
GN
9606
7402
Orie
l R a
nd K
errie
Mar
tinM
oorin
gN
on C
ompl
ying
WG
N96
0678
01J
Luke
Moo
ring
Non
Com
plyi
ngW
GN
9606
7802
J Lu
keM
oorin
gN
on C
ompl
ying
App
endi
x 2
- Wai
rara
pa c
ompl
ianc
e
Agr
icul
tura
l dis
char
ges
File
Ref
eren
ceC
onse
nt H
olde
rA
ctiv
ity T
ype
Com
plia
nce
Rat
ing
WAR
9400
6801
Mao
ri Ed
ucat
ion
Foun
datio
nD
airy
Fully
Com
plyi
ngW
AR94
0038
01Bo
sch
Flor
us a
nd C
oD
airy
Mai
nly
Com
plyi
ngW
AR95
0044
01F
des
Tom
be a
nd S
Cra
wfo
rdD
airy
Mai
nly
Com
plyi
ngW
AR95
0067
01M
A an
d R
G L
ovet
tD
airy
Fully
Com
plyi
ngW
AR96
0206
01D
D B
erry
Ltd
Dai
ryM
ainl
y C
ompl
ying
WAR
9602
0501
JA B
ickn
all
Dai
ryFu
lly C
ompl
ying
WAR
9600
0301
Sayw
ell B
roth
ers
Dai
ryM
ainl
y C
ompl
ying
WAR
9502
3401
AGC
Bid
wel
lD
airy
Mai
nly
Com
plyi
ngW
AR01
0135
KGS
Feas
tD
airy
Fully
Com
plyi
ngW
AR01
0129
Wes
tern
Lak
e R
oad
Dai
ryM
ainl
y C
ompl
ying
WAR
0101
28R
and
D C
alve
rtD
airy
Mai
nly
Com
plyi
ngW
AR01
0104
JL a
nd V
A W
illis
Dai
ryFu
lly C
ompl
ying
WAR
9901
1301
RT
McK
enzi
eD
airy
Mai
nly
Com
plyi
ngW
AR98
0134
01LF
Fle
tche
'Muh
unui
'D
airy
Parti
ally
Com
plyi
ngW
AR98
0130
01La
ke M
eado
ws
Partn
ersh
ipD
airy
Non
Com
plyi
ngW
AR98
0090
01TR
McC
rear
yD
airy
Fully
Com
plyi
ngW
AR97
0212
01B
Gea
nge
Dai
ryFu
lly C
ompl
ying
WAR
9701
4701
Pete
r Lov
ett
Dai
ryFu
lly C
ompl
ying
WAR
0102
18P
& V
Farri
erD
airy
Parti
ally
Com
plyi
ngW
AR01
0206
VG &
JA
Bras
sel a
nd B
& G
Far
ms
Dai
ryFu
lly C
ompl
ying
WAR
0101
62H
and
M B
ell
Dai
ryFu
lly C
ompl
ying
WAR
0101
46H
amm
ond
and
Co
Dai
ryPa
rtial
ly C
ompl
ying
WAR
0100
94Pa
haut
ea R
oad
Dai
ryN
on C
ompl
ying
WAR
0003
10C
olin
Hod
der
Dai
ryN
on C
ompl
ying
WAR
0103
23TJ
Her
rick
Dai
ryFu
lly C
ompl
ying
WAR
9700
5101
Hillv
iew
Par
tner
ship
Dai
ryN
on C
ompl
ying
WAR
9700
5001
B L
Geo
rge
Dai
ryFu
lly C
ompl
ying
WAR
9602
3801
Con
wel
l Far
mD
airy
Mai
nly
Com
plyi
ngW
AR95
0031
01P
J an
d K
M S
ayw
ell
Dai
ryFu
lly C
ompl
ying
WAR
9200
2501
Bosc
h Fl
orus
and
Com
pany
Dai
ryFu
lly C
ompl
ying
WAR
9201
7401
GC
