Reports - Production_R0
Transcript of Reports - Production_R0
-
7/27/2019 Reports - Production_R0
1/14
Spill over fromLast Month
Prep weld Paint
0 #DIV/0! 0 0 0 0
Cummulative
workablePrep. weld Paint
0 0 0 #DIV/0! 0 0 0 0
Tons or %
Affecting
Workable
Prod.(Due
to N/A-
Total
Type of
structures
WIP status as
W.O.
No
Total
Weight
(MT)
Date Of
Receipt
Sl.No Job.No Client
Work Order Details
Workable
(MT)
Non-
Workable
(MT)
W.O.
No
Total
Weight(MT)
Date Of
Receipt
TotalWork Order received In Month_______
Work Order Details
Workable
(MT)
Non-
Workable
(MT)
Tons or %
Affecting
WorkableProd.(Due
Type of
structures
Client
WIP status a
Bilad Oman LLC-Steel Industries
Project Production Plan -Month/Year
Sl.No Job.No
-
7/27/2019 Reports - Production_R0
2/14
Sl No. Job No. Work Order Drg No. Item No. Qty. Process WelderID Joint NDT Rem
Tim
Inspection Request Date : Report No.
Bilad Oman L.L.C.-Steel Industries
Offered By. Signature
Inspection Comments
All Items are Released for Blasting and Painting Except for the Hold Items as Commented Above
Inspected By. Signature Date
-
7/27/2019 Reports - Production_R0
3/14
BLASTING & PAINTING - February 2012
MT M-Hrs MT M-Hrs MT M-Hrs MT M-Hrs MT M-Hrs
1-Feb
2-Feb
3-Feb
4-Feb
5-Feb
6-Feb
7-Feb
8-Feb
9-Feb
10-Feb
11-Feb12-Feb
13-Feb
14-Feb
15-Feb
16-Feb
17-Feb
18-Feb
19-Feb
20-Feb
21-Feb
22-Feb23-Feb
24-Feb
25-Feb
26-Feb
27-Feb
28-Feb
29-Feb
0
TOTAL 0 0 0 0 0 0 0 0 0
DATE
TOTAL BS-46 BS-49 BS-51 BS-52
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
-
7/27/2019 Reports - Production_R0
4/14
MT M-Hrs MT M-Hrs MT M-Hrs National Expat Supply Total
0
0
0
0
0
0
0
0
0
0
00
0
0
0
0
0
0
0
0
0
00
0
0
0
0
0
0
0
0 0 0 0 0 0 0 0
Man-Hrs Consumption Report
MANDAYS
#DIV/0! #DIV/0! #DIV/0!
BS-60 BS-61 BS-62 Production Strength
-
7/27/2019 Reports - Production_R0
5/14
0
0
0
0
0
0
0
0
0
0
00
0
0
0
0
0
0
0
0
0
00
0
0
0
0
0
0
0
0 0 0 0 0 0 0
Available
M-hrsIDLE MAN HOURS
Non
productivity
Mhr's
OvertimeAbsent Rework
Flashings /
Gutter/
Handrails/
Sagrods/ Rod
-
7/27/2019 Reports - Production_R0
6/14
UOM PREP FITUP PAINTING TOTAL
Man days
Man days
M-Hrs.
M-Hrs.
M-Hrs.
M-Hrs.
M-Hrs.
M-Hrs.
MT
M-hrs/Ton
Project
NameTotal FG.
Man-Hrs
Preparation
Man-Hrs
Fit Up
Man-Hrs
PaintingTotal Man-Hrs
Avg
ProductionM-hrs/Ton
After Painting 0
0.00 0.00 0.00 0.00 0.00
Project No.Work
Order
Description Qty. Weight RMEquivalent
Production (MT)
0.000
Project No.Work
Order
Man
Hour's
Total Rework Equivalent Production 0.000
Total Other Item's Equivalent Production
Rework Details
RATE (M.Hr's/UNIT)Equivalent production
(MT)REMARKS
Total FG 0.00
Other Items Production--Report
RATE (M.Hr's/UNIT)
Productivity
Project No. Man-Hrs Welding
Overtime
Available Manpower
Production
IDLE Man Hours
Flashing / Gutter / Handrails/
Anchor Bolts / Sagrods
Non-Productive Hrs.
