Request for Proposals Lansing School District Purchasing ... · Two Chameleon slides Burma Bride...

58
1 Telephone (517) 755-3030 January 19, 2010 Request for Proposals Lansing School District Purchasing Office 519 West Kalamazoo, Room 203 Lansing MI 48933 This is not an order Sealed proposals for the furnishing of items and services listed on the sheets attached to the bid proposal documents that are available on our web-site will be received in the Lansing School District Purchasing Office, 519 W. Kalamazoo St., Room 200, Lansing, Michigan 48933 until February 2, 2010, 2:00PM local time. Three copies of your bid using the enclosed proposal form shall be submitted in a sealed envelope and clearly marked: SO-1533 Playground Equipment. To obtain a copy of this request for bid please visit our web site at: https://www.edline.net/pages/Lansing_SD/Departments/Purchasing or call our office at 517-755-3030 if you require a copy be e-mailed to you. No faxed bids or e-mailed bids will be accepted. All bids shall be submitted in accordance with the attached instructions and shall remain firm for a period of ninety (90) days after the opening of bids. The Lansing School District reserves the right to reject any or all bids, in whole or in part, and to accept the bid or portion of the bid that, in their opinion, best serves the interests of the Lansing School District. Lansing School District ______________________ Celestine Hart Director of Purchasing

Transcript of Request for Proposals Lansing School District Purchasing ... · Two Chameleon slides Burma Bride...

  • 1

    Telephone (517) 755-3030 January 19, 2010

    Request for Proposals Lansing School District

    Purchasing Office 519 West Kalamazoo, Room 203

    Lansing MI 48933

    This is not an order

    Sealed proposals for the furnishing of items and services listed on the sheets attached to the bid proposal documents that are available on our web-site will be received in the Lansing School District Purchasing Office, 519 W. Kalamazoo St.,

    Room 200, Lansing, Michigan 48933 until

    February 2, 2010, 2:00PM local time. Three copies of your bid using the enclosed proposal form shall be submitted in a sealed envelope and clearly marked: SO-1533 Playground Equipment.

    To obtain a copy of this request for bid please visit our web site at: https://www.edline.net/pages/Lansing_SD/Departments/Purchasing or call our

    office at 517-755-3030 if you require a copy be e-mailed to you.

    No faxed bids or e-mailed bids will be accepted. All bids shall be submitted in accordance with the attached instructions and shall remain firm for a period of ninety (90) days after the opening of bids. The Lansing School District reserves the right to reject any or all bids, in whole or in part, and to accept the bid or portion of the bid that, in their opinion, best serves the interests of the Lansing School District. Lansing School District ______________________ Celestine Hart Director of Purchasing

  • 2

    PROPOSAL FORM

    LANSING SCHOOL DISTRICT Playground Equipment -Willow

    Lansing School District Celestine Hart Purchasing Department 519 West Kalamazoo, Room 200 Lansing Michigan 48933 We hereby propose to furnish, deliver and install the items listed below for the unit prices indicated in accordance with the terms, conditions and specifications included.

    Quantity Description Total Price 1 Play structure ____________________

    Miracle Recreation #714-S197-M9J or Approved Equal

    Bidding on _____________________ (manufacturer and model) ______Square feet

    Engineered wood fiber per square foot $ ________ Total $_______________

    ______Square feet Excavation per square foot $ ________

    Total $_______________ Borders Estimated quantity ______ per foot $ _________

    Surface installation Estimated quantity ____ per square foot $ ________ Include an itemized bill of materials with pricing with your proposal. If bidding other than specified please include descriptive literature. All Surface preparation and Site work pricing (if not listed above): ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Delivery of all products bid (if not listed above): ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

  • 3

    Miscellaneous parts and materials required to complete installation (include pricing): ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Turn-Key installation of all products bid on Willow Elementary School site Installation Total $______________ Grand Total Project $_____________________________

    This items bid meet or exceed all specifications included in this bid. (Yes/No) ________ If no all exceptions are listed below: Company __________________________ Address: ____________________________

    ____________________________________ ____________________________________ Fax: ____________ Phone: _____________ Date: ____________________ Signature: __________________________ Printed Name: ______________________ Title: ________________________________

  • 4

    PROPOSAL FORM LANSING SCHOOL DISTRICT

    Playground Equipment - Kendon Lansing School District Celestine Hart Purchasing Department 519 West Kalamazoo, Room 200 Lansing Michigan 48933 We hereby propose to furnish, deliver and install the items listed below for the unit prices indicated in accordance with the terms, conditions and specifications included.

    Quantity Description Total Price 1 Play structure ____________________

    All About Play 560-0444 or Approved Equal

    Bidding on _____________________ (manufacturer and model) ______Square feet

    Engineered wood fiber per square foot $ ________ Total $_______________

    ______Square feet Excavation per square foot $ ________

    Total $_______________ Borders Estimated quantity ______ per foot $ _________

    Surface installation Estimated quantity ____ per square foot $ ________ Include an itemized bill of materials with pricing with your proposal. If bidding other than specified please include descriptive literature. All Surface preparation and Site work pricing (if not listed above): ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Delivery of all products bid (if not listed above): ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

  • 5

    Miscellaneous parts and materials required to complete installation (include pricing): ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ Turn-Key installation of all products bid on Willow Elementary School site $_________ GRAND TOTAL – Project $______________

    This items bid meet or exceed all specifications included in this bid. (Yes/No) ________ If no all exceptions are listed below: Company __________________________ Address: ____________________________

    ____________________________________ ____________________________________ Fax: ____________ Phone: _____________ Date: ____________________ Signature: __________________________ Printed Name: ______________________ Title: ________________________________

  • 6

    Specifications, Special Conditions and Instructions - Kendon Play unit shall contain: Sattellite Walk, FS All About Play – 560-0444 or approved equal Certified Wood Fiber Surfacing Stone Border Geotextile Fabric 1. Substitutions, alternative brands may be offered. Submit a drawing plus

    an itemized list of equipment that completes a comparable (subject to District review and acceptance) structure.

    2. The equipment bid must be suitable for 4 to 12 year old children.

    Product must meet or exceed the Consumer Product Safety Commission guidelines and ASTM F1487.

    3. Product must be ADA Compliant. 4. The address of installation is: 827 Kendon Drive Lansing MI 48910

    Specifications, Special Conditions and Instructions - Willow Multi level access play unit shall contain: Transfer point Pod hopper ATA stairs Side by side climber Scale and slide Vertical ladder Tree-o climber Typhoon slide Steel-vue crawl tube Two Chameleon slides Burma Bride Two 4’/ 10’ stacked decks 6’deck 8’ deck Crunch station

  • 7

    5. Substitutions, alternative brands may be offered. Submit a drawing plus an itemized list of equipment that completes a comparable (subject to District review and acceptance) structure.

    6. The equipment bid must be suitable for 4 to 12 year old children.

    Product must meet or exceed the Consumer Product Safety Commission guidelines and ASTM F1487.

    7. Product must be ADA Compliant. 8. The address of installation is: 1012 West Willow Street Lansing, MI 48915

  • STATE OF MICHIGAN

    JENNIFER M. GRANHOLM GOVERNOR

    DEPARTMENT OF ENERGY, LABOR & ECONOMIC GROWTH LANSING

    STANLEY “SKIP” PRUSS DIRECTOR

    DELEG is an equal opportunity employer/program. Auxiliary aids, services and other reasonable accommodations are available upon request to individuals with disabilities.

    WAGE & HOUR DIVISION

    P.O. BOX 30476 • LANSING, MICHIGAN 48909-7976 www.michigan.gov/wagehour • (517) 335-0400 • FAX (517) 335-0077

    REQUIREMENTS OF THE PREVAILING WAGES ON STATE PROJECTS ACT, PUBLIC ACT 166 OF 1965

    The Michigan Department of Labor & Economic Growth determines prevailing rates pursuant to the Prevailing Wages on State Projects Act, Public Act 166 of 1965, as amended. The purpose of establishing prevailing rates is to provide minimum rates of pay that must be paid to workers on construction projects for which the state or a school district is the contracting agent and which is financed or financially supported by the state. By law, prevailing rates are compiled from the rates contained in collectively bargained agreements which cover the locations of the state projects. The official prevailing rates provide an hourly rate which includes wage and fringe benefit totals for designated construction mechanic classifications. The overtime rates also include wage and fringe benefit totals. Please pay special attention to the overtime and premium pay requirements. Prevailing wage is satisfied when wages plus fringe benefits paid to a worker are equal to or greater than the required rate. State of Michigan responsibilities under the law:

    • The department establishes the prevailing rate for each classification of construction mechanic requested by a contracting agent prior to contracts being let out for bid on a state project.

