Republic Act No. 3601 · Republic Act No. 3601 • An act creatingthe NationalIrrigation...

12

Transcript of Republic Act No. 3601 · Republic Act No. 3601 • An act creatingthe NationalIrrigation...

  • Republic Act No. 3601

    • Anact creating theNational IrrigationAdministration (NIA) signed into lawby thenPresidentDiosdadoMacapagalon June22,1963.PresidentialDecreeNos.552and1701amendedcertainsectionofR.A.3601.

    Who is the Irrigators’ Association?

    • Thesearegroupoffarmerswhoareidentifiedasdirectbeneficiariesofanirrigationproject/system,formedintoIrrigatorsAssociationdulyregisteredwiththeSecuritiesandExchangeCommission.

    Legal Basis of Equity Participation

    PD 552 – “AMENDING CERTAIN SECTIONS OF REPUBLIC ACT 3601 ENTITLED AN ACTCREATING THE NATIONAL IRRIGATION ADMINISTRATION”

    P.D.552,Section1(b.1)

    “Tochargeandcollectfromthebeneficiariesofthewaterfromallirrigationsystemsconstructedbyorunderitsadministration,suchfeesoradministrationchargesasmaybenecessarytocoverthecostofoperation,maintenanceandinsurance,andtore-coverthecostofconstructionwithinareasonableperiodoftimetotheextentconsis-tentwithgovernmentpolicy;torecoverfundsorportionsthereofexpendedfortheconstructionand/orrehabilitationofcommunal irrigationsystemswhich fundsshallaccruetoaspecialfundforirrigationdevelopmentunderSection2hereof”.

    NIA Board Resolution No. 2547 – 74 dated December 23, 1974 approving the Proposed Policy and Implementing Guidelines in the Development of Irrigation Projects.

    ItemI.2–“torecoverfromthebeneficiariesofallirrigationsystems,thefullcostofconstructionorportionthereofwithinareasonableperiodof

  • timeandtoextentconsistentwithgovernmentpolicy,inadditiontothecollec-tionofirrigationfeescoveringinsuranceandexpensesfortheoperationsandmaintenanceofthesystembytheNIAorirrigationchargesformanagementandadministration”.

    Item III-B2’“Theestimateof repaymentofconstructioncost shallbe inaccordancewiththefollowing:

    (a) Tenpercent(10%)ofthetotaldirectcostshallbefree;(b) Seventypercent(70%)ofthetotalcostshallberepaidwithoutinterest;(c) Twentypercent(20%)ofthetotalcostshallberepaidwithinterestat6%per annum;and(d) Periodofrepaymentshallnotbelessthantwenty-fiveyearsforgravityirrigation

    projects”.

    ThisNIABoardResolutionwascircularizedthruMC#10S.1975.

    MC # 59 S 1977 – DEFINING THE PARTICIPATION OF IRRIGATORS ASSOCIATIONS IN FINANCING THE CONSTRUCTION OF GRAVITY COMMUNAL IRRIGATION SYSTEMS AND AMENDING MC # 18 s 1977.

    ItemA–EquityParticipationbytheIrrigatorsAssociations

    TheIrrigatorsAssociationforwhomtheNIAconstructsagravitycommunalirrigationsystemshallbearatleasttenpercent(10%)ofthetotaldirectcostofconstruct-ingthesystem.Thisamount,calledequityparticipation,maybeintheformofmoney,labor,rightofway,sup-pliesandmaterials.

  • NIA Board Resolution No. 2584 – 75 recommendedtotheNationalEconomic

    and Development Authority, which issuedNEDA Resolution No. 20 S 1978 dated August 24,

    1978 and duly approved by His Excellency President Ferdi-nandE.MarcosonOctober4, 1978. Thiswas circularizedthruMCNo.62S1978entitled,“NationalPolicyonRepay-mentofConstructionCostofIrrigationFacilities”.

