Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

82
Reporting & Reporting & Recordkeeping Recordkeeping Requirements Requirements § § 63.1515 – 63.1515 – 63.1517 63.1517

Transcript of Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Page 1: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Reporting & Reporting & Recordkeeping Recordkeeping Requirements Requirements

§§63.1515 – 63.151763.1515 – 63.1517

Page 2: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Reporting and Recordkeeping Reporting and Recordkeeping RequirementsRequirements

• §§63.1515 – Notification requirements63.1515 – Notification requirements

• §§63.1516 – Reporting requirements63.1516 – Reporting requirements

• §§63.1517 – Recordkeeping requirements63.1517 – Recordkeeping requirements

Page 3: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Notification RequirementsNotification Requirements

§§63.151563.1515

Page 4: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

NotificationNotification Requirements Requirements

• Initial Notification - Initial Notification - §§63.1515(a)63.1515(a)

• 1515 Notification of compliance status 1515 Notification of compliance status - - §§63. (b)63. (b)

Required Notices

Page 5: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Initial Notification Initial Notification RequirementsRequirements

• Must submit if:Must submit if:

– Area source becomes a major sourceArea source becomes a major source

– New or reconstructed affected or major New or reconstructed affected or major affected sourcesaffected sources

– Intends to construct or reconstruct affected Intends to construct or reconstruct affected sourcesource

Page 6: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• Must submit by:Must submit by:

– 120 days after effective date ( if startup 120 days after effective date ( if startup date precedes effective date), ordate precedes effective date), or

– Within 120 days of becoming subject to Within 120 days of becoming subject to rulerule

Page 7: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• Information that goes in initial notification Information that goes in initial notification per 63.9(b)(2)per 63.9(b)(2)

– Identity of relevant standardIdentity of relevant standard

– Owner/operatorOwner/operator

Page 8: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

– Physical address of sourcePhysical address of source

– Nature, size, design, method of Nature, size, design, method of operation, capacityoperation, capacity

– Major or areaMajor or area

Page 9: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• In addition to initial notification,In addition to initial notification,

– Notice of special compliance obligations Notice of special compliance obligations (see 63.6(b)(3),(4))(see 63.6(b)(3),(4))

Page 10: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

– Notice of performance tests and VE Notice of performance tests and VE teststests

– Additional notice requirements for Additional notice requirements for sources using CMSsources using CMS

Page 11: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• Notification of performance tests and Notification of performance tests and VE testsVE tests

– Performance test notice – 60 days Performance test notice – 60 days prior to testprior to test

– Opacity or VE test notice – 30 days Opacity or VE test notice – 30 days prior to testprior to test

Page 12: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• Additional information required in Additional information required in notices for sources using CMSnotices for sources using CMS

– Requirements defined in 63.9(g), Requirements defined in 63.9(g), e.g., date of CMS performance e.g., date of CMS performance evaluationevaluation

Page 13: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.
Page 14: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Notification of Compliance Notification of Compliance StatusStatus

• General requirements:General requirements:

– Required of each owner and operatorRequired of each owner and operator

– Within 60 days of compliance dates in Within 60 days of compliance dates in §§63.150163.1501

Page 15: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• General Requirements Cont’d.:General Requirements Cont’d.:

– Signed and accuracy certified by Signed and accuracy certified by responsible officialresponsible official

• May be submitted in following manner:May be submitted in following manner:

– In operating permit applicationIn operating permit application

Page 16: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• May be submitted in following manner May be submitted in following manner Cont’d.:Cont’d.:

– In amendment to operating permit In amendment to operating permit applicationapplication

– Separate submittalSeparate submittal

– Combination of aboveCombination of above

Page 17: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.
Page 18: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Notification of Compliance StatusNotification of Compliance Status

• All information required by 63.9, e.g., All information required by 63.9, e.g.,

– Method of determining complianceMethod of determining compliance

– Test resultsTest results

Required Information

Page 19: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Required Information Cont’d.Required Information Cont’d.

– Methods to determine continuous Methods to determine continuous compliancecompliance

– Statement as to complianceStatement as to compliance

Page 20: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• Approved site-specific test plan and CMS Approved site-specific test plan and CMS performance evaluation resultsperformance evaluation results

• Unit labeling per Unit labeling per §§63.1506(b)63.1506(b)

Required Information - continued

Page 21: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Required Information - continuedRequired Information - continued

• Operating parameter value (range) for Operating parameter value (range) for each affected source or emission uniteach affected source or emission unit

– Include supporting documentationInclude supporting documentation

– Procedure use to establish value Procedure use to establish value (lime, injection rate, flux rate, etc.)(lime, injection rate, flux rate, etc.)

