Researcher = Project Manager Manage project resources to achieve deliverable (experiment)...

8
Researcher = Project Manager Manage project resources to achieve deliverable (experiment) supplies, equipment, fabrication, external vendors, staff, and other researchers Before coming to Davis Scheduling Autocad / drafting Mathcad (recommended) Machine shop / hand tools wiki At Davis Labview (required) Forklift driving Electronics instrumentation CGM Wiki at nees.ucdavis.edu

Transcript of Researcher = Project Manager Manage project resources to achieve deliverable (experiment)...

Page 1: Researcher = Project Manager Manage project resources to achieve deliverable (experiment) –supplies, equipment, fabrication, external vendors, staff, and.

Researcher = Project Manager• Manage project resources to achieve deliverable (experiment)

– supplies, equipment, fabrication, external vendors, staff, and other researchers

• Before coming to Davis– Scheduling– Autocad / drafting– Mathcad (recommended)– Machine shop / hand tools– wiki

• At Davis– Labview (required)– Forklift driving– Electronics – instrumentation

CGM Wiki at nees.ucdavis.edu

Page 2: Researcher = Project Manager Manage project resources to achieve deliverable (experiment) –supplies, equipment, fabrication, external vendors, staff, and.

Jonathan BrayPI

Shideh DashtiProject ManagerRESDAQ operator

Wing Shun KwanAssistant

WiDAQ operator

Lars PedersenMechanical design

of structures

UCD shopFabrication of

structures

Ray GerhardElectronics Supply

Chad JusticsFabricator

Centrifuge Operator

Dan WilsonViDAQ operator

Page 3: Researcher = Project Manager Manage project resources to achieve deliverable (experiment) –supplies, equipment, fabrication, external vendors, staff, and.

Scheduling / planning

• 3 months before test schedule is set – complete diagram of experiment and instrumentation

• 1 month before test – all fabricated structures

Page 4: Researcher = Project Manager Manage project resources to achieve deliverable (experiment) –supplies, equipment, fabrication, external vendors, staff, and.
Page 5: Researcher = Project Manager Manage project resources to achieve deliverable (experiment) –supplies, equipment, fabrication, external vendors, staff, and.
Page 6: Researcher = Project Manager Manage project resources to achieve deliverable (experiment) –supplies, equipment, fabrication, external vendors, staff, and.

Page 2 of 3Drafted on 8/11

Page 7: Researcher = Project Manager Manage project resources to achieve deliverable (experiment) –supplies, equipment, fabrication, external vendors, staff, and.

Displacement Transducer Rack Mounted on Container Above Model

Page 8: Researcher = Project Manager Manage project resources to achieve deliverable (experiment) –supplies, equipment, fabrication, external vendors, staff, and.