Risk Assessment Tool
Residual Risk Reduction (R3)
Danny Viator Tony Spencer
Superior Energy Liberty Mutual
Broussard, LA Metairie, LA
April, 2010
-
8/8/2019 Residual Risk Reduction (R3)
2/42
Definition-Residual Risk
ReductionA process that involves a study to:
Analyze jobs Identify hazards and existing controls
Determine the level of risk
Identify controls to reduce risk Measure the amount of risk reduction
-
8/8/2019 Residual Risk Reduction (R3)
3/42
Some Facts About Risk
An inherent feature of systems; a qualitythat always exists to some degree
Is definable in terms of three factors(Frequency, Likelihood, & Severity)
Once it is defined, it can be quantified
The quantity of risk can be changed bychanging these factors
-
8/8/2019 Residual Risk Reduction (R3)
4/42
The Risk Factors
Frequency (Exposure Opportunity)
How often the exposure exists
Likelihood (Chance of Occurrence)
Severity (Degree of Harm) Worst Plausiblescenario
-
8/8/2019 Residual Risk Reduction (R3)
5/42
Risk Rating Scale
Rating Frequency Likelihood Severity
1 < once per shiftor day
2 > once per shiftor day
3 > once per hour
4 > once per fiveminutes
5 At all times
-
8/8/2019 Residual Risk Reduction (R3)
6/42
Risk Rating Scale
Rating Frequency Likelihood Severity
1 Impossible
2 Unlikely
3 Possible
4 Probable
5 Multiple
-
8/8/2019 Residual Risk Reduction (R3)
7/42
Risk Rating Scale
Rating Frequency Likelihood Severity
1 First Aid
2 Medical Treatment
3 Lost time, full recovery
4 Some permanentimpairment
5 Major permanentimpairment or death
-
8/8/2019 Residual Risk Reduction (R3)
8/42
Risk Rating Scale
Rating Frequency Likelihood Severity
1 < once per shiftor day
Impossible First Aid
2 > once per shiftor day
Unlikely Medical Treatment
3 > once per hour Possible Lost time, full recovery
4 > once per fiveminutes
Probable Some permanentimpairment
5 At all times Multiple Major permanentimpairment or death
-
8/8/2019 Residual Risk Reduction (R3)
9/42
Risk = F x L x S
The quantity of risk can be changed bychanging the risk factors
Eliminating a step
Changing how a step is done
Implementing new/revised controls
-
8/8/2019 Residual Risk Reduction (R3)
10/42
Organizing the R3 Team
Team leader
-Familiar with the mechanics of R3
-Can facilitate group decision making Group-Multi-disciplinary
-Health & Safety
-Operations-Engineering
-
8/8/2019 Residual Risk Reduction (R3)
11/42
R3 Example
Climbing & Working on ProductionChristmas Trees
-
8/8/2019 Residual Risk Reduction (R3)
12/42
Production Tree Examples
-
8/8/2019 Residual Risk Reduction (R3)
13/42
Production Tree Examples
-
8/8/2019 Residual Risk Reduction (R3)
14/42
Production Tree Examples
-
8/8/2019 Residual Risk Reduction (R3)
15/42
Production Tree Examples
-
8/8/2019 Residual Risk Reduction (R3)
16/42
Exposure Example
-
8/8/2019 Residual Risk Reduction (R3)
17/42
Exposure Example
-
8/8/2019 Residual Risk Reduction (R3)
18/42
-
8/8/2019 Residual Risk Reduction (R3)
19/42
Production Tree R3 Team
-Warren-Corporate Safety -Tony-Ins LC
-Danny-Division Safety -Terry-Broker-John-Division Safety -Clint-Falls Rep
-Joe-Division Safety
-Joe P-Trainer-Spencer-Training Director
-
8/8/2019 Residual Risk Reduction (R3)
20/42
R3TM BaselineFacility: Superior Wireline Division Exposure: Falls While Working
on Production Trees
System: Production Trees Date: May, 2009
Task: Evaluating the task of climbing and working on production trees
Concern Current Controls F L S Risk New Controls F L S Risk
Employees exposedto falls while eitherclimbing up or downproduction trees
Orientation, JSEA, WorkBoots, Clean Tree, 3 PtClimbing, DedicatedClimbing Training, StopWork Authority, BehaviorBased Safety
4 3 4 48
Risk Index1 48 Risk Index2
Liberty Mutual NMLP
-
8/8/2019 Residual Risk Reduction (R3)
21/42
R3TM SubsequentFacility: Superior Wireline Division Exposure: Falls While
Working on Production Trees
System: Production Trees Date: May, 2009
Task: Evaluating the task of climbing and working on production trees
Concern CurrentControls
F L S Risk New Controls F L S Risk
Employeesexposed tofalls whileeither climbingup or downproductiontrees
All of the controls in theBaseline Assessment plus JobSpecific Fall ProtectionProcedures
4 2 2 16
Risk Index1 Risk Index216
Liberty Mutual NMLP
-
8/8/2019 Residual Risk Reduction (R3)
22/42
R3TM WorksheetFacility: Superior Wireline Division Exposure: Falls While Working
on Production Trees
System: Production Trees Date: May 2009
Task: Evaluating the task of climbing and working on production trees
Concern Current Controls F L S Risk New Controls F L S Risk
Employees exposedto falls while eitherclimbing up or downproduction trees
