Repository Audit and Certification WG Report for MOIMS Closing Plenary Noordwijk, Mar 2014
-
Upload
taylor-dawson -
Category
Documents
-
view
28 -
download
3
description
Transcript of Repository Audit and Certification WG Report for MOIMS Closing Plenary Noordwijk, Mar 2014
April 20, 2023 1
Repository Audit and Certification
WG Report for
MOIMS Closing Plenary
Noordwijk, Mar 2014
April 20, 2023 2
WG REPORT
CONTENTS
A. SUMMARY TECHNICAL STATUS OF EACH WG & BOF
B. CROSS-AREA TECHNICAL ISSUES
C. OTHER ISSUE AND CONCERNS
D. PROPOSED WG RESOLUTIONS/ACTION ITEMS
April 20, 2023 3
B. SUMMARY TECHNICAL STATUS1. RAC WG
Goal: Obtain ISO approval of a standard that establishes the criteria that a repository must meet to be designated an ISO Trusted Digital Repository
Working Group Status: Active __X_ Idle ____
Working Group Summary Situation:
status: OK CAUTION PROBLEM
comment: “Requirements on Bodies..” approved by CCSDS and now awaiting ISO review
Green book draft awaiting finalisation based on audit experiences
WG REPORT
April 20, 2023 4
B. SUMMARY TECHNICAL STATUS: 2
Working Group Summary progress:
– Reviewed status of the documents on RAC Wiki in weekly videoconferences of 6-12 people for 90 mins each
– Face to face meeting in Noordwijk
– “Requirements for Bodies...” – completed CCSDS process, now awaiting ISO FDIS review as ISO 16919
– Schedule (major deliverables only)
• Green book finalisation delayed until audits undertaken by auditors. Then update to Green book will be made by end of 2014 – consistent with revised “Requirements for Bodies..”.
April 20, 2023 5
None
C. CROSS-AREA TECHNICAL ISSUES
WG REPORT
April 20, 2023 6
D. OTHER ISSUES AND CONCERNS
A. Issue 1 None.
WG REPORT
April 20, 2023 7
E. PROPOSED RESOLUTIONS AND ACTIONS FOR CESG/CMC APPROVAL
None
WG REPORT