REPUBLIC OF THE PHILIPPINESDEPARTMENT OF FINANCE
BUREAU OF CUSTOMSPort Area, Manila
Bids and Awards CommitteeSupplemental Bid Bulletin
Addendum No. 1
RENOVATION OF THE OLD NPO BUILDING
This Addendum No. 1 dated 17 December 2014 is issued to clarify, modify or amend items inthe Bid Documents. This shall form an integral part of the Bid Documen~s.
ISSUEA. Item 12.1 (a) Single Largest
Contract
B. Item 12.1 (b )(ii.2)
CLARIFICATION! AMENDMENTS• A photocopy ofl the Single Largest
Completed Contract must be submittedi.e. similar contract completed within thelast five (5) years prior to December 8,2014, whose value must be at least fiftypercent (50%) of the ABC supported bythe Constructors P~rformance EvaluationSystem (CPES) rating sheet which musthave a satisfactorY rating or a certificateof satisfactory cOl1lpletion of the project.
• Tax Clearance Certificate from theBureau of Internal I Revenue shall also besubmitted as parf of the eligibility andtechnical documents contained in thefirst envelope. I
• The List of Contractor's personnel to beassigned to th~ Contract must besupported by thelr respective updatedresumes, photodopy of ProfessionalRegulations Corrimission (PRC) validlicense, DPWH Accreditation andOccupational and Safety Certificate, ifapplicable.1. Materials EngiJneer
- Valid PRC License- Updated esume- DPWH acc~editation
2. Safety Officer I- Valid PRC ~icense- Updated rfsume- Occupational and Safety
Certificate
3. Master Plumber I- Valid PRCLicense- Updated resume
IC. Additional Scope of Work
For guidance and information of all concerned.
~
1~~AI URO M. LACHICA, CESO 11D~ uty Commissioner, IAG fCl airperson, SCC-SAC
• Include scope ~f work for therehabilitation of structural columns,beams and slabs Iand non-destructivetesting to verify the structural soundnessand stability ofl the rehabilitatedstructure.
• The contractor shall provide a certificateof non-destructive I test, indicating thatthe rehabilitation made with the buildingstructure is structurally sound,conducted by a separate privateconsultant who has the technicalexpertise and modern equipment.