res_jordan_price (1)

2
Jordan Price A.Sc.T. Process Technologist * denotes projects completed with other firms Design with community in mind Jordan joined Stantec in February 2008 after the completion of his Water Resources Engineering Technology Diploma at SIAST Palliser Campus. Jordan gained comprehensive working knowledge of field practices and procedures through his role as a Construction Coordinator, In which he worked with a variety of contractors on Urban Land and Water/Wastewater Treatment projects. His role has evolved to take advantage of his field experience and now provides insightful evaluations of peer designs as well as the creation of alternative design methods and field practices to contract packages, designs, and studies in an office setting. Jordan has gained valuable experience working on Water and Wastewater Treatment projects and applications within Saskatchewan. He has become familiar with local and regulations and legislations as well as making clients aware of anticipated regulation changes allowing communities time to prepare for future any future upgrades that are required. Jordan provides Water Modeling services for pressure flow applications in both steady state and extended period simulations with the use of Bentley WaterCAD software. Jordan’s pride in his work is evident in his dedication and commitment in regards to existing clients and their projects. EDUCATION Diploma, Water Resources Engineering Technology, SIAST Palliser Campus/Moose Jaw, Saskatchewan, 2007 REGISTRATIONS Registered Engineering Technologist #201008, Saskatchewan Applied Science Technologists and Technicians MEMBERSHIPS Member, Saskatchewan Water and Wastewater Association PROJECT EXPERIENCE Mining Cigar Lake Uranium Mine*, Cigar Lake, Saskatchewan (Intermediate Mine Technician) Underground Mine Technician responsible for completing high accuracy surveys of blasted drifts, three dimensional scans and model creating of existing drifts and infrastructure, ventilation monitoring and control and routine checks on horizontal and vertical control in underground shafts and drifts. Urban Land McOrmond Drive P.W.M. and Trunk Tunneling, Saskatoon, Saskatchewan (Process Technologist) Provided underground rebar inspection of manhole vaults prior to concrete pour(s). Cote First Nation Sanitary Servicing, Cote First Nation, Saskatchewan (Process Technologist) Completed detailed design, specifications, and project management for 50%, 90%, and Issued for Construction documents for a 500 meter gravity sewer main to provide service connection to commercial buildings Foxtail Grove, Regina, Saskatchewan (Construction Coordinator) Completed high accuracy, topographical survey of natural and manmade features for a full section of proposed development land in northeast Regina. Sasktel Site Servicing 201 Camponi Place, Saskatoon, Saskatchewan (Construction Coordinator) Site Engineering duties providing specification interpretation, underground utility and surface layouts and creating drawings of record. Harbour Landing, Regina, Saskatchewan (Construction Coordinator) Coordination of gas, railway, and power right of ways, site grading, underground utility layouts, creating drawings of record and specification interpretation. Wastewater Treatment 20 Year Waste Water Treatment and Storage Capital Plan, Estevan, Saskatchewan (Process Technologist) Study on population growth and the impacts anticipated on the existing waste water infrastructure for the City of Estevan.

Transcript of res_jordan_price (1)

Page 1: res_jordan_price (1)

Jordan Price A.Sc.T.

Process Technologist

* denotes projects completed with other firms Design with community in mind

Jordan joined Stantec in February 2008 after the completion of his Water Resources Engineering Technology Diploma at SIAST Palliser Campus. Jordan gained comprehensive working knowledge of field practices and procedures through his role as a Construction Coordinator, In which he worked with a variety of contractors on Urban Land and Water/Wastewater Treatment projects. His role has evolved to take advantage of his field experience and now provides insightful evaluations of peer designs as well as the creation of alternative design methods and field practices to contract packages, designs, and studies in an office setting.

Jordan has gained valuable experience working on Water and Wastewater Treatment projects and applications within Saskatchewan. He has become familiar with local and regulations and legislations as well as making clients aware of anticipated regulation changes allowing communities time to prepare for future any future upgrades that are required. Jordan provides Water Modeling services for pressure flow applications in both steady state and extended period simulations with the use of Bentley WaterCAD software. Jordan’s pride in his work is evident in his dedication and commitment in regards to existing clients and their projects.

