Engineers | Scientists | Planners PARECORP.COM 10 LINCOLN ROAD, SUITE 210 FOXBORO, MA 02035 T 508.543.1755 F 508.543.1881 8 BLACKSTONE VALLEY PLACE LINCOLN, RI 02865 T 401.334.4100 F 401.334.4108 July 22, 2020 Boston Conservation Commission Boston Environment Department Boston City Hall, Room 805 Boston, Massachusetts 02201 Re: Request to Amend Order of Conditions Boston Planning & Development Agency Pier 4 Culvert and Sinkhole Repairs Boston, MA DEP File No. 006-1644 (Pare Project No. 18228.00) Dear Members of the Conservation Commission: On behalf of the Boston Planning & Development Agency (BPDA), Pare Corporation (Pare) is submitting a Request for Amendment to the Order of Conditions Intent for the Pier 4 Culvert and Sinkhole Repairs project in the Charlestown Navy Yard in Charlestown (DEP File No. 006-1644, issued July 11, 2019). Included for your review are the following materials: One (1) copy of the revised page 4 of WPA Form 3 for the above-referenced project; and One (1) 11 x 17" set of Project Plans, revised July 2020. Please note that abutters are being notified via Certificate of Mailing as provided for under 310 CMR 10.05(4)(a). A copy of the stamped Certificate of Mailing and signed Affidavit of Service will be supplied prior to the public hearing. BPDA currently proposes additional repairs to Pier 4 beyond the scope of work permitted under the existing OOC to address additional critical deficiencies that were recently identified at Pier 4. The five (5) existing 8- inch steel beams supporting the concrete slab at Pier 4 (as shown on the attached revised Project Plans) have failed and require replacement. The proposed repairs are critical for the safe operation of this section of the pier. This section of the pier cannot be opened to the public until this repair work has been completed. The work will require the removal of the existing precast concrete deck within the limits shown on the Project Plans, removal and replacement of the five (5) each 8-inch pile caps with new, galvanized 12 inch pile caps, and replacement of the precast deck and concrete topping. All of the additional work is located above the MHW elevation. The currently proposed work is to be completed concurrently with the approved scope of work at Pier 4 and will occur in the following sequence: 1. Mobilization of Equipment 2. Shoring of inside precast planks (if any) 3. Temporary relocation of existing electrical services.

Transcript of Request to Amend Order of Conditions Boston Planning & … Pier 4... · Pier 4 Culvert and Sinkhole...

Page 1: Request to Amend Order of Conditions Boston Planning & … Pier 4... · Pier 4 Culvert and Sinkhole Repairs Boston, MA DEP File No. 006-1644 (Pare Project No. 18228.00) Dear Members

E n g i n e e r s | S c i e n t i s t s | P l a nn e r s

P AR E C OR P . C OM

10 L INCOLN ROAD, SUITE 210 FOXBORO, MA 02035

T 508.543.1755 F 508.543.1881

8 BLACKSTONE VALLEY PLACE L INCOLN, RI 02865

T 401.334.4100 F 401.334.4108

July 22, 2020 Boston Conservation Commission Boston Environment Department Boston City Hall, Room 805 Boston, Massachusetts 02201 Re: Request to Amend Order of Conditions

Boston Planning & Development Agency Pier 4 Culvert and Sinkhole Repairs Boston, MA DEP File No. 006-1644

(Pare Project No. 18228.00)

Dear Members of the Conservation Commission: On behalf of the Boston Planning & Development Agency (BPDA), Pare Corporation (Pare) is submitting a Request for Amendment to the Order of Conditions Intent for the Pier 4 Culvert and Sinkhole Repairs project in the Charlestown Navy Yard in Charlestown (DEP File No. 006-1644, issued July 11, 2019). Included for your review are the following materials:

One (1) copy of the revised page 4 of WPA Form 3 for the above-referenced project; and One (1) 11 x 17" set of Project Plans, revised July 2020.