War
ren
Dai
ryFu
lly C
ompl
ying
WAR
9400
4601
WE
Osb
ourn
eD
airy
Mai
nly
Com
plyi
ngW
AR03
0083
Dea
n Bi
rcha
llD
airy
Fully
Com
plyi
ngW
AR03
0079
EP &
PW
H W
atki
nson
Dai
ryFu
lly C
ompl
ying
WAR
0300
60H
arry
Bos
chD
airy
Fully
Com
plyi
ngW
AR03
0067
HL
and
ML
McL
enna
nD
airy
Fully
Com
plyi
ngW
AR03
0057
Kenn
eth
and
Atha
lie S
age
Dai
ryFu
lly C
ompl
ying
WAR
0300
56G
D F
airb
roth
erD
airy
Fully
Com
plyi
ngW
AR02
0133
Andr
ew W
harri
eD
airy
Fully
Com
plyi
ngW
AR02
0106
Gar
y J
Birc
hall
Dai
ryFu
lly C
ompl
ying
WAR
0201
03Er
ic S
noek
Dai
ryFu
lly C
ompl
ying
WAR
0200
73D
S an
d JJ
Ros
eD
airy
Fully
Com
plyi
ngW
AR02
0065
DW
Woo
dD
airy
Fully
Com
plyi
ngW
AR02
0046
Div
ersi
on P
artn
ersh
ipD
airy
Fully
Com
plyi
ngW
AR01
0331
LJ a
nd C
A Si
gver
tsen
Dai
ryFu
lly C
ompl
ying
WAR
0103
30D
B O
sbou
rne
Dai
ryPa
rtial
ly C
ompl
ying
WAR
0102
93N
H a
nd B
A W
adha
mD
airy
Fully
Com
plyi
ngW
AR01
0292
P &
K Vo
llebr
egt
Dai
ryN
on C
ompl
ying
WAR
0102
74JD
& D
J Sa
ywel
lD
airy
Fully
Com
plyi
ngW
AR01
0276
J Fo
rem
anD
airy
Fully
Com
plyi
ngW
AR01
0267
NR
Ter
ryD
airy
Fully
Com
plyi
ngW
AR01
0263
AH &
AC
Web
ster
Dai
ryFu
lly C
ompl
ying
WAR
0102
19W
& K
Goo
din
Dai
ryFu
lly C
ompl
ying
WAR
0102
10Po
uaw
ha R
oad
Dai
ryFu
lly C
ompl
ying
WAR
0101
92U
pper
Bel
vede
re R
oad
Dai
ryFu
lly C
ompl
ying
WAR
0101
91N
oel E
Sm
allw
ood
Dai
ryFu
lly C
ompl
ying
WAR
0101
80R
W W
ilmhu
rst
Dai
ryFu
lly C
ompl
ying
WAR
0101
74AK
Gat
esD
airy
Mai
nly
Com
plyi
ngW
AR01
0168
Lars
en E
stat
eD
airy
Fully
Com
plyi
ngW
AR01
0152
N &
J F
ishe
rD
airy
Fully
Com
plyi
ngW
AR01
0147
VJ Z
abel
lD
airy
Fully
Com
plyi
ngW
AR01
0097
Burt
and
Co
Dai
ryM
ainl
y C
ompl
ying
WAR
0100
62Ku
men
ga R
oad,
Fea
ther
ston
Dai
ryFu
lly C
ompl
ying
WAR
0003
66G
J S
tuar
tD
airy
Fully
Com
plyi
ngW
AR00
0357
AP B
row
neD
airy
Fully
Com
plyi
ngW
AR00
0349
I R W
ither
Dai
ryFu
lly C
ompl
ying
WAR
9701
7901
DF
and
FA F
uge
Dai
ryFu
lly C
ompl
ying
WAR
9701
7801
AB Z
wag
erm
anD
airy
Fully
Com
plyi
ngW
AR97
0177
01M
E D
anie
ll "A
kour
a".
