Reporte de Evaluación de Integridad de Tubulares...

78
© 2014 GOWell. All rights reserved. This document and the information contained herein are the sole property of GOWell. Any reproduction or distribution-in whole or in part-without written permission of GOWell is prohibited. Reporte de Evaluación de Integridad de Tubulares (MTD/MFC) Compañia: PEMEX Exploracion y Produccion Pozo: Samaria -6117 Yacimiento: Samaria Luna Pais: Mexico Corrida: - Fecha de Registro: 07 Nov 2014 Referencia: - Analista: Geber Leotaud

Transcript of Reporte de Evaluación de Integridad de Tubulares...

Page 1: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

© 2014 GOWell. All rights reserved. This document and the information contained herein are the sole property of GOWell. Any reproduction or distribution-in whole or in part-without written permission of GOWell is prohibited.

Reporte de Evaluación de

Integridad de Tubulares

(MTD/MFC)

Compañia: PEMEX Exploracion y Produccion

Pozo: Samaria -6117

Yacimiento: Samaria Luna

Pais: Mexico

Corrida: -

Fecha de Registro: 07 – Nov – 2014

Referencia: -

Analista: Geber Leotaud

Page 2: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 1 of 77

Tabla de Contenido

1. Objetivos y Conclusiones ................................................................................................................................................ 3

1.1. Introduccion. ........................................................................................................................................................... 3

1.2. Objetivos. ................................................................................................................................................................ 3

1.3. Detalles del Trabajo. ............................................................................................................................................... 3

1.4. Conclusiones ........................................................................................................................................................... 3

1.5. Control de Calidad del Registro. ............................................................................................................................. 4

1.6. Interpretacion del Registro ..................................................................................................................................... 7

1.6.1. Detalles............................................................................................................................................................ 7

1.6.2. Todo el Intervalo Registrado ........................................................................................................................... 8

1.6.3. Tuberia de Revestimiento y produccion 3.5 ;7 y 5 ins. ................................................................................. 10

2. Apendice A: Diagrama de Pozo. .................................................................................................................................... 67

3. Appendix B: Tool Specification ..................................................................................................................................... 68

3.1. MFC Tool Specifications & Logging Modes ........................................................................................................... 68

3.2. MTD Tool Specifications & Logging Modes .......................................................................................................... 69

3.3. Diagrama de la Herramienta. ............................................................................................................................... 70

4. Apendice C: Definicion de Terminos en el Reporte de Analisis de Tubulares .............................................................. 71

4.1. Dimensiones del Tubular ...................................................................................................................................... 71

4.2. Maxima Penetracion ............................................................................................................................................. 72

4.3. Perdida de Pared .................................................................................................................................................. 73

5. Apendice D: Procesamiento y Presentacion de la Data ................................................................................................ 76

5.1. Procesamiento de la Data ..................................................................................................................................... 76

5.2. Descripcion de la Presentacion Post Procesada ................................................................................................... 77

5.3. Lista de Archivos & Medios .................................................................................................................................. 77

Page 3: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 2 of 77

AVISO LEGAL

Este reporte fue preparado por GOWell Petroleum Equipment Co., Ltd o por sus afiliadas o subsidiarias (“GOWell”) como un requerimiento de [Compania] (“Compania”o

“Usted”).

Este reporte es la interpretacion de la informacion suministrada por Usted de GOWell y la interpretacion, analisis, recomendaciones, consejos y conclusiones contenidos

en este reporte son opiniones basadas en inferencias de mediciones, relaciones empiricas, asunciones y practicas de la industria (la “interpretacion y/o

recomendaciones”), dichas inferencias, asunciones y practicas no son infalibles, y en relacion a ello los geologos profesionales, ingenieros, consultores de perforacion,

y analistas pueden diferir y pudieran tener un numero de posibles interpretaciones y conclusiones.

Por consiguiente, GOWELL no garantiza la precision, exactitud, o integridad de cualquier clase de Interpretaciones y/o Recomendaciones, o que Su confianza o la

confianza de terceras partes en tales Interpretaciones y/o Recomendaciones conllevara cualquier resultado particular. USTED ASUME COMPLETA RESPONSABILIDAD

EN EL USO DE TALES INTERPRETACIONES Y/O RECOMENDACIONES Y DE TODAS LAS DECISIONES BASADAS AL RESPECTO (INCLUYENDO SIN LIMITANTES LAS DECISIONES

BASADAS EN CUALQUIER EVALUACION DE GAS Y PETROLEO, PRONOSTICOS DE PRODUCCION Y RESERVAS ESTIMADAS, PROPORCIONADA POR GOWELL MEDIANTE ESTE

DOCUMENTO), Y USTED SE COMPROMETE A LIBERAR, DEFENDER, INDEMNIZAR Y MANTENER INOFENSIVO A GOWELL DE CUANTAS RECLAMACIONES PUEDAN

DERIVARSE DE LA UTILIZACION DE TALES INTERPRETACIONES Y/O RECOMENDACIONES.

Page 4: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 3 of 77

1. Objetivos y Conclusiones

1.1. Introduccion.

El Registro realizado con las herramientas de Detector de Espesores Electromagnetica (MTD) y Multi Finger

Caliper de 24 dedos (MFC24), las cuales fueron corridas el 09 de noviembre del 2014 en el pozo Samaria-6117

desde 4538.0 m hasta superficie.

1.2. Objetivos.

El objetivo de este estudio fue identificar y cuantificar correctamente cualquier perdida de pared o daño (tal

como distorsiones/deformaciones trasversales o pandeos, grietas o rupturas) a traves de las tubería de

producción (TP) de 3.5 pulgadas ; y las tuberías de revestimiento (TR) de 7 y 5 pulgadas respectivamente con

uso de la herramienta MTD .

1.3. Detalles del Trabajo.

El dia 07 de noviembre se bajaron las herramientas MTD y MFC24 en el pozo Samaria -6117, el cual

estaba cerrado, a una velocidad aproximada a 25mpm. Antes se realizo un viaje de calibración hasta 4530.0

metros , profundidad que se tomo como base para el registro, a las 00:00 am aproximadamente, las

herramientas estaban en el fondo del pozo, se procedio abrir Caliper y registrar de forma ascendente a una

velocidad cercana a 5mpm.

1.4. Conclusiones

Según la herramienta MFC 24 se pudo detectar los dos tipos de tubería de producción existentes; el pozo estaba

completado con tubería de 3.5 pulgadas de diámetro pero con características distintas en cuanto a su grado. El

cambio de tubería de 3.5’’ (TRC-95) x 3.5 ‘’ (N-80) fue localizado a 1700.0 m.

A nivel general con la corrida del MFC 24 se observó una tubería de producción de 3.5’’ y revestidor de 5’’ con

buena integridad a lo largo de la sección registrada; no observándose anomalías o características que infirieran

algún daño significativo.

Igualmente en la corrida combinada de MFC-MTD se pudo observar buena integridad tanto en la tubería de

producción como en los revestimientos de 5’’ y 7’’ respectivamente. Solo se observaron valores importantes de

perdida y penetración en la zonas de los intervalos existentes a (4470-4487, 4515-4530) m.

La herramienta MTD detectó con normalidad la existencia del revestidor de 7 ‘’ localizado por detrás de la

tubería de producción a 2333.1 m.

Page 5: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 4 of 77

1.5. Control de Calidad del Registro.

Tabla 1 – Control de Calidad del Registro MFC

Area del Control de Calidad Resultado

1Estan todos los dedos en contacto con la pared interna de la tubería (data cruda)? Yes

2Se realizaron las calibraciones antes y después y están dentro de las especificaciones? Yes

3Se aplico la corrección por descentralización? Yes

4Es aceptable la descentralización de la herramienta? Yes

5El radio promedio se aproxima al radio nominal teórico (en tubería con buena condición)? Yes

6Se observa con claridad los patrones de manufactura de la pared interna (en tubería con buena condición)? Yes

7Existen algunos dedos reconstruidos o atascados? No

8Son los Cuellos o Conexiones identificables en todas las trazas de los dedos? Yes

9Es aceptable el nivel de rotación de la herramienta? Yes

10Ha sido aplicada la calibración master correcta (MFC)? Yes

11Se correlaciona el pase repetido con el principal? No

Comentarios del Control de Calidad

1

2

3

4

5

6

7

8

9

10

11 No fuecorrida la seccion repetida.

Comentarios Adicionales

Page 6: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 5 of 77

Tabla 2 – Control de Calidad del Registro MTD

Área de Control de Calidad Resultado

1Estan todas las curvas del MTD libres de ruidos anormales Si

2Esta la curva AI leyendo por encima de 300 a lo largo de todo el registro y libre de saltos repentinos falsos? Si

3Esta la curva Anoise centrada a 2000 y libre de intervalos ruidosos? Si

4Las curvas crudas (particularmente las A) responden coherentemente con el diagrama del pozo? Si

5La curva de temperatura del hoyo muestra una tendencia geotérmica típica y está libre de ruido? Si

6Son las profundidades de las principales características en el diagrama del pozo consistentes con la respuesta del registro MTD?

Si

7Se identifican con claridad los cuellos de los tubulares interno y externo en las curvas crudas A y C? Si

8El mapa de Control de Calidad del sensor A en tiempo real muestra claramente una característica regular de decaimiento monótono?

Si

9Se mantuvo la velocidad de registro correcta y consistente a lo largo del registro? Si

Comentarios Específicos del Control de Calidad mencionado arriba

1

2

3

4

5

6

7

8

9

Comentarios Adicionales del Control de Calidad

Page 7: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 6 of 77

Informacion del Pozo Complementaria

Requerida Recibida? Opcional Recibida?

Archivo LAS Si Historia del Pozo Si

Copia de Campo Si Historia de Produccion Si

Registro del Trabajo Si Estado del Pozo Si

Diagrama del Pozo Si Registro GR de Hoyo Abierto Si

Diagrama de Completación Si Registro de Evaluación de Cemento

No

Diagrama de la Sarta Si Tipo de Fluido en el Hoyo Si

Programa del Registro Si Registro de la Trayectoria del Pozo

Si

Objetivos del Trabajo Si Archivo DB Si

Page 8: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 7 of 77

1.6. Interpretacion del Registro

1.6.1. Detalles

Según la información proporcionada por la Herramiente de detección de espesores, se registro una

tubería de produccion con un un espesor nominal igual a 0.254 pulgadas correpondiente a una TP de

3.5 pulgadas respectivamente.

Acorde con los resultados de las herramientas MTD y MFC24 la tubería de producción esta en buenas

condiciones. Segun los resultados del MTD los valores de presencia de corrosión en la tubería es muy

ligera, es decir, los valores de corrosion no sobrepasaron el 20%, la mayor de ellas se ubico a los 4095.8

metros con un 14.8% (profundidad de ubicación del Mandril) .

En total se analizaron 460 tubos de producción de los cuales el 99% de las muestras tienen presencia

corrosion que va de 0% a 12% (459 TP) respectivamente (ver figura 4), es decir, valores muy ligeros

según el analisis, y solo un 1% corresponden a muestras con presencia de corrosión que van de 12% a

20%, que aun siguen siendo ligeros, según el analisis.

Desde el punto de vista de penetraciones según la herramienta MFC24, la tubería de producción y

revestidor el 97% (445 tubos) muestran penetraciones ligeras que corresponden a la letra B, es decir

penetraciones que van de 10% a 25%. Un 1.00% (04 tubos) presenta penetraciones que van de 25-

50% que corresponden a la letra C ; y están referidas a las perforaciones existentes en los intervalos

(4470 m - 4487 m) y ( 4515 m – 4530 m); y un 02 % penetraciones con menos de 10 % que

corresponden a la letra A; 08 tubos.

Por otra parte, la herramienta MTD, registro tuberias de revestimiento de 7.0 y 5.0 pulgadas con

espesores nominales de 0.498 y 0.362 pulgadas correspondiente a un peso de 35 lb/ft y 18 lb/ft

respectivamante, valores que estan muy cerca del espesor leido por la herramienta, lo cual indica que

tanto la tubería como los revestidores están en buenas condiciones, como veran en la figura 1 y figura

2; el color verde indica buena integridad en la tubería de revestimiento.

La mayor perdida de metal registrada en la TR de 5.0 pulgadas según el MTD se observo a 4364.9

metros con un 9.7% que representa un espesor minimo de pared igual a 0.327 pulg; en la TR de 7.0

pulgadas se observo a 4388.9 metros con un 14.1 % y un espesor minimo de pared igual a 0.4228 pulg.

(ver figura 6-7).

Para las estadísticas del MFC no se tomaron en consideración los valores generados en los accesorios

de la completacion ( MANDRIL-CAMISA-EMPACADURA ) ; en vista que esto puede dar resultados

pueden afectar las estdisticas finales.

Page 9: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 8 of 77

1.6.2. Todo el Intervalo Registrado.

Figura 1. Intervalo MFC.

Page 10: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 9 of 77

Figura 2. Intervalo MTD.

Page 11: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 10 of 77

1.6.3. Tuberia de Revestimiento 7 y 5 pulgadas.

Se registraron 4360.0 metros de tubería de revestimiento correpondiente a un TR de 7.0 pulgadas de

diametro externo con un espesor de pared igual 0.498 pulgadas, valor que esta muy cerca del espesor leido por

la herramienta, dicha TR esta en buenas condiciones, no presenta ninguna deformidad u anomalia que reportar,

su perdida de metal no supero el 14.1% en todo el intervalo registrado.a su vez se registraron 380 .0 metros del

TR de 5.0 pulgadas de diámetro externo con un espesor de pared igual a 0.362 pulgadas , valor que esta muy cerca

del espesor medido por la herramienta. Con respecto a la tubería de producción TP de 3.5 pulgadas de diámetro

externo con un espesor de pared igual a 0.254 pulgadas ,valor que esta muy cerca del espesor leído por la

herramienta y lo cual indica buena integridad de la misma.

Page 12: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 11 of 77

Figura 3

MTD = Tuberia de Revestimiento

MTD = Tuberia de Produccion

-10%

0%

10%

20%

30%

40%

50%

0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500

% W

all L

oss

Depth (meters)

Max Wall Loss % Per Joint

Page 13: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 12 of 77

Figura 4

Tope (m)

Base (m)

Longitud (m)

Espesor Nom (pulg)

Espsor Min

(pulg)

Max Perdida Metal

(m)

Max Perdida Metal

(%) Grado

4095.09 4107.0 12.41 0.254 0.216 4095.8 14.8 B

4157.93 4170.58 12.65 0.254 0.200 4161.0 21.1 C

Grade Color Wall Loss % Comment

A <12% Very Light

B 12>-20% Light

C 20>-30% Moderate

D 30>-40% Significant

E >40% Intensive

G <Nominal Undergage

A 458

B 1

C 1

D 0

E 0

G 0

MTD = Tuberia de Produccion

A99 %

B0%

C0%D

0%E

0%G

0%

Max Loss % Pie Graph

Page 14: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 13 of 77

Figura 6

MTD = Tuberia de Revestimiento 7 ins.

-10%

0%

10%

20%

30%

40%

50%

0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000

% W

all L

oss

Depth (meters)

Max Wall Loss % Per Joint

Page 15: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 14 of 77

Figura 6

Grade Color Wall Loss % Comment

A <12% Very Light

B 12>-20% Light

C 20>-30% Moderate

D 30>-40% Significant

E >40% Intensive

G <Nominal Undergage

A 316

B 7

C 0

D 0

E 0

G 0

Tope (m)

Base (m)

Longitud (m)

Espesor Nom (pulg)

Espsor Min

(pulg)

Max Perdida Metal

(m)

Max Perdida Metal

(%) Grado

4375.70 4389.50 13.87 0.498 0.428 4388.9 14.1 B

4421.70 4432.00 10.32 0.498 0.434 4422.3 12.8 B

4464.40 4478.30 13.96 0.498 0.437 4477.5 12.3 B

4478.80 4492.10 13.21 0.498 0.435 4489.3 12.6 B

A98%

B2%

C0%D

0%E

0%G

0%

Max Loss % Pie Graph - MTD

MTD = Tuberia de Revestimiento 7 ins.

Page 16: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 15 of 77

-10%

0%

10%

20%

30%

40%

50%

4,150 4,200 4,250 4,300 4,350 4,400 4,450 4,500 4,550

% W

all L

oss

Depth (meters)

Max Wall Loss % Per Joint

MTD = Tuberia de Revestimiento 5 ins.