Production Strength
Absentism
Rework
Description WELD
Bilad Oman L.L.C-Steel IndustriesPRODUCTIVITY REPORT -Month /Year AS ON:
PRD/DPF-7.0.8 REV_
-
7/27/2019 Reports - Production_R0
7/14
Emp. Month:
TOTAL
P (hrs) OT (hrs) P (hrs) OT (hrs) P (hrs) OT (hrs) P (hrs) OT (hrs) P (hrs) OT (hrs) (HRS)
21 5 0 3.5 0 0 2 10.522 8.5 2 10.5
23 8.5 2 10.5
24 8.5 2 10.5
25 8.5 2 10.5
26 0
27 0
28 0
29 0
30 0
31 0
1 0
2 0
3 0
4 0
5 0
6 0
7 0
8 0
9 0
10 0
11 0
12 0
13 0
14 0
15 0
16 0
17 0
18 0
19 0
20 0
TOTAL 22 4 3.5 0 0 2 17 4 0 0
Signature Foreman Verified By
Bilad Oman L.L.C-Steel Industries
BO-420063
Job Card DepartmentName :
Trade :
Date
Allocation to jobs (hours)
BO-420051 BO-420052 BO-420054 BO-420062
PRD/DPF-7.0.5 REV_
-
7/27/2019 Reports - Production_R0
8/14
Sl.No HAZARDS
Sl. Employees-Present ( Name) Employee NO Designation Signature
Training Conducted By
NAME
SIGN
DATE
Date :
TIME:
CONTROL MEASURES
Bilad Oman LLC -Steel Industries
Tool Box TalkDEPARTMENT:
SUBJECT:
HSE/TBT/01 REV_
-
7/27/2019 Reports - Production_R0
9/14
Training Start Date :
Training Duration :
S.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
S.No. Name Emp. No. Trade Signature
1
2
3
4
5
6
7
8
9
10
Signature
BILAD OMAN LLCSteel Industries
IN-HOUSE TRAINING RECORDDepartment :
Subject :
DETAILS OF TRAINING
I certifiy that the above employees have understood the subject and attained required competence level with
respect to training imparted.
Training Conducted By
Name Position
Details of the Employee Trained
Declaration By Trainer
HRD/DPF/10.0.1 Rev_
-
7/27/2019 Reports - Production_R0
10/14
1 2 3 4 5 6 7 8 9 ## ## ## ## ## ## ## ## ## ## 20 #
Planned 0
Actual 0
Planned 0
Actual 0
Beam Proceesor Planned 0Actual 0
Planned 0
Actual 0
Planned 0
Actual 0
Planned 0
Actual 0
Planned 0
Actual 0
Planned 0
Actual 0
Planned 0
Actual 0
Planned 0
Actual 0
Planned 0
Actual 0
Planned 0
Actual 0
Planned 0
Actual 0
Planned 0
Actual 0
Planned 0
Actual 0
Planned 0
Actual 0
Planned 0
Actual 0
Planned 0
Actual 0EXTRA HEAVY STRUCTURE
2
LIGHT STRUCTURE
Daily Production Plan
LIGHT STRUCTURE
MEDIUM STRUCTURE
1
4
BU-Manual
Month-Year
A
Plate processor
1
2
B
TOTAL
Sheet Processor
Machining work
BU-Auto
6
HEAVY STRUCTURE
EXTRA HEAVY STRUCTURE
2
HEAVY STRUCTURE3
MEDIUM STRUCTURE
1
3
FABRICATION
WELDINGC
BILAD OMAN LLC
PREPARATION
4
3
4
5
Page 10 of 14
-
7/27/2019 Reports - Production_R0
11/14
1 2 3 4 5 6 7 8 9 ## ## ## ## ## ## ## ## ## ## 20 ##
Planned 0
Actual 0
Daily Production Plan Month-Year
TOTAL
BILAD OMAN LLC
Planned 0
Actual 0
Planned 0Actual 0
Planned 0
Actual 0
Planned 0
Actual 0
Planned 0
Actual 0
Planned 0
Actual 0
Planned 0
Primer 0
Mid 0
Final 0
Actual 0
Primer 0Mid 0
Final 0
Planned 0
Primer 0
Mid 0
Final 0
Actual 0
Primer 0
Mid 0
Final 0
Planned 0
Primer 0
Mid 0
Final 0
Actual 0Primer 0
Mid 0
Final 0
Planned 0
Primer 0
Mid 0
Final 0
Actual 0
Primer 0
Mid 0
Final 0
3 HEAVY STRUCTURE
4 EXTRA HEAVY STRUCTURE
1 LIGHT STRUCTURE
2 MEDIUM STRUCTURE
2
PAINTING
BLASTING
Manual Blast 1
D
Auto Blast 1
Manual Blast 2
E
Auto Blast 2
3
4
1
Page 11 of 14
-
7/27/2019 Reports - Production_R0
12/14
0 31
Page 12 of 14
-
7/27/2019 Reports - Production_R0
13/14
0 31
Page 13 of 14
-
7/27/2019 Reports - Production_R0
14/14
D:\Bilad-Amarjeet\SAP\Final Submissio