    Item A – Equity Participation by the Irrigators As-sociation,“theIrrigatorsAssociationforwhomtheNIAconstructsagravitycommunalirrigationsystem

    shallbearduringtheconstructionatleasttenpercent(10%)ofDIRECTCOST(netofcostofroads,etc,ifany)orP300.00perhectareofareatobeirrigatedwhicheverislower. This amount (minimumrequirement, theassociationmay contributemore ifdesired),whichisknownasequityparticipationcouldbeintheformofmoney,labor,right-of-way, supplies andmaterials, etc. Overhead, including supervision and sur-chargeshallnotexceed10%ofESTIMATEDDIRECTCOST.Thistypeofexpenseshallnotbechargedtotheassociation.

    ItemB–Theprovisionsonrecoveryofcostandinterestshallapplytoallcommunalirrigationprojects/systemsconstructedbytheNIAwhich issubject torepaymentofcostunderPD552.”

    MC # 15 S 1981 – EQUITY OR COUNTERPART PARTICIPATION OF IRRIGATORS ASSOCIA-TIONS IN COMMUNAL IRRIGATION PROJECTS. “For the purpose of supplementing pre-vious memoranda on the above subject the following guidelines are hereby issued:

    1. Theterm“equityparticipation”isthesameas“counterpartparticipation”.Asthelatterisusuallymoreunderstandabletothefarmers,itshouldhenceforthbeusedinlieuoftheformer.

    2. Ingeneral,“counterpart”or“equityparticipation”bytheassociationshallbeatleast10%ofthecostoflabor,materials,andequipmentuseontheprojectandmaybeanyoracombinationofthefollowing:

    a. ThecostoflaboratNIAratesfurnishedbytheassociationwithoutpaymentfromtheNIA.Thelabormaybeforcanals,structures,farmditches,drainageditches,

    surveys,temporaryfieldoffice,bodegas,takingandrecordinggage,read-ings,securityandguardingservices,andsimilarworksdonebytheAssociationontheproject.

    b.ThecostofmaterialsandsuppliesusedintheprojectfurnishedbytheAssociationwithoutpaymentfromNIA.

  • c. Theright-of-wayofcanals,diversionworks,structuresoraccessroadsfur-nished by the Associationwithout payment fromNIAwithin the serviceareaonlandsownedbythebeneficiariesoftheproject.

    d. Anyright-of-wayacquiredbytheAssociationonlandsoutsidetheserviceareaoftheprojectwithoutpaymentfromNIA.

    e. CashcontributedbytheAssociationtotheconstruction.

    MC # 29 S 1984 – GUIDELINES AND PROCEDURES IN THE RECORDING AND CONTROL OF EQUITY CONTRIBUTION OF IRRIGATORS ASSOCIATIONS FOR THE CONSTRUCTION OF COMMUNAL IRRIGATION PROJECTS.

    MC # 27 S 1991 – COST RECOVERY SCHEMES AND OTHER PERTINENT GUIDELINES FOR COMMUNAL IRRIGATION PROJECTS.

    SCHEME 1 – THIRTY PERCENT (30%) EQUITY PARTICIPATION

    This arrangement could be availedof by the Irrigators Associationsinplaceoftheregularamortiza-tionofthechargeablecostun-derthefollowingconditions:

    a. Thatthe IA iswillingandcapable to raise within theconstruction/rehabilitationperioditsequityparticipationwhichisdefinedastheamountequivalent to THIRTY PERCENT

    (30%)ofthechargeablecost.

    b.ThatthemoneyvalueoftheIAeq-uityparticipationmaycomefromthefol-lowing:

    1. Thecostof laborvaluedatNIArates fur-nishedbytheIAwithoutpaymentfromNIA.The labormay be for the constructionof diversion works, canals, farmditches, drainage ditches,

  • temporaryfieldoffice,bodegas,conductof surveys, taking and recording gage,

    readings, security and guarding services,andsimilarworksdonebytheIAontheproject.

    2. Thecostofmaterialsand supplies furnishedby theIA,usedintheprojectandwithoutpaymentfromNIA.

    3.The costof right-of-way for canals, diversionworks,structures, or access roads negotiated and acquired

    bytheIAeitherwithinoroutsidetheserviceareaoftheprojectandwithoutpaymentfromNIA.

