Research Development
TYPES OF DEVELOPMENT
On-Site Upgrading
Preserving their location, character and social structure but improve basic service and physical
environment. Land, lanes, road and open spaces are improved without changing layout or plot
sizes
On-Site Reblocking
Improving infrastructure and physical conditions in existing communities by making some
adjustment to the layout of the houses and roads to install Sewers and drainage system walkway
& roads yet ensure continuity of community
On-Site Reconstructions
Demolished and rebuilt on land either under a long term lease or after negotiated to buy the land.
DBKK (Dewan Bandaraya for Kota Kina)
Application of plan approval
Application letter
Copy of landownership certified by Commissioner of Oath or Justice of Peace
Copies of valid document like power of attorney/sales and purchase agreement/tenancy
agreement
Six set of building plans property arranged and folded in A4 size prepared by
professional consultant
1
Research Development
General Information
1. Title of plan should have:
Types of Building
Total number of unit
Total number of floors
Name of owner and company
Address of Building owner
Lot number/ title number
Road/street name
Section name
2. Building plan should completed with following
Well defined location plan not more 1:1000 or more. Name of road should be shown on
location plan -Floor plan, vertical elevation plan (front rear and side), sections and roof
plan with scale of 1:100 or 1:200 (according to building size)
Drainage and sewage plan should be indicated clearly in the site plan
Road layout plan, entrance road access and vehicle parking lots together with the traffic
flow shown either in site plan or separately
Indicate calculation on plot ratio, calculation of building floor area in accordance with
usage such as office.
1) Consultant prepares plans and submits to DBKK
2
Research Development
2) Plan checked for compliance of basic requirements for submission of plans
3A) If incomplete submit letter of non-compliance and return to consultant
3B) If complied, open file, calculate fee and send payment notice to consultant
4) Circulate plan to relevant department eg. Jabatan Bomba, Health Department and so on
5) Bomba and Medical comment about plan
6) Plan will be checked. If there is any complication or not straight forward, plan will be referred
to building plans committee.
7A) If does not comply with requirements, letter requesting, revision will be prepared and sent to
the consultant
7B) If complies with the requirement, approval letter will be prepared
8) Consultant will be contracted to collect building plan which has been endorsed with approval
9) Approval plan filed
Brief goal
Pitch for an idea in written form.
Simpler the better but informative.
Brief Structure
The Goal : Identity core nugget explains the goal.
The Idea : Version of one's 5 second pitch.
The Problem : Modified version of pitch, set-up provides framework for the idea.
The Audience : What's the idea for? If you are pitching directly to your
customer in an appropriate way for their consumption
3
Research Development
The Approach : Explain how the idea works
Challenges & Unknown: Questions that will be asked and missed out important stuff
Design Brief
Design brief is a written document which has to be translated spatially ad technically by an
architect
Must be written prior to the appointment of an architect
Provide a clear framework for the development of a design that meets the needs and
aspiration of the architectural service client
Good thorough brief will form the basis of the professional agreement the client will sign
with the architect
Clarify on service, cost, timing and procedure -identify objective and main priority of the
project Writing
Generic guidance and empirical evidence about space standards and performance
requirement. Generic guidance should always tuned to the specific site
Existing building as qualitative reference
Aim Design brief should have
Mission &Vision
Objective
Performance requirement and measures.
Practical requirement for the relationship between spaces, focusing on performance requirement
instead of detail. Convenient to give a schedule of area.
Design criteria and principle of designs
4
Research Development
Priority
Management decisions and responsibility
Time frame, limits about time scale
Limits about budget
As much factual information about the current condition of the building or site as it is
available. It may be better to give a summary and include relevant drawings and
document in appendix
Writing effective brief
Purpose of project brief
Give everyone started with a common understanding of goal
Gives direction and against those who test concept and execution as one moves through
projects -provide clarity on why you're doing this project
Writing the brief
Provide a list of requirement and include all relevant info specification
Size and location of design
Critical elements
Limitation
Avoid prescribe solution. Be clear what project needs to achieve so designer can explore ideas.
Benchmark in mind
Provide a list of things that you as a client wants to avoid.
Budget
5
Research Development
Provide budget prevent wasting time and resource when trying to maximize budget
Provide budget allow designer to know if project is going to be worthwhile
Timeframe
Detailed schedule of the project and set realistic deadline for the completion of work
Take into account the various stage of the design project such as consultation, concept
development production and delivering.
Getting consultation permits
Submission to local authority through OSC Apply for pre-building approval at the one
stop center of municipality of Kuala Lumpur. However, the builders need to visit
agencies that provide the pre-approval in order to obtain information.
Obtain development order from planning department *planning permission issued by DO
by PD of local authority authorities development of land. Permit is valid for 12 months,
within which time construction begins.
1. 120 days for large scale project
6
Research Development
Consisting of complicated development plans, building or more than five levels,
construction involving layout plans for a development area of more than 2acres or project
affecting the popularity density and change of zone area.
2. 60 days for mid-scale project
Fewer than 5 levels, fewer than 5,000 square feet or involving changes/addition/alteration
made to available shops/housing unit.
3. 45 days for small-scale projects
Involving addition/changes/ alteration to existing bungalow units, two storey
units and terrace units and now bungalow units built accordance with approved layout
plans only.
7