Reports TAG Update - BrMUG · 2017. 9. 29. · 2 Report TAG baseline suggestions: •Font size...
Transcript of Reports TAG Update - BrMUG · 2017. 9. 29. · 2 Report TAG baseline suggestions: •Font size...
1
AASHTOWare Bridge
2017BrMUG Reports TAG Update
2
Report TAG baseline suggestions:
• Font size should be legible
• English units
• Most existing reports should be
started from scratch
• Any table on a page should be able
to be exported in excel
3
Updated reports?
• 23 Metrics
• Orphaned Elements
4
23 Metrics
• Includes Metrics 6, 7, 8, 9, 10, 11, 13, and
14
5
Orphaned Elements
6
Which reports to focus on?
• The TAG decided to discuss
inspection/SI&A first.
7
Which “existing” reports to focus on?
• Inspection
• Inspection SI&A
• Network Element Summary
• Bridge Condition Summary
8
9
• “One Stop”
Inspection reports
• Combines SI&A,
Element Report,
Inspection
Procedures
Report, and a
Channel Profile
Report
10
Which other reports to focus on?
11
Inspection Data Work Candidates
Default Utility Tree Utility Weight Profiles
Benefits
Actions Network Actions
Element Deterioration Rates NBI Deterioration
Rates NBI Conversion
Profiles
Network
Policies Lifecycle
Policies Funding Sources
Projects
Segments
Performance Measures
Funding Allocation
Programs
Scenario
Explorer
Optimization
Project Categories
NBIS requirements, Summary
Listing of Bridges & Condition
Strategy to
minimize life
cycle costs
Performance Target
Alternative Strategies
Lifecycle Planning
Deterioration
Models
Work Types
& Costs
Bridge
Objectives &
Measures
Identify &
Assess Risk
Evaluate &
Prioritize Risk
Performance
Target
Financial Plan – 10 year
costs and annual needs
Investment Strategies & 5 year Plan
12
Which other reports to focus on?
• Provide feedback/ideas on handout
• Interested not only in *which* reports, but what
content do you need?
• Add thoughts later and email Beckie
13
Or… join the Reports TAG!