Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign...

31
1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology Promotion Corporation August 15, 2011

Transcript of Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign...

Page 1: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  1

Cover page 

 

 

Request for Proposal  Outsourcing of Redesign and Upgrade of OIST Website 

 

Okinawa Institute of Science and Technology 

Promotion Corporation 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

August 15, 2011 

Page 2: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  2

  

Table of contents page 

 

 

Contents 1  Introduction .............................................................................................................................. 4 

1.1  Purpose of Request for Proposal ....................................................................................... 4 

1.2  Background........................................................................................................................ 4 

1.2.1  OIST ............................................................................................................................ 4 

1.2.2  OIST Web/Communications/IT .................................................................................. 4 

1.2.3  Existing Content Management Systems and Websites.............................................. 5 

1.2.4  Systems Infrastructure/Hosting ................................................................................. 5 

1.2.5  OIST Content Managers ............................................................................................. 5 

1.2.6  Enterprise Systems Integration .................................................................................. 6 

1.3  Service Location................................................................................................................. 6 

1.4  Term of Agreement............................................................................................................ 6 

1.5  Completeness and Compliance ......................................................................................... 6 

1.6  Official Issuing Contact ...................................................................................................... 7 

1.7  Definition of Terms ............................................................................................................ 7 

2  Schedule of Events .................................................................................................................... 7 

3  Proposal Information and Processes ........................................................................................ 8 

3.1  Compliance with Specifications......................................................................................... 8 

3.2  Intent to Respond.............................................................................................................. 8 

3.3  Decline to Offer ................................................................................................................. 8 

3.4  Required Proposal Format................................................................................................. 8 

3.5  Requirements for Return of Response .............................................................................. 8 

3.6  Questions and Clarification ............................................................................................... 9 

Page 3: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  3

3.7  Vendor Presentations ........................................................................................................ 9 

3.8  Rights Reserved by OIST and Restrictions on RFP Process ................................................ 9 

4  Vendor Information and Qualifications .................................................................................... 9 

4.1  General Corporate and Contact Information .................................................................... 9 

4.2  Vendor Experience .......................................................................................................... 10 

4.2.1  Drupal Specific Experience....................................................................................... 10 

4.2.2  Domain and Development Experience .................................................................... 13 

4.3  Vendor Client List References.......................................................................................... 14 

4.4  Value Added Services ...................................................................................................... 14 

4.5  Relevant Litigation/Investigations ................................................................................... 15 

5  Scope and Specifications ........................................................................................................ 15 

5.1  Scope ............................................................................................................................... 15 

5.1.1  Main Activities.......................................................................................................... 15 

5.2  Specifications................................................................................................................... 18 

5.2.1  Setup and Operational Requirements...................................................................... 18 

5.2.2  Non‐functional Requirements.................................................................................. 20 

5.3  Drupal Functional Requirements..................................................................................... 22 

5.3.2  Migration Timeline Requirements ........................................................................... 25 

5.4  Deliverables ..................................................................................................................... 26 

5.5  Additional Scope of Work................................................................................................ 26 

5.5.1  Development Services.............................................................................................. 26 

5.5.2  Additional New Sites ................................................................................................ 27 

5.6  Independent Verification and Validation ........................................................................ 27 

6  Appendix A: Glossary .............................................................................................................. 28 

 

 

 

 

Page 4: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  4

1 Introduction 

1.1 Purpose of Request for Proposal The purpose of this Request for Proposal (RFP) is for the Okinawa Institute of Science and 

Technology (OIST) to establish a contract with a Vendor that will create a comprehensive, 

integrated web  system  to  accommodate  the  current  and  future  needs  of OIST  using  a 

content management system  (CMS) built on  the Drupal open source software platform. 

The  intended  scope  of  this  RFP  includes  obtaining  the  software  and  planning,  design, 

implementation and testing services required to install, implement, migrate, and support 

the  new  CMS,  any  installed  modules,  integration  with  other  systems,  or  additional 

enhancements. 

1.2 Background 

1.2.1 OIST The Okinawa Institute of Science and Technology Promotion Corporation (OIST PC) was 

founded by  the  Japanese government with  the goal of creating a world‐class  research 

institute  in Okinawa. At OIST all research and education  is conducted  in English, half of 

the faculty  is recruited from overseas, and half of the student body and faculty body  is 

planned to be non‐Japanese. OIST PC will transition to a School Corporation (OIST SC) in 

November 2011 and begin accepting students as a graduate school in September 2012. 

 

To  coincide  with  this  transition,  OIST  is  seeking  the  creation  of  a  comprehensive, 

integrated web  system  to  unify  and  integrate  current  external,  internal,  and  auxiliary 

websites and  support  the needs of a graduate  school. Of particular  importance  is  the 

launch  of  new  public  facing  external  sites  for  the  November  2011  transition  to  a 

graduate school. 

1.2.2 OIST Web/Communications/IT OIST  currently  uses  staff  resources  from  Communications  and  IT  sections  to  support 

Web‐related  projects,  management,  and  operations.  OIST  is  considering  the 

establishment of a  formal Web Strategy Counsel to provide direction and guidance  for 

OIST’s overall Web strategy, implementation, standardization, resource needs, reporting, 

and  policies.  OIST  also  maintains  an  IT  Infrastructure  Working  Group  to  coordinate 

activities  for  improvements  to  core  IT  systems and policies,  including Web application 

systems, usage, and security. 

 

Page 5: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  5

OIST  is  introducing a new Graphics Standard Manual and official  logo to unify  its visual 

presence and brand. To support the transition to a graduate school and the introduction 

of  the  Graphics  Standard  Manual,  OIST  intends  that  the  implementation  of  a 

comprehensive, integrated web system will unite all of its websites under a single CMS, 

with the goal of streamlining management and oversight and offering users a consistent 

and extensible system for internal and external use, regardless of whether users are on 

campus or not. 

