Land must first must be surveyed so exact boundaries are know.

Surveys are done by licensed professionals called Surveyors.

Historically their work was done with instruments called Transits.

These used complex geometry,trigonometry and triangulation to determine bearings and distances. Surveys were calculated and drawn by hand.

Page 3: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

Modern day Surveyors use high tech. instruments called Total Stations.

A total station is an electronic/optical instrument used in modern surveying. It is an electronic transit integrated with an electronic distance meter to read slope distances from the instrument to a particular point.

Total Stations also use GPS to locate the instrument and to establish a point of beginning.

Page 4: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

Property lines are usually shown in Bearings.

A bearing is a direction and a distance. It would specify which direction a line would go and how far in that distance.

For example a property line might say:

Page 5: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

Surveyors use the Bearings and distances to label and describe the entire outer perimeter of the piece of land.

When the boundaries are officially determined, we then choose an appropriate house site.

Road access and topography are the next things to consider.

Page 6: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

Topography is the surface shapes and features of the earths surface.

Another name for a topographical map is a contour map

See contour map handout.

Page 7: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

What is represented by lines very close together?

What is represented by lines very far apart?

What is represented by looping lines?

What geographical feature is represented by lines forming a “V” that point down hill?

Page 8: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

• Construction requires preparation of the site• Top soil removed and stored for later final

grading• Cut and fill may be required

Cut – The removal of natural soil or rock Fill – The addition of soil or rock

• Final grading involves adjusting the slope of the site to provide adequate drainage

photo courtesy of constructionphotographs.com

Page 9: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

Cut and fill should be balanced

May require several iterations

photo courtesy of constructionphotographs.com photo courtesy of constructionphotographs.com

Page 10: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

• Calculations are performed to estimate the volume of soil to be added and the volume of soil to be removed

• Profile views document the difference between the existing grade and the final grade

photo courtesy of constructionphotographs.com

Page 11: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

Why is land clearing and excavation so expensive? Machines are expensive to operate

or hire outMaterials are expensive to

purchase and to truck in or out.

Page 12: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

What machines are used?

Page 13: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

What is this machine called?

Page 14: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

What is this machine called?

Page 15: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

What is this machine called?

Page 16: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

What is this machine called?

Page 17: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

What is this machine called?

Page 18: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

What is this machine called?

Page 19: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

What is this machine called?

Page 20: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

What is this machine called?

Page 21: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

What is this machine called?

Page 22: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Page 23: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

Foundation holes are usually dug with an excavator.

They are dug to a depth to accommodate the planned basement. Common depths are

8 or 9 feet deep.

Page 24: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

After the holes are dug the soil is compacted using a compactor.

Page 25: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

Usually 4 to 6 inches of crushed stone is laid at the bottom of the foundation and is also compacted.

More or less stone is used depending on the water table

Page 26: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

Footings are formed using conventional lumber and are typically 2 feet wide.

They form a solid base to increase the surface area and bearing capacity under the foundation wall.

Page 27: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

Drainage is an important aspect of site preparations.

Footing drains, Basement floor drains and rainwater drains all need to be considered before concrete can be poured and backfilling is done.

Page 28: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

Drains are to gravity feed water to a location down hill that can sufficiently take away the run off.

Gutter drains are to be made out of solid PVC pipe primed and glued together.

Footing, floor, curtain, and French drains are all made of perforated PVC pipe

The above listed drain types collect surface and ground water through the perforations in the PVC pipe and take the water away from that location.

Page 29: Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.

All inspections must take place before concrete is poured and backfilling is done.

Why? What is the inspector

looking for?