Page 17: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 16 of 77

Figura 7

A100%

B0%C

0%D

0%E

0%G

0%

Max Loss % Pie Graph - MTD Grade

Color Wall Loss % Comment

A <12% Very Light

B 12>-20% Light

C 20>-30% Moderate

D 30>-40% Significant

E >40% Intensive

G <Nominal Undergage

A 24

B 0

C 0

D 0

E 0

G 0

Page 18: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 17 of 77

Figura 8

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500

% P

enet

rati

on

Depth (meters)

Max Penetration Percent Per Joint MFC24 = TP

Page 19: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 18 of 77

Figura 9

Grade Color

Penetration %

Comment

A <10% Very Light

B 10>-25% Light

C 25>-50% Moderate

D 50>-75% Significant

E >75% Intensive

R <0% < Nominal

IR

A 8

B 445

C 4

D 0

E 0

R 0

Tope (m)

Base (m)

Longitud (m)

Max Pen (m)

Max Pen (pulg)

Max Pen (%) Grado

4468.21 4482.05 13.84 4480.08 4.5 27.3 C

4482.85 4496.79 13.95 4486.24 4.5 27.5 C

4511.32 4524.42 13.10 4520.17 4.6 40.9 C

4524.72 4531.98 7.26 4528.33 4.5 36.5 C

MFC24 = TP

A0%

B65%

C35%

D0%

Max Penetration % Pie Graph

Page 20: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 19 of 77

Figura 10

-10%

0%

10%

20%

30%

40%

50%

0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500

% W

all L

oss

Depth (meters)

Max Wall Loss % Per Joint MFC24 = TP

Page 21: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 20 of 77

Figura 11

Grade Color Wall Loss % Comment

A <12% Very Light

B 12>-20% Light

C 20>-30% Moderate

D 30>-40% Significant

E >40% Intensive

G <Nominal Undergage

A 457

B 0

C 0

D 0

E 0

G 0

MFC24 = TP

A100%

B0%C

0%D

0%E

0%G

0%

Max Loss % Pie Graph

Page 22: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 21 of 77

Tuberia de Produccion - Vista de cambio de grado de TRC-95 a N-80 a 1700 metros en la tuberia de producción.

Figura 12 – Vista de cambio de grado en la tuberia de producción.

Page 23: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 22 of 77

Intervalo perforado desde 4470.0 – 4487.0 metros.

Figura 13 – intervalo perforado 4470.0-4487.0 metros.

Page 24: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 23 of 77

Intervalo perforado desde 4470.0 – 4487.0 metros. Vista 3D.

Figura 14. Vista 3D intervalo perforado 4470.0-4487.0 metros.

Page 25: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 24 of 77

Intervalo perforado desde 4515.0 – 4530.0 metros.

Figura 15 – intervalo perforado 4515.0-4530.0 metros.

Page 26: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 25 of 77

Intervalo perforado desde 4515.0 – 4530.0 metros. Vista 3D.

Figura 16 .vista 3D intervalo perforado 4515.0-4530.0 metros.

Sección registrada con MTD desde 4538.0 a superficie.

Page 27: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 26 of 77

Figura 17. Intervalo registrado de MTD.

Detección de TR de 7 pulgadas por detrás de la tubería de producción a 2333.0 metros.

Page 28: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 27 of 77

Figura 18. Detección de revestidor de 7 pulgadas por detrás de tubería de producción.

Tuberia de producción de 3.5 pulgadas y revestidor de 5 pulgadas según MFC.

Page 29: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 28 of 77

Tope (m) Base (m)

Longitud (m)

Prof.Max Pen (m)

Max Pen (in)

Max Pen (%)

Prof.Max Perdida

Metal (m)

Max Perdida Metal

(%)

Prof.Min Diam (m)

Min Diam (in)

10.17 13.99 3.83 13.47 3.063 14.0 12.07 1.5 13.49 3.0

14.49 23.55 9.06 23.43 3.075 16.3 22.97 2.4 14.76 3.0

24.05 33.13 9.08 32.62 3.092 19.7 32.83 3.3 24.32 3.0

33.63 42.05 8.42 39.16 3.050 11.4 38.52 1.2 36.69 3.0

42.55 51.66 9.11 51.65 3.061 13.6 51.65 1.8 44.24 3.0

52.16 61.14 8.98 52.18 3.064 14.2 60.82 1.2 52.37 3.0

61.64 70.77 9.14 61.67 3.058 13.0 70.77 0.7 63.81 3.0

71.27 80.36 9.08 79.67 3.054 12.2 79.90 3.1 71.54 3.0

80.86 89.89 9.03 85.51 3.061 13.6 86.38 1.0 81.11 3.0

90.39 99.52 9.14 91.78 3.058 13.0 90.44 0.6 90.67 3.0

100.02 109.08 9.06 104.30 3.068 15.0 102.62 0.5 100.26 3.0

109.58 118.72 9.14 111.10 3.057 12.8 118.40 2.4 109.86 3.0

119.22 128.30 9.08 122.54 3.054 12.2 127.77 3.6 125.79 3.0

128.80 137.91 9.11 135.83 3.091 19.5 128.89 1.0 129.04 3.0

138.41 146.80 8.39 138.45 3.092 19.7 141.88 0.7 139.15 3.0

147.30 156.33 9.03 147.99 3.073 15.9 156.33 1.1 147.54 3.0

156.83 165.94 9.11 162.85 3.091 19.5 165.90 1.1 157.13 3.0

166.44 175.55 9.11 171.28 3.063 14.0 175.54 0.9 168.51 3.0

176.05 185.19 9.14 183.44 3.078 16.9 183.92 0.7 176.31 3.0

185.69 194.72 9.03 192.35 3.045 10.4 192.35 1.5 185.90 3.0

195.22 204.30 9.08 199.89 3.077 16.7 203.97 2.9 196.77 3.0

204.80 214.02 9.22 205.14 3.095 20.3 209.38 0.7 205.04 2.9

214.52 223.60 9.08 222.49 3.064 14.2 215.39 0.4 214.74 2.9

224.10 233.27 9.16 226.29 3.067 14.8 227.45 0.1 224.33 2.9

233.77 242.93 9.16 239.53 3.083 17.9 236.30 0.1 233.91 2.9

243.43 252.54 9.11 251.46 3.101 21.5 249.79 0.3 243.60 2.9

253.04 262.20 9.16 253.40 3.076 16.5 253.73 0.9 253.24 2.9

262.70 271.81 9.11 265.24 3.093 19.9 271.29 0.9 262.88 2.9

272.31 281.00 8.68 277.54 3.080 17.3 281.00 0.3 272.60 2.9

281.50 290.63 9.14 281.84 3.064 14.2 287.89 0.6 281.73 3.0

291.13 300.03 8.90 292.44 3.092 19.7 292.44 0.6 291.33 2.9

300.53 309.70 9.16 307.44 3.071 15.6 309.16 0.5 300.76 2.9

310.20 319.31 9.11 314.03 3.068 15.0 316.64 0.5 310.43 2.9

319.81 348.22 28.41 324.53 3.071 17.9 329.22 9.4 320.06 2.9

348.72 357.88 9.16 356.25 3.068 14.4 353.05 0.0 348.85 2.9

358.38 367.46 9.08 360.29 3.083 18.5 359.23 0.3 358.65 2.9

367.96 377.07 9.11 370.04 3.065 16.9 376.38 0.8 368.23 2.9

Page 30: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 29 of 77

Tope (m) Base (m)

Longitud (m)

Prof.Max Pen (m)

Max Pen (in)

Max Pen (%)

Prof.Max Perdida

Metal (m)

Max Perdida Metal

(%)

Prof.Min Diam (m)

Min Diam (in)

377.57 386.76 9.19 377.83 3.086 21.1 378.95 1.5 377.79 2.9

387.26 396.13 8.87 392.31 3.078 16.3 392.31 0.8 387.46 2.9

396.63 405.77 9.14 399.32 3.099 14.2 397.94 0.6 398.77 3.0

406.27 414.98 8.71 410.53 3.075 19.1 414.58 0.5 406.47 3.0

415.48 424.64 9.16 417.35 3.064 20.9 423.73 0.7 415.73 2.9

425.14 433.53 8.39 426.12 3.089 14.8 426.12 0.9 425.33 3.0

434.03 443.17 9.14 434.23 3.098 9.8 442.39 0.3 434.32 2.9

443.67 452.89 9.22 449.30 3.067 11.6 451.50 0.5 443.89 2.9

453.39 462.44 9.06 457.26 3.042 18.9 454.16 0.1 453.53 2.9

462.94 472.13 9.19 471.38 3.051 16.1 468.46 0.8 463.20 2.9

472.63 481.77 9.14 474.51 3.088 16.5 474.51 0.5 481.77 2.9

482.27 491.41 9.14 487.59 3.074 17.5 483.49 0.0 482.54 2.9

491.91 500.67 8.76 498.22 3.076 15.6 500.12 0.3 492.19 2.9

501.17 509.88 8.70 508.91 3.081 16.1 501.67 0.5 501.33 2.9

510.18 519.33 9.15 515.50 3.071 17.7 515.50 0.6 510.45 2.9

519.63 528.53 8.91 521.56 3.074 10.8 528.53 7.7 520.01 2.9

528.73 538.12 9.38 537.68 3.082 15.7 532.20 0.4 529.04 2.9

538.32 547.75 9.44 545.07 3.047 16.5 545.07 0.8 538.70 2.9

547.95 557.44 9.49 555.75 3.072 20.3 548.52 0.6 548.36 2.9

557.64 567.08 9.44 566.63 3.076 16.9 561.14 0.5 557.95 2.9

567.28 576.50 9.22 575.23 3.095 16.7 568.02 0.5 567.63 2.9

576.70 586.17 9.46 583.63 3.078 15.9 576.73 0.2 577.08 2.9

586.37 595.75 9.38 591.32 3.077 14.4 594.86 0.6 586.66 2.9

595.95 605.44 9.49 598.14 3.073 12.2 601.10 0.0 596.36 2.9

605.64 615.08 9.44 606.51 3.065 16.3 607.17 0.4 605.98 2.9

615.28 624.74 9.46 624.74 3.054 13.4 624.74 8.3 615.71 2.9

624.94 634.32 9.38 630.41 3.075 15.2 626.13 0.9 625.29 2.9

634.52 643.99 9.46 639.06 3.076 16.5 643.99 5.8 636.69 2.9

644.19 653.22 9.04 645.52 3.058 13.0 653.23 8.6 644.53 2.9

653.42 662.43 9.01 660.71 3.060 17.5 662.44 2.8 653.69 2.9

662.63 672.04 9.41 666.30 3.069 15.7 667.14 0.0 662.94 2.9

672.24 681.65 9.41 674.85 3.076 16.3 675.59 0.0 672.64 2.9

681.85 691.35 9.49 682.75 3.058 18.9 682.75 0.8 682.21 2.9

691.55 700.93 9.38 700.14 3.081 11.8 696.48 0.6 691.91 2.9

701.13 710.65 9.52 709.45 3.072 20.1 710.65 8.4 701.55 2.9

710.85 719.99 9.14 712.90 3.075 20.5 711.52 0.7 711.17 2.9

720.19 729.65 9.46 724.94 3.088 15.2 724.37 0.3 720.56 2.9

Page 31: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 30 of 77

Tope (m) Base (m)

Longitud (m)

Prof.Max Pen (m)

Max Pen (in)

Max Pen (%)

Prof.Max Perdida

Metal (m)

Max Perdida Metal

(%)

Prof.Min Diam (m)

Min Diam (in)

729.85 739.24 9.38 730.97 3.052 15.0 731.18 0.0 730.22 2.9

739.44 749.01 9.57 748.55 3.094 19.5 739.44 10.0 739.83 2.9

749.21 758.22 9.01 749.22 3.096 14.8 758.22 3.0 749.47 2.9

758.42 767.05 8.64 761.97 3.069 20.5 759.15 0.3 758.77 2.9

767.25 776.77 9.52 767.79 3.068 15.4 776.77 4.8 767.63 2.9

776.97 786.46 9.49 780.18 3.091 17.7 786.41 8.4 777.40 2.9

786.66 796.04 9.38 792.39 3.067 15.2 796.05 4.6 786.97 2.9

796.24 805.65 9.41 802.46 3.096 9.6 804.80 0.0 796.64 2.9

805.85 814.57 8.72 813.00 3.070 16.9 806.79 0.2 806.19 2.9

814.77 824.29 9.52 815.36 3.082 18.9 824.29 4.9 815.16 2.9

824.49 833.92 9.44 827.88 3.069 18.7 829.63 0.4 824.74 2.9

834.12 843.05 8.93 840.48 3.041 23.0 842.78 0.5 834.41 2.9

843.25 852.05 8.80 844.85 3.078 17.5 852.05 4.1 843.60 2.9

852.25 861.66 9.41 859.86 3.088 15.7 853.33 0.7 852.63 2.9

861.86 871.24 9.38 864.54 3.087 14.4 870.61 0.0 862.30 2.9

871.44 880.91 9.46 876.52 3.109 15.4 871.45 0.5 871.83 2.9

881.11 889.50 8.40 881.53 3.081 14.4 888.08 0.7 889.48 2.9

889.70 899.09 9.38 890.14 3.072 14.4 898.45 1.5 890.01 2.9

899.29 908.32 9.04 899.71 3.065 15.2 905.81 0.6 899.72 2.9

908.52 917.99 9.46 914.06 3.070 15.0 917.99 2.4 908.54 3.0

918.19 927.65 9.46 920.38 3.065 16.1 919.78 0.0 918.51 2.9

927.85 937.23 9.38 932.91 3.065 13.4 932.14 0.0 928.23 2.9

937.43 946.95 9.52 937.84 3.069 16.9 937.44 3.3 937.83 2.9

947.15 956.53 9.38 947.92 3.070 15.4 955.88 0.1 947.59 2.9

956.73 966.20 9.46 961.68 3.074 16.1 957.46 0.8 957.12 2.9

966.40 975.83 9.44 975.50 3.068 15.6 969.05 0.1 966.80 2.9

976.03 985.50 9.46 980.68 3.074 12.6 976.19 0.0 976.38 2.9

985.70 995.16 9.46 988.28 3.060 14.6 985.85 0.0 994.80 2.9

995.36 1004.77 9.41 996.93 3.078 14.2 998.89 0.8 995.73 2.9

1004.97 1014.44 9.46 1013.82 3.070 15.7 1013.82 0.3 1005.38 2.9

1014.64 1024.07 9.44 1020.44 3.074 12.8 1017.79 0.0 1015.02 2.9

1024.27 1033.76 9.49 1031.21 3.071 13.6 1033.77 4.2 1024.28 2.9

1033.96 1043.40 9.44 1036.13 3.056 16.1 1043.24 0.7 1034.40 2.9

1043.60 1053.06 9.46 1045.50 3.066 17.1 1053.07 1.0 1043.93 2.9

1053.26 1062.70 9.44 1053.56 3.064 16.1 1054.70 0.3 1053.60 2.9

1062.90 1072.28 9.38 1067.00 3.072 14.6 1067.00 0.0 1063.27 2.9

1072.48 1081.97 9.49 1078.05 3.057 16.7 1072.49 3.9 1072.94 2.9

Page 32: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 31 of 77

Tope (m) Base (m)

Longitud (m)

Prof.Max Pen (m)

Max Pen (in)

Max Pen (%)

Prof.Max Perdida

Metal (m)

Max Perdida Metal

(%)

Prof.Min Diam (m)

Min Diam (in)