1.2.3 Existing Content Management Systems and Websites Currently OIST maintains a number of websites and systems for managing content. The 

current  external  website  runs  on  a  vendor‐customized  version  of  the  Joomla  open 

source CMS platform  (PHP,  Linux  server) which has proven  insufficient and  cannot be 

updated  or  extended  very  easily.  The  current  internal website  runs  on  an  internally‐

supported DotNetNuke  open  source CMS  platform  (ASP, Windows  server),  and  it  has 

proven  insufficient  for the needs of the administrative and research community. Public 

websites  for  research  units  and websites  for workshops  and  courses  run  by  research 

units are hosted on several servers at OIST Campus, Seaside House, and  IRP  in Uruma 

City  using  a  number  of  different  architectures,  platforms,  and  software,  from  static 

HTML  to  DokuWiki  to  researcher‐built  custom  scripts.  The  OIST Welcome  Club  and 

Human  Resources  section  have  set  up  two  wikis  hosted  on  Google  to  offer  OIST 

employees and  families a venue  for creating a community and exchanging  information 

on  living and working at OIST.  In  the absence of an available,  flexible, well‐maintained 

internal website, many departments  in  the administration have  set up  section‐specific 

websites. The appearance and branding of these many websites lack consistency and do 

not match the new official OIST Graphics Standard Manual. What is more, these internal 

websites are not accessible outside of the OIST intranet. 

1.2.4 Systems Infrastructure/Hosting Currently OIST  IT department provides and maintains all  IT  systems  infrastructure and 

hosting for known and identified websites. 

1.2.5 OIST Content Managers OIST will have a wide variety of content managers from various departments, units, and 

sections  comprised  of  administrative  staff,  faculty,  and  students.  The majority  of  the 

content  managers  will  be  non‐technical  staff  with  little  knowledge  or  need  for 

knowledge of HTML to perform basic content management tasks as part of their regular 

responsibilities. Common  content management  tasks performed by  content managers 

Page 6: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  6

include  but  are  not  limited  to  adding  new  content,  uploading  files,  editing/deleting 

existing content, adding new menu  items, and editing/deleting menu  items. Workflow 

processes  and  rules  governing  the  use  and  publishing  of  content  are  intended  to  be 

implemented as part of the web CMS. 

1.2.6 Enterprise Systems Integration OIST  is planning  for  a  series of enterprise‐wide  IT  system deployments by  the end of 

2011 including the following: 

• ERP 

• ECM/Document Management (OpenText, Alfresco) 

• Accounting/Payroll 

• Directory Services (Microsoft Active Directory/LDAP) 

• Email/Messaging (Microsoft Exchange) 

• Portal (ITER YWC project, joint effort between OIST and ITER) 

• LMS (Sakai)  

 

Selection of Drupal as the web CMS platform was made  in part based on the ability to 

integrate with a wide variety of enterprise systems. 

1.3 Service Location Vendor will meet onsite with OIST  stakeholders  in  the early planning  stages  to develop 

and  finalize  details  of  the  project,  but  the  development  of  the  system will  take  place 

offsite. The number of and timing of these meetings should be included in the proposal as 

part of the overall development project plan. 

1.4 Term of Agreement The  initial  contract duration will be one year, during which    the  firm will  complete  the 

initial development of the external sites in preparation for the November announcement, 

and the subsequent development of internal subsystems like unit and section subsites. At 

the  time  of  the  initial  contract,  approval will  be  sought  for  a  contract  for    the  initial 

support and adjustment period. 

1.5 Completeness and Compliance In  the  initial phase of  the evaluation, proposals will be  reviewed  for  completeness and 

compliance  with  all  requests  and  requirements,  including  proposal  instructions, 

specifications, and terms and conditions of the RFP. Proposals that fail to comply with the 

essential  requests and  requirements of  the RFP may be  rejected as non‐responsive and 

Page 7: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  7

eliminated  from  further  consideration.    Vendors  should  understand  that  RFP  terms, 

conditions, and technical specifications do not fully  identify nor completely define OIST’s 

service  requirements and  satisfaction. The  successful Vendor  shall be expected  to work 

closely with OIST’s designated representatives to deliver an effective and efficient solution 

resulting in high overall customer satisfaction. 

1.6 Official Issuing Contact Procurement Section, OIST 

1919‐1, Tancha, Onna‐Son, Kunigami, Okinawa 904‐0412 Japan 

Tel: +81‐98‐966‐2293. Fax: +81‐98‐966‐2887 

E‐mail: [email protected] 

1.7 Definition of Terms See Appendix A: Glossary included with this RFP. Please note that any special terms which 

are not identified in this RFP may be identified separately in one or more attachments. 

2 Schedule of Events The  schedule of events presented below  represents OIST’s best estimate of  the  schedule 

that will be  followed. However, delays  to  the procurement process may occur which may 

require adjustments to the proposed schedule. If an activity on this schedule is delayed, the 

rest of  the  schedule may be  shifted  as  appropriate. Any  changes  to  the dates up  to  the 

closing date of  the RFP will be publicly posted prior  to  the closing date. After  the closing 

date, OIST reserves the right to adjust the remainder of the proposed dates, including dates 

for  evaluation,  negotiations,  award,  and  contract  terms  on  an  as  needed  basis with  or 

without notice. 

 

Description of Activity  Due Date RFP released  15‐August Written questions submitted to OIST   24‐August Responses provided from OIST on website  26‐August Proposals due  5‐September Proposal evaluation and screening completed  9‐September Vendor presentations   TBD Final evaluation by committee  TBD Finalize contract terms  20‐September Notice of award  20‐September 

Page 8: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  8

3 Proposal Information and Processes 

3.1 Compliance with Specifications Vendor  proposals  must  satisfy  all  project  specifications,  and  vendor  must  satisfy 

qualifications listed in this RFP. 

3.2 Intent to Respond OIST requests that any Vendor who intends to respond to this RFP send notice via email of 

their intent to respond to the Official Issuing Contact identified in this RFP. Receipt of the 

intent to respond email will ensure that the Vendor will receive copies of any additional 

information or changes to this RFP. 

3.3 Decline to Offer OIST  requests  that any Vendor who  receives a copy of  this RFP but declines  to  respond 

send notice via email of their decline to offer to the Official  Issuing Contact  identified  in 

this  RFP.  Receipt  of  the  decline  to  offer  email will  ensure  that  the Vendor will  not  be 

removed from consideration for future engagements. 

3.4 Required Proposal Format OIST  requests  no  specific  format.  However,  the  Vendor’s  proposal  should  include  the 

following items; 

• Company name (full legal name). 

• Company address (corporate headquarters) 

• Contact person’s name 

• Telephone number 

• Email address 

• Quotation  (cost estimation)  (The quotation shall  include any costs  related  to  the 

scope and specifications) 

OIST does not bear any costs for preparing the proposals.  

 

3.5 Requirements for Return of Response • All proposals must be submitted in electronic format. 

• The Vendor may withdraw a proposal prior to the due date. 

• Late submissions will not be accepted by OIST. 

• A legally authorized representative of the Vendor must sign the proposal. 

• The ability of OIST to open all electronic information submitted must be verified by 

OIST Procurement department prior to acceptance. 