    Contracting agent responsibilities under the law: • If a contract is not awarded or construction does not start within 90 days of the date of the

    issuance of rates, a re-determination of rates must be requested by the contracting agent.

    • Rates for classifications needed but not provided on the Prevailing Rate Schedule, must be obtained prior to contracts being let out for bid on a state project.

    • The contracting agent, by written notice to the contractor and the sureties of the contractor known to the contracting agent, may terminate the contractor's right to proceed with that part of the contract, for which less than the prevailing rates have been or will be paid, and may proceed to complete the contract by separate agreement with another contractor or otherwise, and the original contractor and his sureties shall be liable to the contracting agent for any excess costs occasioned thereby.

    Contractor responsibilities under the law: • Every contractor and subcontractor shall keep posted on the construction site, in a

    conspicuous place, a copy of all prevailing rates prescribed in a contract. • Every contractor and subcontractor shall keep certified payrolls, as used in the industry,

    of each and every construction mechanic, and verification of such certified payroll in writing by either a representative or auditor/certified accountant at the end of such a

  • certified payroll. These records should include the occupation and indicate the hours worked on each project for each classification and the actual wages and benefits paid. This record shall be available for reasonable inspection by the contracting agent or the department.

    • Each contractor or subcontractor is separately liable for the payment of the prevailing rate to its employees.

    • The prime contractor is responsible for advising all subcontractors of the requirement to pay the prevailing rate prior to commencement of work.

    • The prime contractor is secondarily liable for payment of prevailing rates that are not paid by a subcontractor.

    • A construction mechanic shall only be paid the apprentice rate if registered with the United States Department of Labor, Bureau of Apprenticeship and Training and the rate is included in the contract.

    Enforcement: A person who has information of an alleged prevailing wage violation on a state project may file a complaint with the Wage & Hour Division. The department will investigate and attempt to resolve the complaint informally. During the course of an investigation, if the requested records and posting certification are not made available in compliance with Section 5 of Act 166, the investigation will be concluded and a referral to the Office of Attorney General for civil action will be made. The Office of Attorney General will pursue costs and fees associated with a lawsuit if filing is necessary to obtain records. A violation of Act 166 may result in the contractor’s name being added to the Prevailing Wage Act Violators List published on the division’s website, updated monthly. This list includes the names and addresses of contractors and subcontractors the division has found in violation of Act 166 based on complaints from individuals and third parties. The Prevailing Wage Act Violators List is intended to inform contracting agents of contractors that have violated Act 166 for use in determining who should receive state-funded projects.

  • (REV 02/13/01)

    ENGINEERS - CLASSES OF EQUIPMENT LIST

    UNDERGROUND ENGINEERS HAZARDOUS WASTE ABATEMENT ENGINEERS CLASS I Backfiller Tamper, Backhoe, Batch Plant Operator, Clam-Shell, Concrete Paver (2 drums or larger), Conveyor Loader (Euclid type), Crane (crawler, truck type or pile driving), Dozer, Dragline, Elevating Grader, End Loader, Gradall (and similar type machine), Grader, Power Shovel, Roller (asphalt), Scraper (self propelled or tractor drawn), Side Broom Tractor (type D-4 or larger), Slope Paver, Trencher (over 8’ digging capacity), Well Drilling Rig, Mechanic, Slip Form Paver, Hydro Excavator. CLASS II Boom Truck (power swing type boom), Crusher, Hoist, Pump (1 or more 6" discharge or larger gas or diesel powered by generator of 300 amps or more, inclusive of generator), Side Boom Tractor (smaller than type D-4 or equivalent), Tractor (pneu-tired, other than backhoe or front end loader), Trencher (8’ digging capacity and smaller), Vac Truck. CLASS III Air Compressors (600 cfm or larger), Air Compressors (2 or more less than 600 cfm), Boom Truck (non-swinging, non-powered type boom), Concrete Breaker (self-propelled or truck mounted, includes compressor), Concrete Paver (1 drum, ½ yard or larger), Elevator (other than passenger), Maintenance Man, Mechanic Helper, Pump (2 or more 4" up to 6" discharge, gas or diesel powered, excluding submersible pump), Pumpcrete Machine (and similar equipment), Wagon Drill Machine, Welding Machine or Generator (2 or more 300 amp or larger, gas or diesel powered). CLASS IV Boiler, Concrete Saw (40HP or over), Curing Machine (self-propelled), Farm Tractor (w/attachment), Finishing Machine (concrete), Firemen, Hydraulic Pipe Pushing Machine, Mulching Equipment, Oiler (2 or more up to 4", exclude submersible), Pumps (2 or more up to 4" discharge if used 3 hrs or more a day-gas or diesel powered, excluding submersible pumps), Roller (other than asphalt), Stump Remover, Vibrating Compaction Equipment (6’ wide or over), Trencher (service) Sweeper (Wayne type and similar equipment), Water Wagon, Extend-a-Boom Forklift.

    CLASS I Backhoe, Batch Plant Operator, Clamshell, Concrete Breaker when attached to hoe, Concrete Cleaning Decontamination Machine Operator, Concrete Pump, Concrete Paver, Crusher, Dozer, Elevating Grader, Endloader, Farm Tractor (90 h.p. and higher), Gradall, Grader, Heavy Equipment Robotics Operator, Hydro Excavator, Loader, Pug Mill, Pumpcrete Machines, Pump Trucks, Roller, Scraper (self-propelled or tractor drawn), Side Boom Tractor, Slip Form Paver, Slope Paver, Trencher, Ultra High Pressure Waterjet Cutting Tool System Operator, Vactors, Vacuum Blasting Machine Operator, Vertical Lifting Hoist, Vibrating Compaction Equipment (self-propelled), and Well Drilling Rig. CLASS II Air Compressor, Concrete Breaker when not attached to hoe, Elevator, End Dumps, Equipment Decontamination Operator, Farm Tractor (less than 90 h.p.), Forklift, Generator, Heater, Mulcher, Pigs (Portable Reagent Storage Tanks), Power Screens, Pumps (water), Stationary Compressed Air Plant, Sweeper, Water Wagon and Welding Machine.

    Revised: 05/23/08

  • Michigan Department of Energy, Labor & Economic Growth

    Wage & Hour Division PO Box 30476

    Lansing , MI 48909-7976 JENNIFER M. GRANHOLM 517.335.0400 STANLEY “SKIP” PRUSS GOVERNOR www.michigan.gov/wagehour DIRECTOR

    WHD-9917 (08/07) Page 1 of 1

    Informational Sheet: Prevailing Wages on State ProjectsGeneral Information Regarding Fringe Benefits

    Certain fringe benefits may be credited toward the payment of the Prevailing Wage Rate: o If a fringe benefit is paid directly to a construction mechanic o If a fringe benefit contribution or payment is made on behalf of a construction mechanic o If a fringe benefit, which may be provided to a construction mechanic, is pursuant to a written contract

    or policy o If a fringe benefit is paid into a fund, for a construction mechanic

    When a fringe benefit is not paid by an hourly rate, the hourly credit will be calculated based on the annual value of the fringe benefit divided by 2080 hours per year (52 weeks @ 40 hours per week). The following is an example of the types of fringe benefits allowed and how an hourly credit is calculated:

    Vacation Dental insurance Vision insurance Health insurance Life insurance Tuition Bonus401k Employer Contribution

    Total Hourly Credit

    40 hours X $14.00 per hour = $560/2080 = $31.07 monthly premium X 12 mos. = $372.84 /2080 = $5.38 monthly premium X 12 mos. = $64.56/2080 = $230.00 monthly premium X 12 mos. = $2,760.00/2080 = $27.04 monthly premium X 12 mos. = $324.48/2080 = $500.00 annual cost/2080 = 4 quarterly bonus/year x $250 = $1000.00/2080 = $2000.00 total annual contribution/2080 =

    $.27$.18$.03

    $1.33$.16$.24$.48$.96

    $3.65

    Other examples of the types of fringe benefits allowed: � Sick pay � Holiday pay � Accidental Death & Dismemberment insurance premiums

    The following are examples of items that will not be credited toward the payment of the Prevailing Wage Rate:o Legally required payments, such as:

    � Unemployment Insurance payments � Workers’ Compensation Insurance payments � FICA (Social Security contributions, Medicare contributions)

    o Reimbursable expenses, such as: � Clothing allowance or reimbursement � Uniform allowance or reimbursement � Gas allowance or reimbursement � Travel time or payment � Meals or lodging allowance or reimbursement � Per diem allowance or payment

    o Other payments to or on behalf of a construction mechanic that are not wages or fringe benefits, such as:� Industry advancement funds � Financial or material loans

  • Michigan Department Energy, Labor & Economic Growth Wage & Hour Division

    Overtime Provisions for MICHIGAN PREVAILING WAGE RATE COMMERCIAL SCHEDULE

    1. Overtime is represented as a nine character code. Each character represents a certain period of time after the

    first 8 hours Monday thru Friday.