Dai
ryFu
lly C
ompl
ying
WAR
9602
2001
GJ
Evan
sD
airy
Fully
Com
plyi
ngW
AR01
0120
A an
d L
Har
vey
Dai
ryFu
lly C
ompl
ying
WAR
0101
13H
A C
hris
tens
enD
airy
Fully
Com
plyi
ngW
AR01
0099
KM a
nd J
C G
ray
Dai
ryFu
lly C
ompl
ying
WAR
9601
1901
JA a
nd J
B R
ose
Dai
ryFu
lly C
ompl
ying
WAR
9601
0201
Lynx
Far
mD
airy
Fully
Com
plyi
ngW
AR96
0071
01Ko
kota
u Pa
rtner
ship
Dai
ryFu
lly C
ompl
ying
WAR
9501
2301
RE
Perc
yD
airy
Fully
Com
plyi
ngW
AR95
0222
01R
ylib
Tru
stD
airy
Mai
nly
Com
plyi
ngW
AR95
0177
01R
anga
taum
u Pa
rtner
ship
Dai
ryFu
lly C
ompl
ying
WAR
9501
6801
PJ a
nd G
M R
yan
Dai
ryFu
lly C
ompl
ying
WAR
9501
3601
A an
d P
Van
Barn
dale
Dai
ryFu
lly C
ompl
ying
WAR
9601
96PD
Bur
gess
Dai
ryFu
lly C
ompl
ying
WAR
9801
9501
EB G
awith
Dai
ryM
ainl
y C
ompl
ying
WAR
9801
5601
IR a
nd IM
Hic
ksD
airy
Fully
Com
plyi
ngW
AR98
0018
01BB
Pat
rick
Dai
ryFu
lly C
ompl
ying
WAR
9800
1701
AG a
nd D
M E
dwin
gton
Dai
ryFu
lly C
ompl
ying
WAR
9702
7201
J C
oven
ey a
nd A
Ham
mel
ehle
Dai
ryFu
lly C
ompl
ying
WAR
9702
5701
RD
and
LJ
Goo
dwin
Dai
ryFu
lly C
ompl
ying
WAR
9700
8401
JF a
nd C
A Pe
rcy
Dai
ryFu
lly C
ompl
ying
WAR
9700
7301
S an
d W
Van
den
Bos
chD
airy
Fully
Com
plyi
ngW
AR97
0044
01W
oodl
eigh
Far
m T
rust
Dai
ryFu
lly C
ompl
ying
WAR
9602
8701
JC M
cNam
ara
Dai
ryFu
lly C
ompl
ying
WAR
9500
9801
S an
d L
forb
esD
airy
Fully
Com
plyi
ngW
AR95
0091
01D
R S
tuar
tD
airy
Parti
ally
Com
plyi
ngW
AR95
0089
01PH
McM
anaw
ayD
airy
Mai
nly
Com
plyi
ngW
AR95
0070
01L
A Ty
erD
airy
Fully
Com
plyi
ngW
AR95
0065
01JR
Dou
llD
airy
Fully
Com
plyi
ngW
AR95
0054
01BH
and
GJ
Farle
yD
airy
Fully
Com
plyi
ngW
AR94
0065
01C
A C
lark
e Es
tate
Dai
ryFu
lly C
ompl
ying
WAR
9400
0401
PS a
nd A
E Pa
lmer
Dai
ryFu
lly C
ompl
ying
WAR
9501
4401
Pinf
olds
Far
mD
airy
Fully
Com
plyi
ngW
AR95
0143
01PE
and
VL
Batc
helo
rD
airy
Fully
Com
plyi
ngW
AR94
0020
01R
A an
d G
YM S
mith
Dai
ryFu
lly C
ompl
ying
WAR
9200
2901
AL O
sbou
rne
Dai
ryFu
lly C
ompl
ying
Mis
cella
neou
s di
scha
rges
File
Ref
eren
ceC
onse
nt H
olde
r A
ctiv
ity T
ype
Com
plia
nce
Rat
ing
WAR
0103
06M
aste
rton
Dis
trict
Cou
ncil
Com
preh
ensi
ve S
torm
wat
er D
isch
arge
Fully
Com
plyi
ngW
AR01
0067
Gen
esis
Pow
er L
tdIn
dust
rial W
aste
Dis
char
geFu
lly C
ompl
ying
WAR
0100
68G
enes
is P
ower
Ltd
Indu