1082.17 1091.61 9.44 1086.26 3.061 14.4 1086.26 0.0 1082.56 2.9

1091.81 1101.25 9.44 1093.82 3.074 17.5 1093.03 0.0 1092.26 2.9

1101.45 1110.97 9.52 1109.44 3.079 12.6 1110.97 1.7 1101.86 2.9

1111.17 1120.55 9.38 1113.51 3.074 17.1 1114.50 0.4 1111.51 2.9

1120.75 1130.21 9.46 1129.77 3.066 16.3 1129.86 1.3 1121.22 3.0

1130.41 1139.88 9.46 1130.57 3.077 17.7 1136.38 0.0 1130.80 2.9

1140.08 1149.49 9.41 1146.32 3.065 16.3 1140.12 0.1 1149.31 2.9

1149.69 1158.75 9.06 1150.95 3.081 16.5 1150.95 0.5 1150.10 2.9

1158.95 1168.41 9.46 1159.37 3.056 12.2 1160.54 0.0 1159.26 2.9

1168.61 1178.02 9.41 1169.53 3.079 15.4 1169.86 0.0 1168.93 2.9

1178.22 1187.31 9.09 1182.04 3.075 16.5 1187.32 2.1 1178.63 2.9

1187.51 1196.95 9.44 1196.48 3.082 15.7 1196.95 8.6 1187.89 2.9

1197.15 1206.16 9.01 1204.84 3.075 19.1 1206.16 2.1 1197.57 2.9

1206.36 1215.74 9.38 1209.59 3.076 15.9 1215.10 0.0 1206.75 2.9

1215.94 1225.41 9.46 1218.71 3.054 10.8 1216.03 0.0 1216.39 2.9

1225.61 1235.04 9.44 1234.74 3.070 16.3 1233.72 0.2 1225.94 2.9

1235.24 1244.79 9.54 1243.82 3.076 19.1 1244.76 9.0 1235.65 2.9

1244.99 1254.37 9.38 1245.40 3.072 12.2 1252.45 0.1 1245.34 2.9

1254.57 1263.98 9.41 1255.98 3.089 13.4 1263.98 3.8 1254.97 3.0

1264.18 1273.51 9.33 1271.01 3.076 16.5 1273.42 1.6 1264.56 3.0

1273.71 1283.20 9.49 1275.62 3.064 14.2 1273.71 2.3 1274.17 2.9

1283.40 1292.84 9.44 1290.29 3.073 18.3 1285.02 0.9 1283.88 2.9

1293.04 1302.50 9.46 1293.49 3.047 15.4 1302.02 4.1 1293.48 3.0

1302.70 1312.17 9.46 1305.97 3.075 16.1 1312.17 6.8 1303.01 2.9

1312.37 1321.75 9.38 1319.79 3.089 18.7 1321.20 3.8 1312.73 3.0

1321.95 1331.31 9.36 1326.41 3.054 13.4 1330.93 0.7 1322.34 3.0

1331.51 1340.92 9.41 1332.53 3.060 15.0 1332.03 1.4 1331.98 3.0

1341.12 1350.61 9.49 1350.00 3.076 17.7 1350.61 7.5 1341.58 3.0

1350.81 1360.19 9.38 1358.83 3.064 21.7 1360.15 1.5 1351.18 2.9

1360.39 1369.85 9.46 1366.67 3.085 18.3 1363.84 0.2 1360.76 2.9

1370.05 1379.09 9.04 1371.14 3.070 15.2 1372.03 1.0 1370.37 2.9

1379.29 1388.73 9.44 1382.98 3.074 12.8 1387.35 0.6 1379.61 2.9

1388.93 1398.39 9.46 1395.68 3.087 16.9 1389.68 0.0 1389.35 2.9

1398.59 1407.36 8.77 1402.36 3.060 11.6 1407.36 6.4 1398.89 2.9

1407.56 1416.30 8.74 1412.45 3.068 14.6 1416.31 6.4 1407.91 2.9

1416.50 1425.86 9.36 1422.27 3.082 15.0 1422.27 1.4 1416.90 3.0

1426.06 1435.44 9.38 1430.11 3.102 15.2 1435.18 1.3 1426.48 3.0

Page 33: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 32 of 77

Tope (m) Base (m)

Longitud (m)

Prof.Max Pen (m)

Max Pen (in)

Max Pen (%)

Prof.Max Perdida

Metal (m)

Max Perdida Metal

(%)

Prof.Min Diam (m)

Min Diam (in)

1435.64 1445.16 9.52 1437.36 3.085 16.7 1445.16 1.9 1436.05 2.9

1445.36 1454.64 9.28 1445.81 3.069 18.1 1454.63 8.9 1445.70 3.0

1454.84 1464.14 9.30 1460.66 3.057 13.6 1464.14 8.8 1455.10 2.9

1464.34 1473.49 9.14 1467.51 3.078 17.3 1472.81 0.0 1464.68 2.9

1473.69 1482.75 9.06 1474.43 3.051 14.0 1482.19 1.0 1474.06 2.9

1482.95 1491.66 8.72 1487.33 3.066 14.6 1490.38 0.9 1483.27 2.9

1491.86 1501.30 9.44 1494.98 3.068 15.9 1493.29 0.6 1492.23 2.9

1501.50 1510.89 9.38 1505.57 3.069 14.2 1504.92 0.9 1501.89 2.9

1511.09 1520.52 9.44 1515.63 3.077 9.3 1520.52 1.0 1511.43 2.9

1520.72 1530.05 9.33 1523.49 3.084 17.7 1523.49 0.7 1521.09 2.9

1530.25 1539.66 9.41 1530.72 3.061 20.9 1531.14 1.5 1530.57 3.0

1539.86 1548.85 8.98 1545.35 3.080 17.7 1548.84 1.5 1540.23 2.9

1549.05 1558.51 9.46 1554.96 3.063 14.0 1550.66 1.3 1549.43 2.9

1558.71 1567.69 8.98 1567.64 3.066 15.2 1567.26 2.2 1559.13 3.0

1567.89 1576.90 9.01 1569.85 3.073 19.3 1576.43 1.0 1568.31 3.0

1577.10 1586.49 9.38 1583.92 3.068 15.0 1579.10 0.7 1577.55 2.9

1586.69 1596.23 9.54 1596.21 3.058 13.0 1596.21 8.8 1587.07 2.9

1596.43 1605.81 9.38 1596.55 3.064 14.4 1597.05 0.8 1596.73 2.9

1606.01 1615.48 9.46 1615.31 3.039 17.5 1615.48 1.3 1608.13 3.0

1615.68 1625.06 9.38 1622.38 3.082 15.9 1618.50 0.0 1616.00 2.9

1625.26 1634.38 9.12 1631.29 3.098 17.5 1634.37 8.9 1625.61 2.9

1634.58 1643.56 8.98 1635.93 3.082 19.1 1643.56 5.5 1634.86 2.9

1643.76 1652.50 8.74 1644.02 3.063 16.3 1645.16 1.0 1644.08 2.9

1652.70 1662.14 9.44 1653.14 3.069 11.8 1656.57 0.0 1653.03 2.9

1662.34 1671.56 9.22 1665.97 3.090 17.5 1663.15 0.9 1662.73 2.9

1671.76 1681.28 9.52 1678.65 3.068 17.7 1681.28 3.4 1671.77 2.9

1681.48 1690.73 9.25 1690.71 3.058 15.9 1690.72 11.4 1681.48 2.9

1690.93 1700.21 9.28 1699.03 3.065 17.1 1700.05 1.6 1691.19 3.0

1700.41 1709.66 9.25 1708.28 3.081 12.2 1708.13 0.0 1701.94 2.9

1709.86 1719.29 9.44 1717.23 3.073 15.0 1710.00 0.0 1710.32 2.9

1719.49 1728.72 9.22 1726.44 3.081 15.4 1727.52 0.0 1719.97 3.0

1728.92 1738.41 9.49 1738.41 3.089 15.2 1738.41 10.6 1728.93 2.9

1738.61 1747.75 9.14 1742.26 3.075 15.0 1739.37 0.0 1738.64 2.9

1747.95 1757.52 9.57 1754.85 3.052 12.0 1747.95 5.6 1748.32 3.0

1757.72 1767.10 9.38 1760.47 3.081 14.6 1766.46 0.0 1767.10 2.9

1767.30 1776.72 9.41 1771.69 3.082 14.8 1771.69 0.0 1767.68 2.9

1776.92 1786.38 9.46 1777.18 3.073 15.4 1776.92 6.1 1777.29 2.9

Page 34: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 33 of 77

Tope (m) Base (m)

Longitud (m)

Prof.Max Pen (m)

Max Pen (in)

Max Pen (%)

Prof.Max Perdida

Metal (m)

Max Perdida Metal

(%)

Prof.Min Diam (m)

Min Diam (in)

1786.58 1795.08 8.50 1794.77 3.079 9.6 1794.77 0.0 1787.07 2.9

1795.28 1804.53 9.25 1797.60 3.054 13.6 1795.28 2.1 1795.70 2.9

1804.73 1814.01 9.28 1805.19 3.068 7.9 1804.87 0.0 1805.09 3.0

1814.21 1823.54 9.33 1818.41 3.070 18.5 1816.26 2.0 1814.71 3.0

1823.74 1833.18 9.44 1830.85 3.069 14.6 1833.16 8.6 1824.07 3.0

1833.38 1842.57 9.20 1838.37 3.068 12.0 1833.49 0.0 1837.01 2.9

1842.77 1852.05 9.28 1843.19 3.053 11.2 1852.05 2.5 1843.19 2.9

1852.25 1861.63 9.38 1861.62 3.066 15.2 1861.60 8.4 1861.63 2.9

1861.83 1870.95 9.12 1862.63 3.067 13.2 1862.63 0.0 1862.19 2.9

1871.15 1880.48 9.33 1878.64 3.070 11.4 1871.15 0.8 1871.53 2.9

1880.68 1890.09 9.41 1885.09 3.041 15.7 1880.76 0.0 1881.07 2.9

1890.29 1899.78 9.49 1899.78 3.062 13.8 1899.78 8.1 1890.66 3.0

1899.98 1909.26 9.28 1908.87 3.071 15.6 1900.56 1.6 1900.28 3.0

1909.46 1918.95 9.49 1914.90 3.061 15.2 1909.46 5.9 1909.98 3.0

1919.15 1928.50 9.36 1925.77 3.032 17.9 1923.57 2.6 1919.48 3.0

1928.70 1937.95 9.25 1929.79 3.086 13.0 1937.96 3.3 1929.03 2.9

1938.15 1947.35 9.20 1942.08 3.066 15.7 1942.08 0.0 1938.56 2.9

1947.55 1956.77 9.22 1950.80 3.053 16.9 1950.80 0.0 1947.86 2.9

1956.97 1966.28 9.30 1966.28 3.049 14.0 1966.28 10.0 1957.32 2.9

1966.48 1975.70 9.22 1975.70 3.069 14.0 1975.70 2.4 1966.79 2.9

1975.90 1985.15 9.25 1981.07 3.059 15.9 1985.15 2.0 1976.21 2.9

1985.35 1994.52 9.17 1986.74 3.050 14.4 1986.26 0.0 1993.73 2.9

1994.72 2004.13 9.41 2002.86 3.072 15.0 2003.47 2.3 1995.11 2.9

2004.33 2013.61 9.28 2009.54 3.062 11.8 2004.33 0.0 2012.16 3.0

2013.81 2023.06 9.25 2014.18 3.071 10.8 2013.88 0.0 2021.29 2.9

2023.26 2032.72 9.46 2024.52 3.069 15.9 2024.52 2.5 2023.63 3.0

2032.92 2042.30 9.38 2033.26 3.083 11.6 2034.12 0.0 2033.23 2.9

2042.50 2051.86 9.36 2042.93 3.058 9.8 2051.86 4.4 2042.87 2.9

2052.06 2061.23 9.17 2052.38 3.072 12.6 2060.01 0.0 2052.34 2.9

2061.43 2070.68 9.25 2061.84 3.078 10.0 2069.61 0.0 2061.78 2.9

2070.88 2080.08 9.20 2071.87 3.063 17.1 2071.87 0.2 2070.88 2.9

2080.28 2089.53 9.25 2088.72 3.063 12.4 2080.28 2.9 2080.70 3.0

2089.73 2099.14 9.41 2092.92 3.073 10.6 2091.10 0.0 2090.24 2.9

2099.34 2108.62 9.28 2105.03 3.065 15.9 2104.44 0.0 2099.73 2.9

2108.82 2118.23 9.41 2110.05 3.068 15.0 2109.65 0.0 2108.81 2.9

2118.43 2127.65 9.22 2121.46 3.052 16.1 2125.81 0.0 2118.84 2.9

2127.85 2137.34 9.49 2135.22 3.047 15.7 2137.34 10.2 2128.25 2.9

Page 35: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 34 of 77

Tope (m) Base (m)

Longitud (m)

Prof.Max Pen (m)

Max Pen (in)

Max Pen (%)

Prof.Max Perdida

Metal (m)

Max Perdida Metal

(%)

Prof.Min Diam (m)

Min Diam (in)

2137.54 2146.82 9.28 2142.20 3.073 13.4 2146.82 0.9 2137.55 2.9

2147.02 2156.21 9.20 2153.83 3.051 9.8 2148.85 0.0 2147.33 2.9

2156.41 2165.02 8.61 2164.26 3.042 11.0 2156.51 0.0 2156.91 2.9

2165.22 2174.42 9.20 2173.11 3.056 13.8 2166.44 0.4 2165.22 2.9

2174.62 2184.03 9.41 2183.70 3.043 13.8 2174.62 2.8 2175.02 2.9

2184.23 2193.56 9.33 2184.24 3.079 15.0 2184.23 10.9 2184.63 2.9

2193.76 2202.98 9.22 2196.72 3.055 12.2 2196.72 0.0 2195.40 3.0

2203.18 2212.43 9.25 2205.98 3.050 11.4 2203.19 1.7 2208.25 2.9

2212.63 2221.83 9.20 2216.46 3.060 13.4 2212.63 0.0 2213.23 2.9

2222.03 2231.52 9.49 2226.83 3.046 10.6 2222.03 2.4 2228.74 2.9

2231.72 2241.00 9.28 2233.20 3.073 15.9 2241.00 3.4 2234.22 2.9

2241.20 2249.65 8.45 2249.23 3.068 15.6 2248.78 1.1 2249.63 2.9

2249.85 2259.26 9.41 2250.68 3.074 13.2 2250.83 0.0 2250.25 2.9

2259.46 2268.73 9.28 2265.40 3.072 15.6 2260.72 0.0 2259.83 2.9

2268.93 2278.40 9.46 2274.13 3.060 12.2 2278.40 0.6 2269.39 2.9

2278.60 2288.03 9.44 2283.20 3.042 16.5 2288.04 0.0 2278.59 2.9

2288.23 2297.48 9.25 2293.01 3.048 15.6 2295.47 1.4 2297.11 2.9

2297.68 2306.96 9.28 2306.96 3.062 14.8 2306.96 11.2 2306.90 2.9

2307.16 2315.85 8.69 2312.44 3.062 10.4 2307.89 0.0 2307.16 2.9

2316.05 2325.49 9.44 2324.86 3.068 17.1 2320.99 1.5 2318.05 2.9

2325.69 2334.94 9.25 2331.62 3.054 10.4 2334.94 3.5 2325.99 2.9

2335.14 2344.63 9.49 2344.61 3.050 15.4 2344.60 11.7 2343.56 2.9

2344.83 2354.13 9.30 2345.82 3.060 11.8 2348.76 0.0 2345.17 2.9

2354.33 2363.85 9.52 2354.35 3.046 15.4 2354.35 11.2 2354.88 2.9

2364.05 2373.27 9.22 2371.01 3.073 14.8 2373.27 0.8 2372.61 2.9

2373.47 2382.88 9.41 2377.84 3.071 14.4 2373.63 0.0 2373.82 2.9

2383.08 2392.52 9.44 2383.72 3.059 13.8 2391.43 0.0 2383.49 2.9

2392.72 2401.97 9.25 2396.59 3.071 13.6 2401.97 0.0 2394.21 2.9

2402.17 2411.39 9.22 2407.33 3.054 15.7 2408.13 0.0 2407.77 2.9

2411.59 2421.03 9.44 2411.99 3.076 11.4 2412.72 0.0 2411.60 2.9

2421.23 2430.45 9.22 2428.01 3.071 13.0 2426.34 0.0 2421.54 2.9

2430.65 2440.06 9.41 2437.00 3.067 15.4 2439.10 0.0 2431.14 2.9

2440.26 2449.75 9.49 2440.62 3.045 10.8 2449.75 1.8 2440.67 2.9

2449.95 2459.34 9.38 2454.87 3.079 13.4 2450.66 0.0 2449.96 2.9

2459.54 2468.76 9.22 2467.10 3.045 13.0 2459.54 0.0 2461.11 2.9

2468.96 2478.26 9.30 2478.26 3.070 15.9 2478.26 10.4 2469.38 2.9

2478.46 2487.61 9.14 2481.02 3.052 12.4 2480.50 0.0 2478.75 2.9

Page 36: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 35 of 77

Tope (m) Base (m)

Longitud (m)

Prof.Max Pen (m)

Max Pen (in)

Max Pen (%)

Prof.Max Perdida

Metal (m)

Max Perdida Metal

(%)

Prof.Min Diam (m)

Min Diam (in)