Page 9: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  9

3.6 Questions and Clarification All questions  concerning  this RFP must be  submitted  in writing  via  email or  fax  to  the 

Official  Issuing  Contact  specified  in  this  RFP.  No  questions  other  than  written  will  be 

accepted, and no response other  than written will be considered binding upon OIST. All 

Vendors must submit questions by the deadline specified in the Schedule of Events. OIST 

retains  the  right  to  accept  or  deny  questions  submitted  late  or  by  another method. 

Questions about this RFP are expected to be submitted by email or fax. OIST requests no 

specific format, however, the questions should include following items; 

• Name of company submitting the question 

• Question number (1, 2, 3…) and corresponding relevant section of the RFP (3.6) 

• Contact person’s name 

• Telephone number 

• Email address 

3.7 Vendor Presentations OIST reserves the right to invite Vendors to present their proposal factors and solutions to 

the evaluation team. 

3.8 Rights Reserved by OIST and Restrictions on RFP Process  

• OIST reserves the right to reject any or all proposals, including by way of example 

only and without  limitation, any proposal that does not contain all the requested 

information. 

• OIST reserves the right to award in part, in whole, or not at all. 

• OIST  is the sole owner of all data and  information contained within this RFP and 

any related attachments. Vendors shall use this information exclusively to prepare 

their response. Vendors should not disclose this information to any other company 

or use it for any other purpose unless required by law or legal process. 

4 Vendor Information and Qualifications 

4.1 General Corporate and Contact Information Please  provide  the  following  information  for  all  Vendors  that  are  represented  in  the 

response to this RFP. If more than one Vendor is represented, please indicate the primary 

and secondary Vendor relationships. 

• Company Name (full legal name) 

• Company Address (corporate headquarters) 

Page 10: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  10

• Other Office Locations (list all locations if multiple offices) 

• Authorized Contact Person’s Name 

• Telephone Number 

• Email Address 

4.2 Vendor Experience The  following  areas  outline  the  types  of  experience  and  background  that  OIST  is 

requesting  from  Vendors  for  the  purposes  of  this  RFP. OIST  recognizes  that  it may  be 

desirable  and  practical  for  Vendors  to work  in  partnership with  other  Vendors  for  the 

delivery  of  the  services  requested.  In  the  same  spirit  of  community  and  global 

collaboration that is part of its mission, OIST is fully supportive of this approach. 

4.2.1 Drupal Specific Experience 

4.2.1.1 Drupal Software Relationship and Community Involvement The Vendor  should be  committed  to  involvement and  support with  the Drupal open 

source  software project  and  community. OIST expects  the Vendor  to demonstrate  a 

desire  to  give  back  to  the  Drupal  community  through  participation  in  commonly 

accepted activities and events. 

• Vendor  is encouraged  to provide a  list of activities  including but not  limited  to 

posts,  articles  written,  events  attended,  participation  in  local  meet‐ups, 

sponsorships,  code  contributions,  presentations  given,  partnerships,  and/or 

other  evidence  to  indicate  that  the  Vendor  has  an  understanding  of  Drupal 

software and involvement in the community. 

4.2.1.2 Drupal Project Experience The Vendor should have experience  in creation and migration projects with a Drupal 

CMS  solution.  OIST  expects  references  from  previous  customers  for  similar  sized 

education, government, or corporate organizations. 

• Vendor should provide references for which similar services to those described in 

this RFP have been provided during the past three years. The list should include 

company  name,  address,  contact  name  (name,  title,  email,  and  telephone), 

company website URL, and description of services delivered. 

• Vendor must also disclose any services terminated by any client and the reasons 

for termination. 

 

Please note that OIST reserves the right to use references developed on  its own. Also 

Page 11: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  11

note that vendor references and experience will be heavily weighted  in the selection 

process. 

4.2.1.3 Drupal Functionality Experience The  Vendor  should  have  experience  in  the  capabilities  and  use  of  core  Drupal 

functionality and a wide range of contributed Drupal functionality  including modules, 

themes,  and  installation  profiles  (distributions). OIST  expects  the Vendor  to  be well 

versed in the development and implementation of D6 and D7. 

• Vendor should provide examples from previous project engagements where they 

have  worked  with  key  functionality  identified  in  this  RFP  including  but  not 

limited  to  Organic  Groups,  custom  workflows,  and  automated  creation  of 

subsites. 

 

Please  note  that OIST  expects  the Vendor  to  demonstrate  in‐depth  experience with 

Drupal functionality and capabilities, such as: 

• Structure and display including CCK, Views, Panels • Administration 

• Granular access rights and authorization • Content and functionality staging and development 

• Content  and  SEO  including  URL  paths,  printer/email/PDF  versions,  redirects, 

sitemaps, meta tags, page titles 

• Navigation and organization including menus, taxonomy, breadcrumbs 

• WYSIWYG editors and image uploading 

• Video and image handling including ImageAPI, ImageCache, Imagefield, Lightbox 

• User profile, ratings, and notifications • Marketing including Webform, Google Analytics 

• Events and calendars • Development including Devel, Drush  

4.2.1.4 Drupal Support The  Vendor  should  have  the  ability  to  provide  ongoing  support  post  creation  and 

migration  of  the Drupal  CMS  solution. OIST  expects  the  Vendor  to  offer  directly  or 

through  partnership  help  desk  support,  Drupal  software  support  to  OIST  to 

troubleshoot major problems with stability and functionality, assistance with applying 

appropriate  patches  and  fixes  for  Drupal,  and  testing  of  module  installations  and 

upgrades.  More  specifically,  OIST  expects  the  Vendor  to  ensure  that  all  modules 

Page 12: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  12

installed by the Vendor will work with all other existing components of the system at 

least to the current level of functionally agreed upon by OIST. If installation of a module 

breaks another module or component of the system, OIST expects that the Vendor will 

troubleshoot the issue and provide a solution. The Vendor is expected to keep track of 

when  new  versions  of  installed modules  become  available  and  to  take  the  lead  to 

schedule version updates when appropriate. OIST expects that the Vendor will be able 

to  demonstrate  procedures  for  dealing  with  system  downtime  and  outages,  both 

planned  and  unplanned,  and  best  practices  for  monitoring  the  Drupal  CMS 

environment. 

• Vendor  should  provide  a  description  of  their  support  services  and  processes, including  but  not  limited  to  help  desk,  trouble  ticketing,  Service  Level 

Agreements  (SLAs), maintenance and patching  routines,  test plans, downtime 

procedures, monitoring systems, and incident management. 