Page 22: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• Capture/collection equipment design Capture/collection equipment design informationinformation

• Conformance with bag leak detection Conformance with bag leak detection specificationsspecifications

Required Information - continued

Page 23: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• Documentation specifications for Documentation specifications for afterburner used on scrap afterburner used on scrap dryer/delac/decoat kiln Documentation dryer/delac/decoat kiln Documentation of specifications for sweat furnace of specifications for sweat furnace afterburner afterburner

– – temperature/residence timetemperature/residence time

Required Information - continued

Page 24: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Required Information - continued

• Approved OM&M PlanApproved OM&M Plan

• Startup, shutdown, and malfunction Startup, shutdown, and malfunction planplan

Page 25: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.
Page 26: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Reporting RequirementsReporting Requirements

§§63.151663.1516

Page 27: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Required ReportsRequired Reports

• Startup, shutdown, and malfunction Startup, shutdown, and malfunction plan-plan-§§63.1516(a)63.1516(a)

• Excess emissions/summary report- Excess emissions/summary report- §§63.1516(b)63.1516(b)

Page 28: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Required Reports Cont’d.Required Reports Cont’d.

• Annual compliance certifications- Annual compliance certifications- §§63.1516(c)63.1516(c)

Page 29: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.
Page 30: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Startup, Shutdown, and Startup, Shutdown, and Malfunction (SS&M) PlanMalfunction (SS&M) Plan

• Develop/implement Plan according to Develop/implement Plan according to 63.6(e)(3)63.6(e)(3)

Page 31: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Startup, Shutdown, and Startup, Shutdown, and Malfunction (SS&M) Plan Cont’d.Malfunction (SS&M) Plan Cont’d.

• For malfunctions, plan to also include:For malfunctions, plan to also include:

– Procedures to determine and record Procedures to determine and record causecause

– Corrective actions to be takenCorrective actions to be taken

Page 32: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.
Page 33: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Excess Emissions Summary Excess Emissions Summary ReportReport

• Required semiannually (every 6 months)Required semiannually (every 6 months)

• 60 days after end of 6-month period60 days after end of 6-month period

• Must contain information on CMS Must contain information on CMS performance per 63.10 (c)performance per 63.10 (c)

General

Page 34: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Excess Emissions Summary Excess Emissions Summary Report Cont’d.Report Cont’d.

GeneralGeneral

• When no deviations from parameters-When no deviations from parameters-report “No excess emissions”report “No excess emissions”

Page 35: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• Corrective action, per OM&M Plan, not Corrective action, per OM&M Plan, not initiated within 1 hour for:initiated within 1 hour for:

–Bag leak detection alarmBag leak detection alarm

–COM deviationCOM deviation

–VE from aluminum scrap shredderVE from aluminum scrap shredder

Report required if . . .

Page 36: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

ReportReport required if . . .

• Excursion from approved operating Excursion from approved operating parameter value or rangeparameter value or range

• Action taken not consistent with SS&M Action taken not consistent with SS&M PlanPlan

Page 37: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Report required if . . .Report required if . . .

• Affected source not operated according to Affected source not operated according to this subpartthis subpart

• Deviation from 3-day, 24 hr rolling avg. Deviation from 3-day, 24 hr rolling avg. emission limit for SAPUemission limit for SAPU

Page 38: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.
Page 39: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Excess Emissions Summary Excess Emissions Summary ReportReport

Thermal chip dryer – Only unpainted Thermal chip dryer – Only unpainted aluminum chips usedaluminum chips used

• Dross-only furnace – Only dross usedDross-only furnace – Only dross used

Required Certifications

Page 40: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Required Certifications- continued

• Sidewell group 1 furnace, w/APCD-Sidewell group 1 furnace, w/APCD-

– Molten metal level above top of hearth/ Molten metal level above top of hearth/ sidewell passage during reactive fluxing, sidewell passage during reactive fluxing, andand

Page 41: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Required Certifications- continuedRequired Certifications- continued

– Reactive fluxing only in sidewell (or Reactive fluxing only in sidewell (or hearth) equipped with APCD for PM, hearth) equipped with APCD for PM, HCI, D/FHCI, D/F

• Group 1 melting/holding furnace, w/o Group 1 melting/holding furnace, w/o APCD – Only clean charge usedAPCD – Only clean charge used

Page 42: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Required Certifications- continuedRequired Certifications- continued

• Group 2 furnaceGroup 2 furnace– Only clean charge usedOnly clean charge used– No reactive fluxingNo reactive fluxing

• In-line fluxer using no reactive flux – OnlyIn-line fluxer using no reactive flux – Only nonreactive, non-HAP fluxes usednonreactive, non-HAP fluxes used

Page 43: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• Submit results of any performance test Submit results of any performance test documenting:documenting:

• Test methods and proceduresTest methods and procedures• Process operationsProcess operations• Monitoring parameters ranges/values Monitoring parameters ranges/values

for each testfor each test

Page 44: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.
Page 45: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Annual Compliance CertificationsAnnual Compliance Certifications

• Required by 40 CFR part 70 or 71Required by 40 CFR part 70 or 71

• Certify continuing compliance, for the Certify continuing compliance, for the year, based upon:year, based upon:

– Any period of excess emissions Any period of excess emissions

reported as requiredreported as required

Page 46: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Annual Compliance Annual Compliance Certifications Cont’d.Certifications Cont’d.