stria
l Was
te D
isch
arge
Fully
Com
plyi
ngW
AR01
0069
Gen
esis
Pow
er L
tdIn
dust
rial W
aste
Dis
char
geFu
lly C
ompl
ying
WAR
0300
30C
arte
rton
Dis
trict
Cou
ncil
Sew
age
Dis
char
geN
on C
ompl
ying
WAR
9501
4801
Car
terto
n D
istri
ct C
ounc
ilSe
wag
e D
isch
arge
Non
Com
plyi
ngW
AR96
0286
Sout
h W
aira
rapa
Dis
trict
Cou
ncil
Sew
age
Dis
char
geN
on C
ompl
ying
WAR
0200
74M
aste
rton
Dis
trict
Cou
ncil
Sew
age
Dis
char
geFu
lly C
ompl
ying
WAR
0200
74M
aste
rton
Dis
trict
Cou
ncil
Sew
age
Dis
char
geFu
lly C
ompl
ying
WAR
0103
48Le
arn
& Li
ve M
inis
trySe
wag
e D
isch
arge
Mai
nly
Com
plyi
ng
Wat
er p
erm
its
File
Ref
eren
ceC
onse
nt h
olde
r A
ctiv
ity T
ype
Com
plia
nce
Rat
ing
WAR
0002
93K
H &
A J
Sag
eTa
keM
ainl
y C
ompl
ying
WAR
0003
07Pa
ul C
ollin
s Fa
mily
Tru
stTa
keM
ainl
y C
ompl
ying
WAR
0003
08C
Eng
elTa
keFu
lly C
ompl
ying
WAR
0003
11J
Dou
glas
& K
Gou
ldst
one
Take
Mai
nly
Com
plyi
ngW
AR00
0348
I R W
ither
Take
Fully
Com
plyi
ngW
AR00
0352
Stua
rt Jo
hn D
enbe
eTa
keFu
lly C
ompl
ying
WAR
0003
75J
C M
cNam
ara
Take
Mai
nly
Com
plyi
ng
WAR
0003
90R
ylib
Dai
ries
Ltd
Take
Mai
nly
Com
plyi
ngW
AR00
0419
RL
Gas
kell
Take
Mai
nly
Com
plyi
ngW
AR01
0041
C E
ngel
Take
Parti
ally
Com
plyi
ngW
AR01
0071
Les
Won
gTa
keFu
lly C
ompl
ying
WAR
0100
73BF
& J
Bos
chTa
keN
on C
ompl
ying
WAR
0101
05A
H W
ebst
erTa
keM
ainl
y C
ompl
ying
WAR
0101
26B
R O
'Nea
leTa
keFu
lly C
ompl
ying
WAR
0101
30La
ke M
eado
ws
Partn
ersh
ipTa
keM
ainl
y C
ompl
ying
WAR
0101
49N
D R
Dav
ies
Take
Fully
Com
plyi
ngW
AR01
0163
Pine
have
n O
rcha
rds
Ltd
Take
Fully
Com
plyi
ngW
AR01
0208
Mao
ri Ed
ucat
ion
Trus
tTa
keFu
lly C
ompl
ying
WAR
0102
37A
G &
H A
Mur
phy
Take
Fully
Com
plyi
ngW
AR01
0246
Ian
Lesl
ieTa
keFu
lly C
ompl
ying
WAR
0102
49R
F &
V L
Gre
enTa
keM
ainl
y C
ompl
ying
WAR
0102
60J
Clin
ton-
Bake
rTa
keFu
lly C
ompl
ying
WAR
0102
96W
aina
wa
Riv
er E
stat
e Lt
dTa
keFu
lly C
ompl
ying
WAR
0103
00Te
Par
e Fa
rm L
tdTa
keFu
lly C
ompl
ying
WAR
0103
03D
ryla
nds
Trus
tTa
keFu
lly C
ompl
ying
WAR
0103
15M
L M
oran
Take
Non
Com
plyi
ngW
AR01
0317
John
and
Mic
helle
Auc
hinc
loss
Take
Fully
Com
plyi
ngW
AR01
0321
Burn
t Spu
r Mar
tinbo
roug
h Li
mite
dTa
keFu
lly C
ompl
ying
WAR
0103
41R
otop
ai T
rust
Take
Fully
Com
plyi
ngW
AR01
0350
R H
War
ren
Take
Fully