4.2.1.5 Drupal Customizations and Quality Assurance The Vendor should have the ability to manage customizations and quality assurance of 

a Drupal CMS solution. OIST expects the Vendor to demonstrate experience with code 

customization, security, integrity, and QA testing. 

• Vendor  should  provide  description  of  how  customizations  to Drupal  code  and 

security were managed during previous project engagements. 

4.2.1.6 Drupal Training The  Vendor  should  have  the  ability  to  provide  training  to  all  levels  of  users with  a 

Drupal  CMS  solution. OIST  expects  the Vendor  to  provide  sample  training materials 

from previous project engagements to demonstrate experience with training different 

user levels at an organization. 

• Vendor  should  provide  training  samples  including  but  not  limited  to 

adding/editing  content,  creating  new  websites,  creating/cloning  sites, 

maintaining existing sites, and developing user training. 

4.2.1.7 Drupal Architecture The  Vendor  should  have  experience  with  installation  of  a  Drupal  CMS  solution  in 

development,  staging,  and  production  environments.  The  Vendor  should  be 

knowledgeable  in  the  architecture,  planning,  and  configuration  of  Drupal‐based 

software  applications  both  in  virtualized  public  cloud  and/or  private  cloud 

infrastructure and physical server implementations. 

• Vendor should provide implementation plans from previous project engagements 

Page 13: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  13

for development, staging, and production servers  including but not  limited  to 

scalability, performance, and security. 

• Vendor  should  provide  names  of  cloud  hosting  partners,  list  of  client 

engagements,  and  descriptions  of  hosting  architecture  implemented  from 

previous engagements. 

4.2.2 Domain and Development Experience 

4.2.2.1 Scientific Research and Education Experience The Vendor should have experience working with and building web systems for publicly 

funded  scientific  research  and  education  institutions  similar  to  OIST  in  scope  and 

mission. OIST  expects  the Vendor  to demonstrate  expertise  and understanding with 

how to work with these types of clients, build consensus and knowledge sharing, and 

support the many facets and goals of the organization.  

• Vendor  should  provide  reference  contacts  from  previous  project  engagements 

with scientific research and education institutions. 

4.2.2.2 CMS Strategy and Migration The Vendor  should have experience  in developing  comprehensive migration  strategy 

and  plan  for multiple  different  CMS  platforms. OIST  expects  the  Vendor  to  provide 

clear  and  concise  plans  for  how  they  will  migrate  content  from  the  current  CMS 

installations and various content repositories to a Drupal CMS solution. 

• Vendor should provide a high‐level plan outlining the major activities and tasks 

involved  in  migrating  content  from  existing  CMS  and  other  repositories 

identified  in  this  RFP  including  but  not  limited  to  how  migration  may  be 

automated, known issues to look for, and example timelines.  

• Vendor  should  provide  a  list  of  open  source  and  commercial  web  content 

management,  document management,  and  enterprise  content management 

software that they have experience with implementations and migrations from 

previous project engagements. 

4.2.2.3 Agile Development Practices and Project Management The  Vendor  should  have  experience  with  Agile  development  practices  and  project 

management approaches, such as Kanban, Scrum, and XP. OIST expects the Vendor to 

demonstrate use of agile approaches  to  standard project activities  including but not 

limited  to  scope  management,  requirements  management,  estimating,  budget 

management,  schedule  management,  communications,  performance  measurement, 

Page 14: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  14

quality  assurance  and  testing,  risk management,  resource management,  and  change 

control. OIST intends that the implementation outlined in this RFP be performed using 

Agile  practices  with  multiple  iterative  development  and  release  cycles  during  the 

course of the project. 

• Vendor  should  provide  description  of  their  Agile  development  and  project 

management  practices  including  use  of  their  project  management  tracking 

tools, source control systems, and release management processes. 

• Vendor  should  provide  a  high‐level  project  plan  with  estimated  milestones 

outlining an agile approach with multiple iterative release cycles for completion 

of the project. 

4.2.2.4 Distributed Team Collaboration The  Vendor  should  demonstrate  experience working with  distributed  project  teams 

spread  across multiple  locations  and  time  zones.  OIST  expects  the  Vendor  to  have 

experience working with and managing multiple project team members in a distributed 

manner  including  but  not  limited  to  internal  staff  of  the  Vendor,  external  staff  in 

partnership with other companies, and external staff from the client. 

• Vendor  should provide description  from previous project engagements of how 

they  have  both  managed  and  been  involved  in  projects  requiring  use  of 

distributed teams. 

• Vendor  should provide  list of  communication and  collaboration  tools  that  they 

use  to  facilitate working with distributed  teams and brief description of how 

team members use them in daily activities. 

4.2.2.5 Staff Experience The  Vendor  should  have  the  ability  to  assign  highly  qualified  and  experienced  staff 

members in key project positions. 

• Vendor should provide resume or CV of Project Manager.  

4.3 Vendor Client List References The list of client references explained in the Drupal Project Experience section above must 

include scientific research and education institutions. 

4.4 Value Added Services Vendors may describe other value‐added services that they can make available and deem 

applicable to OIST but not necessarily addressed  in this RFP. OIST shall determine which 

value‐added  service  options  shall  be  most  beneficial  from  both  a  cost  and  service 

Page 15: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  15

standpoint, and may further negotiate these options to include or omit dependent on the 

needs of OIST. 

4.5 Relevant Litigation/Investigations Vendors must describe any current lawsuits, legal actions, or governmental investigations 

against  their  company  including  but  not  limited  to  parties  of  dispute,  any  equipment 

affected, cause of action, jurisdiction and date of legal complaint. 

5 Scope and Specifications  

5.1 Scope The  scope  for  this  RFP  is  to  select  a  Vendor  that will  provide  a  comprehensive  set  of 

services  to develop and deploy a Drupal‐based CMS,  implement and migrate content  to 

the Drupal‐based CMS  replacing  the  existing  content  and web  publishing  systems,  and 

support the Drupal‐based CMS while offering ongoing web development services. 