    Monday thru Friday Saturday Sunday & Holidays Four 10s

    First 8 Hours 4

    9th Hour 1 5

    10th Hour 2 6

    Over 10 hours 3 7

    8 9

    Overtime for Monday thru Friday after 8 hours: the 1st character is for time worked in the 9th hour (8.1 - 9 hours) the 2nd character is for time worked in the 10th hour (9.1 - 10 hours) the 3rd character is for time worked beyond the 10th hour (10.1 and beyond) Overtime on Saturday: the 4th character is for time worked in the first 8 hours on Saturday (0 - 8 hours) the 5th character is for time worked in the 9th hour on Saturday (8.1 - 9 hours) the 6th character is for time worked in the 10th hour (9.1 - 10 hours) the 7th character is for time worked beyond the 10th hour (10.01 and beyond) Overtime on Sundays & Holidays The 8th character is for time worked on Sunday or on a holiday

    Four Ten Hour Days The 9th character indicates if an optional 4-day 10-hour per day workweek can be worked between Monday and Friday without paying overtime after 8 hours worked, unless otherwise noted in the rate schedule. To utilize a 4 ten workweek, notice is required from the employer to employee prior to the start of work on the project.

    2. Overtime Indicators Used in the Overtime Provision:

    H - means TIME AND ONE-HALF due X - means TIME AND ONE-HALF due after 40 HOURS worked D - means DOUBLE PAY due Y - means YES an optional 4-day 10-hour per day workweek can be worked without paying overtime after 8 hours worked N - means NO an optional 4-day 10-hour per day workweek can not be worked without paying overtime after 8 hours worked

    3. EXAMPLES: HHHHHHHDN - This example shows that the 1½ rate must be used for time worked after 8 hours Monday thru Friday (characters 1 - 3); for all hours worked on Saturday, 1½ rate is due (characters 4 - 7). Work done on Sundays or holidays must be paid double time (character 8). The N (character 9) indicates that 4 ten-hour days is not an acceptable workweek at regular pay.

    XXXHHHHDY - This example shows that the 1½ rate must be used for time worked after 40 hours are

    worked Monday thru Friday (characters 1-3); for hours worked on Saturday, 1½ rate is due (characters 4 – 7). Work done on Sundays or holidays must be paid double time (character 8). The Y (character 9) indicates that 4 ten-hour days is an acceptable alternative workweek. (REV 09/29/09)

  • State of Michigan Wage and Hour Division Department of Energy, Labor and Economic Growth 7150 Harris Dr. PO Box 30476 Official Request #: 61 Lansing, MI 48909-7976 Requestor: LANSING SCHOOL DISTRICT Telephone: 517-322-1825 Project Description: PLAYGROUND EQUIPMENT INSTALLATION Fax: 517-322-6352 Project Number: SO-1533 WILLOW ELEMENTARY www.michigan.gov/wagehour Ingham County Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 1 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Asbestos & Lead Abatement Laborer Asbestos & Lead Abatement Laborer MLDC $35.55 $47.67 $59.78 H H H X X X X D Y 4 ten hour days @ straight time allowed Monday- 8/6/2009 Saturday, must be consecutive calendar days

    Asbestos & Lead Abatement, Hazardous Material Handler Asbestos and Lead Abatement, Hazardous Material AS207 $35.55 $48.15 $60.75 H H H X X X X D Y Handler 11/4/2009 4 ten hour days @ straight time allowed Monday-

    Boilermaker Boilermaker BO169 $54.70 $81.08 $107.45 H H H H H H H D Y 8/14/2009 Apprentice Rates: 1st 6 months $40.31 $59.49 $78.67 2nd 6 months $41.45 $61.21 $80.95 3rd 6 months $42.57 $62.88 $83.19 4th 6 months $43.69 $64.57 $85.43 5th 6 months $44.81 $66.24 $87.67 6th 6 months $49.53 $73.40 $97.26 7th 6 months $49.32 $73.01 $96.69 8th 6 months $51.58 $76.40 $101.21 Bricklayer Brick, stone, artificial, cement masonry, pointing, caulking BR9-31 $42.13 $55.56 $68.99 H H H X X X X D Y & cleaning 10/30/2009 Apprentice Rates: 0-749 hours $31.39 $39.45 $47.51 750-1,499 hours $32.73 $41.46 $50.19 1,500-2,249 hours $34.07 $43.47 $52.87 2,250-2,999 hours $35.41 $45.48 $55.55 3,000-3,749 hours $36.76 $47.51 $58.25 3,750-4,499 hours $38.10 $49.51 $60.93 4,500 - 5,249 hours $39.44 $51.53 $63.61 5,250 - 6,000 hours $40.79 $53.55 $66.31 Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 1 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 2 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Carpenter Floor layer CA1004FL $33.27 $44.19 $55.11 H H H H H H H D N 1/30/2009 Apprentice Rates: 1st Year $24.53 $31.08 $37.63 2nd Year $26.72 $34.37 $42.01 3rd Year $28.90 $37.63 $46.37 4th Year $29.99 $39.27 $48.55 Carpenter and piledriver CA1004L $37.81 $50.48 $63.15 H H H H H H H D Y 1/30/2009 Apprentice Rates: 1st Year $27.67 $35.27 $42.87 2nd Year $30.21 $39.08 $47.95 3rd Year $32.74 $42.87 $53.01 4th Year $34.01 $44.78 $55.55 Cement Mason Cement Mason PL16-7 $35.42 $47.47 $59.51 H H H H H H H D Y 10/16/2009 Four 10s allowed Monday-Thursday with Friday or Saturday inclement weather make up days. Saturday hours for inclement weather make up shall be paid straight rate unless over 40 hours worked.

    Apprentice Rates: 1st year $26.99 $34.82 $42.65 2nd year $29.40 $38.43 $47.47 3rd year $31.81 $42.05 $52.29 Drywall Drywall Taper and Finisher PT-845-DF $35.42 $47.42 $59.42 H H H H H H H D N 10/6/2009 Apprentice Rates: 0 - 1,000 hours $24.62 $31.22 $37.82 1,001 - 2,000 hours $25.82 $33.02 $40.22 2,001 to 3,000 hours $27.74 $35.90 $44.06 3,001 to 4,000 hours $29.42 $38.42 $47.42 4,001 to 5,000 hours $31.82 $42.02 $52.22 5,001 to 6,000 hours $34.22 $45.62 $57.02

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 2 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 3 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Electrician Road Way Electrical Work EC-17 $45.37 $65.63 $85.90 H H H H H H H D Y Double time due after 16 hours on any calendar day and 11/19/2007 all hours Sunday.

    Apprentice Rates: 1st 6 months $29.17 $41.34 $53.50 2nd 6 months $31.19 $44.36 $57.54 3rd 6 months $33.21 $47.40 $61.58 4th 6 months $35.23 $50.43 $65.62 5th 6 months $37.25 $53.46 $69.66 6th 6 months $41.32 $59.57 $77.80 Subdivision of county Williamston, Locke, Leroy, Wheatfield & White Oak Inside wireman EC-252-IW $56.00 $76.56 $97.11 H H D H D D D D N 7/10/2009 Apprentice Rates: 1st Period $30.79 $38.74 $46.69 2nd Period $35.45 $45.74 $56.01 3rd Period $39.56 $51.90 $64.23 4th Period $43.66 $58.05 $72.43 5th Period $47.78 $64.23 $80.67 6th Period $51.89 $70.39 $88.89 Subdivision of county Townships of Onondaga, Leslie, Stockbridge and Bunker Hill Sound and Communications Installer/Technician EC-252-SC $35.72 $48.51 $61.30 H H D H D D D D N 7/10/2009 Apprentice Rates: Period 1 $20.30 $26.70 $33.09 Period 2 $21.58 $28.62 $35.65 Period 3 $22.85 $30.52 $38.19 Period 4 $24.14 $32.46 $40.77 Period 5 $25.42 $34.38 $43.33 Period 6 $27.97 $38.20 $48.43 Subdivision of county Onondaga, Leslie, Stockbridge & Bunker Hill townships Inside Wireman EC-665-IW $48.26 $64.72 $81.18 H H D H H H D D Y 3/6/2007 Apprentice Rates: 0-1000 hours $27.79 $35.18 $42.60 1000-2000 hours $29.44 $37.68 $45.90 2000-3500 hours $31.08 $40.13 $49.17 3500-5000 hours $34.38 $45.09 $55.78 5000-6500 hours $37.67 $50.01 $62.35 6500-8000 hours $40.96 $54.96 $68.94 Subdivision of county Lansing, Meridian, Williamston, Locke, Delhi, Alaiedon, Wheatfield, Leroy, Aurelius, Vevay, Ingham, & White Oak townships

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 3 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 4 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Sound and Communication Journeyman EC-665-SD $37.23 $49.49 $61.76 H H D H H H D D Y 12/8/2008 Apprentice Rates: 1st period $21.54 $27.68 $33.81 2nd period $23.10 $29.85 $36.60 3rd period $24.68 $32.04 $39.41 4th period $26.25 $34.22 $42.20 5th period $27.82 $36.41 $45.00 6th period $29.38 $38.58 $47.78 Subdivision of county Lansing, Meridian, Williamston, Locke, Delhi, Alaiedon, Wheatfield, Leroy, Aurelius, Vevay, Ingham and White townships Lineman/Technician outside utility and commercial power EC-876 $47.05 $68.11 $89.17 H H H H H H H D Y and high voltage pipe type cable work and electrical 11/18/2009 underground. Four 10s allowed Monday-Thursday with Friday makeup or Tuesday-Friday with Monday makeup.