– Met all monitoring, recordkeeping, Met all monitoring, recordkeeping, and reporting requirementsand reporting requirements

Page 47: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.
Page 48: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Recordkeeping Recordkeeping RequirementsRequirements§§63.151763.1517

Page 49: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Recordkeeping Recordkeeping RequirementsRequirements

• General requirements for keeping recordsGeneral requirements for keeping records– Subpart RRRSubpart RRR– General Provisions (63.10(b))General Provisions (63.10(b))

• Specific requirements of subpart RRRSpecific requirements of subpart RRR

Page 50: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

General Recordkeeping General Recordkeeping Requirements Requirements

Subpart RRRSubpart RRR

• Retain records for 5 years – most recent Retain records for 5 years – most recent 2 yrs onsite, remaining 3 yrs offsite2 yrs onsite, remaining 3 yrs offsite

Page 51: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Subpart RRR Cont’d.Subpart RRR Cont’d.

• Retain on microfilm, computer disks, Retain on microfilm, computer disks, magnetic tape, microfichemagnetic tape, microfiche

• Report information on paper or on diskReport information on paper or on disk

Page 52: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

General ProvisionsGeneral Provisions §§ 63.10(b) 63.10(b)

• Process SS&M’sProcess SS&M’s

• APCD malfunction and maintenance on APCD malfunction and maintenance on APCDAPCD

Required RecordsRequired Records

Page 53: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Required Records Cont’d.Required Records Cont’d.

• Information necessary to show Information necessary to show conformance with SS&M Plan, e.g., conformance with SS&M Plan, e.g., checklistchecklist

• Each period during which CMS Each period during which CMS malfunctions or is inoperativemalfunctions or is inoperative

Page 54: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Required Records - continuedRequired Records - continued

• Results of performance/ VE/opacity Results of performance/ VE/opacity tests, CMS performance evaluationstests, CMS performance evaluations

• CMS calibrations, adjustments, CMS calibrations, adjustments, maintenancemaintenance

Page 55: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• Documentation of notifications - initial Documentation of notifications - initial and compliance statusand compliance status

• Keeps records supporting applicability Keeps records supporting applicability determination that source is not subject determination that source is not subject to standardto standard

Required Records - continuedRequired Records - continued

Page 56: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Subpart RRR Recordkeeping Subpart RRR Recordkeeping RequirementsRequirements

For affected sources/emission units For affected sources/emission units controlled by fabric filtercontrolled by fabric filter

Required RecordsRequired Records

Page 57: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• If bag leak detection system used, keep If bag leak detection system used, keep records of:records of:

–Total operating hours of source Total operating hours of source –Each alarmEach alarm–Time of corrective actionsTime of corrective actions–Cause of alarm, corrective actions Cause of alarm, corrective actions

takentaken

Page 58: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• If COM used, keep records of:If COM used, keep records of:– Opacity measurement dataOpacity measurement data– Explanations for periods when 6 minute Explanations for periods when 6 minute

opacity exceeds 5%, includingopacity exceeds 5%, including–Cause and time of emissions and Cause and time of emissions and

corrective action takencorrective action taken–Time of corrective actionsTime of corrective actions

Page 59: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• Affected sources controlled by Affected sources controlled by afterburner, keep records ofafterburner, keep records of

– 15-minute average operating 15-minute average operating temperaturestemperatures

(cont’d on next page)(cont’d on next page)

Page 60: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

– Periods when 3-hr average Periods when 3-hr average temperature < established minimumtemperature < established minimum

–Explanation of cause, corrective Explanation of cause, corrective actions actions

– Annual InspectionsAnnual Inspections

Page 61: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• For scrap dryer/delacq/decoat kiln For scrap dryer/delacq/decoat kiln and group 1 furnaceand group 1 furnace– Subject to D/F and HCI emission Subject to D/F and HCI emission

standards, andstandards, and

– Controlled by lime-injected fabric filterControlled by lime-injected fabric filter

Page 62: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• Keep records of:Keep records of:– 15-minute average inlet temperatures15-minute average inlet temperatures

– 3-hr block average temperature > 3-hr block average temperature > established max (+25F)established max (+25F)

– Explanation of cause, corrective actionsExplanation of cause, corrective actions

Page 63: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• Sources controlled by lime-injected Sources controlled by lime-injected fabric filter, keep records of:fabric filter, keep records of:– Inspections of feeder hopper to verify Inspections of feeder hopper to verify

presence/flow of limepresence/flow of lime

(Cont’d. on next page)(Cont’d. on next page)