2487.81 2497.14 9.33 2487.81 3.070 15.2 2487.81 10.9 2488.26 2.9

2497.34 2506.61 9.28 2502.69 3.067 14.8 2506.52 0.0 2503.10 2.9

2506.81 2516.28 9.46 2508.77 3.065 13.6 2516.28 3.9 2515.62 2.9

2516.48 2525.83 9.36 2520.16 3.078 16.9 2517.15 0.0 2516.81 2.9

2526.03 2535.31 9.28 2526.60 3.051 11.6 2526.04 5.2 2532.32 2.9

2535.51 2544.76 9.25 2537.95 3.062 13.0 2544.76 3.2 2535.52 2.9

2544.96 2554.18 9.22 2546.09 3.061 18.5 2554.19 10.7 2545.43 2.9

2554.38 2563.50 9.12 2559.57 3.072 9.3 2554.41 0.0 2554.73 2.9

2563.70 2573.11 9.41 2563.74 3.050 14.6 2563.73 10.4 2564.11 2.9

2573.31 2582.56 9.25 2573.93 3.058 11.6 2573.41 0.0 2576.19 2.9

2582.76 2592.14 9.38 2585.02 3.070 14.6 2586.27 2.3 2583.29 3.0

2592.34 2601.67 9.33 2598.58 3.047 13.0 2601.68 0.7 2592.72 2.9

2601.87 2611.10 9.22 2604.59 3.060 15.2 2601.99 0.0 2602.16 2.9

2611.30 2620.55 9.25 2619.57 3.058 16.3 2615.56 2.1 2611.65 2.9

2620.75 2630.08 9.33 2620.75 3.073 14.4 2620.75 10.8 2621.17 2.9

2630.28 2639.53 9.25 2637.59 3.055 15.0 2638.75 0.0 2639.52 2.9

2639.73 2649.17 9.44 2644.68 3.069 12.0 2639.73 6.6 2640.21 2.9

2649.37 2658.62 9.25 2651.22 3.067 12.6 2649.50 0.0 2649.66 2.9

2658.82 2667.99 9.17 2658.93 3.061 15.0 2658.93 0.0 2659.21 2.9

2668.19 2677.54 9.36 2671.15 3.078 15.4 2668.19 4.5 2668.58 2.9

2677.74 2687.02 9.28 2687.02 3.051 18.3 2677.74 9.7 2678.84 2.9

2687.22 2696.66 9.44 2696.66 3.058 12.2 2687.23 7.1 2687.27 2.9

2696.86 2706.19 9.33 2702.63 3.086 19.9 2705.44 3.6 2705.77 3.0

2706.39 2715.66 9.28 2711.81 3.039 13.6 2715.63 2.4 2707.71 2.9

2715.86 2724.93 9.06 2720.20 3.066 16.1 2720.20 1.6 2724.80 2.9

2725.13 2734.54 9.41 2734.50 3.051 14.0 2734.51 8.8 2734.53 2.9

2734.74 2743.96 9.22 2737.06 3.066 15.0 2736.06 1.5 2736.94 2.9

2744.16 2753.57 9.41 2744.86 3.058 16.5 2753.57 8.8 2744.56 3.0

2753.77 2763.05 9.28 2754.31 3.069 19.7 2756.89 3.3 2762.70 3.0

2763.25 2771.80 8.56 2770.45 3.075 17.7 2771.63 4.2 2763.67 3.0

2772.00 2781.39 9.38 2777.16 3.065 17.3 2781.39 7.9 2772.48 3.0

2781.59 2790.89 9.30 2790.45 3.068 15.7 2790.53 2.1 2784.67 3.0

2791.09 2800.37 9.28 2798.10 3.053 12.8 2798.70 1.4 2791.09 3.0

2800.57 2809.26 8.69 2801.03 3.056 17.1 2809.26 8.8 2800.91 3.0

2809.46 2818.68 9.22 2815.76 3.068 15.7 2811.73 2.6 2818.33 3.0

2818.88 2828.26 9.38 2823.09 3.070 18.9 2818.89 7.6 2828.08 3.0

2828.46 2837.61 9.14 2833.36 3.061 13.6 2828.46 4.5 2837.25 3.0

Page 37: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 36 of 77

Tope (m) Base (m)

Longitud (m)

Prof.Max Pen (m)

Max Pen (in)

Max Pen (%)

Prof.Max Perdida

Metal (m)

Max Perdida Metal

(%)

Prof.Min Diam (m)

Min Diam (in)

2837.81 2846.39 8.58 2844.56 3.070 15.4 2844.73 2.2 2838.14 3.0

2846.59 2855.97 9.38 2855.05 3.085 17.1 2846.59 4.6 2855.71 3.0

2856.17 2865.58 9.41 2865.20 3.054 12.2 2857.41 1.5 2863.25 3.0

2865.78 2875.06 9.28 2874.41 3.093 14.8 2874.41 2.1 2867.02 3.0

2875.26 2884.62 9.36 2883.31 3.061 18.5 2878.77 2.4 2880.64 3.0

2884.82 2894.12 9.30 2893.08 3.074 16.1 2892.78 2.1 2885.17 2.9

2894.32 2903.68 9.36 2896.24 3.063 16.3 2894.32 2.4 2902.74 3.0

2903.88 2913.21 9.33 2910.58 3.068 15.0 2913.21 4.1 2909.03 2.9

2913.41 2922.74 9.33 2919.62 3.076 14.6 2922.74 4.0 2913.81 3.0

2922.94 2932.21 9.28 2927.12 3.092 18.5 2932.22 7.2 2931.83 3.0

2932.41 2941.77 9.36 2938.34 3.082 14.6 2933.62 2.2 2932.69 2.9

2941.97 2951.43 9.46 2950.88 3.080 17.9 2950.97 3.1 2942.35 3.0

2951.63 2961.12 9.49 2955.85 3.072 19.3 2961.12 7.2 2952.17 2.9

2961.32 2970.73 9.41 2964.37 3.057 14.8 2969.98 2.7 2961.64 3.0

2980.57 2989.95 9.38 2988.10 3.079 11.8 2989.59 2.6 2980.86 2.9

2990.15 2999.65 9.49 2995.85 3.072 19.1 2999.64 6.3 2991.98 3.0

2999.85 3009.20 9.36 3002.09 3.088 21.3 3003.98 2.7 3000.26 2.9

3009.40 3018.84 9.44 3010.55 3.061 17.9 3010.55 2.6 3009.76 2.9

3019.04 3028.50 9.46 3020.76 3.070 17.7 3028.19 2.3 3019.39 3.0

3028.70 3038.11 9.41 3036.66 3.079 14.2 3033.57 2.5 3029.08 2.9

3038.31 3047.75 9.44 3041.80 3.054 17.5 3042.86 2.4 3038.77 2.9

3047.95 3057.39 9.44 3057.34 3.067 15.9 3052.45 2.3 3048.28 2.9

3057.59 3067.00 9.41 3065.33 3.086 15.4 3061.93 2.3 3059.40 3.0

3067.20 3076.63 9.44 3071.10 3.074 15.9 3068.08 3.0 3067.59 3.0

3076.83 3086.32 9.49 3081.09 3.075 18.3 3077.01 2.8 3077.19 3.0

3086.52 3096.01 9.49 3086.89 3.068 14.2 3096.02 7.0 3086.96 3.0

3096.21 3105.65 9.44 3101.12 3.066 14.6 3105.65 4.5 3096.56 2.9

3105.85 3115.21 9.36 3109.83 3.086 17.5 3107.51 1.6 3106.21 2.9

3115.41 3124.87 9.46 3115.47 3.066 18.3 3117.80 2.7 3115.86 3.0

3125.07 3134.56 9.49 3128.64 3.083 16.3 3128.64 3.2 3125.48 3.0

3134.76 3144.12 9.36 3136.66 3.090 16.1 3138.45 3.1 3135.19 2.9

3144.32 3153.81 9.49 3145.90 3.067 15.7 3144.32 8.4 3144.82 2.9

3154.01 3163.50 9.49 3160.08 3.072 15.7 3163.50 4.6 3154.34 2.9

3163.70 3173.16 9.46 3169.20 3.082 17.7 3173.16 7.3 3163.97 3.0

3173.36 3182.72 9.36 3175.12 3.079 19.3 3182.35 2.6 3173.64 3.0

3182.92 3192.36 9.44 3188.21 3.052 15.4 3188.21 2.0 3183.33 3.0

3192.56 3201.99 9.44 3192.95 3.089 17.3 3197.37 2.7 3192.89 2.9

Page 38: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 37 of 77

Tope (m) Base (m)

Longitud (m)

Prof.Max Pen (m)

Max Pen (in)

Max Pen (%)

Prof.Max Perdida

Metal (m)

Max Perdida Metal

(%)

Prof.Min Diam (m)

Min Diam (in)

3202.19 3211.66 9.46 3206.31 3.100 18.5 3210.96 2.5 3202.56 2.9

3211.86 3221.27 9.41 3217.74 3.083 19.9 3213.55 2.6 3212.27 2.9

3221.47 3230.91 9.44 3225.65 3.082 15.9 3224.43 2.9 3221.78 2.9

3231.11 3240.52 9.41 3235.91 3.064 16.1 3234.88 2.6 3231.61 3.0

3240.72 3250.21 9.49 3250.04 3.081 14.0 3244.70 2.6 3241.21 2.9

3250.41 3259.82 9.41 3252.93 3.073 15.9 3254.62 2.8 3250.75 3.0

3260.02 3269.48 9.46 3266.80 3.070 16.3 3264.88 2.7 3260.52 3.0

3269.68 3279.06 9.38 3276.89 3.073 16.9 3274.44 2.0 3270.06 3.0

3279.26 3288.83 9.57 3279.69 3.085 16.7 3288.83 7.0 3279.67 2.9

3289.03 3298.36 9.33 3289.33 3.064 13.6 3293.68 2.6 3289.37 2.9

3298.56 3308.05 9.49 3303.95 3.066 22.0 3298.57 7.2 3298.99 3.0

3308.25 3317.72 9.46 3310.54 3.081 17.9 3310.32 1.5 3308.59 2.9

3317.92 3327.33 9.41 3321.52 3.085 15.7 3319.10 2.3 3318.26 3.0

3327.53 3336.99 9.46 3336.50 3.075 14.6 3331.24 1.8 3327.90 3.0

3337.19 3346.58 9.38 3345.94 3.074 15.9 3337.39 2.0 3337.58 3.0

3346.78 3356.19 9.41 3350.85 3.072 14.2 3350.05 2.3 3347.08 2.9

3356.39 3365.90 9.52 3360.05 3.072 17.9 3360.05 3.1 3358.34 3.0

3366.10 3375.54 9.44 3374.46 3.082 17.1 3368.20 2.4 3366.49 2.9

3375.74 3385.18 9.44 3377.99 3.090 15.0 3384.87 2.3 3378.01 3.0

3385.38 3394.84 9.46 3387.65 3.070 17.5 3394.84 1.9 3385.75 3.0

3395.04 3404.45 9.41 3401.34 3.080 18.3 3397.25 1.5 3395.38 2.9

3404.65 3414.09 9.44 3413.91 3.086 15.7 3412.22 2.6 3406.48 3.0

3414.29 3423.75 9.46 3416.06 3.093 18.5 3422.95 2.5 3414.63 2.9

3423.95 3433.41 9.46 3431.35 3.073 13.8 3424.78 2.1 3424.30 3.0

3433.61 3443.08 9.46 3436.44 3.074 15.6 3438.02 2.3 3433.98 3.0

3443.28 3452.39 9.11 3445.97 3.063 16.3 3444.49 2.4 3443.75 3.0

3453.19 3462.33 9.14 3453.88 3.073 18.3 3453.88 2.2 3453.27 2.9

3462.53 3471.96 9.44 3466.72 3.075 18.3 3466.72 2.4 3462.88 3.0

3472.16 3481.22 9.06 3478.12 3.065 14.4 3478.12 2.6 3472.48 2.9

3482.02 3491.06 9.04 3489.04 3.073 15.9 3486.16 2.2 3482.23 2.9

3491.56 3500.77 9.21 3499.96 3.078 20.3 3496.15 2.2 3491.89 2.9

3501.07 3510.49 9.42 3508.43 3.077 22.6 3509.85 2.5 3501.40 2.9

3510.79 3520.07 9.28 3514.61 3.061 16.5 3517.51 2.8 3511.09 3.0

3520.37 3529.79 9.42 3523.87 3.104 18.1 3526.15 2.0 3520.65 2.9

3530.09 3539.37 9.28 3537.27 3.083 15.2 3531.44 3.1 3530.40 3.0

3539.67 3549.01 9.34 3539.95 3.072 15.4 3541.54 2.9 3548.40 3.0

3549.31 3558.64 9.34 3552.65 3.066 16.1 3558.45 2.9 3549.54 2.9

Page 39: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 38 of 77

Tope (m) Base (m)

Longitud (m)

Prof.Max Pen (m)

Max Pen (in)

Max Pen (%)

Prof.Max Perdida

Metal (m)

Max Perdida Metal

(%)

Prof.Min Diam (m)

Min Diam (in)

3558.94 3568.23 9.28 3568.04 3.073 15.4 3559.06 2.6 3559.21 3.0

3568.53 3577.52 9.00 3576.07 3.064 14.0 3569.70 2.2 3568.75 2.9

3578.02 3587.23 9.21 3580.08 3.083 17.1 3581.64 1.9 3578.27 3.0

3587.53 3596.85 9.31 3587.55 3.079 18.5 3587.54 11.4 3596.20 3.0

3597.15 3606.46 9.31 3599.62 3.068 19.9 3600.73 2.9 3597.50 3.0

3606.76 3616.20 9.44 3613.67 3.081 17.3 3611.39 2.6 3607.09 3.0

3616.50 3625.71 9.21 3618.07 3.085 15.6 3621.11 2.6 3618.15 3.0

3626.21 3634.94 8.73 3633.07 3.072 16.5 3633.55 2.8 3634.85 2.9

3635.24 3644.50 9.26 3644.38 3.086 19.1 3638.43 1.6 3635.51 3.0

3644.80 3654.08 9.28 3646.25 3.062 18.1 3646.25 2.7 3653.73 3.0

3654.38 3663.69 9.31 3654.76 3.071 10.8 3655.40 2.3 3663.36 3.0

3663.99 3673.41 9.42 3665.37 3.075 16.7 3673.39 7.9 3673.40 2.9

3673.71 3682.88 9.18 3680.21 3.085 16.3 3682.11 2.5 3679.14 3.0

3683.18 3692.52 9.34 3683.42 3.085 13.8 3687.95 1.9 3683.55 2.9

3692.82 3702.10 9.28 3700.04 3.065 19.7 3699.37 2.2 3693.10 2.9

3702.40 3711.93 9.52 3702.82 3.073 15.6 3706.86 2.9 3702.79 3.0

3712.23 3721.46 9.23 3715.13 3.095 12.6 3713.30 2.4 3712.50 2.9

3721.76 3731.12 9.36 3722.97 3.107 14.6 3731.09 7.3 3722.00 2.9

3731.42 3740.73 9.31 3732.25 3.076 16.1 3739.88 2.6 3731.66 2.9

3741.03 3750.13 9.10 3745.90 3.084 15.0 3750.13 3.8 3741.36 2.9

3750.43 3759.58 9.15 3757.78 3.069 15.7 3751.66 0.4 3750.43 2.9

3759.88 3769.22 9.34 3762.60 3.070 19.9 3761.27 2.8 3760.14 3.0

3769.52 3778.83 9.31 3773.48 3.074 13.8 3778.08 2.2 3776.15 3.0

3779.13 3787.61 8.48 3779.73 3.070 15.4 3781.64 2.2 3779.47 3.0

3787.91 3797.38 9.47 3794.99 3.061 13.6 3788.58 0.4 3788.19 2.9

3797.68 3806.96 9.28 3799.32 3.069 15.2 3806.10 1.9 3797.95 3.0

3807.26 3816.55 9.28 3810.63 3.063 16.9 3807.61 1.6 3813.02 3.0

3816.85 3826.05 9.20 3825.13 3.079 15.9 3826.04 6.3 3817.15 2.9

3826.35 3835.71 9.36 3834.53 3.086 21.9 3826.36 9.9 3831.96 3.0

3836.01 3845.38 9.36 3844.71 3.093 18.1 3844.71 3.2 3836.31 3.0

3845.68 3855.04 9.36 3846.40 3.080 14.6 3852.70 2.9 3846.00 2.9

3855.34 3864.65 9.31 3856.51 3.071 16.7 3863.90 4.2 3855.78 2.9

3864.95 3874.34 9.39 3866.87 3.076 16.7 3873.53 3.1 3865.21 2.9

3874.64 3883.98 9.34 3875.04 3.089 15.7 3883.96 9.9 3874.95 3.0

3884.28 3893.59 9.31 3885.00 3.084 18.3 3892.85 3.4 3884.47 2.9

3893.89 3903.20 9.31 3896.24 3.047 13.2 3898.03 0.0 3894.14 2.9

3903.50 3912.84 9.34 3909.22 3.077 20.9 3912.40 3.9 3910.40 3.0

Page 40: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 39 of 77

Tope (m) Base (m)