    Apprentice Rates: 1st period $30.20 $42.69 $55.26 2nd period $32.32 $46.02 $59.70 3rd period $34.42 $49.16 $63.90 4th period $36.53 $52.33 $68.12 5th period $38.63 $55.47 $72.32 6th period $40.74 $58.64 $76.54 7th period $42.84 $61.79 $80.74 Subdivision of county Alaiedon, Aurelius, Bunker Hill, Delhi, Ingham, Lansing, Leslie, Meridan, Onondago, Stockbridge, & Vevay townships Elevator Constructor Elevator Constructor Mechanic EL-85 $56.82 $97.32 D D D D D D D D Y 1/22/2008 Apprentice Rates: 1st year $38.60 $60.88 2nd year $42.64 $68.96 3rd year $44.67 $73.02 4th year $48.72 $81.12

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 4 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 5 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Glazier Glazier GL-826 $40.12 $53.94 $67.75 H H H H D D D D Y 10/7/2009 Apprentice Rates: 1st 6 months $29.07 $37.36 $45.65 2nd 6 months $30.45 $39.43 $48.41 3rd 6 months $31.83 $41.50 $51.17 4th 6 months $33.21 $43.57 $53.93 5th 6 months $34.59 $45.64 $56.69 6th 6 months $35.98 $47.73 $59.47 7th 6 months $37.36 $49.79 $62.23 8th 6 months $38.74 $51.87 $64.99 Heat and Frost Insulator Spray Insulation AS25S $20.14 $29.14 H H H H H H H H N 3/5/2007 Heat and Frost Insulator and Asbestos Worker Heat and Frost Insulator and Asbestos Worker AS47 $43.80 $58.01 $72.22 H H H H H H H D Y 4 ten hour work days shall be either Monday thru 7/20/2009 Thursday or Tuesday thru Friday

    Apprentice Rates: 1st year $25.48 $32.59 $39.69 2nd year $29.14 $37.67 $46.19 3rd year $32.80 $42.75 $52.69 4th year $36.47 $47.84 $59.21 5th year $40.14 $52.93 $65.72 Ironworker Siding, Glazing, Curtain Wall IR-25-GZ2 $41.86 $52.62 $63.37 H H H H H H D D Y 4 tens may be worked Monday thru Thursday @ straight 8/14/2009 time. If bad weather, Friday may be a make up day. If holiday celebrated on a Monday, 4 10s may be worked Tuesday thru Friday. Work in excess of 12 hours per day must be paid @ double time.

    Apprentice Rates: Level 1 $25.93 $32.38 $38.84 Level 2 $27.99 $34.98 $41.97 Level 3 $30.06 $37.59 $45.12 Level 4 $32.13 $40.20 $48.26 Level 5 $34.19 $42.80 $51.40 Level 6 $36.26 $45.40 $54.54

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 5 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 6 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Pre-engineered Metal Work IR-25-PE-Z3 $39.47 $49.54 $59.60 X X H X X X X D Y 5/8/2008 Apprentice Rates: 1st Level $23.47 $28.51 $33.55 2nd Level $25.12 $30.85 $36.58 3rd Level $26.78 $33.19 $39.61 4th Level $28.44 $35.55 $42.66 5th Level $30.10 $37.90 $45.70 6th Level $31.36 $39.65 $47.93 Reinforced Iron Work IR-25-RF $51.36 $73.35 $95.34 H H D H D D D D N 8/14/2009 Apprentice Rates: Level 1 $31.67 $43.52 $55.36 Level 2 $34.21 $47.33 $60.44 Level 3 $36.74 $51.12 $65.50 Level 4 $39.28 $54.93 $70.58 Level 5 $41.81 $58.73 $75.64 Level 6 $44.35 $62.54 $80.72 Rigging Work IR-25-RIG $56.98 $85.28 $113.58 H H H H H H H D N 8/14/2009 Apprentice Rates: Level 1& 2 $32.28 $48.17 $64.05 Level 3 $35.11 $52.41 $69.71 Level 4 $37.93 $56.64 $75.35 Level 5 $40.76 $60.89 $81.01 Level 6 $43.59 $65.13 $86.67 Decking IR-25-SD $48.94 $73.16 $97.37 H H H H H H D D Y 4 tens may be worked Monday thru Thursday @ straight 8/14/2009 time. If bad weather, Friday may be a make up day. If holiday celebrated on a Monday, 4 10s may be worked Tuesday thru Friday. Work in excess of 12 hours per day must be paid @ double time.

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 6 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 7 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Structural, ornamental, conveyor, welder and pre-cast IR-25-STR $57.11 $85.41 $113.71 H H H H H H D D Y 4 tens may be worked Monday thru Thursday @ straight 8/14/2009 time. If bad weather, Friday may be a make up day. If holiday celebrated on a Monday, 4 10s may be worked Tuesday thru Friday. Work in excess of 12 hours per day must be paid @ double time.

    Apprentice Rates: Levels 1 & 2 $32.28 $48.17 $64.05 Level 3 $35.11 $52.41 $69.71 Level 4 $37.93 $56.64 $75.35 Level 5 $40.76 $60.89 $81.01 Level 6 $43.58 $65.12 $86.65 Level 7 $46.41 $69.37 $92.31 Level 8 $49.24 $73.60 $97.97 Industrial Door erection & construction IR-25-STR-D $35.72 $47.34 $58.96 H H D H H H D D Y 3/28/2008 Fence, Sound Barrier & Guardrail erection/installation and IR-340-F2 $26.80 $36.63 $46.45 X X H X X X H D N Exterior Signage work 8/13/2009 Four ten hour work days may be worked during Monday- Saturday.

    Apprentice Rates: 60% Level $18.70 $24.59 $30.49 65% Level $19.71 $26.10 $32.48 70% Level $20.73 $27.61 $34.49 75% Level $21.74 $29.11 $36.48 80% Level $22.75 $30.61 $38.47

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 7 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 8 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Laborer Journeyperson - building and heavy construction craft L499L $31.99 $42.45 $52.91 H H H H H H H D Y laborer, portable concrete mixer operator, air, electric or 7/10/2009 gasoline tool operator, hot dope carrier, tar kettle tender, gasoline vibrators, concrete gas buggies, concrete saw, signal person and top person on sewer, caisson construction (open cut work), concrete shoveler, car pusher, and bottom person (on sewer work). Demolition laborer, 3" pumps & below, jobsite clean-up, deep cleaning, jackhammer operators, burner, crock layer, caisson worker, tunnel mucker and tunnel miner, welder, mortar mixer, scaffold builder, forklift operator (masonry only), helper and tender on work customarily performed by laborers and all laborers working for plasterer tenders. All hours worked on Saturday except as an inclement

    Apprentice Rates: 0-1,000 hours $26.76 $34.61 $42.45 1,001-2,000 hours $27.81 $36.18 $44.55 2,001-3,000 hours $28.85 $37.74 $46.63 3,001-4,000 hours $30.94 $40.87 $50.81 Mason Tender L499M $32.05 $42.70 $53.35 H H H H H H H D Y 1/13/2009 Apprentice Rates: 0-1,000 hours $26.73 $34.72 $42.71 1,001-2,000 hours $27.79 $36.31 $44.83 2,001-3,000 hours $28.85 $37.90 $46.95 3,001-4,000 hours $30.99 $41.11 $51.23 Laborer - Hazardous Class A Laborer - performing work in conjunction with site LHAZ-Z6-A $30.72 $43.57 $56.42 H H H H H H H D Y preparation and other preliminary work prior to actual 11/14/2008 removal, handling, or containment of hazardous waste substances not requiring use of personal protective equipment required by state or federal regulations; or a laborer performing work in conjunction with the removal, handling, or containment of hazardous waste substances when use of personal protective equipment level "D" is required.

