    BHARTIYA INSTITUTE OF ENGINEERING AND

    TECHNOLOGY, SIKAR

    CONDIDATES DECLARATION

    I hereby certify that the work which is being presented in the report entitled SuratgarhSuper Thermal Power Station, Suratgarh by Rakesh kumar kumawat in partialfulfillment of requirements for the award of degree of B.Tech(3rd year, Electrical Engg)

    submitted in the Department of Electrical Engg. at Jaipur National University, Jaipuris an authentic record of my own carried out during a period from Jun 14, 2010 to July28, 2010 under the supervision of Naveen Chand Jain.

    Signature of the Student

    The B.Tech (3rd year, Electrical Engg) seminar presentation of Rakesh kumarkumawat has been held on.and accepted.

    Signature of the Examiner 1 Signature of the Examiner 2

    II

  • 7/27/2019 Reportstps

    3/9

  • 7/27/2019 Reportstps

    4/9

    PREFACE

    This is training of 45days my training place was STPS, SURATGARH.STPS means is

    super thermal power station generated the electrical energy by thermal / steam energy athigh presser and high voltage.

    A thermal power station is a power plant in which the prime mover is steam driven.Water is heated, turns into steam and spins a steam turbine which drives an electricalgenerator or alternator which convert mechanical energy into electrical energy. The basicthree source of energy used for generation of electricity are water, coal and nuclear fuels.

    Arrangement of different feeder level and switch yards included information of bus bararrangement of different level isolator and growing substation also power transformercircuit breaker oil, filtration plant, and compression protection control room and place

    are level.

    IV

    http://en.wikipedia.org/wiki/Power_planthttp://en.wiktionary.org/wiki/prime_moverhttp://en.wikipedia.org/wiki/Steamhttp://en.wikipedia.org/wiki/Steam_turbinehttp://en.wikipedia.org/wiki/Electrical_generatorhttp://en.wikipedia.org/wiki/Electrical_generatorhttp://en.wikipedia.org/wiki/Power_planthttp://en.wiktionary.org/wiki/prime_moverhttp://en.wikipedia.org/wiki/Steamhttp://en.wikipedia.org/wiki/Steam_turbinehttp://en.wikipedia.org/wiki/Electrical_generatorhttp://en.wikipedia.org/wiki/Electrical_generator
  • 7/27/2019 Reportstps

    5/9

    PAGE NO.1 INTRODUCTION 01

    1.1 LOCATION 01

    1.2 OPRATION PERFORMANCE OF THE PLANT 02

    1.3 ENVIRMENTAL PROFILE 02

    2 SELECTION OF THERMAL POWER PLANT 03

    2.1 PLANT LOCATION 03

    2.2 SIZE OF UNIT 03

    3 EQUIPMENT ON A THERMAL POWER PLANT 04

    3.1 COAL HANDLING PLANT 05

    3.1.1 UNLOADING 05

    3.1.2 TRANSFER 06

    3.1.3 STOKER 06

    3.1.4 PURVERIZATION OF COAL 07

    3.1.5 ASH DISPOSAL 08

    3.2 DRAFT SYSTEM 08

    3.3 BOILER 09

    3.3.1 FIRE TUBE BOILER 10

    3.3.2 WATER TUBE BOILER 11

    3.3.3 BOILER DRUME 12

    3.4 ASH HANDLING PLANT 13

    3.5 TURBINE 14

    3.5.1 IMPULSE TURBINE 15

    V

  • 7/27/2019 Reportstps

    6/9

    3.5.2 IMPULSE REACTION TURBINE 15

    3.6 CONDENSER 16

    3.7 ECONOMIZER 17

    3.8 SUPER HEATER AND REHEATER 18

    3.9 DEHEATER 19

    3.10 AIR PREHEATER 20

    3.11 ALTERNATOR 21

    3.12 COOLING TOWER 22

    3.13 FEED WATER HEATER 23

    3.14 ELECTRO STATIC PRECIPITER 24

    3.15 STACK 26

    4 CONCLUSION 27

    5 REFERANCE 28

    PAGE NO.

    DIAGRAMS:1. COAL HANDLING PLANT 05

    2. RAILOY 06

    3. COAL POLZER 07

    4. FORCED DRAF FAN 09

    5. FIRE TUBE BOILER 11

    VI

  • 7/27/2019 Reportstps

    7/9

  • 7/27/2019 Reportstps

    8/9

    NOTE:Type of font: Times New RomanMain heading: 14 Times New Roman, Bold, capital latter

    Sub heading: 12 Times New Roman Bold , small latter

    Line spacing: 1.5

    Report : 12 Times New Roman

    VIII

  • 7/27/2019 Reportstps

    9/9

    IX