Longitud (m)

Prof.Max Pen (m)

Max Pen (in)

Max Pen (%)

Prof.Max Perdida

Metal (m)

Max Perdida Metal

(%)

Prof.Min Diam (m)

Min Diam (in)

3913.14 3922.45 9.31 3913.86 3.075 18.1 3913.17 3.0 3914.43 3.0

3922.75 3932.38 9.63 3929.60 3.062 16.3 3922.89 2.9 3923.09 3.0

3932.68 3941.91 9.23 3936.30 3.092 14.4 3935.13 2.2 3932.98 2.9

3942.21 3951.60 9.39 3951.54 3.071 14.8 3945.49 2.8 3942.53 3.0

3951.90 3961.26 9.36 3952.86 3.056 16.3 3961.23 5.2 3952.22 3.0

3961.56 3970.68 9.12 3970.11 3.066 22.0 3964.89 3.1 3961.91 3.0

3970.98 3980.29 9.31 3974.12 3.074 18.3 3971.03 11.5 3971.01 2.9

3980.59 3990.01 9.42 3984.12 3.068 16.5 3980.63 4.8 3980.74 3.0

3990.31 3999.54 9.23 3991.57 3.072 16.7 3991.57 2.5 3990.36 3.0

3999.84 4009.12 9.28 4002.46 3.093 16.9 3999.84 3.0 4000.13 2.9

4009.42 4018.68 9.26 4010.38 3.062 16.9 4010.38 2.9 4011.63 3.0

4018.98 4028.16 9.18 4027.82 3.070 14.6 4022.33 2.4 4019.24 2.9

4028.46 4037.72 9.26 4029.14 3.061 20.7 4036.31 2.1 4028.73 2.9

4038.02 4047.33 9.31 4042.36 3.069 19.5 4042.36 3.9 4040.14 2.9

4047.63 4056.96 9.34 4052.11 3.078 15.0 4056.94 2.0 4053.43 3.0

4057.26 4066.31 9.04 4063.83 3.073 16.9 4063.83 3.0 4057.50 3.0

4066.61 4076.13 9.52 4076.11 3.103 15.6 4076.11 11.0 4076.13 2.9

4076.43 4085.63 9.20 4076.76 3.084 21.7 4085.59 10.4 4085.63 2.9

4085.93 4094.79 8.86 4093.53 3.066 17.5 4085.98 11.3 4085.95 2.9

4095.09 4107.50 12.41

4107.80 4116.79 8.99 4108.25 3.086 18.5 4116.70 4.5 4108.12 3.0

4117.09 4127.73 10.65

4128.03 4136.78 8.75 4132.03 3.077 17.3 4129.56 2.5 4128.17 2.9

4137.08 4148.30 11.22

4149.10 4157.63 8.53 4153.53 3.085 16.3 4157.63 2.1 4155.60 2.9

4157.93 4170.58 12.65

4170.88 4184.94 14.06 4180.78 3.098 14.5 4173.13 4.7 4172.31 4.3

4185.24 4198.77 13.53 4197.44 3.084 14.0 4197.85 2.7 4185.67 4.2

4199.07 4212.75 13.69 4211.46 3.075 11.1 4211.87 3.6 4199.73 4.2

4213.05 4226.48 13.42 4213.42 3.065 14.5 4213.25 4.8 4225.79 4.2

4226.78 4240.92 14.14 4237.64 3.067 15.5 4226.90 3.9 4228.04 4.2

4241.22 4254.77 13.56 4241.36 3.075 14.9 4241.36 4.2 4254.22 4.2

4255.07 4269.35 14.28 4269.22 3.104 12.6 4257.93 3.6 4267.22 4.3

4269.65 4283.21 13.57 4278.26 3.085 11.5 4283.10 4.0 4283.17 4.2

4283.81 4297.94 14.13 4291.54 3.076 14.0 4287.61 4.1 4283.81 4.2

4298.24 4311.69 13.45 4309.27 3.077 13.1 4298.56 3.4 4310.57 4.2

4311.99 4326.16 14.17 4323.39 3.078 15.7 4315.65 4.1 4320.62 4.2

Page 41: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 40 of 77

Tope (m) Base (m)

Longitud (m)

Prof.Max Pen (m)

Max Pen (in)

Max Pen (%)

Prof.Max Perdida

Metal (m)

Max Perdida Metal

(%)

Prof.Min Diam (m)

Min Diam (in)

4326.46 4340.44 13.98 4339.54 3.078 15.7 4330.03 3.2 4340.21 4.2

4340.74 4354.45 13.72 4342.49 3.066 16.0 4342.71 3.9 4349.92 4.2

4354.75 4368.87 14.12 4354.94 3.097 13.8 4357.07 3.7 4365.46 4.2

4369.17 4382.90 13.73 4374.42 3.091 14.4 4371.51 3.5 4376.37 4.3

4383.70 4397.35 13.65 4390.13 3.068 13.7 4386.22 3.3 4395.55 4.3

4397.65 4411.05 13.40 4402.10 3.078 14.0 4397.65 2.7 4410.68 4.2

4411.35 4425.27 13.93 4416.29 3.071 13.4 4413.78 2.9 4413.42 4.2

4425.57 4439.40 13.82 4431.80 3.102 12.0 4436.88 4.2 4431.83 4.2

4439.70 4453.62 13.93 4443.29 3.081 15.2 4440.12 3.6 4452.96 4.2

4453.92 4467.91 13.98 4464.41 14.0 4455.85 3.3 4455.02 4.3

4468.21 4482.05 13.84 4480.08 3.086 27.3 4481.76 3.9 4475.52 4.2

4482.85 4496.79 13.95 4486.24 27.5 4494.84 5.2 4487.92 4.2

4497.09 4511.02 13.93 4503.88 3.080 14.0 4505.50 3.6 4510.69 4.2

4511.32 4524.42 13.10 4520.17 40.9 4519.72 5.2 4522.79 4.2

4524.72 4531.98 7.26 4528.33 3.075 36.5 4528.33 4.6 4527.63 4.2

4532.28 4538.64 6.37 4532.28 16.0 4532.28 2.3 4538.64 0.0

Page 42: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 41 of 77

Tuberia de Produccion – Resultados Tuberia de Producción según MTD

Tope (m)

Base (m)

Longitud (m)

Espesor Nominal(in)

Espesor Minimo

(in)

Prof Max Perdida

(m)

Max Perdida

(%)

10.17 13.99 3.83 0.254 0.252 11.79 0.9

14.49 23.55 9.06 0.254 0.251 22.97 1.2

24.05 33.13 9.08 0.254 0.252 25.93 0.9

33.63 42.05 8.42 0.254 0.254 41.88 0.8

42.55 51.66 9.11 0.254 0.253 43.08 0.3

52.16 61.14 8.98 0.254 0.252 54.26 0.7

61.64 70.77 9.14 0.254 0.253 70.14 0.6

71.27 80.36 9.08 0.254 0.251 79.89 1.1

80.86 89.89 9.03 0.254 0.251 87.84 1.0

90.39 99.52 9.14 0.254 0.251 92.51 1.1

100.02 109.08 9.06 0.254 0.251 101.12 1.0

109.58 118.72 9.14 0.254 0.250 118.32 1.4

119.22 128.30 9.08 0.254 0.250 127.80 1.5

128.80 137.91 9.11 0.254 0.251 137.26 1.1

138.41 146.80 8.39 0.254 0.252 138.96 0.9

147.30 156.33 9.03 0.254 0.251 151.01 1.1

156.83 165.94 9.11 0.254 0.251 165.20 1.0

166.44 175.55 9.11 0.254 0.252 167.06 0.7

176.05 185.19 9.14 0.254 0.253 183.81 0.5

185.69 194.72 9.03 0.254 0.254 186.31 0.1

195.22 204.30 9.08 0.254 0.253 203.89 0.3

204.80 214.02 9.22 0.254 0.252 209.87 0.7

214.52 223.60 9.08 0.254 0.253 219.09 0.5

224.10 233.27 9.16 0.254 0.253 230.15 0.4

233.77 242.93 9.16 0.254 0.253 239.00 0.5

243.43 252.54 9.11 0.254 0.253 250.94 0.5

253.04 262.20 9.16 0.254 0.253 260.37 0.3

262.70 271.81 9.11 0.254 0.253 268.71 0.4

272.31 281.00 8.68 0.254 0.252 277.32 0.7

281.50 290.63 9.14 0.254 0.253 287.61 0.5

291.13 300.03 8.90 0.254 0.253 295.61 0.5

Page 43: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 42 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk (in)

Min Thk (in)

Max Loss Depth(m)

Max Loss (%)

300.53 309.70 9.16 0.254 0.253 308.86 0.2

310.20 319.31 9.11 0.254 0.254 317.75 0.0

319.81 348.22 28.41 0.254 0.253 335.97 0.3

348.72 357.88 9.16 0.254 0.254 354.81 0.1

358.38 367.46 9.08 0.254 0.253 363.31 0.3

367.96 377.07 9.11 0.254 0.253 375.42 0.4

377.57 386.76 9.19 0.254 0.253 384.80 0.2

387.26 396.13 8.87 0.254 0.252 393.66 0.9

396.63 405.77 9.14 0.254 0.253 397.97 0.5

406.27 414.98 8.71 0.254 0.252 411.01 0.7

415.48 424.64 9.16 0.254 0.253 421.56 0.5

425.14 433.53 8.39 0.254 0.253 432.70 0.5

434.03 443.17 9.14 0.254 0.253 439.22 0.4

443.67 452.89 9.22 0.254 0.253 450.61 0.5

453.39 462.44 9.06 0.254 0.253 455.32 0.2

462.94 472.13 9.19 0.254 0.253 471.55 0.5

472.63 481.77 9.14 0.254 0.252 475.58 0.7

482.27 491.41 9.14 0.254 0.253 486.23 0.2

491.91 500.67 8.76 0.254 0.253 500.07 0.2

501.17 509.88 8.70 0.254 0.253 505.57 0.5

510.18 519.33 9.15 0.254 0.253 517.93 0.4

519.63 528.53 8.91 0.254 0.254 526.49 0.1

528.73 538.12 9.38 0.254 0.253 532.12 0.4

538.32 547.75 9.44 0.254 0.253 545.93 0.3

547.95 557.44 9.49 0.254 0.254 551.16 0.0

557.64 567.08 9.44 0.254 0.253 561.17 0.6

567.28 576.50 9.22 0.254 0.252 575.01 1.0

576.70 586.17 9.46 0.254 0.252 584.38 0.6

586.37 595.75 9.38 0.254 0.252 593.15 0.9

595.95 605.44 9.49 0.254 0.252 603.65 0.8

605.64 615.08 9.44 0.254 0.252 611.90 0.8

Page 44: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 43 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk (in)

Min Thk (in)

Max Loss Depth(m)

Max Loss (%)

615.28 624.74 9.46 0.254 0.252 620.18 0.7

624.94 634.32 9.38 0.254 0.252 632.18 0.9

634.52 643.99 9.46 0.254 0.252 639.24 0.7

644.19 653.22 9.04 0.254 0.251 652.37 1.3

653.42 662.43 9.01 0.254 0.251 655.48 1.2

662.63 672.04 9.41 0.254 0.251 665.92 1.2

672.24 681.65 9.41 0.254 0.252 678.53 0.9

681.85 691.35 9.49 0.254 0.251 689.44 1.0

691.55 700.93 9.38 0.254 0.252 695.45 0.9

701.13 710.65 9.52 0.254 0.252 707.32 0.7

710.85 719.99 9.14 0.254 0.252 718.46 0.6

720.19 729.65 9.46 0.254 0.254 721.42 0.0

729.85 739.24 9.38 0.254 0.253 732.60 0.4

739.44 749.01 9.57 0.254 0.253 747.20 0.5

749.21 758.22 9.01 0.254 0.253 750.39 0.2

758.42 767.05 8.64 0.254 0.253 766.49 0.5

767.25 776.77 9.52 0.254 0.252 771.46 0.7

776.97 786.46 9.49 0.254 0.253 778.14 0.2

786.66 796.04 9.38 0.254 0.253 787.77 0.5

796.24 805.65 9.41 0.254 0.252 803.77 0.7

805.85 814.57 8.72 0.254 0.252 806.60 0.7

814.77 824.29 9.52 0.254 0.253 822.37 0.3

824.49 833.92 9.44 0.254 0.253 832.38 0.6

834.12 843.05 8.93 0.254 0.252 842.27 0.7

843.25 852.05 8.80 0.254 0.251 850.76 1.3

852.25 861.66 9.41 0.254 0.250 856.33 1.7

861.86 871.24 9.38 0.254 0.253 863.90 0.4

871.44 880.91 9.46 0.254 0.252 879.62 0.7

881.11 889.50 8.40 0.254 0.253 883.29 0.5

889.70 899.09 9.38 0.254 0.252 898.40 0.6

899.29 908.32 9.04 0.254 0.252 906.94 0.7

Page 45: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 44 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk (in)

Min Thk (in)

Max Loss Depth(m)

Max Loss (%)

908.52 917.99 9.46 0.254 0.252 908.72 0.8

918.19 927.65 9.46 0.254 0.253 925.06 0.6

927.85 937.23 9.38 0.254 0.253 936.62 0.2

937.43 946.95 9.52 0.254 0.252 944.55 0.9

947.15 956.53 9.38 0.254 0.253 955.84 0.3

956.73 966.20 9.46 0.254 0.249 964.70 2.0

966.40 975.83 9.44 0.254 0.249 970.41 2.0

976.03 985.50 9.46 0.254 0.253 976.68 0.6

985.70 995.16 9.46 0.254 0.253 987.05 0.6

995.36 1004.77 9.41 0.254 0.252 999.66 0.7

1004.97 1014.44 9.46 0.254 0.252 1012.61 1.0

1014.64 1024.07 9.44 0.254 0.251 1021.27 1.2

1024.27 1033.76 9.49 0.254 0.250 1027.05 1.4

1033.96 1043.40 9.44 0.254 0.251 1041.53 1.3

1043.60 1053.06 9.46 0.254 0.251 1048.00 1.2

1053.26 1062.70 9.44 0.254 0.252 1057.78 0.9

1062.90 1072.28 9.38 0.254 0.253 1063.77 0.3

1072.48 1081.97 9.49 0.254 0.253 1075.65 0.5

1082.17 1091.61 9.44 0.254 0.252 1084.21 0.7

1091.81 1101.25 9.44 0.254 0.252 1097.99 0.8

1101.45 1110.97 9.52 0.254 0.251 1104.74 1.0

1111.17 1120.55 9.38 0.254 0.252 1114.32 0.9

1120.75 1130.21 9.46 0.254 0.252 1127.67 0.8

1130.41 1139.88 9.46 0.254 0.252 1133.54 0.8

1140.08 1149.49 9.41 0.254 0.252 1145.10 0.7

1149.69 1158.75 9.06 0.254 0.251 1157.28 1.1

1158.95 1168.41 9.46 0.254 0.252 1166.46 0.9

1168.61 1178.02 9.41 0.254 0.251 1176.67 1.1

1178.22 1187.31 9.09 0.254 0.250 1186.20 1.5

1187.51 1196.95 9.44 0.254 0.251 1195.40 1.3

1197.15 1206.16 9.01 0.254 0.249 1202.03 2.0

Page 46: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 45 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk (in)

Min Thk (in)

Max Loss Depth(m)

Max Loss (%)