5.1.1 Main Activities The main activities being sought include but are not limited to: 

• Planning  

o Conduct 2‐3 on‐site planning meetings with stakeholders. 

o Producing high‐level planning document which outlines: 

Project goals 

Roles and responsibilities for all parties involved 

Project timeline, including deliverables 

Design brief 

Working architectural site map 

Working implementation specification, including: 

• All modules and distribution packages 

• All anticipated customizations 

• Interface and design 

o Produce home page wireframes showing content types, relationships, and 

relative placement which are then refined in response to OIST input 

o Present  2‐3  home  page  graphic  concepts  which  are  then  refined  in 

response to OIST input 

o Produce  sub‐page  graphic  concepts  based  on  finalized  home  page 

concepts 

Page 16: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  16

o Produce wireframes or working examples for all main technical interfaces, 

including but not  limited to searches, results, publications management, 

etc. 

o Wireframes for any page requested by OIST 

• Hardware Requirements and Network Configuration 

o At  the beginning of  the development phase,  the vendor will produce   a 

detailed  recommended  hardware  document  on  which  OIST  can  base 

purchasing decisions  to establish  the hardware  infrastructure necessary 

to support the system being proposed. 

Hardware requirements/ recommendations should be as detailed 

as  possible,  addressing  issues  such  as  virtual  machines  versus 

dedicated  servers,  number  of  cores,  disk  cache,  offline  storage 

architecture, etc. 

The proposal should should include at least one concrete example 

of  a  comparable  system  that  the  firm  has  implemented  at  an 

institution similar in purpose and scale to OIST. 

o At  the beginning of  the development phase,  the  vendor will produce a 

detailed network configuration recommendation that will ensure that the 

new  web  system  satisfies  industry  standards  for  security  and 

maintainability 

Document should follow security best practices and address such 

issues as how web and database servers are separated from other 

DMZ  servers,  network  segmentation  and  isolation,  redundancy, 

implementation of offsite backups and mirror sites,  integration of 

a hardware load balancer, and other topics as dictated by the OIST 

IT  section  staff  with  the  goal  of maximizing  the  efficiency  and 

functionality of the new web system. 

The  initial  bid  proposal  should  include  at  least  one  concrete 

example of a comparable system that the firm has implemented at 

an institution similar in purpose and scale to OIST. 

• Implementing a CMS using the latest version of Drupal 

• Migrating or preparing for migration the following existing websites and content 

to the new system: 

o Main public website (Joomla) 

o News website (various) 

o Research unit and section sites (static HTML, DocuWiki, custom) 

Page 17: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  17

o Workshop and course sites (static HTML, DocuWiki, custom) 

o Internal Intranet site (DotNetNuke) 

o OIST community site (Google sites) 

• Training OIST staff on use of the Drupal‐based CMS 

• Supporting the Drupal‐based CMS 

• Implementing hosting environment in coordination with OIST IT department 

5.1.1.1 Implementation OIST expects the rights for both Drupal and the CMS to be free and clear for OIST’s use. 

The  selected Vendor will obtain  the  latest version of Drupal appropriate  for meeting 

the requirements and any related modules at no cost to OIST. 

 

OIST  expects  that  the  selected  Vendor  will  provide  a  Drupal‐based  CMS  with  all 

components to complete a comprehensive CMS transformation. 

 

OIST expects  the selected Vendor  to  install Drupal and all  required CMS components 

for  a multi‐site,  enterprise  level  CMS  for OIST.  The  implementation  of  the  CMS will 

occur at the data center(s) designated by OIST IT department. 

5.1.1.2 Migration OIST expects the selected Vendor to fully manage and be responsible for preparing the 

migration  procedures  of  the  existing  websites  to  the  new  Drupal‐based  CMS.  It  is 

expected  that  the  selected  Vendor’s  migrating  efforts  be  supported  by  both  their 

internal  resources and designated OIST  resources.  It  is anticipated  that  the migration 

would begin with the main public site, the news site, the internal Intranet site, and the 

OIST community site followed by the various research unit, section, workshop, course, 

and personal websites. OIST expects the Vendor to be sensitive to the scheduling issues 

of the organization. 

 

It  is  important  that  the  selected  Vendor  be  able  to  provide  enhancements  to  each 

website during migration. However, it will be also important to keep a consistent “look 

and feel” of the sites according to the officially sanctioned OIST style guide. Continuity 

of all the sites is also an important factor during the migration phase. 

5.1.1.3 Training OIST requires the Vendor to provide training to the OIST Web team,  including but not 

limited to instructions on the finalized site architecture, how to build a new Drupal site 

Page 18: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  18

based  on  an  existing  site  in  the  system,  creating  and  assigning  permissions  to  new 

users, and how to best provide support to the various Content Managers throughout 

the organization. 

5.1.1.4 Support OIST requires that the selected Vendor support the CMS prior to the first migration and 

have post‐migration support services for the CMS. Support services include but are not 

limited to: 

• Break/fix support • Routine maintenance and updates 

• Help desk • Website security 

5.1.1.5 Hosting OIST  requires  the  selected  Vendor  to  consult  with  OIST  IT  staff  regarding  the 

architecture and configuration of  the hosting environment  for  the Drupal  solution  in 

coordination with  OIST  IT  department.  OIST  expects  the  Vendor  to  determine  and 

provide  a  hosting  environment  necessary  to  support  the  multi‐site  Drupal  CMS 

installation. The hosting plan should  leverage all resources using current virtualization 

tools to deliver a secure, high performance computing platform that can accommodate 

the scope of this migration, with room to grow as OIST’s website services continue to 

grow. OIST expects  the dedicated hosting environment  to be managed,  scalable, and 

redundant, with uptime  standards  and nightly backups  in  conformance with OIST  IT 

department. 

5.2 Specifications 

5.2.1 Setup and Operational Requirements 

5.2.1.1 Platform The  platform  for  development  and  production  should  be  Scientific  Linux  6  (highly 

preferable), unless vendor has an overwhelming reason to require the use of RHEL6, in 

which case server and support license costs must be included in the contract amount. 

The virtual machine technology used must be KVM. No other server OS environments 

will be accepted. 

 

UTF‐8 content, with all functions, including search, compatible with both Japanese and 

English is required. 

Page 19: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  19

 

WebAuth  shall be used  to  integrate with OIST Active Directory  for authorization and 

authentication,  and  the  vendor will  be  expected  to  cooperate with OIST  IT  staff  in 

integration and stabilization. 

5.2.1.2 Support Duration and extensions to be negotiated. 

5.2.1.3 Availability The Vendor must work with OIST  IT  department  to  ensure  that  all  IT  infrastructure 

systems  and  application  servers  providing  the  Drupal  CMS  platform  provide 

redundancy with the ability to easily and quickly switch over in case of system failure. 

 

A roll‐back system must be in place that will return a website to a previously backed‐up 

state. This process must be documented, tested, and verified before delivery. 

 

The Vendor must build  into the system compatibility with offsite mirrors and backups 

and provide a recommendation for how to integrate these measures into the system. 

 

The Vendor must provide a recommendation for how a hardware load balancer would 

be used with the system. 