Orientation, JSEA, WorkBoots, Clean Tree, 3 PtClimbing, Stop WorkAuthority, Behavior BasedSafety
4 3 4 48 All of the controls in theBaseline Assessmentplus Job Specific FallProtection Procedures
4 2 2 16
Risk Index1 48 Risk Index2 16
Liberty Mutual NMLP
-
8/8/2019 Residual Risk Reduction (R3)
23/42
Overview of Tree
-
8/8/2019 Residual Risk Reduction (R3)
24/42
Use of Fall Protection
-
8/8/2019 Residual Risk Reduction (R3)
25/42
Production Tree
Residual Risk Reduction
R3 = [(RI1 RI2)/RI1 X100] = % Reduction
48-16 = 67% Reduction48x100
-
8/8/2019 Residual Risk Reduction (R3)
26/42
R3 Example
Wire Sticks
While Reaming Packing
-
8/8/2019 Residual Risk Reduction (R3)
27/42
-
8/8/2019 Residual Risk Reduction (R3)
28/42
-
8/8/2019 Residual Risk Reduction (R3)
29/42
-
8/8/2019 Residual Risk Reduction (R3)
30/42
Exposure Example
-
8/8/2019 Residual Risk Reduction (R3)
31/42
Exposure Example
-
8/8/2019 Residual Risk Reduction (R3)
32/42
Exposure Example
-
8/8/2019 Residual Risk Reduction (R3)
33/42
Wire Sticks R3 Team
-Warren-Corporate Safety -Tony-Ins LC
-Danny-Division Safety
-John-Division Safety
-Ryan-Division Safety
-Matt-Corporate Safety
-Robert-Operations
-BJ-Training
R3TM B li
-
8/8/2019 Residual Risk Reduction (R3)
34/42
R3TM BaselineDivision-Superior Wireline Division-Slickline
Exposure-Wire Sticks
System-Stuffing Box Packing Date-October, 2009
Task-Evaluating the task of reaming out stuffing box packings
Concern Current Controls F L S Risk New Controls F L S Risk
Slickline Operatorsand Helpers are
exposed to receivingwire sticks in thehands while they arereaming out stuffingbox packings
New employee orientation,JSAs, Safety meetings,
Kong Gloves, Pig tail & viceprocedure recommended,Stop Work Authority,Behavior Based Safety
5 4 3 60
Risk Index 60
Liberty Mutual NMLPPoster 3
R3TM S b t
-
8/8/2019 Residual Risk Reduction (R3)
35/42
R3TM SubsequentDivision-Superior Wireline Division-Slickline
Exposure-Wire Sticks
System-Stuffing Box Packing Date-October, 2009Task-Evaluating the task of reaming out stuffing box packings
Concern Current Controls F L S Risk New Controls F L S Risk
Slickline Operators andHelpers are exposed toreceiving wire sticks inthe hands while theyare reaming out stuffingbox packings
All controls listed in theBaseline assessmentplus packing mfg toream out to 0.125(vs.0.092), shop to reamout to 0.125, supplyream assist tool to allfield operators, add JSAon reaming specifics,safety meetingemphasis on for next 90
days on these controlsby field safety staff
5 2 1 10
Risk Index 10
R3TM W k h t
-
8/8/2019 Residual Risk Reduction (R3)
36/42
R3TM WorksheetDivision-Superior Wireline Division-Slickline
Exposure-Wire Sticks
System-Stuffing Box Packing Date-October, 2009Task-Evaluating the task of reaming out stuffing box packings
Concern Current Controls F L S Risk New Controls F L S Risk
Slickline Operatorsand Helpers areexposed to receivingwire sticks in thehands while they arereaming out stuffingbox packings
New employee orientation,Kong Gloves, Pig tail &vice procedurerecommended, Stop WorkAuthority, Behavior BasedSafety
5 4 3 60 All controls listed in theBaseline assessmentplus packing mfg toream out to 0.125(vs.0.092), shop toream out to 0.125,supply ream assist toolto all field operators,add JSA on reamingspecifics, safetymeeting emphasis on
for next 90 days onthese controls by fieldsafety staff
5 2 1 10
Risk Index 60 10
-
8/8/2019 Residual Risk Reduction (R3)
37/42
Assist Tool
-
8/8/2019 Residual Risk Reduction (R3)
38/42
Assist Tool
-
8/8/2019 Residual Risk Reduction (R3)
39/42
Residual Risk Reduction
R3 = [(RI1 RI2)/RI1 X100] = % Reduction
60-10 = 83% Reduction60x100
-
8/8/2019 Residual Risk Reduction (R3)
40/42
R3 Analysis
Define the
F-L-S scales
Define the system to
be studied
(Activity)
Identify the
concerns to
be analyzed
(Incidents)
Score each concern
on the F-L-S scales
Identify/Analyze
controls
Identify
New
controls
Implement the new
controls
Re-score the
concerns with
the new controls
Report the R3
as a Safety
Outcome!
-
8/8/2019 Residual Risk Reduction (R3)
41/42
Other R3 Examples
Handling Chicksan pipe
Vehicle traffic flow pattern in an oilfieldyard
Climbing on/off of vacuum tank trailers
Working on a burn table at a mfg plant
Changing catalyst in a cat cracker Access to bucket truck by Linemen
-
8/8/2019 Residual Risk Reduction (R3)
42/42
So Whats In It For Me?
R3 provides a means for examiningsystems
R3 gets the people closest to the risk in
systems involved in its reduction It illustrates how interventions affect risk
It provides both upstream & downstream
measures for safety efforts R3 motivates action to reduce risk from
hazards in systems