    4. CashcontributedbytheIrrigatorsAssociations,

    c.IftherequiredTHIRTYPERCENT(30%)EQUITYPARTICIPATIONisnotmetduringtheconstruction/rehabilitationperiod,theIAshallbegivengraceperiodofonecroppingseasonafterproject completionand turnover to raise the remainingamount.Aftertheonecroppingseasongraceperiod,whateverbetheremainingamountwhichtheIAwasnotabletosettleshallbepaidbythesameimmediatelywithinthesucceedingseason.However,thisunpaidbalanceoftheIAequityparticipationshallbesubjectedtoamaximuminterestofONEPERCENT(1%)PERMONTH.IftheIAwasnotabletoputupcompletelytherequiredequityparticipationafterthetwo(2)croppingseasons,SchemeIIshallbeadopted–theIAwillamortizetheremainingbalanceofconstruc-tion/rehabilitationcostwhichisnetofthetotalchargeablecostandthetotalequitywhichtheIAwasabletoraise(AmounttobeAmortized=totalchargeablecost–totalequityraised).

    SCHEME II – AMORTIZATION OF THE CHARGEABLE COST

    This is the long-term arrangement on costamortization which has been availed of bymostofourcommunalIAs.Underthisarrangement, the IA is required to put upanequityparticipationofNOT LESSTHANTENPERCENT(10%)ofthechargeablecost

    duringtheconstruction/rehabilitationperiod of the project and amortizethe remaining amount (withoutinterest) within an agreed period,

    the duration of whichshallnotexceedfifty(50)years.Theequityparticipa-

    tion of the IA shall consists ofthemoneyvalueoftheitemsdefined

    underSchemeI.bhereof.

  • OTHER PERTINENT GUIDELINES

    • IAWishingtoConvertfromSchemeIItoSchemeI

    • TheIAshouldforwarditsintentionthroughaBoardResolutionaddressedtotheRe-gionalIrrigationManager,attentionthrutheDivisionManager,IrrigationManagementOffice(IMO);

    • TheIABoardResolutionshallbeendorsedbytheDivisionManager,IMOtotheRIMattachingtheretoacurrentstatusofamortizationpaymentoftherequestingIAwhichshallbedulycertifiedbytheRegionalAccountant;

    • TheequityparticipationoftheIAshallbeTHIRTYPERCENT(30%)oftheremainingba-lanceoftheamortizableamountplusanybackaccounts,ifthereareany;and

    • TheequityparticipationoftheIAshallbepayableincashandwithinamaximumperiodofsix(6)months,theeffectivityofwhichshallbereckonedfromthedate the IAhas received thenoticeof theRIMapproving the IArequest.Anyunpaidamountwithinthedesignatedperiodshallbesub-jected to a maximum interest ofONEPERCENT(1%)permonthandtobe settledby the IAwithin thenext sixmonths.

  • MEMORANDUM OF AGREEMENTBY AND BETWEEN

    THE NATIONAL IRRIGATION ADMINISTRATIONAND

    _______________ IRRIGATORS’ ASSOCIATION, INC.

    KNOW ALL MEN BY THESE PRESENTS:

    Thisagreementexecutedandenteredintothis______dayof_______________20__in_____________.

    THENATIONALIRRIGATIONADMINISTRATION,agovernment–ownedandcontrolledcor-porationcreatedunderRepublicAct3601,asamendedbyPresidentialDecreeNo.552withprincipalofficeatEDSA,Diliman,Quezoncity,representedhereinby_________________inhiscapacityas______________referredtoastheNIA:

    AND

    ____________IRRIGATORS’ASSOCIATION,INC.,anassociationorganizedandregisteredwiththeSecuritiesandExchangeCommissionwithprincipalofficeat_____________________,represented in this agreement by ____________________ in his capacity as President,hereinreferredtoastheASSOCIATION.

    WITNESSETH THAT:

    WHEREAS, the Association has petitioned the NIA to construct/rehabilitate the__________ communal irrigation system, which shall irrigate lands situated at________________________.

    WHEREAS,theconstructionoftheprojectintheareaisinaccordancewiththeirrigationdevelopmentoftheNIA;

    NOWTHEREFORE,forandinconsiderationoftheforegoingpremisesandbyauthorityoftheprovisionsofRepublicAct3601asamendedbyPD552

  • and1701,theGuidingPrinciplesandtheRulesandRegulationsoftheNIAwhichareincorporatedpartofthisagreement,thePartieshaveagreedandbythesepresentsdoherebyagreeasfollows;towit:

    ON THE PART OF THENATIONAL IRRIGATION ADMINISTRATION

    1. TheNIAshallbear thecostof investigationandsurvey,planpreparationandotherpre-constructionengineeringactivitiesfortheproject,includingthecostofthecom-munityorganizers.