5.2.1.4 Security Security audit  (vulnerability test) will be done upon delivery and then twice per year 

during support duration. 

 

State‐of‐the‐art security measures and best practices must be followed at every stage 

of development to ensure that the finished product is as secure and stable as possible. 

 

Vendor  must  supply  best‐practices  recommendations  for  administration  and 

maintenance that ensure continued security of the system. 

5.2.1.5 Updates Both the CMS core and all extensions will be kept up to date with updates and minor 

version releases. Major version upgrades will be done with mutual agreement between 

OIST  and  the Vendor  after  the  extensions  being  used  are  compatible with  the  new 

version. 

Page 20: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  20

5.2.1.6 Test Environment The  system must  include  the  ability  to  easily  test  new  extensions,  additional  code, 

design changes, etc. without affecting the site as it is experienced by visitors. 

 

The  site  must  be  easily  cloned  to  create  VMs  for  use  on  development  and  test 

machines. 

5.2.1.7 Development Environment The Vendor will provide a network‐accessible development and preview environment 

for use during  the planning and development  stages of  the project  so  that  the OIST 

Web  and  IT  staff  can be  actively  involved with  the development  team  and  the OIST 

administration  can  provide  feedback  on  the  direction  of  development  as  early  and 

often as possible, when modifications can be more easily made. 

5.2.1.8 Continued System Development Environment The Vendor will provide a system development environment and migration method to 

allow  the vendor and/or OIST  staff  to  continue  to develop new  functionality  for  the 

web system and migrate that functionality to the production environment once  it has 

been confirmed production‐worthy. 

5.2.1.9 Content Staging and Development Functionality The  system will  include  a method  for  content managers  to  safely  develop  content, 

navigation,  and  templates  without  affecting  the  production  site.  Vendor  will  also 

provide a method  for efficiently migrating  this new content to  the production site as 

needed. 

5.2.2 Non­functional Requirements 

5.2.2.1 Multi­browser compatible Firefox 3.5+, Chrome 9+, Safari 4+, Internet Explorer 7+, Opera 10+ 

5.2.2.2 Site search capability The system must offer comprehensive site search capabilities. OIST  intends for Drupal 

to  be  integrated  with  Apache  Solr  for  scalable,  high  performance  faceted  search 

capabilities. OIST will consider deployment of Solr with OIST's web application server 

resources or using Acquia Search (cloud‐based search service from Acquia using Solr for 

D6 or D7 sites). 

Page 21: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  21

5.2.2.3 Print page capability The system must offer page printing capabilities  including PDF versions of designated 

pages. 

5.2.2.4 Completely bilingual The system must offer page‐to‐page language switching between Japanese and English 

for all content and functionality is required. 

5.2.2.5 Themes Each part of  the  system must be  themed  to  conform  to  the new Graphics  Standard 

Manual, and all templates, themes, graphics, etc. will be directed by Communications 

staff of OIST and implemented by the Vendor. 

5.2.2.6 Core Code Modifications The CMS core must not be modified. Features not available in the core must be realized 

by implementing existing extensions or developing new extensions in accordance with 

Drupal community standards. Any new extensions developed must be made available 

to the Drupal community as open source. 

5.2.2.7 WCAG 2.0 The site must pass Level A of conformance to WCAG 2.0. 

5.2.2.8 Style Guide Layout must be done with CSS, and CSS style sheets must be  logically and modularly 

designed for flexibility and efficiency. A complete guide to the CSS styles used must be 

provided so that content added at OIST can follow consistent guidelines.  

5.2.2.9 Legacy content style During content migration,  legacy content must be  reviewed and made  to conform  to 

the look and style of the new site. 

5.2.2.10 Analytics Google Analytics must be implemented to provide site usage statistics. 

5.2.2.11 Legacy content files Resource  files  like  images, PDFs, etc. must be  re‐organized  logically, and  the  links  for 

these images and PDFs must be modified in the legacy content. 

5.2.2.12 Content updates It must be possible for non‐technical OIST staff to create and update content.  

Page 22: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  22

5.2.2.13 Fine­grained User Access Control It must  be  possible  for  administrators  to  restrict  editor/content manager  access  to 

website content on a category or single article basis. 

5.3 Drupal Functional Requirements 

5.3.1.1 CMS The CMS will store all  information made available on the web and serve as the main 

tool of web development for OIST staff. In accordance with research by OIST staff and 

consultants, Drupal has been selected as the best open source CMS to use  for OIST’s 

purposes,  based  on  the  current  and  growing  adoption  of  Drupal  by  similar 

organizations and the availability of research‐ and education‐oriented extensions. 

5.3.1.2 Website and Application Roles The new Drupal‐based web system will serve the following roles: 

5.3.1.2.1 Main public website • Same functionality as the existing public website (http://www.oist.jp). 

5.3.1.2.2 News website • Based on  same  functionality  as  SLAC News Center, which  is  a Drupal‐based 

flexible, extensible platform for serving and archiving content like news stories, 

press  releases,  feature articles, etc.  to both external  and  internal  audiences 

(https://news.slac.stanford.edu/home). 

o External: On its home page, the site showcases SLAC's science, projects 

and people with  feature stories, press  releases,  images and video  for 

external readers. 

o Internal: The SLAC Today page hosts the lab's daily newsletter for SLAC 

staff and users (internal). Under Calendar users find SLAC science talks 

and conferences, including the popular bi‐monthly SLAC Public Lecture 

series. 

• Includes video and photo  libraries with explanations, keyword searches, easy 

linking to CMS content, and export options for file format, size, etc. 

• Serves video and audio podcasts. 

• Offers  integrated workflow  system  for  publishing  content,  including  defined 

workflows  for  content  such  as  announcements  and  news.  Allows  OIST  to 

define roles and semi‐automate editing and approval processes. 

Page 23: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  23

5.3.1.2.3 Websites for research units, sections, and any other collaborative group • Based on the Drupal Organic Groups project, the system will support research 

units  and  groups  easily  creating  and managing  comprehensive  sub‐sites  for 

purposes  of  information  sharing  and  collaboration  with  user  access 

restrictions, blogs, forums, calendars, etc. 

• Should include publications management features. 

• The  system  should  be  configured  so  that  a  new  sub‐site  themed  in 

conformance  to  the  OIST  official  Graphics  Standard Manual  can  be  set  up 

simply, requiring minimal administrator effort. 

5.3.1.2.4 Workshop and course websites • The system will  include functionality that allows  for the creation of websites 

for the courses and workshops sponsored by OIST and managed by research 

units and the Academic Affairs and Workshop Section. 