Please note that abutters are being notified via Certificate of Mailing as provided for under 310 CMR 10.05(4)(a). A copy of the stamped Certificate of Mailing and signed Affidavit of Service will be supplied prior to the public hearing. BPDA currently proposes additional repairs to Pier 4 beyond the scope of work permitted under the existing OOC to address additional critical deficiencies that were recently identified at Pier 4. The five (5) existing 8-inch steel beams supporting the concrete slab at Pier 4 (as shown on the attached revised Project Plans) have failed and require replacement. The proposed repairs are critical for the safe operation of this section of the pier. This section of the pier cannot be opened to the public until this repair work has been completed. The work will require the removal of the existing precast concrete deck within the limits shown on the Project Plans, removal and replacement of the five (5) each 8-inch pile caps with new, galvanized 12 inch pile caps, and replacement of the precast deck and concrete topping. All of the additional work is located above the MHW elevation. The currently proposed work is to be completed concurrently with the approved scope of work at Pier 4 and will occur in the following sequence:

1. Mobilization of Equipment 2. Shoring of inside precast planks (if any) 3. Temporary relocation of existing electrical services.

Page 2: Request to Amend Order of Conditions Boston Planning & … Pier 4... · Pier 4 Culvert and Sinkhole Repairs Boston, MA DEP File No. 006-1644 (Pare Project No. 18228.00) Dear Members

Boston Conservation Commission (2) July 22, 2020

4. Demolition and salvage for re-use the existing handrail and precast concrete planks and curbing, It is assumed that the concrete topping over the precast will be removed, or cut square.

5. Removal and disposal of the existing five (5) deteriorated 8 x 31” cap beams and fastening bolts/clips. The existing tie down weldments will be salvaged to the extent possible.

6. Cut the existing timber support piles approximately 4 inches to allow for installation of the new cap to meet existing grades.

7. Provide and install a galvanized 12 x 53” grade 50 steel pile cap, fastened to the existing piles using the existing tie down weldments.

8. 1 ¼” galvanized anchor bolts will be used to fasten the cap and weldments to the piles. 9. Interior clip angles fastening the cap to the concrete wall shall be L8 x 8 x 3/8” using tow (2) at ¾”

epoxy anchor bolts, with 8” embedment. 10. Following the installation of the cap to existing u/s of concrete elevations, replace the precast concrete

cap slabs and topping, resulting in a smooth, even surface without imperfections. 11. Re-install handrail and electrical service, with touch up painting as required. 12. Scope includes all other miscellaneous work required to perform the cap replacement complete, to the

satisfaction of BPDA. Resource area impacts resulting from the currently proposed work are limited to approximately 945 square feet of Land Subject to Costal Storm Flowage (LSCSF) associated with Boston Harbor. The work is limited to replacement of existing structures and will not result in any decrease to the flood storage capacity of the site. There are no regulatory performance standards associated with LSCFS. Page 4 of WPA Form 3 has been updated to reflect the additional LSCSF impacts. The work will not result in any additional permanent or temporary impacts to coastal resource areas beyond those approved under the existing OOC. Thank you very much for your consideration in this matter. If you have any questions, please feel free to contact us. Sincerely, Pare Corporation

Karl Hammond, P.E. Managing Engineer KH/LHG cc: DEP Northeast Regional Office Charlestown Commerce Center Division of Marine Fisheries, North Shore Office File

Y:\JOBS\18 Jobs\18228.00 BPDA - Charlestown Pier 4 Sinkhole - MA\REPORTS\Permitting\NOI\AMENDED ORDER\OOC Amendment-Cover-Letter.doc

Page 3: Request to Amend Order of Conditions Boston Planning & … Pier 4... · Pier 4 Culvert and Sinkhole Repairs Boston, MA DEP File No. 006-1644 (Pare Project No. 18228.00) Dear Members

wpaform3.doc • rev. 2/8/2018

Page 4 of 9

4

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands

WPA Form 3 – Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40

Provided by MassDEP:

MassDEP File Number

Document Transaction Number

Boston City/Town

B. Buffer Zone & Resource Area Impacts (temporary & permanent) (cont’d)

Check all that apply below. Attach narrative and supporting documentation describing how the project will meet all performance standards for each of the resource areas altered, including standards requiring consideration of alternative project design or location.

Online Users: Include your document transaction number (provided on your receipt page) with all supplementary information you submit to the Department.