1206.36 1215.74 9.38 0.254 0.250 1209.52 1.4

1215.94 1225.41 9.46 0.254 0.250 1219.20 1.5

1225.61 1235.04 9.44 0.254 0.251 1226.74 1.3

1235.24 1244.79 9.54 0.254 0.252 1236.22 0.7

1244.99 1254.37 9.38 0.254 0.252 1252.38 0.7

1254.57 1263.98 9.41 0.254 0.251 1256.56 1.2

1264.18 1273.51 9.33 0.254 0.252 1272.53 1.0

1273.71 1283.20 9.49 0.254 0.252 1281.86 0.7

1283.40 1292.84 9.44 0.254 0.251 1291.46 1.1

1293.04 1302.50 9.46 0.254 0.250 1301.88 1.5

1302.70 1312.17 9.46 0.254 0.251 1303.98 1.1

1312.37 1321.75 9.38 0.254 0.250 1321.07 1.6

1321.95 1331.31 9.36 0.254 0.251 1330.29 1.2

1331.51 1340.92 9.41 0.254 0.251 1332.72 1.2

1341.12 1350.61 9.49 0.254 0.251 1348.05 1.2

1350.81 1360.19 9.38 0.254 0.251 1351.93 1.0

1360.39 1369.85 9.46 0.254 0.251 1368.01 1.1

1370.05 1379.09 9.04 0.254 0.250 1375.01 1.5

1379.29 1388.73 9.44 0.254 0.251 1386.84 1.2

1388.93 1398.39 9.46 0.254 0.251 1397.36 1.1

1398.59 1407.36 8.77 0.254 0.251 1402.58 1.2

1407.56 1416.30 8.74 0.254 0.251 1415.10 1.2

1416.50 1425.86 9.36 0.254 0.251 1423.40 1.2

1426.06 1435.44 9.38 0.254 0.251 1430.79 1.4

1435.64 1445.16 9.52 0.254 0.251 1442.61 1.3

1445.36 1454.64 9.28 0.254 0.251 1453.21 1.4

1454.84 1464.14 9.30 0.254 0.252 1455.76 0.9

1464.34 1473.49 9.14 0.254 0.251 1471.66 1.1

1473.69 1482.75 9.06 0.254 0.251 1482.36 1.4

1482.95 1491.66 8.72 0.254 0.250 1489.90 1.5

1491.86 1501.30 9.44 0.254 0.251 1499.28 1.2

Page 47: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 46 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk (in)

Min Thk (in)

Max Loss Depth(m)

Max Loss (%)

1501.50 1510.89 9.38 0.254 0.251 1509.47 1.1

1511.09 1520.52 9.44 0.254 0.251 1512.00 1.2

1520.72 1530.05 9.33 0.254 0.251 1528.25 1.2

1530.25 1539.66 9.41 0.254 0.251 1538.78 1.3

1539.86 1548.85 8.98 0.254 0.250 1542.37 1.5

1549.05 1558.51 9.46 0.254 0.251 1550.14 1.3

1558.71 1567.69 8.98 0.254 0.250 1567.09 1.7

1567.89 1576.90 9.01 0.254 0.250 1576.26 1.7

1577.10 1586.49 9.38 0.254 0.251 1582.09 1.3

1586.69 1596.23 9.54 0.254 0.250 1594.27 1.5

1596.43 1605.81 9.38 0.254 0.250 1603.93 1.4

1606.01 1615.48 9.46 0.254 0.251 1614.56 1.4

1615.68 1625.06 9.38 0.254 0.251 1623.19 1.3

1625.26 1634.38 9.12 0.254 0.249 1630.94 2.0

1634.58 1643.56 8.98 0.254 0.249 1642.17 2.1

1643.76 1652.50 8.74 0.254 0.249 1645.03 2.0

1652.70 1662.14 9.44 0.254 0.250 1654.76 1.7

1662.34 1671.56 9.22 0.254 0.249 1666.00 2.0

1671.76 1681.28 9.52 0.254 0.250 1675.71 1.6

1681.48 1690.73 9.25 0.254 0.248 1690.73 2.3

1690.93 1700.21 9.28 0.254 0.247 1699.76 2.8

1700.41 1709.66 9.25 0.254 0.250 1709.39 1.7

1709.86 1719.29 9.44 0.254 0.250 1717.78 1.7

1719.49 1728.72 9.22 0.254 0.250 1728.35 1.7

1728.92 1738.41 9.49 0.254 0.250 1730.26 1.5

1738.61 1747.75 9.14 0.254 0.248 1747.56 2.2

1747.95 1757.52 9.57 0.254 0.248 1752.89 2.5

1757.72 1767.10 9.38 0.254 0.249 1760.10 1.9

1767.30 1776.72 9.41 0.254 0.251 1767.33 1.1

1776.92 1786.38 9.46 0.254 0.251 1777.99 1.2

1786.58 1795.08 8.50 0.254 0.251 1794.70 1.3

Page 48: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 47 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk (in)

Min Thk (in)

Max Loss Depth(m)

Max Loss (%)

1795.28 1804.53 9.25 0.254 0.251 1803.72 1.3

1804.73 1814.01 9.28 0.254 0.250 1814.01 1.5

1814.21 1823.54 9.33 0.254 0.248 1815.74 2.4

1823.74 1833.18 9.44 0.254 0.248 1832.44 2.3

1833.38 1842.57 9.20 0.254 0.250 1835.47 1.6

1842.77 1852.05 9.28 0.254 0.249 1852.05 2.0

1852.25 1861.63 9.38 0.254 0.247 1852.62 2.7

1861.83 1870.95 9.12 0.254 0.251 1863.01 1.2

1871.15 1880.48 9.33 0.254 0.250 1880.06 1.5

1880.68 1890.09 9.41 0.254 0.250 1890.09 1.7

1890.29 1899.78 9.49 0.254 0.249 1898.92 2.0

1899.98 1909.26 9.28 0.254 0.249 1904.42 2.1

1909.46 1918.95 9.49 0.254 0.250 1918.95 1.7

1919.15 1928.50 9.36 0.254 0.248 1926.38 2.5

1928.70 1937.95 9.25 0.254 0.249 1935.63 1.8

1938.15 1947.35 9.20 0.254 0.250 1946.97 1.7

1947.55 1956.77 9.22 0.254 0.250 1949.77 1.7

1956.97 1966.28 9.30 0.254 0.249 1963.28 2.0

1966.48 1975.70 9.22 0.254 0.250 1975.25 1.7

1975.90 1985.15 9.25 0.254 0.250 1977.80 1.7

1985.35 1994.52 9.17 0.254 0.249 1987.51 1.9

1994.72 2004.13 9.41 0.254 0.248 2003.26 2.4

2004.33 2013.61 9.28 0.254 0.249 2007.00 2.0

2013.81 2023.06 9.25 0.254 0.248 2020.59 2.2

2023.26 2032.72 9.46 0.254 0.248 2031.80 2.3

2032.92 2042.30 9.38 0.254 0.250 2042.31 1.7

2042.50 2051.86 9.36 0.254 0.249 2051.39 1.8

2052.06 2061.23 9.17 0.254 0.249 2059.95 2.0

2061.43 2070.68 9.25 0.254 0.250 2061.66 1.5

2070.88 2080.08 9.20 0.254 0.250 2072.10 1.5

2080.28 2089.53 9.25 0.254 0.249 2082.40 1.9

Page 49: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 48 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk (in)

Min Thk (in)

Max Loss Depth(m)

Max Loss (%)

2089.73 2099.14 9.41 0.254 0.251 2090.93 1.4

2099.34 2108.62 9.28 0.254 0.250 2107.78 1.5

2108.82 2118.23 9.41 0.254 0.248 2109.21 2.4

2118.43 2127.65 9.22 0.254 0.251 2126.81 1.4

2127.85 2137.34 9.49 0.254 0.250 2135.63 1.6

2137.54 2146.82 9.28 0.254 0.251 2146.28 1.3

2147.02 2156.21 9.20 0.254 0.250 2155.43 1.5

2156.41 2165.02 8.61 0.254 0.250 2164.32 1.6

2165.22 2174.42 9.20 0.254 0.249 2166.23 1.8

2174.62 2184.03 9.41 0.254 0.250 2183.48 1.7

2184.23 2193.56 9.33 0.254 0.250 2191.99 1.7

2193.76 2202.98 9.22 0.254 0.249 2200.02 1.8

2203.18 2212.43 9.25 0.254 0.250 2211.58 1.6

2212.63 2221.83 9.20 0.254 0.250 2221.47 1.7

2222.03 2231.52 9.49 0.254 0.249 2230.16 1.8

2231.72 2241.00 9.28 0.254 0.250 2241.00 1.7

2241.20 2249.65 8.45 0.254 0.248 2248.50 2.4

2249.85 2259.26 9.41 0.254 0.250 2251.90 1.6

2259.46 2268.73 9.28 0.254 0.250 2267.38 1.5

2268.93 2278.40 9.46 0.254 0.250 2277.94 1.6

2278.60 2288.03 9.44 0.254 0.249 2279.87 1.8

2288.23 2297.48 9.25 0.254 0.247 2290.42 2.9

2297.68 2306.96 9.28 0.254 0.248 2306.07 2.2

2307.16 2315.85 8.69 0.254 0.250 2315.42 1.6

2316.05 2325.49 9.44 0.254 0.248 2318.55 2.3

2325.69 2334.94 9.25 0.254 0.250 2331.52 1.7

2335.14 2344.63 9.49 0.254 0.250 2343.75 1.5

2344.83 2354.13 9.30 0.254 0.251 2353.74 1.4

2354.33 2363.85 9.52 0.254 0.250 2363.45 1.7

2364.05 2373.27 9.22 0.254 0.250 2372.39 1.4

2373.47 2382.88 9.41 0.254 0.250 2375.12 1.5

Page 50: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 49 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk (in)

Min Thk (in)

Max Loss Depth(m)

Max Loss (%)

2383.08 2392.52 9.44 0.254 0.250 2391.83 1.5

2392.72 2401.97 9.25 0.254 0.250 2401.19 1.5

2402.17 2411.39 9.22 0.254 0.250 2410.94 1.5

2411.59 2421.03 9.44 0.254 0.250 2420.57 1.5

2421.23 2430.45 9.22 0.254 0.250 2430.00 1.7

2430.65 2440.06 9.41 0.254 0.250 2439.43 1.6

2440.26 2449.75 9.49 0.254 0.250 2449.32 1.5

2449.95 2459.34 9.38 0.254 0.250 2458.82 1.6

2459.54 2468.76 9.22 0.254 0.250 2459.74 1.6

2468.96 2478.26 9.30 0.254 0.250 2477.07 1.6

2478.46 2487.61 9.14 0.254 0.250 2478.49 1.7

2487.81 2497.14 9.33 0.254 0.250 2488.07 1.6

2497.34 2506.61 9.28 0.254 0.250 2506.09 1.7

2506.81 2516.28 9.46 0.254 0.251 2506.85 1.3

2516.48 2525.83 9.36 0.254 0.251 2525.27 1.0

2526.03 2535.31 9.28 0.254 0.251 2526.19 1.3

2535.51 2544.76 9.25 0.254 0.251 2543.85 1.4

2544.96 2554.18 9.22 0.254 0.252 2553.71 0.9

2554.38 2563.50 9.12 0.254 0.251 2563.14 1.2

2563.70 2573.11 9.41 0.254 0.251 2572.62 1.3

2573.31 2582.56 9.25 0.254 0.251 2573.45 1.2

2582.76 2592.14 9.38 0.254 0.248 2583.75 2.2

2592.34 2601.67 9.33 0.254 0.251 2601.13 1.0

2601.87 2611.10 9.22 0.254 0.249 2611.10 1.8

2611.30 2620.55 9.25 0.254 0.248 2612.49 2.4

2620.75 2630.08 9.33 0.254 0.251 2622.12 1.3

2630.28 2639.53 9.25 0.254 0.251 2638.59 1.4

2639.73 2649.17 9.44 0.254 0.249 2648.42 2.0

2649.37 2658.62 9.25 0.254 0.251 2658.13 1.1

2658.82 2667.99 9.17 0.254 0.250 2660.70 1.5

2668.19 2677.54 9.36 0.254 0.247 2677.06 2.8

Page 51: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 50 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk (in)

Min Thk (in)

Max Loss Depth(m)

Max Loss (%)

2677.74 2687.02 9.28 0.254 0.250 2686.34 1.7

2687.22 2696.66 9.44 0.254 0.248 2688.63 2.3

2696.86 2706.19 9.33 0.254 0.249 2699.23 2.0

2706.39 2715.66 9.28 0.254 0.249 2706.49 2.0

2715.86 2724.93 9.06 0.254 0.249 2716.76 2.1

2725.13 2734.54 9.41 0.254 0.249 2734.54 2.0

2734.74 2743.96 9.22 0.254 0.249 2736.10 2.1

2744.16 2753.57 9.41 0.254 0.248 2745.75 2.4

2753.77 2763.05 9.28 0.254 0.248 2755.03 2.3

2763.25 2771.80 8.56 0.254 0.249 2771.80 2.1

2772.00 2781.39 9.38 0.254 0.248 2780.76 2.4

2781.59 2790.89 9.30 0.254 0.247 2783.14 2.6

2791.09 2800.37 9.28 0.254 0.248 2792.13 2.4

2800.57 2809.26 8.69 0.254 0.248 2802.20 2.3

2809.46 2818.68 9.22 0.254 0.248 2810.86 2.5

2818.88 2828.26 9.38 0.254 0.247 2820.31 2.6

2828.46 2837.61 9.14 0.254 0.247 2829.76 2.7

2837.81 2846.39 8.58 0.254 0.249 2845.79 2.1

2846.59 2855.97 9.38 0.254 0.248 2847.06 2.3

2856.17 2865.58 9.41 0.254 0.248 2856.31 2.3

2865.78 2875.06 9.28 0.254 0.248 2874.40 2.4

2875.26 2884.62 9.36 0.254 0.248 2875.40 2.4

2884.82 2894.12 9.30 0.254 0.248 2893.44 2.5

2894.32 2903.68 9.36 0.254 0.248 2894.43 2.5

2903.88 2913.21 9.33 0.254 0.248 2906.82 2.5

2913.41 2922.74 9.33 0.254 0.248 2922.74 2.5

2922.94 2932.21 9.28 0.254 0.248 2923.35 2.5

2932.41 2941.77 9.36 0.254 0.249 2933.67 2.1

2941.97 2951.43 9.46 0.254 0.248 2950.72 2.2

2951.63 2961.12 9.49 0.254 0.249 2952.58 2.0

2961.32 2970.73 9.41 0.254 0.248 2969.27 2.4

Page 52: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 51 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk (in)

Min Thk (in)

Max Loss Depth(m)

Max Loss (%)

2970.93 2980.37 9.44 0.254 0.248 2978.90 2.4

2980.57 2989.95 9.38 0.254 0.248 2988.71 2.3

2990.15 2999.65 9.49 0.254 0.247 2993.27 2.6

2999.85 3009.20 9.36 0.254 0.249 3008.38 2.1

3009.40 3018.84 9.44 0.254 0.249 3017.07 2.1

3019.04 3028.50 9.46 0.254 0.248 3020.02 2.3

3028.70 3038.11 9.41 0.254 0.249 3029.86 2.1

3038.31 3047.75 9.44 0.254 0.248 3039.13 2.2

3047.95 3057.39 9.44 0.254 0.248 3048.89 2.3

3057.59 3067.00 9.41 0.254 0.248 3060.44 2.4

3067.20 3076.63 9.44 0.254 0.247 3068.29 2.6

3076.83 3086.32 9.49 0.254 0.248 3077.48 2.4

3086.52 3096.01 9.49 0.254 0.248 3088.88 2.4

3096.21 3105.65 9.44 0.254 0.248 3102.76 2.4

3105.85 3115.21 9.36 0.254 0.248 3114.23 2.2

3115.41 3124.87 9.46 0.254 0.248 3123.14 2.3

3125.07 3134.56 9.49 0.254 0.248 3133.03 2.4

3134.76 3144.12 9.36 0.254 0.248 3142.84 2.4

3144.32 3153.81 9.49 0.254 0.246 3146.97 3.0

3154.01 3163.50 9.49 0.254 0.248 3161.98 2.4

3163.70 3173.16 9.46 0.254 0.248 3165.11 2.5

3173.36 3182.72 9.36 0.254 0.248 3174.64 2.5

3182.92 3192.36 9.44 0.254 0.247 3190.80 2.6

3192.56 3201.99 9.44 0.254 0.248 3193.21 2.3

3202.19 3211.66 9.46 0.254 0.248 3210.57 2.5

3211.86 3221.27 9.41 0.254 0.247 3220.02 2.7

3221.47 3230.91 9.44 0.254 0.248 3230.29 2.5

3231.11 3240.52 9.41 0.254 0.247 3233.88 2.8

3240.72 3250.21 9.49 0.254 0.247 3249.53 2.7

3250.41 3259.82 9.41 0.254 0.247 3252.59 2.8

3260.02 3269.48 9.46 0.254 0.247 3268.21 2.8

Page 53: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 52 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk (in)

Min Thk (in)

Max Loss Depth(m)

Max Loss (%)