    Apprentice Rates: 0-1,000 work hours $25.93 $36.39 $46.84 1,001-2,000 work hours $26.89 $37.83 $48.76 2,001-3,000 work hours $27.85 $39.27 $50.68 3,001-4,000 work hours $29.76 $42.13 $54.50

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 8 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 9 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Class B Laborer - performing work in conjunction with the LHAZ-Z6-B $31.72 $45.07 $58.42 H H H H H H H D Y removal, handling, or containment of hazardous waste 11/14/2008 substances when the use of personal protective equipment levels "A", "B" or "C" is required.

    Apprentice Rates: 0-1,000 work hours $26.68 $37.51 $48.34 1,001-2,000 work hours $27.69 $39.03 $50.36 2,001-3,000 work hours $28.70 $40.55 $52.38 3,001-4,000 work hours $30.71 $43.56 $56.40 Laborer Underground - Tunnel, Shaft & Caisson Class I - Tunnel, shaft and caisson laborer, dump man, LAUCT-Z2-1 $32.34 $43.03 $53.71 H H H H H H H D Y shanty man, hog house tender, testing man (on gas), and 9/10/2009 watchman.

    Apprentice Rates: 0-1,000 work hours $27.37 $35.57 $43.77 1,001-2,000 work hours $28.37 $37.07 $45.77 2,001-3,000 work hours $29.36 $38.56 $47.75 3,001-4,000 work hours $31.35 $41.54 $51.73 Class II - Manhole, headwall, catch basin builder, LAUCT-Z2-2 $32.43 $43.16 $53.89 H H H H H H H D Y bricklayer tender, mortar man, material mixer, fence 9/10/2009 erector, and guard rail builder

    Apprentice Rates: 0-1,000 work hours $27.44 $35.68 $43.91 1,001-2,000 work hours $28.44 $37.18 $45.91 2,001-3,000 work hours $29.44 $38.68 $47.91 3,001-4,000 work hours $31.43 $41.66 $51.89 Class III - Air tool operator (jack hammer man, bush LAUCT-Z2-3 $32.53 $43.31 $54.09 H H H H H H H D Y hammer man and grinding man), first bottom man, second 9/10/2009 bottom man, cage tender, car pusher, carrier man, concrete man, concrete form man, concrete repair man, cement invert laborer, cement finisher, concrete shoveler, conveyor man, floor man, gasoline and electric tool operator, gunnite man, grout operator, welder, heading dinky man, inside lock tender, pea gravel operator, pump man, outside lock tender, scaffold man, top signal man, switch man, track man, tugger man, utility man, vibrator man, winch operator, pipe jacking man, wagon drill and air track operator and concrete saw operator (under 40

    Apprentice Rates: 0-1,000 work hours $27.51 $35.78 $44.05 1,001-2,000 work hours $28.52 $37.30 $46.07 2,001-3,000 work hours $29.52 $38.80 $48.07 3,001-4,000 work hours $31.53 $41.81 $52.09

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 9 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 10 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Class IV - Tunnel, shaft and caisson mucker, bracer man, LAUCT-Z2-4 $32.69 $43.55 $54.41 H H H H H H H D Y liner plate man, long haul dinky driver and well point 9/10/2009 Apprentice Rates: 0-1,000 work hours $27.63 $35.96 $44.29 1,001-2,000 work hours $28.65 $37.49 $46.33 2,001-3,000 work hours $29.66 $39.00 $48.35 3,001-4,000 work hours $31.68 $42.04 $52.39 Class V - Tunnel, shaft and caisson miner, drill runner, LAUCT-Z2-5 $32.95 $43.94 $54.93 H H H H H H H D Y keyboard operator, power knife operator, reinforced steel 9/10/2009 or mesh man (e.g. wire mesh, steel mats, dowel bars)

    Apprentice Rates: 0-1,000 work hours $27.83 $36.26 $44.69 1,001-2,000 work hours $28.85 $37.79 $46.73 2,001-3,000 work hours $29.88 $39.34 $48.79 3,001-4,000 work hours $31.93 $42.41 $52.89 Class VI - Dynamite man and powder man. LAUCT-Z2-6 $33.26 $44.41 $55.55 H H H H H H H D Y 9/10/2009 Apprentice Rates: 0-1,000 work hours $28.06 $36.60 $45.15 1,001-2,000 work hours $29.10 $38.16 $47.23 2,001-3,000 work hours $30.14 $39.72 $49.31 3,001-4,000 work hours $32.22 $42.84 $53.47 Class VII - Restoration laborer, seeding, sodding, planting, LAUCT-Z2-7 $25.53 $32.81 $40.09 H H H H H H H D Y cutting, mulching and topsoil grading and the restoration 9/10/2009 of property such as replacing mail boxes, wood chips, planter boxes and flagstones.

    Apprentice Rates: 0-1,000 work hours $22.27 $27.92 $33.57 1,001-2,000 work hours $22.92 $28.90 $34.87 2,001-3,000 work hours $23.57 $29.87 $36.17 3,001-4,000 work hours $24.88 $31.84 $38.79 Landscape Laborer Landscape Specialist includes air, gas, and diesel LLAN-Z2-A $24.65 $33.97 $43.28 X X H X X X H D Y equipment operator, lawn sprinkler installer on landscaping 7/9/2009 work where seeding, sodding, planting, cutting, trimming, backfilling, rough grading or maintenance of landscape projects occurs. Sundays paid at time & one half. Holidays paid at double

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 10 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 11 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== All work pertaining to landscaping where seeding, LLAN-Z2-B $20.45 $27.67 $34.88 X X H X X X H D Y sodding, planting, cutting, trimming, backfilling, rough 7/9/2009 grading or maintaining of landscape projects occurs which may include small power tool operator, lawn sprinkler installer helper, material mover, truck driver. Sundays paid at time & one half. Holidays paid at double time.

    Operating Engineer Class C- Regular equipment operator, crane, stiff leg EN-324-BH2C $44.95 $58.47 $71.99 H H H H H H H D Y derrick, scraper dozer, grader, front end loader, hoist, job 9/28/2009 mechanic, head grease man, concrete pump truck and hydro excavators Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday. Work not performed due to weather,

    Apprentice Rates: 1st 6 months $36.34 $45.81 $55.27 2nd 6 months $37.69 $47.83 $57.97 3rd 6 months $39.04 $49.85 $60.67 4th 6 months $40.39 $51.88 $63.37 5th 6 months $41.75 $53.92 $66.09 6th 6 months $43.10 $55.95 $68.79 Class D- Air tugger (single drum), material hoist, boiler EN-324-BH2D $40.15 $51.27 $62.39 H H H H H H H D Y operator, sweeping machine, winch truck, Bob Cat and 9/28/2009 similar equipment, elevators (when operated by an operating engineer), and fork truck over 20' lift Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.

    Class E- Pump 6" or over, well points, freeze systems, EN-324-BH2E $39.55 $50.37 $61.19 H H H H H H H D Y boom truck (non-swinging), end dumps and laser/power 9/28/2009 screed, concrete wire saw 20 h.p. and over and brokk concrete breaker Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.

    Class F- Air compressor, welder, generators, conveyors, EN-324-BH2F $37.10 $46.70 $56.29 H H H H H H H D Y pumps under 6", Grease man, and fork truck 20' or less lift 9/28/2009 Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday. Work not performed due to weather,

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 11 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 12 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Class G- Oiler, fireman and heater operator EN-324-BH2G $35.40 $44.15 $52.89 H H H H H H H D Y 9/28/2009 Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.

    Class A- Crane w/ main Boom & Jib 220' or longer EN-OSA $46.30 $60.50 $74.69 H H H H H H H D Y 9/28/2009 Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday. Work unabled to be performed due to weather, Monday-Thursday may be scheduled on

    Class A- Crane w/ main Boom & Jib 300' or longer EN-OSA3 $47.80 $62.75 $77.69 H H H H H H H D Y 9/28/2009 Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday. Work unabled to be performed due to weather, Monday-Thursday may be scheduled on

    Class A- Crane w/ main Boom & Jib 400' or longer EN-OSA4 $49.30 $65.00 $80.69 H H H H H H H D Y 9/28/2009 Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday. Work not performed due to weather, Monday-Thursday may be scheduled on Friday.