Resource Area Size of Proposed Alteration Proposed Replacement (if any)

a. Designated Port Areas Indicate size under Land Under the Ocean, below

b. Land Under the Ocean 1,830± 1. square feet

2. cubic yards dredged

c. Barrier Beach Indicate size under Coastal Beaches and/or Coastal Dunes below

d. Coastal Beaches 1. square feet

2. cubic yards beach nourishment

e. Coastal Dunes

1. square feet

2. cubic yards dune nourishment

Size of Proposed Alteration Proposed Replacement (if any)

f. Coastal Banks

1. linear feet

g. Rocky Intertidal Shores

1. square feet

h. Salt Marshes

1. square feet

2. sq ft restoration, rehab., creation

i. Land Under Salt Ponds

1. square feet

2. cubic yards dredged

j. Land Containing Shellfish

1,830± 1. square feet

k. Fish Runs Indicate size under Coastal Banks, inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above

1. cubic yards dredged

l. Land Subject to Coastal Storm Flowage

3,385± (temporary) 1. square feet

4. Restoration/Enhancement

If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.2.b or B.3.h above, please enter the additional amount here.

a. square feet of BVW

b. square feet of Salt Marsh

5. Project Involves Stream Crossings

a. number of new stream crossings

b. number of replacement stream crossings

Page 4: Request to Amend Order of Conditions Boston Planning & … Pier 4... · Pier 4 Culvert and Sinkhole Repairs Boston, MA DEP File No. 006-1644 (Pare Project No. 18228.00) Dear Members
Page 5: Request to Amend Order of Conditions Boston Planning & … Pier 4... · Pier 4 Culvert and Sinkhole Repairs Boston, MA DEP File No. 006-1644 (Pare Project No. 18228.00) Dear Members
Page 6: Request to Amend Order of Conditions Boston Planning & … Pier 4... · Pier 4 Culvert and Sinkhole Repairs Boston, MA DEP File No. 006-1644 (Pare Project No. 18228.00) Dear Members
Page 7: Request to Amend Order of Conditions Boston Planning & … Pier 4... · Pier 4 Culvert and Sinkhole Repairs Boston, MA DEP File No. 006-1644 (Pare Project No. 18228.00) Dear Members
Page 8: Request to Amend Order of Conditions Boston Planning & … Pier 4... · Pier 4 Culvert and Sinkhole Repairs Boston, MA DEP File No. 006-1644 (Pare Project No. 18228.00) Dear Members
Page 9: Request to Amend Order of Conditions Boston Planning & … Pier 4... · Pier 4 Culvert and Sinkhole Repairs Boston, MA DEP File No. 006-1644 (Pare Project No. 18228.00) Dear Members
Page 10: Request to Amend Order of Conditions Boston Planning & … Pier 4... · Pier 4 Culvert and Sinkhole Repairs Boston, MA DEP File No. 006-1644 (Pare Project No. 18228.00) Dear Members
Page 11: Request to Amend Order of Conditions Boston Planning & … Pier 4... · Pier 4 Culvert and Sinkhole Repairs Boston, MA DEP File No. 006-1644 (Pare Project No. 18228.00) Dear Members

List of Abutters to Parcel 0203505000 

Request for Amended Order of Conditions Pier 4 Culvert and Sinkhole Repairs  

Charlestown Navy Yard  July 2020 

 

            LOCUS PROPERTY 

 Parcel      Owner/Address  0203505000    Boston Redevelopment Authority  

Boston Planning and Development Agency One City Hall, Ninth Floor Boston, Massachusetts 02201 

 ABUTTING PROPERTIES 

 Parcel      Owner/Address  0203503000    United States of America       93 Chelsea Street 

Charlestown, MA 02129        0203510700    United States of America       6th Street  

Charlestown MA 02129        0203512000    Navy Yard Plaza Development       120 Fulton Street 

Boston MA 02109  0203504000    MGH Institute of Health       101 Merrimack Street 

Boston MA 02114  0203506010    The Parris Landing Condo Trust       42 Eighth Street  

Charlestown, MA  02129  02035057001    Boston Redevelopment Authority  

Boston Planning and Development Agency One City Hall, Ninth Floor Boston, Massachusetts 02201 

 02035055501          Boston Redevelopment Authority  

Boston Planning and Development Agency One City Hall, Ninth Floor Boston, Massachusetts 02201 

 1 A single notification was sent for all parcels owned by Boston Redevelopment Authority/Boston Planning & Development Agency. 