Com
plyi
ngW
AR01
0351
W &
R S
tolte
Take
Parti
ally
Com
plyi
ngW
AR01
0354
B R
O'N
eale
Take
Fully
Com
plyi
ngW
AR01
0364
A J
C B
idw
illTa
keM
ainl
y C
ompl
ying
WAR
0103
65D
W W
ood
Take
Fully
Com
plyi
ngW
AR01
0375
I Fra
ser
Take
Fully
Com
plyi
ngW
AR02
0005
Pallis
er E
stat
e W
ines
Take
Fully
Com
plyi
ngW
AR02
0010
B R
O'N
eale
Take
Fully
Com
plyi
ngW
AR02
0022
Tota
ra G
rove
Far
mTa
keM
ainl
y C
ompl
ying
WAR
0200
26R
edba
nk E
stat
e Li
mite
dTa
keM
ainl
y C
ompl
ying
WAR
0200
40M
artin
boro
ugh
Cot
tage
Gro
ve L
tdTa
keFu
lly C
ompl
ying
WAR
0200
49R
W &
LE
Wilm
shur
st E
stat
eTa
keFu
lly C
ompl
ying
WAR
0200
54O
poru
a D
airy
Far
ms
Lim
ited
Take
Mai
nly
Com
plyi
ngW
AR02
0064
B R
O'N
eale
Take
Fully
Com
plyi
ngW
AR02
0072
Riv
ersi
de T
rust
Take
Fully
Com
plyi
ngW
AR02
0083
Phil
Gus
cott
Take
Fully
Com
plyi
ngW
AR02
0086
Pallis
er E
stat
e W
ines
Take
Fully
Com
plyi
ngW
AR02
0089
DB
Osb
orne
Tru
stTa
keFu
lly C
ompl
ying
WAR
0200
91Tu
rang
anui
Tru
stTa
keFu
lly C
ompl
ying
WAR
0200
92A
W T
hurs
ton
Take
Fully
Com
plyi
ngW
AR02
0093
A W
Thu
rsto
nTa
keFu
lly C
ompl
ying
WAR
0200
94Pr
esby
teria
n C
hurc
h of
Aot
earo
a N
ZTa
keM
ainl
y C
ompl
ying
WAR
0200
95T
R M
ccre
ary
Take
Non
Com
plyi
ngW
AR02
0098
Moy
ford
Lim
ited
Take
Fully
Com
plyi
ngW
AR02
0105
Lake
view
Tru
st P
artn
ersh
ipTa
keFu
lly C
ompl
ying
WAR
0201
08J
W &
H M
Sho
tter
Take
Mai
nly
Com
plyi
ngW
AR02
0109
Cal
dwel
l Tru
stTa
keFu
lly C
ompl
ying
WAR
0201
10C
aldw
ell T
rust
Take
Non
Com
plyi
ngW
AR02
0112
Scot
t Sim
mon
dsTa
keFu
lly C
ompl
ying
WAR
0201
14N
M &
A C
Gra
yTa
keFu
lly C
ompl
ying
WAR
0201
16O
paki
Wat
er S
uppl
y As
sn In
cTa
keFu
lly C
ompl
ying
WAR
0201
17B
T Tu
cker
Take
Fully
Com
plyi
ngW
AR02
0126
Bruc
e Ja
mie
son
Take
Fully
Com
plyi
ngW
AR02
0138
Mar
tinbo
roug
h G
olf C
lub
Take
Fully
Com
plyi
ngW
AR02
0139
Step
hen
L W
hite
Take
Fully
Com
plyi
ngW
AR02
0143
J H
Sim
mon
dsTa
keFu
lly C
ompl
ying
WAR
0201
47Fe
athe
rsto
n G
olf C
lub
Take
Fully
Com
plyi
ngW
AR02
0155
S A
Barto
nTa
keM
ainl
y C
ompl
ying
WAR
0201
69Te
Kai
rang
a W
ines
Ltd
Take
Mai
nly
Com
plyi
ngW
AR02
0176
Shar
on T
oms
Take
Fully
Com
plyi
ngW
AR02
0184
Lind
say
Braz
enda
leTa
keFu
lly C
ompl
ying
WAR
0201
94B
B Pa
trick
Take
Fully
Com
plyi
ngW
AR92
0097
01G
H T
ullo
chTa
keFu
lly C
ompl