    Class B- Crane Operator with main boom and jib 140' or EN-OSB $46.05 $60.12 $74.19 H H H H H H H D Y longer, tower cranes, gantry crane, whirley derrick 9/28/2009 Four 10 hour days may be scheduled Monday-Thursday or Tuesday-Friday. Work unabled to be performed due to weather, Monday-Thursday may be scheduled on

    Operating Engineer - Marine Construction Diver/Wet Tender, Engineer (hydraulic dredge) GLF-1 $57.10 $74.85 $92.60 X X H H H H H D Y 1/5/2010 Holiday pay= $110.35 per hour

    Subdivision of county all Great Lakes, islands therein, & connecting & tributary waters Crane/Backhoe Operator, 70 ton or over Tug Operator, GLF-2 $55.60 $72.60 $89.60 X X H H H H H D Y Mechanic/Welder, Assistant Engineer (hydraulic dredge), 1/5/2010 Leverman (hydraulic dredge), Diver Tender Holiday pay = $106.60 per hour

    Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Statewide Page 12 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 13 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Deck Equipment Operator, Machineryman, Maintenance GLF-3 $51.85 $66.98 $82.10 X X H H H H H D Y of Crane (over 50 ton capacity) or Backhoe (115,000 lbs 1/5/2010 or more), Tug/Launch Operator, Loader, Dozer on Barge, Deck Machinery Holiday pay = $97.22 per hour

    Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters Deck Equipment Operator, (Machineryman/Fireman), (4 GLF-4 $46.75 $59.33 $71.90 X X H H H H H D Y equipment units or more), Off Road Trucks, Deck Hand, 1/5/2010 Tug Engineer, & Crane Maintenance 50 ton capacity and under or Backhoe 115,000 lbs or less, Assistant Tug Operator

    Subdivision of county All Great Lakes, islands therein, & connecting & tributary waters Operating Engineer Hazardous Waste Class I Level A - Fully encapsulating chemical resistant suit w/ EN-324-HWCI-Z2A $48.03 $63.09 $78.15 H H H H H H H D Y pressure demand, full face piece SCBA or pressure 10/2/2009 demand supplied air respirator w/ escape SCBA. The highest available level of respiratory, skin and eye protection. Four 10 hour days may be worked Monday-Thursday

    Apprentice Rates: 1st 6 months $38.49 $49.04 $59.57 2nd 6 months $40.00 $51.30 $62.59 3rd 6 months $41.50 $53.54 $65.59 4th 6 months $43.01 $55.81 $68.61 5th 6 months $44.52 $58.08 $71.63 6th 6 months $46.02 $60.33 $74.63 Level B & C protection. B - Pressure demand, full face EN-324-HWCI-Z2B $47.08 $61.67 $76.25 H H H H H H H D Y SCBA or pressure demand supplied air respirator w/ 10/2/2009 escape SCBA w/chemical resistant clothing. C - Full face piece, air purifying canister-equipped respirator w/chemical resistant clothing. Four 10 hour days may be worked Monday-Thursday with Friday as a straight-time make up day.

    Apprentice Rates: 1st 6 months $37.83 $48.04 $58.25 2nd 6 months $39.29 $50.23 $61.17 3rd 6 months $40.76 $52.44 $64.11 4th 6 months $42.20 $54.60 $66.99 5th 6 months $43.66 $56.78 $69.91 6th 6 months $45.13 $58.99 $72.85

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 13 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 14 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Level D - Coveralls, safety boots, glasses or chemical EN-324-HWCI-Z2D $45.78 $59.72 $73.65 H H H H H H H D Y splash goggles and hard hats. 10/2/2009 Four 10 hour days may be worked Monday-Thursday with Friday as a straight-time make up day.

    Apprentice Rates: 1st 6 months $36.91 $46.66 $56.41 2nd 6 months $38.31 $48.77 $59.21 3rd 6 months $39.70 $50.85 $61.99 4th 6 months $41.10 $52.95 $64.79 5th 6 months $42.49 $55.04 $67.57 6th 6 months $43.88 $57.12 $70.35 Level D When Capping Landfill Coveralls, safety boots, EN-324-HWCI-Z2DCL $45.53 $59.34 $73.15 H H H H H H H D Y glasses or chemical splash goggles and hard hats. 10/2/2009 Four 10 hour days may be worked Monday-Thursday with Friday as a straight-time make up day.

    Apprentice Rates: 1st 6 months $36.74 $46.41 $56.07 2nd 6 months $38.13 $48.49 $58.85 3rd 6 months $39.51 $50.56 $61.61 4th 6 months $40.89 $52.63 $64.37 5th 6 months $42.27 $54.70 $67.13 6th 6 months $43.65 $56.77 $69.89 Operating Engineer Hazardous Waste Class II Level A - Fully encapsulating chemical resistant suit w/ EN-324-HWCII-Z2A $43.63 $56.49 $69.35 H H H H H H H D Y pressure demand, full face piece SCBA or pressure 10/2/2009 demand supplied air respirator w/ escape SCBA. The highest available level of respiratory, skin and eye protection. Four 10 hour days may be worked Monday-Thursday

    Level B & C protection. B - Pressure demand, full face EN-324-HWCII-Z2B $42.69 $55.08 $67.47 H H H H H H H D Y SCBA or pressure demand supplied air respirator w/ 10/2/2009 escape SCBA w/chemical resistant clothing. C - Full face piece, air purifying canister-equipped respirator w/chemical resistant clothing. Four 10 hour days may be worked Monday-Thursday with Friday as a straight-time make up day.

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 14 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 15 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Level D - Coveralls, safety boots, glasses or chemical EN-324-HWCII-Z2D $41.39 $53.13 $64.87 H H H H H H H D Y splash goggles and hard hats. 10/2/2009 Four 10 hour days may be worked Monday-Thursday with Friday as a straight-time make up day.

    Level D When Capping Landfill Coveralls, safety boots, EN-324-HWCII-Z2DCL $41.14 $52.76 $64.37 H H H H H H H D Y glasses or chemical splash goggles and hard hats. 10/2/2009 Four 10 hour days may be worked Monday-Thursday with Friday as a straight-time make up day.

    Operating Engineer Hazardous Waste Crane w/ Boom & Jib leads 140' or longer Level A - Fully encapsulating chemical resistant suit w/ EN-324-HW140-Z2A $50.68 $67.07 $83.45 H H H H H H H D Y pressure demand, full face piece SCBA or pressure 10/2/2009 demand supplied air respirator w/ escape SCBA. The highest available level of respiratory, skin and eye protection. Four 10 hour days may be worked Monday-Thursday

    Level B & C protection. B - Pressure demand, full face EN-324-HW140-Z2B $49.62 $65.48 $81.33 H H H H H H H D Y SCBA or pressure demand supplied air respirator w/ 10/2/2009 escape SCBA w/chemical resistant clothing. C - Full face piece, air purifying canister-equipped respirator w/chemical resistant clothing. Four 10 hour days may be worked Monday-Thursday with Friday as a straight-time make up day.

    Level D - Coveralls, safety boots, glasses or chemical EN-324-HW140-Z2D $48.43 $63.69 $78.95 H H H H H H H D Y splash goggles and hard hats. 10/2/2009 Four 10 hour days may be worked Monday-Thursday with Friday as a straight-time make up day.

    Level D When Capping Landfill Coveralls, safety boots, EN-324-HW140-Z2DCL $48.18 $63.32 $78.45 H H H H H H H D Y glasses or chemical splash goggles and hard hats. 10/2/2009 Four 10 hour days may be worked Monday-Thursday with Friday as a straight-time make up day.

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 15 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 16 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Operating Engineer Hazardous Waste Crane w/ Boom & Jib leads 220' or longer Level A - Fully encapsulating chemical resistant suit w/ EN-324-HW220-Z2A $50.98 $67.52 $84.05 H H H H H H H D Y pressure demand, full face piece SCBA or pressure 10/2/2009 demand supplied air respirator w/ escape SCBA. The highest available level of respiratory, skin and eye protection. Four 10 hour days may be worked Monday-Thursday

    Level B & C protection. B - Pressure demand, full face EN-324-HW220-Z2B $49.94 $65.96 $81.97 H H H H H H H D Y SCBA or pressure demand supplied air respirator w/ 10/2/2009 escape SCBA w/chemical resistant clothing. C - Full face piece, air purifying canister-equipped respirator w/chemical resistant clothing. Four 10 hour days may be worked Monday-Thursday with Friday as a straight-time make up day.

    Level D - Coveralls, safety boots, glasses or chemical EN-324-HW220-Z2D $48.73 $64.14 $79.55 H H H H H H H D Y splash goggles and hard hats. 10/2/2009 Four 10 hour days may be worked Monday-Thursday with Friday as a straight-time make up day.