3269.68 3279.06 9.38 0.254 0.247 3271.04 2.9

3279.26 3288.83 9.57 0.254 0.247 3288.08 2.8

3289.03 3298.36 9.33 0.254 0.247 3289.81 2.7

3298.56 3308.05 9.49 0.254 0.248 3306.55 2.5

3308.25 3317.72 9.46 0.254 0.247 3309.15 2.8

3317.92 3327.33 9.41 0.254 0.248 3326.20 2.5

3327.53 3336.99 9.46 0.254 0.247 3328.42 2.6

3337.19 3346.58 9.38 0.254 0.247 3345.54 2.7

3346.78 3356.19 9.41 0.254 0.247 3354.76 2.8

3356.39 3365.90 9.52 0.254 0.247 3360.11 2.9

3366.10 3375.54 9.44 0.254 0.247 3374.23 2.7

3375.74 3385.18 9.44 0.254 0.247 3384.55 2.8

3385.38 3394.84 9.46 0.254 0.247 3386.03 2.9

3395.04 3404.45 9.41 0.254 0.246 3403.40 3.0

3404.65 3414.09 9.44 0.254 0.246 3412.68 3.1

3414.29 3423.75 9.46 0.254 0.247 3415.10 2.8

3423.95 3433.41 9.46 0.254 0.246 3428.20 3.3

3433.61 3443.08 9.46 0.254 0.248 3433.98 2.5

3443.28 3452.39 9.11 0.254 0.246 3444.12 3.2

3453.19 3462.33 9.14 0.254 0.247 3453.50 2.8

3462.53 3471.96 9.44 0.254 0.247 3464.25 2.9

3472.16 3481.22 9.06 0.254 0.247 3472.63 2.9

3482.02 3491.06 9.04 0.254 0.247 3490.65 2.7

3491.56 3500.77 9.21 0.254 0.247 3492.58 2.8

3501.07 3510.49 9.42 0.254 0.247 3509.83 2.6

3510.79 3520.07 9.28 0.254 0.247 3518.47 2.7

3520.37 3529.79 9.42 0.254 0.247 3529.79 2.8

3530.09 3539.37 9.28 0.254 0.246 3537.25 3.3

3539.67 3549.01 9.34 0.254 0.247 3540.46 2.7

3549.31 3558.64 9.34 0.254 0.247 3558.63 2.9

3558.94 3568.23 9.28 0.254 0.247 3558.99 2.8

Page 54: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 53 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk (in)

Min Thk (in)

Max Loss Depth(m)

Max Loss (%)

3568.53 3577.52 9.00 0.254 0.247 3576.26 2.8

3578.02 3587.23 9.21 0.254 0.248 3586.66 2.5

3587.53 3596.85 9.31 0.254 0.247 3596.24 2.9

3597.15 3606.46 9.31 0.254 0.246 3605.23 3.0

3606.76 3616.20 9.44 0.254 0.247 3616.19 2.8

3616.50 3625.71 9.21 0.254 0.246 3624.04 3.3

3626.21 3634.94 8.73 0.254 0.247 3634.94 2.7

3635.24 3644.50 9.26 0.254 0.246 3636.09 3.1

3644.80 3654.08 9.28 0.254 0.247 3653.32 2.8

3654.38 3663.69 9.31 0.254 0.247 3662.74 2.9

3663.99 3673.41 9.42 0.254 0.246 3672.30 3.0

3673.71 3682.88 9.18 0.254 0.245 3682.18 3.6

3683.18 3692.52 9.34 0.254 0.246 3683.97 3.2

3692.82 3702.10 9.28 0.254 0.246 3700.66 3.2

3702.40 3711.93 9.52 0.254 0.246 3711.08 3.2

3712.23 3721.46 9.23 0.254 0.246 3720.89 3.2

3721.76 3731.12 9.36 0.254 0.246 3722.44 3.3

3731.42 3740.73 9.31 0.254 0.246 3732.36 3.2

3741.03 3750.13 9.10 0.254 0.246 3742.39 3.3

3750.43 3759.58 9.15 0.254 0.247 3751.00 2.6

3759.88 3769.22 9.34 0.254 0.246 3761.00 3.0

3769.52 3778.83 9.31 0.254 0.245 3771.88 3.4

3779.13 3787.61 8.48 0.254 0.246 3779.88 3.3

3787.91 3797.38 9.47 0.254 0.246 3797.38 3.3

3797.68 3806.96 9.28 0.254 0.245 3798.42 3.6

3807.26 3816.55 9.28 0.254 0.246 3808.47 3.3

3816.85 3826.05 9.20 0.254 0.246 3817.64 3.2

3826.35 3835.71 9.36 0.254 0.246 3834.53 3.0

3836.01 3845.38 9.36 0.254 0.245 3844.04 3.5

3845.68 3855.04 9.36 0.254 0.246 3846.30 3.3

3855.34 3864.65 9.31 0.254 0.245 3863.45 3.7

Page 55: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 54 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk (in)

Min Thk (in)

Max Loss Depth(m)

Max Loss (%)

3864.95 3874.34 9.39 0.254 0.246 3873.70 3.2

3874.64 3883.98 9.34 0.254 0.245 3883.15 3.5

3884.28 3893.59 9.31 0.254 0.246 3884.63 3.3

3893.89 3903.20 9.31 0.254 0.246 3903.20 3.3

3903.50 3912.84 9.34 0.254 0.245 3912.04 3.7

3913.14 3922.45 9.31 0.254 0.245 3913.44 3.5

3922.75 3932.38 9.63 0.254 0.246 3923.74 3.1

3932.68 3941.91 9.23 0.254 0.245 3941.91 3.5

3942.21 3951.60 9.39 0.254 0.246 3948.66 3.2

3951.90 3961.26 9.36 0.254 0.246 3961.22 3.1

3961.56 3970.68 9.12 0.254 0.245 3969.09 3.5

3970.98 3980.29 9.31 0.254 0.247 3971.57 2.7

3980.59 3990.01 9.42 0.254 0.246 3990.01 3.2

3990.31 3999.54 9.23 0.254 0.245 3999.54 3.6

3999.84 4009.12 9.28 0.254 0.245 4009.13 3.5

4009.42 4018.68 9.26 0.254 0.244 4017.35 3.8

4018.98 4028.16 9.18 0.254 0.245 4026.86 3.5

4028.46 4037.72 9.26 0.254 0.245 4037.20 3.6

4038.02 4047.33 9.31 0.254 0.244 4047.33 3.8

4047.63 4056.96 9.34 0.254 0.243 4048.08 4.2

4057.26 4066.31 9.04 0.254 0.245 4057.33 3.4

4066.61 4076.13 9.52 0.254 0.244 4076.13 4.1

4076.43 4085.63 9.20 0.254 0.244 4076.93 4.1

4085.93 4094.79 8.86 0.254 0.245 4086.20 3.5

4095.09 4107.50 12.41 0.254 0.216 4095.81 14.8

4107.80 4116.79 8.99 0.254 0.245 4116.40 3.7

4117.09 4127.73 10.65 0.254 0.241 4118.59 5.1

4128.03 4136.78 8.75 0.254 0.242 4128.14 4.9

4137.08 4148.30 11.22 0.254 0.240 4139.71 5.7

4149.10 4157.63 8.53 0.254 0.242 4157.63 4.9

Page 56: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 55 of 77

Tope (m)

Base (m)

Longitud (m)

Espesor Nominal(in)

Espesor Minimo

(in)

Prof Max Perdida

(m)

Max Perdida

(%)

37.20 51.62 14.43 0.498 0.477 44.05 4.2

51.92 64.85 12.92 0.498 0.466 64.74 6.3

65.15 78.15 13.00 0.498 0.465 66.80 6.7

78.45 92.04 13.59 0.498 0.459 85.88 7.7

92.34 106.26 13.93 0.498 0.460 94.85 7.6

106.56 120.41 13.84 0.498 0.462 113.35 7.3

120.71 134.55 13.84 0.498 0.460 122.98 7.7

134.85 148.35 13.51 0.498 0.458 135.36 8.1

148.65 162.49 13.84 0.498 0.462 151.36 7.3

162.79 175.63 12.84 0.498 0.466 168.74 6.4

175.93 190.86 14.93 0.498 0.474 176.59 4.9

191.16 204.41 13.26 0.498 0.472 197.33 5.1

204.72 219.06 14.34 0.498 0.469 207.50 5.8

219.36 233.28 13.93 0.498 0.469 233.01 5.8

233.58 247.17 13.59 0.498 0.435 243.64 12.6

247.47 260.98 13.51 0.498 0.472 249.03 5.2

261.28 275.37 14.09 0.498 0.476 269.47 4.4

275.67 289.26 13.59 0.498 0.472 277.75 5.2

289.56 303.32 13.76 0.498 0.474 291.89 4.9

303.62 319.30 15.68 0.498 0.476 310.90 4.5

319.60 331.60 12.00 0.498 0.468 329.19 6.1

331.90 345.83 13.93 0.498 0.467 338.88 6.3

346.13 357.88 11.75 0.498 0.473 353.35 5.1

358.18 373.69 15.52 0.498 0.475 359.87 4.6

373.99 388.08 14.09 0.498 0.475 379.72 4.6

388.38 402.22 13.84 0.498 0.469 398.81 5.8

402.52 416.53 14.01 0.498 0.476 405.51 4.5

416.83 430.51 13.67 0.498 0.474 419.63 4.8

430.81 444.73 13.93 0.498 0.474 436.88 4.8

445.03 458.87 13.84 0.498 0.476 455.98 4.4

459.17 472.26 13.09 0.498 0.468 472.26 6.0

Tuberia de Revestimiento de 7 pulgadas. Resultados de MTD

Page 57: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 56 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk

(mm)

Min Thk (mm)

Max Loss Depth(m)

Max Loss (%)

472.56 484.31 11.75 0.498 0.468 472.78 6.0

484.61 498.53 13.93 0.498 0.475 488.11 4.7

498.83 512.59 13.76 0.498 0.476 504.65 4.4

512.89 526.57 13.67 0.498 0.477 521.24 4.1

526.87 540.37 13.51 0.498 0.470 529.90 5.6

540.67 554.35 13.67 0.498 0.479 543.91 3.7

554.64 568.49 13.84 0.498 0.475 560.22 4.7

568.79 576.27 7.48 0.498 0.474 576.04 4.8

576.57 586.23 9.66 0.498 0.471 582.67 5.4

586.53 595.76 9.24 0.498 0.472 589.73 5.2

596.07 610.32 14.26 0.498 0.469 607.64 5.9

610.62 624.47 13.84 0.498 0.470 619.16 5.7

624.76 638.94 14.18 0.498 0.468 636.61 6.0

639.24 652.83 13.59 0.498 0.472 641.96 5.2

653.13 667.06 13.93 0.498 0.471 659.82 5.5

667.36 681.11 13.76 0.498 0.471 672.69 5.4

681.41 695.34 13.93 0.498 0.469 686.91 5.8

695.64 709.14 13.51 0.498 0.474 695.70 4.9

709.45 722.95 13.51 0.498 0.477 710.53 4.3

723.25 736.17 12.92 0.498 0.491 730.84 1.5

736.47 748.89 12.42 0.498 0.490 748.11 1.6

749.19 764.12 14.93 0.498 0.490 758.59 1.6

764.42 778.60 14.18 0.498 0.487 776.65 2.1

778.89 792.07 13.17 0.498 0.483 786.35 3.0

792.37 805.62 13.26 0.498 0.487 794.61 2.3

805.92 819.93 14.01 0.498 0.484 806.24 2.8

820.23 833.82 13.59 0.498 0.488 824.76 2.0

834.12 848.46 14.34 0.498 0.478 848.45 3.9

848.76 862.86 14.09 0.498 0.451 851.92 9.5

863.16 876.91 13.76 0.498 0.487 863.29 2.3

877.21 891.14 13.93 0.498 0.490 882.45 1.6

Page 58: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 57 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk

(mm)

Min Thk (mm)

Max Loss Depth(m)

Max Loss (%)

891.44 905.28 13.84 0.498 0.492 899.54 1.2

905.58 919.67 14.09 0.498 0.480 910.68 3.7

919.97 934.32 14.34 0.498 0.489 920.26 1.7

934.62 948.46 13.84 0.498 0.491 946.84 1.3

948.76 962.51 13.76 0.498 0.480 962.51 3.7

962.81 976.57 13.76 0.498 0.452 966.09 9.3

976.87 990.96 14.09 0.498 0.494 976.93 0.7

991.26 1004.60 13.34 0.498 0.493 994.72 1.0

1004.90 1019.30 14.43 0.498 0.474 1014.30 4.7

1019.60 1032.60 12.92 0.498 0.475 1026.40 4.6

1032.80 1046.90 14.01 0.498 0.463 1033.70 7.0

1047.20 1061.10 13.93 0.498 0.474 1053.00 4.7

1061.40 1075.60 14.18 0.498 0.491 1062.60 1.3

1075.90 1089.30 13.42 0.498 0.496 1086.70 0.4

1089.60 1103.80 14.18 0.498 0.488 1100.80 2.0

1104.10 1117.60 13.59 0.498 0.486 1111.90 2.3

1117.90 1132.00 14.09 0.498 0.479 1130.10 3.8

1132.30 1145.70 13.34 0.498 0.489 1139.40 1.9

1146.00 1159.90 13.93 0.498 0.479 1158.60 3.8

1160.20 1174.00 13.76 0.498 0.475 1168.30 4.6

1174.30 1188.20 13.93 0.498 0.452 1187.20 9.3

1188.50 1201.80 13.34 0.498 0.465 1196.80 6.7

1202.10 1215.50 13.42 0.498 0.459 1206.00 7.7

1215.80 1230.10 14.26 0.498 0.478 1222.20 4.0

1230.40 1244.60 14.18 0.498 0.485 1244.60 2.6

1244.90 1258.20 13.34 0.498 0.493 1254.90 0.9

1258.50 1273.40 14.85 0.498 0.479 1263.80 3.8

1273.70 1286.70 13.00 0.498 0.495 1283.80 0.5

1287.00 1300.70 13.76 0.498 0.488 1292.70 1.9

1301.00 1314.40 13.34 0.498 0.477 1312.10 4.2

1314.70 1328.30 13.67 0.498 0.490 1321.60 1.7

Page 59: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 58 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk

(mm)

Min Thk (mm)

Max Loss Depth(m)

Max Loss (%)

1328.60 1342.50 13.84 0.498 0.481 1340.80 3.5

1342.80 1356.50 13.76 0.498 0.489 1350.50 1.8

1356.80 1371.00 14.18 0.498 0.490 1369.70 1.6

1371.30 1385.00 13.67 0.498 0.489 1379.00 1.8

1385.30 1398.10 12.84 0.498 0.495 1387.70 0.5

1398.40 1413.40 14.93 0.498 0.487 1407.30 2.3

1413.70 1427.60 13.93 0.498 0.485 1416.20 2.6

1427.90 1442.00 14.09 0.498 0.492 1433.70 1.2

1442.30 1455.50 13.26 0.498 0.485 1445.00 2.7

1455.80 1469.90 14.09 0.498 0.489 1464.00 1.9

1470.20 1483.60 13.34 0.498 0.484 1482.60 2.8

1483.90 1497.40 13.51 0.498 0.494 1491.60 0.8

1497.70 1511.40 13.76 0.498 0.480 1510.80 3.5

1511.70 1526.00 14.26 0.498 0.490 1520.40 1.6

1526.30 1539.50 13.17 0.498 0.491 1529.90 1.4

1539.80 1554.00 14.26 0.498 0.498 1551.00 0.1

1554.30 1568.20 13.84 0.498 0.498 1557.00 0.1

1568.50 1582.50 14.09 0.498 0.489 1576.80 1.8

1582.80 1596.00 13.17 0.498 0.495 1596.00 0.6

1596.30 1609.70 13.42 0.498 0.495 1596.60 0.5

1610.00 1624.10 14.01 0.498 0.487 1615.40 2.1

1624.30 1637.90 13.59 0.498 0.474 1634.30 4.7

1638.20 1652.80 14.51 0.498 0.458 1652.40 8.0

1653.10 1666.00 12.92 0.498 0.463 1662.00 7.0

1666.30 1680.20 13.93 0.498 0.476 1671.40 4.3

1680.50 1693.40 12.92 0.498 0.478 1690.50 4.0

1693.70 1707.70 14.01 0.498 0.477 1700.10 4.3

1708.00 1721.70 13.67 0.498 0.485 1719.20 2.6

1722.00 1735.60 13.59 0.498 0.484 1728.60 2.8

1735.90 1749.80 13.93 0.498 0.454 1747.60 8.9

1750.10 1763.70 13.59 0.498 0.455 1757.30 8.7

Page 60: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 59 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk

(mm)

Min Thk (mm)

Max Loss Depth(m)

Max Loss (%)