ying
WAR
9201
1501
J A
Bick
nell
Take
Mai
nly
Com
plyi
ngW
AR93
0058
01N
R T
erry
Take
Fully
Com
plyi
ngW
AR93
0087
01JR
's P
apaw
ai O
rcha
rds
Ltd
Take
Fully
Com
plyi
ngW
AR96
0165
01Lo
ch N
ess
Farm
Take
Fully
Com
plyi
ngW
AR97
0065
01M
ahun
ga G
olf C
lub
Take
Fully
Com
plyi
ngW
AR98
0071
01Th
e Tr
uste
esTa
keM
ainl
y C
ompl
ying
WAR
9800
9401
Mar
tinbo
roug
h Es
tate
Ltd
Take
Mai
nly
Com
plyi
ngW
AR99
0002
Div
ersi
on P
artn
ersh
ipTa
keM
ainl
y C
ompl
ying
WAR
9900
1001
M S
& G
Joh
nson
Take
Mai
nly
Com
plyi
ngW
AR99
0107
01A
G W
harri
eTa
keFu
lly C
ompl
ying
WAR
9902
27C
ragg
y R
ange
Vin
eyar
ds L
tdTa
keM
ainl
y C
ompl
ying
WAR
0200
18Pl
atfo
rm F
arm
Ltd
Take
Non
Com
plyi
ngW
AR02
0017
Taum
ata
Trus
tTa
keN
on C
ompl
ying
WAR
0200
90T
R M
ccre
ary
Take
Fully
Com
plyi
ngW
AR01
0067
Gen
esis
Pow
er L
tdD
amFu
lly C
ompl
ying
WAR
0100
68G
enes
is P
ower
Ltd
Dis
char
ge W
ater
Fully
Com
plyi
ngW
AR69
0393
Mas
terto
n D
istri
ct C
ounc
ilTa
keFu
lly C
ompl
ying
WAR
6903
92M
aste
rton
Dis
trict
Cou
ncil
Take
Non
Com
plyi
ngW
AR94
0080
Mas
terto
n D
istri
ct C
ounc
ilTa
keFu
lly C
ompl
ying
WAR
9902
22M
aori
Educ
atio
n Tr
ust
Take
Non
Com
plyi
ngW
AR95
0050
Car
terto
n D
istri
ct C
ounc
ilTa
keM
ainl
y C
ompl
ying
WAR
6905
06C
arte
rton
Dis
trict
Cou
ncil
Take
Non
Com
plyi
ngW
AR92
0103
Car
terto
n D
istri
ct C
ounc
ilTa
keN
on C
ompl
ying
WAR
9600
30So
uth
Wai
rara
pa D
istri
ct C
ounc
ilD
amM
ainl
y C
ompl
ying
WAR
9600
30So
uth
Wai
rara
pa D
istri
ct C
ounc
ilD
amM
ainl
y C
ompl
ying
WAR
9301
24So
uth
Wai
rara
pa D
istri
ct C
ounc
ilTa
keFu
lly C
ompl
ying
WAR
6904
25So
uth
Wai
rara
pa D
istri
ct C
ounc
ilTa
keN
on C
ompl
ying
WAR
9301
25So
uth
Wai
rara
pa D
istri
ct C
ounc
ilTa
keFu
lly C
ompl
ying
WAR
9901
42So
uth
Wai
rara
pa D
istri
ct C
ounc
ilTa
keFu
lly C
ompl
ying
WAR
9900
01So
uth
Wai
rara
pa D
istri
ct C
ounc
ilTa
keFu
lly C
ompl
ying
WAR
0103
06M
aste
rton
Dis
trict
Cou
ncil
Take
Non
Com
plyi
ngW
AR01
0306
Mas
terto
n D
istri
ct C
ounc
ilTa
keFu
lly C
ompl
ying
WAR
0201
58D
Osb
orne
Take
Non
Com
plyi
ngW
AR01
0235
L Br
azen
dale
Take
Non
Com
plyi
ng
Land
use
con
sent
s
File
Ref
eren
ceC
onse
nt H
olde
rA
ctiv
ity T
ype
Com
plia
nce
Rat
ing
WAR
9802
1801
Fore
st E
nter
pris
esVe
geta
tion
Rem
oval
Fully
Com
plyi
ngW
AR02
0008
Jacq
uelin
e J.