    Level D When Capping Landfill Coveralls, safety boots, EN-324-HW220-Z2DCL $48.48 $63.77 $79.05 H H H H H H H D Y glasses or chemical splash goggles and hard hats. 10/2/2009 Four 10 hour days may be worked Monday-Thursday with Friday as a straight-time make up day.

    Operating Engineer Hazardous Waste Regular Crane, Job Mechanic, Dragline Operator, Boom Truck Operator, Power Shovel Operator and Concrete Pump with boom Level A - Fully encapsulating chemical resistant suit w/ EN-324-HWRC-Z2A $49.00 $64.55 $80.09 H H H H H H H D Y pressure demand, full face piece SCBA or pressure 10/2/2009 demand supplied air respirator w/ escape SCBA. The highest available level of respiratory, skin and eye protection. Four 10 hour days may be worked Monday-Thursday

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 16 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 17 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Operating Engineer Hazardous Waste Regular Crane, Job Mechanic, Dragline Operator, Boom Truck Operator, Power Shovel Operator and Concrete Pump with Boom Operator Level B & C protection. B - Pressure demand, full face EN-324-HWRC-Z2B $48.05 $63.12 $78.19 H H H H H H H D Y SCBA or pressure demand supplied air respirator w/ 10/2/2009 escape SCBA w/chemical resistant clothing. C - Full face piece, air purifying canister-equipped respirator w/chemical resistant clothing. Four 10 hour days may be worked Monday-Thursday with Friday as a straight-time make up day.

    Level D - Coveralls, safety boots, glasses or chemical EN-324-HWRC-Z2D $46.75 $61.17 $75.59 H H H H H H H D Y splash goggles and hard hats. 10/2/2009 Four 10 hour days may be worked Monday-Thursday with Friday as a straight-time make up day.

    Level D When Capping Landfill Coveralls, safety boots, EN-324-HWRC-Z2DCL $46.50 $60.80 $75.09 H H H H H H H D Y glasses or chemical splash goggles and hard hats. 10/2/2009 Four 10 hour days may be worked Monday-Thursday with Friday as a straight-time make up day.

    Operating Engineer Steel Work Forklift, 1 Drum Hoist EN-324-ef $54.06 $71.85 $89.63 H H D H H H D D Y 6/2/2009 Crane w/ 120' boom or longer EN-324-SW120 $56.51 $75.52 $94.53 H H D H H H D D Y 6/2/2009 Crane w/ 120' boom or longer w/ Oiler EN-324-SW120-O $57.51 $77.02 $96.53 H H D H H H D D Y 6/2/2009 Crane w/ 140' boom or longer EN-324-SW140 $57.69 $77.29 $96.89 H H D H H H D D Y 6/2/2009 Crane w/ 140' boom or longer W/ Oiler EN-324-SW140-O $58.69 $78.79 $98.89 H H D H H H D D Y 6/2/2009 Boom & Jib 220' or longer EN-324-SW220 $57.96 $77.70 $97.43 H H D H H H D D Y 6/2/2009 Crane w/ 220' boom or longer w/ Oiler EN-324-SW220-O $58.96 $79.20 $99.43 H H D H H H D D Y 6/2/2009 Boom & Jib 300' or longer EN-324-SW300 $59.46 $79.95 $100.43 H H D H H H D D Y 6/2/2009 Crane w/ 300' boom or longer w/ Oiler EN-324-SW300-O $60.46 $81.45 $102.43 H H D H H H D D Y 6/2/2009 Boom & Jib 400' or longer EN-324-SW400 $60.96 $82.20 $103.43 H H D H H H D D Y 6/2/2009

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 17 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 18 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Crane w/ 400' boom or longer w/ Oiler EN-324-SW400-O $61.96 $83.70 $105.43 H H D H H H D D Y 6/2/2009 Crane Operator, Job Mechanic, 3 Drum Hoist & EN-324-SWCO $56.15 $74.98 $93.81 H H D H H H D D Y 6/2/2009 Apprentice Rates: 0-999 hours $44.35 $57.53 $70.71 1,000-1,999 hours $46.23 $60.35 $74.47 2,000-2,999 hours $48.12 $63.19 $78.25 3,000-3,999 hours $50.01 $66.02 $82.03 4,000-4,999 hours $51.89 $68.84 $85.79 5,000 hours $53.77 $71.66 $89.55 Crane w/ Oiler EN-324-SWCO-O $57.15 $76.48 $95.81 H H D H H H D D Y 6/2/2009 Compressor or Welder Operator EN-324-SWCW $48.70 $63.81 $78.91 H H D H H H D D Y 6/2/2009 Hoisting Operator, 2 Drum Hoist, & Rubber Tire Backhoe EN-324-SWHO $55.51 $74.02 $92.53 H H D H H H D D Y 6/2/2009 Oiler EN-324-SWO $47.29 $61.69 $76.09 H H D H H H D D Y 6/2/2009 Tower Crane & Derrick where work is 50' or more above EN-324-SWTD50 $57.24 $76.62 $95.99 H H D H H H D D Y first level 6/2/2009

    Tower Crane & Derrick 50' or more w/ Oiler where work EN-324-SWTD50-O $58.24 $78.12 $97.99 H H D H H H D D Y station is 50' or more above first level 6/2/2009

    Operating Engineer Underground Class I Equipment EN-324A2-UC1 $45.53 $59.32 $73.10 H H H H H H H D Y 9/10/2009 Apprentice Rates: 0-999 hours $36.76 $46.41 $56.06 1,000-1,999 hours $38.14 $48.48 $58.82 2,000-2,999 hours $39.52 $50.55 $61.58 3,000-3,999 hours $40.89 $52.61 $64.32 4,000-4,999 hours $42.27 $54.68 $67.08 5,000-5,999 hours $43.65 $56.75 $69.84 Class II Equipment EN-324A2-UC2 $40.64 $51.98 $63.32 H H H H H H H D Y 9/10/2009 Class III Equipment EN-324A2-UC3 $40.14 $51.23 $62.32 H H H H H H H D Y 9/10/2009 Class IV Equipment EN-324A2-UC4 $39.86 $50.81 $61.76 H H H H H H H D Y 9/10/2009

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 18 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 19 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Painter Painter PT-845-BR $31.74 $42.36 $52.98 H H H H H H H D Y 10/6/2009 A 4-10s workweek allowed Monday-Thursday. Friday may be a make-up day if less than 40 were worked Mon-

    Apprentice Rates: 0-1000 hours $22.18 $28.02 $33.86 1001-2000 hours $23.24 $29.61 $35.98 2001-3000 hours $24.94 $32.16 $39.38 3001-4000 hours $26.43 $34.40 $42.36 4001-5000 hours $28.55 $37.58 $46.60 5001-6000 hours $30.68 $40.77 $50.86 Pipe and Manhole Rehab General Laborer for rehab work or normal cleaning and TM247 $26.00 $34.90 H H H H H H H H N cctv work-top man, scaffold man, CCTV assistant, jetter- 6/16/2009 vac assistant

    Tap cutter/CCTV Tech/Grout Equipment Operator: unit TM247-2 $30.50 $41.65 H H H H H H H H N driver and operator of CCTV; grouting equipment and tap 6/16/2009 cutting equipment

    CCTV Technician/Combo Unit Operator: unit driver and TM247-3 $29.25 $39.77 H H H H H H H H N operator of cctv unit or combo unit in connection with 6/16/2009 normal cleaning and televising work

    Boiler Operator: unit driver and operator of steam/water TM247-4 $31.00 $42.40 H H H H H H H H N heater units and all ancillary equipment associated 6/16/2009

    Combo Unit driver & Jetter-Vac Operator TM247-5 $31.00 $42.40 H H H H H H H H N 6/22/2009 Pipe Bursting & Slip-lining Equipment Operator TM247-6 $32.00 $43.90 H H H H H H H H N 6/22/2009 Plasterer Plasterer PL16-2 $36.42 $49.14 $61.86 H H H H H H H D N 10/16/2009 Apprentice Rates: 1st year $27.52 $35.79 $44.06 2nd year $30.06 $39.60 $49.14 3rd year $32.60 $43.41 $54.22

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 19 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 20 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Plumber & Pipefitter Plumber & Pipefitter PL-333-RI $51.02 $76.33 $101.64 H H H H H H H D Y Four 10s allowed Monday thru Thursday. Friday not a 12/29/2009 makeup, considered OT, paid @ time & one-half.