Page 12: Request to Amend Order of Conditions Boston Planning & … Pier 4... · Pier 4 Culvert and Sinkhole Repairs Boston, MA DEP File No. 006-1644 (Pare Project No. 18228.00) Dear Members

List of Abutters to Parcel 0203505000 

Request for Amended Order of Conditions Pier 4 Culvert and Sinkhole Repairs  

Charlestown Navy Yard  July 2020 

 

             02035056001          Boston Redevelopment Authority  

Boston Planning and Development Agency One City Hall, Ninth Floor Boston, Massachusetts 02201  

0203505100          Flagship Wharf Condo Association       1 Pier 8, 13th Street       Charlestown, MA  02129   

Page 13: Request to Amend Order of Conditions Boston Planning & … Pier 4... · Pier 4 Culvert and Sinkhole Repairs Boston, MA DEP File No. 006-1644 (Pare Project No. 18228.00) Dear Members

NOTIFICATION TO ABUTTERS 

BOSTON CONSERVATION COMMISSION 

 

In accordance with the Massachusetts Wetlands Protection Act, Massachusetts General Laws Chapter 

131, Section 40, and the Boston Wetlands Ordinance, you are hereby notified as an abutter to a project 

filed with the Boston Conservation Commission.  

A. Boston Planning & Development Agency has filed a Request for an Amendment to an Order of 

Conditions with the Boston Conservation Commission seeking permission to alter an Area Subject to 

Protection under the Wetlands Protection Act (General Laws Chapter 131, section 40) and Boston 

Wetlands Ordinance.  

B. The address of the lot where the activity is proposed is Pier 4 at the Charlestown Navy Yard – parcel 

ID 0203505000, Charlestown MA.  

C. The project involves Repairs to Pier 4 beyond the scope of the existing Order of Conditions (DEP File 

No 006‐1644). The additional repairs include replacement of five (5) pile caps and replacement of the 

pre‐cast deck and concrete topping.  

D. Copies of the Notice of Intent may be obtained by contacting the Boston Conservation Commission at 

[email protected].  

E. Copies of the Notice of Intent may be obtained from Pare Corporation between the hours of 8 and 5, 

Monday through Friday by calling 508‐543‐1755.  

F. In accordance with the Commonwealth of Massachusetts Executive Order Suspending Certain 

Provisions of the Open Meeting Law, the public hearing will take place virtually at 

https://zoom.us/j/6864582044. If you are unable to access the internet, you can call 1‐929‐205‐ 6099, 

enter Meeting ID 686 458 2044 # and use # as your participant ID.  

G. Information regarding the date and time of the public hearing may be obtained from the Boston 

Conservation Commission by emailing [email protected] or calling (617) 635‐3850 between the hours of 9 

AM to 5 PM, Monday through Friday.  

NOTE: Notice of the public hearing, including its date, time, and place, will be published at least five (5) 

days in advance in the Boston Herald.  

NOTE: Notice of the public hearing, including its date, tine, and place, will be posted on 

www.boston.gov/public‐notices and in Boston City Hall not less than forty‐eight (48) hours in advance.  

NOTE: If you would like to provide comments, you may attend the public hearing or send written 

comments to [email protected] or Boston City Hall, Environment Department, Room 709, 1 City Hall 

Square, Boston, MA 02201  

NOTE: You also may contact the Boston Conservation Commission or the Department of Environmental 

Protection Northeast Regional Office for more information about this application or the Wetlands 

Protection Act. To contact DEP, call: the Northeast Region: (978) 694‐3200. 

Page 14: Request to Amend Order of Conditions Boston Planning & … Pier 4... · Pier 4 Culvert and Sinkhole Repairs Boston, MA DEP File No. 006-1644 (Pare Project No. 18228.00) Dear Members

AFFIDAVIT OF SERVICE Under the Massachusetts Wetlands Protection Act, MGL Ch 131, S. 40

& Filing Requirements for a Wetlands Permit with the Boston Conservation Commission

I, Lauren Gluck of Pare Corporation, hereby certify under the penalties of perjury that on July 23, 2020, I gave notification to abutters in compliance with the second paragraph of Massachusetts General Laws Chapter 131, Section 40, and the DEP Guide to Abutter Notification dated April 8, 1994, in connection with the following matter: A Request for an Amendment to an Order of Conditions issued under the Massachusetts Wetlands Protection Act was filed by the Boston Planning and Development Agency with the Boston Conservation Commission on July 22, 2020 for property located at Pier 4 in the Charlestown Navy Yard – Parcel ID 0203505000. The form of the notification, and a list of the abutters to whom it was given and their addresses, are attached to this Affidavit of Service.

July 23, 2020 Signature and Date