Ste
war
tD
amFu
lly C
ompl
ying
WAR
0300
42A
A Bu
chan
anSt
ream
Wor
kFu
lly C
ompl
ying
WAR
0004
25D
epar
tmen
t Of C
onse
rvat
ion
Brid
geFu
lly C
ompl
ying
WAR
0004
27O
ldfie
ld A
ggre
gate
s Lt
dBr
idge
Fully
Com
plyi
ngW
AR01
0054
A K
Gat
esPl
antin
gFu
lly C
ompl
ying
war
0100
76C
arte
rton
Dis
trict
Cou
ncil
Stre
am W
ork
Fully
Com
plyi
ngw
ar01
0095
Te K
aira
nga
Win
es L
tdD
amFu
lly C
ompl
ying
WAR
0103
13Te
Wha
nga
Farm
Tru
stD
amM
ainl
y C
ompl
ying
WAR
0200
28M
aste
rton
Inte
rmed
iate
Sch
ool
Stre
am W
ork
Non
Com
plyi
ngW
AR02
0029
Mas
terto
n D
istri
ct C
ounc
ilBr
idge
Fully
Com
plyi
ngW
AR01
0376
A &
E C
rofo
otBr
idge
Fully
Com
plyi
ngW
AR02
0032
S J
Car
lsen
Qua
rryFu
lly C
ompl
ying
WAR
0200
34C
arte
rton
Dis
trict
Cou
ncil
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WAR
0200
36Ju
ken
Nis
sho
Lim
ited
Brid
geFu
lly C
ompl
ying
WAR
0200
33C
arte
rton
Dis
trict
Cou
ncil
Brid
geFu
lly C
ompl
ying
WAR
0201
22Ju
ken
Nis
sho
Lim
ited
Earth
wor
kFu
lly C
ompl
ying
WAR
0202
04R
iver
sdal
e Be
ach
Rat
epay
ers
Assn
.St
ream
Wor
kM
ainl
y C
ompl
ying
WAR
0103
51W
& R
Sto
lteSt
ream
Wor
kFu
lly C
ompl
ying
WAR
0003
99Ka
iroa
Trus
tSt
ream
Wor
kM
ainl
y C
ompl
ying
WAR
0200
60W
hitta
kers
Saw
milli
ngVe
geta
tion
Rem
oval
Non
Com
plyi
ngW
AR01
0216
Wel
ls In
vest
men
ts L
tdSt
ream
Wor
kM
ainl
y C
ompl
ying
WAR
9602
5218
Tran
sit
Brid
geFu
lly C
ompl
ying
WAR
9903
13O
pera
tions
Dep
tSt
ream
Wor
kFu
lly C
ompl
ying
WAR
0003
64O
pera
tions
Dep
tSt
ruct
ure:
Haz
ard
Miti
gatio
nFu
lly C
ompl
ying
WAR
0101
88Te
Kai
rang
a W
ines
Ltd
Stru
ctur
e: G
ener
alM
ainl
y C
ompl
ying
WAR
0002
24M
aste
rton
Dis
trict
Cou
ncil
Stre
am W
ork
Fully
Com
plyi
ngW
AR02
0014
Ope
ratio
ns D
ept
Stre
am W
ork
Fully
Com
plyi
ngW
AR02
0121
EP &
PW
Wat
kins
onSt
ream
Wor
kFu
lly C
ompl
ying
WAR
0201
34R
B &
L J
Cra
igSt
ream
Wor
kFu
lly C
ompl
ying
WAR
0201
90O
pera
tions
Dep
tSt
ream
Wor
kFu
lly C
ompl
ying
WAR
0300
02Br
uce
Buch
anan
Ltd
Stre
am W
ork
Fully
Com
plyi
ngW
AR03
0016
Col
in G
ooch
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WAR
0300
58D
anie
l Har
tBr
idge
Fully
Com
plyi
ngW
AR99
0288
Ope
ratio
ns D
ept
Stre
am W
ork
Fully
Com
plyi
ng
WAR
9903
14Ju
ken
Nis
sho
Lim
ited
Qua
rryFu
lly C
ompl
ying
WAR
0002
01Ju
ken
Nis
sho
Lim
ited
Earth
wor
kFu
lly C
ompl
ying
WAR
0002
24M
aste
rton
Dis
trict
Cou
ncil
Stre
am W
ork
Mai
nly
Com
plyi
ngW
AR00
0236
Juke
n N
issh
o Li
mite
dQ
uarry
Mai
nly
Com
plyi
ngW
AR00
0248
Ope
ratio
ns D
ept
Stru
ctur
e: G
ener
alFu
lly C
ompl
ying
WAR
0002
95W
ellin
gton
Reg
iona
l Cou
ncil
Earth
wor
kFu
lly C
ompl
ying
WAR
0003
37O
pera
tions
Dep
tEa
rthw
ork
Fully
Com
plyi
ngW
AR00
0342
Ope
ratio
ns D
ept
Stre
am W
ork
Fully
Com
plyi
ngW
AR00
0400
Dep
artm
ent O
f Con
serv
atio
nVe
geta
tion
Rem
oval
Fully
Com
plyi
ngW
AR00
0402
Juke
n N
issh
o Li
mite
dEa
rthw
ork
Fully
Com
plyi
ngw
ar00
0402
Juke
n N
issh
o Li
mite
dEa
rthw
ork
Fully
Com
plyi
ng