• Workshop  and  course  websites  will  require  online  applications  (integrated 

referral  letter upload, CV and  letter of  intent upload, access‐controlled data 

and  file  storage,  and  CSV  download  of  applicant  data),  program,  schedule, 

speaker  profiles,  participant  profiles,  and  integrated  wiki  for  collaborative 

work.  

• Participants  must  compete  for  a  place  in  the  workshop  or  course,  so  an 

application  workflow  must  be  implemented  in  each  workshop  site  which 

allows for entry of form data, uploads of PDF files, user‐specific storage areas 

for  information  and  files,  and  user  access  controls  so  that  only  event 

organizers can access applicant data. Specifics of the application management 

aspect of the system will be determined during development in collaboration 

with OIST representatives. 

• A custom form generator configured to satisfy application and selection needs 

as defined by OIST may be sufficient, depending on the functionality offered. 

• Each workshop and course will also have a sub‐site based on Organic Groups, 

but  the  configuration will be  customized  for workshop  and  course use. The 

details of this configuration will be determined during the development phase. 

• The  system  should  be  configured  so  that  a  new  sub‐site  themed  in 

conformance  to  the  OIST  official  Graphics  Standard Manual  can  be  set  up 

simply, requiring minimal administrator effort. 

Page 24: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  24

5.3.1.2.5 Personal sub‐sites • All researchers and students will be able to easily create a sub‐site using the 

Drupal OpenScholar project (or components of the project). The OpenScholar 

project  includes  functions  for  publication  management,  blogs,  calendar, 

custom pages, news, CV, wiki, bulletin boards, and other features. 

• As with unit sites, the personal sub‐sites will be configured to conform to the 

Graphics Standard Manual guidelines and use the official logo. 

• The  system  should  be  configured  so  that  a  new  sub‐site  themed  in 

conformance  to  the  OIST  official  Graphics  Standard Manual  can  be  set  up 

simply, requiring minimal administrator effort. 

5.3.1.2.6 Internal Intranet website • Information restricted to OIST members, such as internal calendars, restricted 

documents, internal galleries, internal forums, notifications, etc. 

• Active‐Directory/LDAP‐managed  login  authentication  and  authorization  for 

off‐campus and on‐campus access. 

5.3.1.2.7 OIST Community website • Information intended for OIST members and their families, such as person‐to‐

person  marketplace,  information  about  living  in  Okinawa,  schools,  travel, 

community activities, etc. 

• Active‐Directory/LDAP‐managed  login  authentication  and  authorization  for 

off‐campus and on‐campus access. 

5.3.1.3 Extensions In  the  realization  of  all  functional  requirements,  the  system must  remain  extensible 

with standard Drupal extensions, allowing OIST IT and Communications staff to further 

develop and update the system to accommodate future needs. 

 

Drupal extensions should be implemented to realize the following: 

• File  sharing/download  service  for  OIST  members  to  share  large  files  with 

collaborators off campus. 

• Flexible video and photo gallery/library  to enable users  to  share photos within OIST and to the outside. 

• Flexible, customizable form generator to allow for ad‐hoc creation of forms with 

db  data  storage,  file  uploads,  and  event  triggers  for  complex  processes.  This 

functionality  will  be  used  for  things  like  campus  tour  reservations,  event 

Page 25: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  25

registration, and seminars. 

• Glossary extension to manage term definitions and generate a glossary of terms 

and their meanings. 

• Calendar  system  that  can manage  separate  calendars  for  internal  and external 

use,  including RSS  feeds,  ical/vcal  import/export, and compatibility with cloud 

calendar  sites  like  Google,  Yahoo,  Hotmail.  Integration  with  OIST  Exchange 

server also desirable. 

• Mailing list management. 

5.3.1.4 Custom Content Drupal  custom  content  types  should be developed  to accommodate  specific  content 

needs, including but not limited to: 

• Press Release content type that has a "Release Date‐Time" field for press release 

embargos. 

• Types  for news, press  releases, etc. which  feature  a built‐in  image  gallery  that 

keeps the photos associated with the article itself so that the editor creating the 

content does not have to figure out a place to store the photos. 

5.3.2 Migration Timeline Requirements The  table below outlines  the desired general  timeline objectives  that OIST has  for  the 

various parts of the overall implementation project. 

 

Website Role  Due Date  Live Status  Content Migration Main public website  November 2011  Production  Existing, Bilingual News website  November 2011  Production  Existing, Bilingual Section unit sites  November 2011  Development  TBD by OIST Research unit sites  November 2011  Development  TBD by OIST Workshop sites  November 2011  Development  TBD by OIST Personal sites  November 2011  Development  TBD by OIST Intranet site  November 2011  Production  Existing, Bilingual Community site  November 2011  Production  Existing, Bilingual 

 

Please note  that only  the existing content  for  the main public website, news website, 

Intranet  site,  and  community  site  is  expected  to  be migrated  to  production  by  the 

Vendor.  The  migration  of  existing  content  must  include  both  Japanese  and  English 

content so that sites are fully bilingual at delivery. OIST intends that its staff and content 

managers will work with the Vendor to coordinate and assist with the migration process. 

The creation of all new content for those sites will be handled by OIST. 

Page 26: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  26

 

Please note that all Section unit sites, Research unit sites, Workshop sites, and Personal 

sites are not expected to be migrated completely and put into production by the Vendor. 

The sites must include the functionality to support both Japanese and English content so 

that the sites can be fully bilingual. OIST intends that its staff and content managers will 

handle the migration of these various sites over time to the new Drupal CMS  including 

the determination of whether the content will be bilingual. OIST intends that the Vendor 

will complete development for the capability for OIST to create those sites on the new 

Drupal CMS and demonstrate test migrations for those sites. 

 

Please note that while the Intranet and Community sites will be migrated to production 

by the Vendor, OIST intends to use these Drupal CMS sites primarily for backend content 

management and administration.  Internal and external users will access  content  from 

these  sites  through a new portal  for  staff,  faculty,  students, and  community members 

based on the joint YWC project between OIST and ITER. 

5.4 Deliverables All  deliverables  shall  be  submitted  in  Japanese  and  English  both  uploaded  online  and 

provided in duplicated CD‐ROMS. (Deadlines negotiable.) 

• Hardware Requirements and Network Configuration Document Recommendation 

for hardware and network environmentdefined under “Scope”. 

• Layout Manual:  A manual  of  examples  of  the  CSS  used  which  can  serve  as  a 

manual for staff creating and maintaining content. 