    Apprentice Rates: 1st 6 months $32.97 $49.26 $65.54 2nd 6 months $34.61 $51.72 $68.82 3rd 6 months $36.25 $54.18 $72.10 4th 6 months $37.89 $56.64 $75.38 5th 6 months $39.53 $59.10 $78.66 6th 6 months $41.17 $61.56 $81.94 7th 6 months $42.82 $64.03 $85.24 8th 6 months $44.46 $66.49 $88.52 9th 6 months $46.10 $68.95 $91.80 10th 6 months $47.74 $71.41 $95.08 Roofer Commercial Roofer RO-70-Z2 $34.95 $46.38 $57.80 X X H H H H H D Y 3/28/2008 Apprentice Rates: 1st Class $20.63 $25.35 $30.07 2nd Class $22.56 $28.19 $33.82 3rd Class $24.53 $31.12 $37.70 4th Class $26.36 $33.83 $41.31 5th Class $28.21 $36.56 $44.90 6th Class $30.03 $39.23 $48.43 Sewer Relining Class I-Operator of audio visual CCTV system including SR-I $40.32 $54.65 $68.97 H H H H H H H D N remote in-ground cutter and other equipment used in 11/10/2009 conjunction with CCTV system.

    Class II-Operator of hot water heaters and circulation SR-II $38.79 $52.35 $65.91 H H H H H H H D N system; water jetters; and vacuum and mechanical debris 11/10/2009 removal systems and those assisting.

    Sheet Metal Worker Sheet Metal Worker SHM-7-1 $44.97 $58.26 $71.55 H H H H D D D D Y 4 10s allowed as consecutive days, M-Th or T-F 9/9/2009 Apprentice Rates: First Year $24.02 $30.67 $37.31 Second Year $29.14 $37.11 $45.09 Third Year $37.00 $46.31 $55.61 Fourth Year $39.65 $50.28 $60.91

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 20 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 21 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Sprinkler Fitter Sprinkler Fitter SP 669 $46.51 $61.99 $77.47 H H H H H H H D Y 9/17/2009 Apprentice Rates: Class 1 & 2 $23.44 $31.31 $39.17 Class 3 $29.35 $37.75 $46.15 Class 4 $30.93 $40.12 $49.31 Class 5 $35.50 $45.47 $55.45 Class 6 $37.07 $47.83 $58.59 Class 7 $38.65 $50.20 $61.75 Class 8 $40.22 $52.55 $64.89 Class 9 $41.79 $54.91 $68.03 Class 10 $43.36 $57.27 $71.17 Tile, Terrazzo and Mosiac Finisher BR9-31-TF $28.62 $37.71 $46.80 H H H X X X X D Y 10/30/2009 Apprentice Rates: 0-749 hours $22.26 $28.17 $34.08 750-1,499 hours $23.17 $29.54 $35.90 1,500-2,249 hours $24.08 $30.90 $37.72 2,250-2,999 hours $24.98 $32.25 $39.52 3,000-3,749 hours $25.89 $33.62 $41.34 3,750-4,499 hours $26.80 $34.98 $43.16 Setter BR9-31-TS $33.99 $44.76 $55.52 H H H X X X X D Y 10/30/2009 Apprentice Rates: 0-749 hours $26.45 $33.44 $40.44 750-1499 hours $27.53 $35.06 $42.60 1500-2249 hours $28.61 $36.68 $44.76 2250-2999 hours $29.68 $38.29 $46.90 3000-3749 hours $30.76 $39.91 $49.06 3750-4499 hours $31.84 $41.53 $51.22 Truck Driver of all trucks of 8 cubic yd capacity or over TM-RB2 $36.84 $36.44 H H H H H H H H Y 9/17/2009 of all trucks of 8 cubic yard capacity or less TM-RB2A $36.74 $36.29 H H H H H H H H Y 9/17/2009 on euclid type equipment TM-RB2B $36.99 $36.66 H H H H H H H H Y 9/17/2009

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 21 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 22 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Underground Laborer Open Cut, Class I Construction Laborer LAUC-Z3-1 $30.28 $39.89 $49.49 H H H H H H H D Y 9/10/2009 Apprentice Rates: 0-1,000 work hours $25.93 $33.36 $40.79 1,001-2,000 work hours $26.80 $34.66 $42.53 2,001-3,000 work hours $27.67 $35.97 $44.27 3,001-4,000 work hours $29.41 $38.58 $47.75 Underground Laborer Open Cut, Class II Mortar and material mixer, concrete form man, signal LAUC-Z3-2 $30.42 $40.10 $49.77 H H H H H H H D Y man, well point man, manhole, headwall and catch basin 9/10/2009 builder, guard rail builders, headwall, seawall, breakwall, dock builder and fence erector.

    Apprentice Rates: 0-1,000 work hours $26.04 $33.52 $41.01 1,001-2,000 work hours $26.91 $34.83 $42.75 2,001-3,000 work hours $27.79 $36.15 $44.51 3,001-4,000 work hours $29.54 $38.78 $48.01 Underground Laborer Open Cut, Class III Air, gasoline and electric tool operator, vibrator operator, LAUC-Z3-3 $30.54 $40.28 $50.01 H H H H H H H D Y drillers, pump man, tar kettle operator, bracers, rodder, 9/10/2009 reinforced steel or mesh man (e.g. wire mesh, steel mats, dowel bars, etc.), cement finisher, welder, pipe jacking and boring man, wagon drill and air track operator and concrete saw operator (under 40 h.p.), windlass and tugger man, and directional boring man.

    Apprentice Rates: 0-1,000 work hours $26.13 $33.66 $41.19 1,001-2,000 work hous $27.01 $34.98 $42.95 2,001-3,000 work hours $27.89 $36.30 $44.71 3,001-4,000 work hours $29.66 $38.96 $48.25 Underground Laborer Open Cut, Class IV Trench or excavating grade man. LAUC-Z3-4 $30.59 $40.35 $50.11 H H H H H H H D Y 9/10/2009 Apprentice Rates: 0-1,000 work hours $26.17 $33.72 $41.27 1,001-2,000 work hours $27.05 $35.04 $43.03 2,001-3,000 work hours $27.93 $36.36 $44.79 3,001-4,000 work hours $29.70 $39.02 $48.33

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 22 of 23

  • Official 2010 Prevailing Wage Rates for State Funded Projects Issue Date: 1/15/2010 Contract must be awarded by: 4/15/2010 Page 23 of 23 Classification Last Straight Time and Double Overtime Name Description Updated Hourly a Half Time Provision ============================================================================================================== Underground Laborer Open Cut, Class V Pipe Layer LAUC-Z3-5 $30.73 $40.56 $50.39 H H H H H H H D Y 9/10/2009 Apprentice Rates: 0-1,000 work hours $26.27 $33.87 $41.47 1,001-2,000 work hours $27.16 $35.20 $43.25 2,001-3,000 work hours $28.05 $36.54 $45.03 3,001-4,000 work hours $29.84 $39.22 $48.61 Underground Laborer Open Cut, Class VI Grouting man, top man assistant, audio visual television LAUC-Z3-6 $28.03 $36.51 $44.99 H H H H H H H D Y operations and all other operations in connection with 9/10/2009 closed circuit television inspection, pipe cleaning and pipe relining work and the installation & repair of water service pipe & appurtenances

    Apprentice Rates: 0-1,000 work hours $24.25 $30.84 $37.43 1,001-2,000 work hours $25.00 $31.96 $38.93 2,001-3,000 work hours $25.76 $33.10 $40.45 3,001-4,000 work hours $27.27 $35.37 $43.47 Underground Laborer Open Cut, Class VII Restoration laborer, seeding, sodding, planting, cutting, LAUC-Z3-7 $25.18 $32.24 $39.29 H H H H H H H D Y mulching and topsoil grading and the restoration of 9/10/2009 property such as replacing mail boxes, wood chips, planter boxes, flagstones etc.

    Apprentice Rates: 0-1,000 work hours $22.11 $27.63 $33.15 1,001-2,000 work hours $22.72 $28.54 $34.37 2,001-3,000 work hours $23.34 $29.48 $35.61 3,001-4,000 work hours $24.57 $31.32 $38.07

    Official Request 61 Official Rate Schedule Requestor: LANSING SCHOOL DISTRICT Every contractor and subcontractor shall keep Project Description: PLAYGROUND EQUIPMENT INSTALLATION posted on the construction site, in a conspicuous place, a copy of all prevailing wage and fringe Project Number: SO-1533 WILLOW ELEMENTARY benefit rates prescribed in a contract. County: Ingham Page 23 of 23

  • Binder SO-1533 Playground EquipmentSO-1533 Playground2010 Willow and Kendon 2SO-1533 Playground diagramSO-1533 Playground diagram 2Binder SO-1533 Playground Prevailing WageSO-1533 coverSO-1533 Eng Class AttachSO-1533 Infosheet_PW_Fringe_benefitsSO-1533 overtime chartSO-1533 zz alpha pw rate county select master

    Bid Attachements 10-28-09

    Specifications, Special Conditions and Instructions