    2. TheNIAshallhavetherighttoenterprivatepropertyoftheAssociationinconnectionwiththeconstructionoftheproposedprojectandtheNIAoritsemployeesshallnotbeheldliablewhatsoevertodamageswhichtheAssociationmaysustainonaccountofsaidactivities,unlessthereisgrossnegligenceorwillfulactsdonebytheNIAoritsemployeestocausesuchdamages.

    3. TheNIAshalllikewisebearthecostofconstructionofdiversionworksandappurte-nantstructures,thecanalsandotherirrigationstructuresincludingtheturn-outsoftheirrigationprojects.

    4. The NIA shall render assistance to the said Association in the organization and/orstrengtheningtheIrrigatorsAssociation/cooperativeandshalltrainthebeneficiariesorthosepersonsdulyselectedandarequalifiedtoundertaketheoperation,mainte-nanceandmanagementoftheirrigationsystemuponitscompletionandturn-over.

    5. TheNIAandtheAssociationshallconductmonthlycostreconciliationtodeterminetheactualchargeablecosttotheIrrigators’Associationandinordertofacilitateturn-overofthesystem.

    ON THE PART OF THE IRRIGATORS ASSOCIATION

    1. TheAssociationshallberesponsibleforsecuringandcomplyingwithallthe legalrequirementsrelatedtotheconstructionofthe irrigationsys-tem,suchaswaterpermit,legalfeesorchargesandothersimilarrequirements.

    2. The Association shall acquire by legalmeans Right-of-Way of private propertiesaffected by the construction of the projectanditsappurtenances.

    3. TheAssociationshallmakeavailabletotheNIAfor training all personswho shall beulti-matelyresponsiblefortheoperation,

  • maintenanceandmanagementoftheirrigationsystems.

    4. Upontheturn-overoftheirrigationsystem,theAssociationshallmaintainandadministerthesamein

    accordancewiththeBy-LawsoftheAssociation.

    5. TheAssociationshallformulatepoliciesandrulesandregulationsonoperationandmaintenancewithconcur-renceoftheNIA.

    6. Thebeneficiariesshallspendforthecostofrepair,rehabilitationandimprovementoftheirrigationsystem.Providedthatmajorrepairorrehabilitationofdiversionfacilitiesandmajorstructuresmayuponrequestof theAssociationandundersuchtermsandconditionswhichbeembodied in thesupplementalagreementbetweenthePartiesherein,beundertakenbytheNIA.

    7. TheAssociationisobligedtoabidebythetermsandconditionsasstipulatedintheagreementirrespectiveofwhetherornotthesetofofficerschangesfromtimetotime.

    8. TheAssociationshallcontributeasitscounterparttotheconstructionoftheproject,cash,laborandmaterials,thetotalvalueofwhichisnotlessthanTENPERCENT(10%)ofthetotalchargeablecostoftheproject.

    9. TheAssociationshallformulateitsEquityGenerationProgrambasedontheapprovedProgramofWorkoftheprojectusingtheEquityGenerationFormat,whichshallformpartofthisagreement.

    10. TheAssociationshallamortizeforthefollowingchargeablecostincurredbytheNIAontheprojectsuchasexpendituresfor:a. Materialsb. Equipmentrentalc. FuelandOild. Right-of-WaypaidbyNIA,ifanye. LaboruptothelevelofConstructionForeman,Project-In-Charge,InstitutionalDe-

    velopmentOfficerincludingTEV,andallowancesinconnectionwiththeproject.f. Otherexpendituresnotcoveredabovebutagreeduponbybothparties.

    TheAssociationshallnothoweveramortizeforthefollowing;

    a.Constructionofaccessroadorserviceroads b.Floodcontrolorprotectiondikesthatarenotpartofthediversionworksc.Powerengineeringfacilitiesd.Reforestationandothernon-irrigationrelatedfacilities.