• Roll‐back  Manual:  A  manual  for  the  quick  roll‐back  restoration  procedure 

(restoring a site from a backup), including a test report.  

• Restore  Manual:  A  manual  for  complete  restore  of  the  system  (restoring  the 

Drupal CMS implementation from backup), including a test report. 

• Base architecture design document. 

• System structure diagram and document. 

• Complete code base. 

 

5.5 Additional Scope of Work 

5.5.1 Development Services OIST retains the right to request new functionality support post migration, and expects 

the selected Vendor to provide development capabilities either through its own offerings 

Page 27: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  27

or through a partner at an additional cost. 

5.5.2 Additional New Sites During and prior to the migration, OIST may be developing additional websites to add to 

their environment. It is OIST’s intent that the selected Vendor will also handle migration 

of  these  new  sites, with  an  understanding  that  a  change  order will  be  necessary  to 

include them within the scope of work. 

5.6 Independent Verification and Validation Independent Verification and Validation  is a set of activities performed by an entity not 

under control of the selected Vendor. OIST reserves the right to select a separate Vendor 

that  is  technically, managerially,  and  financially  independent  that  will  check  that  the 

deliverables provided by  the  selected Vendor  to meet  the users’ needs  (Validation) and 

check  that  the  deliverables  are well  engineered  (Verification). During  all  phases  of  the 

project,  the  Independent Verification and Validation Vendor will be acting with  the  full 

authority of OIST in performing activities. 

 

 

 

 

 

Page 28: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  28

 

6 Appendix A: Glossary  

Backup Process 

Making copies of data so that these additional copies may be used to restore the original after a 

data  loss  event.  The  primary  purpose  is  to  recover  data  as  from  a  data  loss  caused  by  data 

deletion or corrupted data. 

 

Break/Fix Maintenance 

The work involved in supporting the CMS and its technology when it fails in the normal course 

of its function and needs intervention by a support organization to be restored to working order. 

 

Bug  

The  common  term  used  to  describe  an  error,  flaw, mistake,  failure,  or  fault  in  a  computer 

program or system  that produces an  incorrect or unexpected result, or causes  it  to behave  in 

unintended ways. 

 

Cloud­based Hosting Services 

The practice of using a network of remote servers hosted on the Internet to store, manage, and 

process data, rather than using a local server or personal computer.  

   

CMS Metadata 

Data about data; information that is attached to content that describes certain attributes of the 

information. 

 

Content Development/ Staging 

The process by which content is created, reviewed, and modified in the CMS before being made 

visible to external website visitors. 

 

Content Type 

A  type of  content. These  content  types define what  can be  stored within  the CMS and what 

information is stored with that content.  

 

Deliverable 

Page 29: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  29

Quantifiable services that will be provided during the scope of the project. 

 

Drupal 6.x (D6) and Drupal 7.x (D7) 

Version 6 and version 7 of the Drupal open source software. At any given time, there are two 

major release series of Drupal which are supported. Currently,  these are D6 and D7. Updated 

versions of each of  these are  issued on a  regular basis  (e.g.  for D6 versions 6.0, 6.1, 6.2, etc. 

have been and will continue to be released). 

 

Hacking Event  

Gaining  access  and  change  control  to  the  CMS  and  or  the  live  website  without 

permission/authorization. 

 

Milestone 

A project checkpoint used to validate how the project is progressing and revalidate the work. 

 

Outage 

Downtime or outage duration refers to a period of time that a system whether the CMS or the 

live website fails to provide or perform its primary function. 

 

Patch 

A quick repair job for a piece of programming. During a software product's beta test distribution 

or try‐out period and later after the product is formally released, problems (or bugs) will almost 

always  be  found. A  patch  is  an  immediate  solution  that  is  provided  to  users. A  patch  is  not 

necessarily  the best  solution  for  the problem and  the product developers often  find a better 

solution to provide when they package the product for its next release. 

 

Security Breach  

An act from outside an organization that bypasses security policies, practices, or procedures.  

 

Service Provider 

The vendor and/or supplier responding to this RFP. 

 

Severity Levels Level  Condition  Description Level 1  Live websites and CMS are down and 

no  workaround  is  immediately All  or  a  substantial  portion  of  mission critical data is at a significant risk of loss or 

Page 30: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  30

available  corruption.  There  is  a  substantial  loss  of service. Organization operations have been severely disrupted. Emergency response  is required. 

Level 2  Major  functionality  is  severely impaired 

Operations  can  continue  in  a  restricted fashion,  although  long‐term  productivity might  be  adversely  affected.  A  major milestone  is  at  risk.  Ongoing  and incremental  installations  are  affected.  A temporary workaround is available. 

Level 3  Partial,  non‐critical  loss  of functionality of the software 

Impaired operations of some components, but  the user  is able  to continue using  the software.  Initial  installation milestones are at minimal risk. 

Level 4  General style and usage questions  Cosmetic  issues,  including  errors  in  the documentation. How‐to questions. 

 

Support Levels Level  Type  Description Tier 1  Initial  support  for  user  issues.  Serves 

as starting point for all support tickets.Tier 1 support includes: • Training  content managers  on  how  to 

use the system • Triaging support requests to determine 

if a Tier 1 response  is appropriate, can be  addressed  efficiently,  and  can  be resolved  by  existing  staff  or  if  the request needs to be directed to Tier 2 

• Performing CSS and design updates  to websites 

• Creating  new  user  accounts  and assisting with login errors 

• Enabling existing modules for websites • Handling  minor  updates  to  template 

components where applicable Tier 2  Next  level  of  support  for  user  and 

system  issues.  Serves  as  escalation point for support tickets. 

Tier 2 support includes: • Responding  to  system  bug,  hacking 

event, outage, or security breach issues• Managing Severity Level 1 and 2 tickets• Handling major update to system 

 

User Acceptance Testing (UAT) 

Testing  performed  using  real world  scenarios  and  perceptions  relevant  to  the  end  users  to 

Page 31: Request for Proposal Outsourcing OIST · 1 Cover page Request for Proposal Outsourcing of Redesign and Upgrade of OIST Website Okinawa Institute of Science and Technology

  31

ensure that the end product will meet user needs and specifications. 

 

Wireframe 

A basic visual guide used to show the layout of fundamental elements of a web interface. 

 

Works as Designed  

A  term used  to describe  that  the CMS and  live website are  in working order as  intended and 

agreed upon by the Vendor and the organization. 

 

WYSIWYG 

Acronym for “what you see is what you get.” The term is used in computing to describe a system 

in which content displayed during editing appears the same or very similar to the final output.