Page 64: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• For flow monitors, pressure drop For flow monitors, pressure drop sensors or load cells--monitor and sensors or load cells--monitor and sensor outputsensor output

• If blockages occurred, cause and If blockages occurred, cause and corrective actionscorrective actions

Page 65: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

– Daily inspection of lime feeder setting, if monitoredDaily inspection of lime feeder setting, if monitored• For deviations cause of blockage and corrective For deviations cause of blockage and corrective

actionsactions

• Sources controlled by lime-injected fabric Sources controlled by lime-injected fabric filter - continuedfilter - continued

Page 66: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

– Noncontinuous lime injection system

• Monitored per approved alternative monitoring requirements (63.1510(v)), record:

–Details of each lime addition

–Average lime addition rate

Page 67: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• Group 1 furnaces, or in-line fluxers, keep Group 1 furnaces, or in-line fluxers, keep records of:records of:

– 15-minute block average flux injection15-minute block average flux injection

– Total flux injection rateTotal flux injection rate

Page 68: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

– CalculationsCalculations

– Periods when rate > established Periods when rate > established operating parameter valueoperating parameter value

• Corrective actions takenCorrective actions taken

Page 69: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• CMS, keep records required by CMS, keep records required by 63.10(c ), e.g.:63.10(c ), e.g.:– All CMS measurementsAll CMS measurements– Date/time CMS was inoperativeDate/time CMS was inoperative– Nature of repairs to CMSNature of repairs to CMS– Procedures for CMS quality control Procedures for CMS quality control

programprogram

Page 70: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• Each affected source/emission unit Each affected source/emission unit subject to standard in lb/ton of subject to standard in lb/ton of feed/chargefeed/charge

– Records of feed/charge (or throughput) Records of feed/charge (or throughput) weightsweights

• For each operating cycle orFor each operating cycle or

Page 71: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• Time period used in performance Time period used in performance testtest

• For group 1 furnace w/o APCDFor group 1 furnace w/o APCD– Approved site-specific monitoring planApproved site-specific monitoring plan– Document conformance with planDocument conformance with plan

Page 72: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• For thermal chip dryer, dross-only For thermal chip dryer, dross-only furnace, group 1 melting/holding furnace, group 1 melting/holding furnaces w/o APCD keep records of:furnaces w/o APCD keep records of:– All charge materialsAll charge materials

Page 73: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• Group 1 sidewell furnace w/APCDGroup 1 sidewell furnace w/APCD– Maintain operating logs documentingMaintain operating logs documenting

• Level of molten metal during fluxingLevel of molten metal during fluxing• Fluxing only to sidewell or hearth w/ APCDFluxing only to sidewell or hearth w/ APCD

Page 74: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• For in-line fluxer using no reactive fluxFor in-line fluxer using no reactive flux

– Maintain operating logs documenting Maintain operating logs documenting each flux usedeach flux used

• For group 2 furnaces, records ofFor group 2 furnaces, records of

– All charge materialsAll charge materials

– All fluxing materialsAll fluxing materials

Page 75: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• For each affected source/emission For each affected source/emission unit subject to labeling requirementsunit subject to labeling requirements– Records of monthly inspections for Records of monthly inspections for

proper unit labelingproper unit labeling

Page 76: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• For emission capture/collection and closed For emission capture/collection and closed vent systemvent system

– Records of annual inspectionsRecords of annual inspections

• Records for anyany approved alternative monitoring or test procedure

Page 77: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• Copy of all required plans, includingCopy of all required plans, including

– SS&M PlanSS&M Plan

– OM&M Plan (major and area OM&M Plan (major and area sources)sources)

– Site-specific SAPU emission planSite-specific SAPU emission plan

Page 78: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• For each SAPUFor each SAPU

– Total charge weight, orTotal charge weight, or

– Total aluminum produced for each Total aluminum produced for each 24-hr period24-hr period

– Calculations of 3-day, 24-hr rolling Calculations of 3-day, 24-hr rolling average emissionsaverage emissions

Page 79: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.
Page 80: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

Documents a Facility Must Documents a Facility Must SubmitSubmit

• Initial notification (1time)Initial notification (1time)

• Notification of compliance status (after Notification of compliance status (after any req’d performance/opacity/VE any req’d performance/opacity/VE test)test)

Page 81: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• OM&M Plan (1 time, updates as OM&M Plan (1 time, updates as needed)needed)

• Excess emission/summary report (1/6 Excess emission/summary report (1/6 mo)mo)

Page 82: Reporting & Recordkeeping Requirements §63.1515 – 63.1517.

• Annual compliance certification (1/yr)Annual compliance certification (1/yr)

• Site specific test plan (Prior to Site specific test plan (Prior to performance tests)performance tests)