  • 11. TheAssociationshallpaythesumduetotheNIAinanannualinstallmentwith-outinterest,theamountoftheinstallmenttobethemoneyvalueatprevailinggovernmentpriceof1½cavans(50kg/cav),multipliesbythewetseasonactu-allybenefittedareainhectaresprovidedtheresultingperiodofpaymentdoesnotexceed50years,themaximumpayingperiod.Iftherepaymentperiodexceeds50years,theinstallmentshallbeincreasedsothatrepaymentshallbewithintheperiodnotlongerthan50yearsfromtheturn-overoftheproject.

    12. Amortizationshallbepaidannually,thefirstpaymenttocommencewithinoneyearafterprojectturn-over.

    13. CounterpartparticipationreducedtheamounttheAssociationwillpayNIA.ThustheAssociationshallkeeparecordofthecontribution/participationofeachmember.

    SPECIAL CONDITION

    TofurtherensurerecoveryoftheNIAinvestmentintheproject,theAssociationchoiceofitsOperation’sManagershallbesubjecttoNIA’sapproval.

    TheNIAreservestherighttosupervisetheactivitiesandoperationoftheAssociationforaslongastheconsiderationofthisAgreementhasnotbeenfullypaidbytheAssociation.TheAssociationshall submit itself toNIAsupervisionasa safeguard that theprovisionsofthisAgreementshallbefaithfullyobservedandthattheinterestsofthemembersareprotected.

    Intheexerciseofthesesupervisoryfunctions,theNIAmayaudittheBookofAccountsandrecordsof theAssociationandmay issuenecessaryguidelinesandsuchguidelinesshallformpartofthisAgreement.

    TheAssociation isrequiredtoregister itsofficialreceiptswiththeBIRandsubmitstate-mentsoffinancialconditionsandoperationstotheSEC,copyfurnishedNIAforcontrolandmonitoringactivities.

    Theby-lawsoftheAssociationshallcontainaprovisionthatallfeesreceivedbytheAssocia-tionfromitsmembersandbeneficiariesshallbedirectlydepositedinabankofchoiceandthatthesameaccountcannotbewithdrawnwithoutsignaturesofboththePresidentandtheTreasurer.

    In the absence of a calamity fund, ad-ditional cost of repair/rehabilitation ofprojects not yet turned over and damageddue to force majeure shall be shouldered bytheNIAwiththeAssociationprovidingtheequityintheformof laborand/ormaterials.Theamountof equity shall dependupon theextentof damagesbutshouldbenotlessthantenpercent(10%)ofthetotalcost.Thecostofrepair/rehabilitationofdamagesnotdue to technicaldeficiencyshall be charged to the Associationloan.

  • Producedbythe

    Public Affairs and Information StaffNationalIrrigationAdministration

    Edsa,Diliman,QuezonCity

    NATIONAL IRRIGATION ADMINISTRATION ______________________________IRRIGATORS ASSOCIATION, INC.

    By: By:

    DivisionManager,IMO IAPresident

    SIGNED IN THE PRESENCE OF:

    Project-in-Charge IAVicePresident

    ___________________________________

    InstitutionalDevelopmentOfficer

    RECOMMENDING APPROVAL:

    ___________________________________

    DivisionManager,EngineeringandOperationsDivision

    APPROVED:

    ___________________________________

    RegionalManager

    Amortizationpayment shall not includethecostofaccessroadsorserviceroads,

    flood control or protection dikes that arenotpartofthediversionworks,poweroperating

    facilities,reforestationandshouldbeonlyfortherecoveryofcostofirrigationandfarmdrainagefacilities.

    Forrehabilitationproject,wherethereisanexistingloan,restructuringofamortizationscheduleshouldbedonetoaccommodatetheoldloanandnewloan,providedthattheresultingperiodofamortizationwillnotex-ceedfiftyyears.

    TheNIAthrutheEngineer-in-ChargeandtheInstitutionalDevelopmentOfficershallkeeparecordofthecounterpartparticipationoftheAssociation.

    INWITNESSWHEREOF,thePARTIEStothisAgreementhavehereuntosingedthis instru-mentthis_______dayof____________.