EDUCATIONDiploma, Water Resources Engineering Technology, SIAST Palliser Campus/Moose Jaw, Saskatchewan, 2007

REGISTRATIONSRegistered Engineering Technologist #201008, Saskatchewan Applied Science Technologists and Technicians

MEMBERSHIPSMember, Saskatchewan Water and Wastewater Association

PROJECT EXPERIENCEMiningCigar Lake Uranium Mine*, Cigar Lake, Saskatchewan (Intermediate Mine Technician)Underground Mine Technician responsible for completing high accuracy surveys of blasted drifts, three dimensional scans and model creating of existing drifts and infrastructure, ventilation monitoring and control and routine checks on horizontal and vertical control in underground shafts and drifts.

Urban LandMcOrmond Drive P.W.M. and Trunk Tunneling, Saskatoon, Saskatchewan (Process Technologist)Provided underground rebar inspection of manhole vaults prior to concrete pour(s).

Cote First Nation Sanitary Servicing, Cote First Nation, Saskatchewan (Process Technologist)Completed detailed design, specifications, and project management for 50%, 90%, and Issued for Construction documents for a 500 meter gravity sewer main to provide service connection to commercial buildings

Foxtail Grove, Regina, Saskatchewan (Construction Coordinator)Completed high accuracy, topographical survey of natural and manmade features for a full section of proposed development land in northeast Regina.

Sasktel Site Servicing 201 Camponi Place, Saskatoon, Saskatchewan (Construction Coordinator)Site Engineering duties providing specification interpretation, underground utility and surface layouts and creating drawings of record.

Harbour Landing, Regina, Saskatchewan (Construction Coordinator)Coordination of gas, railway, and power right of ways, site grading, underground utility layouts, creating drawings of record and specification interpretation.

Wastewater Treatment20 Year Waste Water Treatment and Storage Capital Plan, Estevan, Saskatchewan (Process Technologist)Study on population growth and the impacts anticipated on the existing waste water infrastructure for the City of Estevan.

Page 2: res_jordan_price (1)

Jordan Price A.Sc.T.

Process Technologist

* denotes projects completed with other firms

Weyburn Lagoon Expansion, Weyburn, Saskatchewan (Construction Coordinator)Site Engineering Duties including volume control of fill, surface and underground utility layout and daily progress reports for the creation of additional lagoon cells to the City of Weyburn’s existing facility.

Shellbrook Wastewater Treatment Plant, Shellbrook, Saskatchewan (Construction Coordinator/Process Technologist)Site Engineering duties including specification interpretation, volume control of engineered fill, issued progress payment recommendations for the client to the contractor, surface and underground utility layouts and the completion of daily progress reports.

Water TreatmentWater Treatment System Upgrades, Carievale, Saskatchewan (Process Technologist)Detail design and specifications for piping and chemical dosing for the utilization of a Nano Filtration system to replace the existing treatment system for the community

Water Treatment System Upgrades, Young, Saskatchewan (Process Technologist)Detail design and specifications for piping and chemical dosing for the utilization of a Reverse Osmosis system to replace the existing treatment system for the community

30 year Water Treatment System Capital Plan, Milestone, Saskatchewan (Process Technologist)Researched and specified at a conceptual level three alternatives for water treatment for the town of Milestone.  Options considered were Membrane Technologies, Lime Softening and Mixed Media Filtration.

Cote First Nation Water Treatment Plant Upgrades, Cote First Nation, Saskatchewan (Process Technologist)Commissioned process equipment and updated of record drawings for the Water Treatment plant upgrades.

WaterCity of Weyburn Utility Assessment, Weyburn, Saskatchewan (Process Technologist)Utilized storm modeling software in order to create and calibrate a working model representing accurate representation of surface and underground utility impacts at varying storm events.

Buffalo Pound Water Modeling, Moose Jaw, Saskatchewan (Process Technologist)Conducted an EPS water model on the proposed 750 mm diameter potable water force main to replace the existing water main in order to provide redundancy as well as an increased capacity to service the City of Moose jaw.  5 various pumps were modeled in order to determine the life cycle cost of normal operations