1764.00 1777.80 13.84 0.498 0.488 1764.30 2.0

1778.10 1792.10 13.93 0.498 0.487 1786.30 2.2

1792.40 1806.00 13.67 0.498 0.492 1794.90 1.1

1806.30 1820.10 13.76 0.498 0.490 1813.90 1.6

1820.40 1834.30 13.93 0.498 0.489 1833.10 1.9

1834.60 1847.90 13.26 0.498 0.486 1842.50 2.4

1848.20 1861.70 13.51 0.498 0.488 1861.50 1.9

1862.00 1875.90 13.93 0.498 0.497 1863.80 0.1

1876.20 1896.20 19.95 0.498 0.473 1890.00 5.0

1896.50 1903.90 7.48 0.498 0.493 1899.60 0.9

1904.20 1918.50 14.26 0.498 0.487 1912.20 2.1

1918.80 1932.10 13.26 0.498 0.475 1918.80 4.7

1932.40 1945.90 13.59 0.498 0.481 1937.80 3.4

1946.20 1960.00 13.76 0.498 0.481 1947.20 3.5

1960.30 1975.70 15.43 0.498 0.466 1975.60 6.5

1976.00 1988.50 12.50 0.498 0.482 1985.00 3.1

1988.80 2002.40 13.59 0.498 0.484 1994.40 2.8

2002.70 2014.80 12.08 0.498 0.481 2004.00 3.4

2015.10 2028.90 13.76 0.498 0.488 2022.90 2.0

2029.20 2043.20 14.01 0.498 0.484 2032.60 2.8

2043.50 2056.50 13.00 0.498 0.471 2051.70 5.4

2056.80 2070.50 13.76 0.498 0.496 2070.50 0.5

2070.80 2083.00 12.17 0.498 0.494 2080.00 0.7

2083.30 2095.20 11.92 0.498 0.494 2091.60 0.9

2095.50 2109.20 13.67 0.498 0.487 2099.00 2.1

2109.50 2120.90 11.42 0.498 0.479 2109.50 3.8

2121.20 2134.80 13.56 0.498 0.495 2127.50 0.6

2135.30 2149.00 13.68 0.498 0.485 2146.70 2.6

2149.50 2163.00 13.59 0.498 0.493 2156.00 1.0

2163.50 2177.00 13.49 0.498 0.493 2164.80 1.0

2177.50 2191.50 13.96 0.498 0.493 2183.90 1.0

Page 61: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 60 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk

(mm)

Min Thk (mm)

Max Loss Depth(m)

Max Loss (%)

2192.00 2205.60 13.59 0.498 0.484 2193.40 2.8

2206.10 2219.70 13.59 0.498 0.493 2212.30 1.0

2220.20 2233.80 13.59 0.498 0.484 2231.40 2.9

2234.30 2247.30 13.03 0.498 0.466 2240.90 6.4

2247.80 2261.10 13.31 0.498 0.484 2259.10 2.8

2261.60 2275.70 14.05 0.498 0.484 2268.60 2.9

2276.20 2289.80 13.68 0.498 0.491 2278.30 1.5

2290.30 2303.80 13.49 0.498 0.479 2297.40 3.8

2304.30 2317.90 13.59 0.498 0.480 2315.70 3.6

2318.40 2332.30 13.87 0.498 0.483 2332.20 3.0

2332.80 2344.20 11.44 0.498 0.480 2334.80 3.5

2344.70 2354.70 9.95 0.498 0.486 2346.80 2.5

2355.20 2368.30 13.12 0.498 0.477 2363.70 4.3

2368.80 2381.90 13.12 0.498 0.486 2374.50 2.5

2382.40 2395.30 12.94 0.498 0.476 2382.80 4.5

2395.80 2409.60 13.77 0.498 0.484 2401.80 2.8

2410.10 2423.50 13.40 0.498 0.484 2413.50 2.7

2424.00 2437.70 13.68 0.498 0.479 2430.30 3.8

2438.20 2451.90 13.68 0.498 0.474 2440.00 4.9

2452.40 2466.00 13.59 0.498 0.469 2459.20 5.8

2466.50 2479.90 13.40 0.498 0.478 2478.10 4.0

2480.40 2493.40 13.03 0.498 0.482 2487.50 3.2

2493.90 2507.50 13.59 0.498 0.473 2497.00 5.1

2508.00 2521.90 13.87 0.498 0.480 2516.20 3.6

2522.40 2536.20 13.87 0.498 0.482 2528.80 3.1

2536.70 2550.30 13.59 0.498 0.484 2545.50 2.7

2550.80 2564.30 13.49 0.498 0.483 2554.00 3.0

2564.80 2578.30 13.49 0.498 0.482 2575.30 3.3

2578.80 2592.70 13.87 0.498 0.482 2592.00 3.2

2593.20 2606.80 13.68 0.498 0.482 2602.50 3.2

2607.30 2621.10 13.77 0.498 0.486 2621.10 2.4

Page 62: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 61 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk

(mm)

Min Thk (mm)

Max Loss Depth(m)

Max Loss (%)

2621.60 2635.30 13.68 0.498 0.461 2630.00 7.5

2635.80 2649.70 13.87 0.498 0.485 2649.60 2.6

2650.20 2664.00 13.87 0.498 0.472 2658.50 5.2

2664.50 2678.10 13.59 0.498 0.479 2677.40 3.9

2678.60 2692.30 13.68 0.498 0.482 2686.90 3.1

2692.80 2706.60 13.77 0.498 0.487 2697.00 2.2

2707.10 2720.70 13.59 0.498 0.483 2715.60 3.0

2721.20 2734.90 13.77 0.498 0.489 2724.10 1.9

2735.40 2749.10 13.68 0.498 0.487 2745.80 2.2

2749.60 2763.40 13.77 0.498 0.484 2762.90 2.8

2763.90 2777.60 13.68 0.498 0.488 2769.50 1.9

2778.10 2791.60 13.49 0.498 0.488 2789.10 2.1

2792.10 2805.80 13.77 0.498 0.485 2800.70 2.5

2806.30 2820.40 14.05 0.498 0.484 2820.00 2.8

2820.90 2834.70 13.77 0.498 0.481 2828.20 3.5

2835.20 2848.80 13.59 0.498 0.482 2846.30 3.3

2849.30 2862.40 13.12 0.498 0.488 2854.10 2.0

2862.90 2876.40 13.49 0.498 0.486 2874.90 2.3

2876.90 2890.60 13.68 0.498 0.485 2884.40 2.6

2891.10 2904.90 13.87 0.498 0.480 2903.60 3.6

2905.40 2919.20 13.77 0.498 0.487 2907.80 2.3

2919.70 2932.70 13.03 0.498 0.476 2932.10 4.4

2933.20 2946.30 13.03 0.498 0.479 2941.60 3.9

2946.80 2960.60 13.87 0.498 0.482 2951.80 3.1

2961.10 2974.50 13.40 0.498 0.482 2970.50 3.1

2975.00 2988.80 13.77 0.498 0.477 2980.00 4.2

2989.30 3003.00 13.68 0.498 0.469 2999.50 5.7

3003.50 3017.30 13.87 0.498 0.469 3009.00 5.8

3017.80 3031.80 13.96 0.498 0.471 3028.30 5.5

3032.30 3045.30 13.03 0.498 0.465 3037.90 6.5

3045.80 3059.60 13.77 0.498 0.464 3057.20 6.9

Page 63: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 62 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk

(mm)

Min Thk (mm)

Max Loss Depth(m)

Max Loss (%)

3060.10 3074.10 13.96 0.498 0.471 3066.80 5.5

3074.60 3088.60 14.05 0.498 0.461 3076.50 7.4

3089.10 3101.70 12.56 0.498 0.467 3095.80 6.3

3102.20 3115.80 13.59 0.498 0.459 3105.40 7.9

3116.30 3129.70 13.40 0.498 0.477 3124.70 4.2

3130.20 3143.70 13.49 0.498 0.463 3134.40 7.0

3144.20 3157.90 13.77 0.498 0.476 3153.60 4.4

3158.40 3172.10 13.68 0.498 0.460 3163.30 7.7

3172.60 3186.70 14.05 0.498 0.466 3182.60 6.3

3187.20 3200.40 13.21 0.498 0.454 3192.20 8.8

3200.90 3214.60 13.68 0.498 0.467 3201.90 6.3

3215.10 3228.90 13.87 0.498 0.470 3221.10 5.6

3229.40 3243.50 14.05 0.498 0.467 3240.40 6.2

3244.00 3257.20 13.21 0.498 0.481 3250.00 3.4

3257.70 3271.70 13.96 0.498 0.451 3269.30 9.4

3272.20 3285.40 13.21 0.498 0.456 3279.00 8.4

3285.90 3299.80 13.87 0.498 0.484 3298.20 2.9

3300.30 3313.80 13.59 0.498 0.485 3309.80 2.6

3314.30 3328.30 13.96 0.498 0.457 3317.50 8.3

3328.80 3342.80 13.96 0.498 0.459 3336.80 7.8

3343.30 3357.10 13.87 0.498 0.482 3356.10 3.2

3357.60 3371.60 13.96 0.498 0.455 3365.70 8.6

3372.10 3384.60 12.56 0.498 0.449 3375.40 9.9

3385.10 3399.20 14.05 0.498 0.479 3394.70 3.8

3399.70 3413.70 13.96 0.498 0.454 3404.30 8.8

3414.20 3428.00 13.87 0.498 0.483 3423.60 3.1

3428.50 3442.20 13.68 0.498 0.476 3433.20 4.4

3442.70 3455.90 13.21 0.498 0.488 3443.50 2.0

3456.40 3469.90 13.49 0.498 0.488 3463.70 2.0

3470.40 3484.00 13.59 0.498 0.470 3471.80 5.6

3484.50 3496.20 11.72 0.498 0.487 3492.10 2.2

Page 64: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 63 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk

(mm)

Min Thk (mm)

Max Loss Depth(m)

Max Loss (%)

3496.70 3510.10 13.40 0.498 0.487 3510.10 2.3

3510.60 3524.90 14.24 0.498 0.489 3518.80 1.9

3525.40 3538.70 13.31 0.498 0.464 3529.60 6.8

3539.20 3552.80 13.59 0.498 0.478 3548.80 4.0

3553.30 3567.90 14.61 0.498 0.488 3567.40 1.9

3568.40 3581.30 12.94 0.498 0.488 3576.90 1.9

3581.80 3596.40 14.61 0.498 0.448 3587.10 10.0

3596.90 3609.60 12.66 0.498 0.485 3606.30 2.6

3610.10 3623.80 13.68 0.498 0.488 3615.70 2.0

3624.30 3639.10 14.80 0.498 0.480 3634.70 3.7

3639.60 3650.60 11.07 0.498 0.477 3644.20 4.3

3651.10 3663.20 12.10 0.498 0.447 3653.70 10.1

3663.70 3678.80 15.08 0.498 0.455 3673.20 8.6

3679.30 3692.20 12.94 0.498 0.450 3682.70 9.6

3692.70 3707.20 14.43 0.498 0.477 3701.90 4.2

3707.70 3720.80 13.12 0.498 0.476 3711.60 4.4

3721.30 3735.70 14.43 0.498 0.444 3730.70 10.8

3736.20 3749.60 13.40 0.498 0.461 3740.40 7.5

3750.10 3763.70 13.59 0.498 0.474 3759.40 4.8

3764.20 3778.00 13.77 0.498 0.449 3768.90 9.9

3778.50 3792.40 13.96 0.498 0.472 3787.40 5.1

3792.90 3801.90 8.92 0.498 0.470 3797.00 5.6

3802.40 3816.00 13.59 0.498 0.474 3806.60 4.7

3816.50 3827.30 10.88 0.498 0.460 3825.80 7.7

3827.80 3845.20 17.32 0.498 0.456 3835.30 8.3

3845.70 3858.40 12.75 0.498 0.489 3854.00 1.8

3858.90 3873.60 14.71 0.498 0.449 3864.50 9.9

3874.10 3886.90 12.84 0.498 0.492 3883.30 1.2

3887.40 3902.60 15.17 0.498 0.465 3893.40 6.7

3903.10 3916.10 12.94 0.498 0.450 3912.40 9.6

3916.60 3931.70 15.17 0.498 0.490 3923.40 1.6

Page 65: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 64 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk

(mm)

Min Thk (mm)

Max Loss Depth(m)

Max Loss (%)

3932.20 3944.90 12.66 0.498 0.453 3941.60 8.9

3945.40 3958.70 13.31 0.498 0.484 3951.30 2.8

3959.20 3970.30 11.07 0.498 0.488 3961.00 2.0

3970.80 3984.70 13.96 0.498 0.481 3980.10 3.4

3985.20 3999.40 14.15 0.498 0.463 3999.20 7.1

3999.90 4009.10 9.20 0.498 0.471 4008.80 5.4

4009.60 4022.40 12.84 0.498 0.462 4018.50 7.3

4022.90 4033.20 10.32 0.498 0.482 4027.80 3.2

4033.70 4049.10 15.36 0.498 0.457 4037.30 8.3

4049.60 4065.90 16.29 0.498 0.464 4056.70 6.8

4066.40 4075.20 8.83 0.498 0.494 4075.10 0.7

4075.70 4089.80 14.05 0.498 0.466 4085.30 6.5

4090.30 4103.50 13.21 0.498 0.442 4097.70 11.2

4104.00 4117.50 13.49 0.498 0.481 4107.20 3.4

4118.00 4131.80 13.77 0.498 0.477 4118.60 4.2

4132.30 4148.10 15.83 0.498 0.472 4139.30 5.1

4148.60 4160.30 11.72 0.498 0.476 4157.30 4.5

4160.80 4169.70 8.92 0.498 0.477 4162.00 4.2

4170.20 4184.20 13.96 0.498 0.486 4170.30 2.5

4184.70 4195.20 10.51 0.498 0.495 4190.60 0.7

4195.70 4209.20 13.49 0.498 0.491 4204.40 1.4

4209.70 4219.70 10.04 0.498 0.495 4217.80 0.6

4220.20 4232.60 12.38 0.498 0.492 4220.80 1.1

4233.10 4245.90 12.84 0.498 0.492 4233.20 1.1

4246.40 4260.80 14.33 0.498 0.489 4254.50 1.7

4261.30 4274.20 12.94 0.498 0.487 4269.10 2.1

4274.70 4290.40 15.64 0.498 0.487 4280.00 2.3

4290.90 4304.60 13.77 0.498 0.483 4300.50 2.9

4305.10 4318.40 13.31 0.498 0.482 4318.20 3.2

4318.90 4331.10 12.19 0.498 0.487 4320.80 2.1

4331.60 4345.90 14.24 0.498 0.487 4332.70 2.3

Page 66: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 65 of 77

Top Body(m)

Bottom Body(m)

Body Length(m)

Nom Thk

(mm)

Min Thk (mm)

Max Loss Depth(m)

Max Loss (%)

4346.40 4360.50 14.15 0.498 0.485 4351.30 2.6

4361.00 4375.20 14.15 0.498 0.000 4365.80 100.0

4375.70 4389.50 13.87 0.498 0.428 4388.90 14.1

4390.00 4404.30 14.24 0.498 0.439 4400.40 11.9

4404.80 4421.20 16.39 0.498 0.440 4405.30 11.7

4421.70 4432.00 10.32 0.498 0.434 4422.30 12.8

4432.50 4446.80 14.33 0.498 0.000 4446.60 100.0

4447.30 4463.90 16.57 0.498 0.438 4455.90 12.0

4464.40 4478.30 13.96 0.498 0.437 4477.50 12.3

4478.80 4492.10 13.21 0.498 0.435 4489.30 12.6

4492.60 4503.80 11.26 0.498 0.441 4493.80 11.4

4504.30 4517.60 13.31 0.498 0.440 4511.90 11.7

4518.10 4533.50 15.39 0.498 0.440 4524.10 11.6

Page 67: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 66 of 77

Tope (m)

Base (m)

Longitud (m)

Espesor Nominal(in)

Espesor Minimo

(in)

Prof Max Perdida

(m)

Max Perdida

(%)

4195.70 4209.20 13.49 0.362 0.359 4198.20 1.0

4209.70 4219.70 10.04 0.362 0.359 4212.10 1.0

4220.20 4232.60 12.38 0.362 0.356 4224.10 1.5

4233.10 4245.90 12.84 0.362 0.358 4235.90 1.1

4246.40 4260.80 14.33 0.362 0.357 4256.10 1.4

4261.30 4274.20 12.94 0.362 0.357 4271.10 1.3

4274.70 4290.40 15.64 0.362 0.355 4284.40 2.0

4290.90 4304.60 13.77 0.362 0.357 4300.50 1.4

4305.10 4318.40 13.31 0.362 0.354 4317.10 2.2

4318.90 4331.10 12.19 0.362 0.356 4319.70 1.8

4331.60 4345.90 14.24 0.362 0.356 4334.30 1.6

4346.40 4360.50 14.15 0.362 0.355 4360.10 2.0

4361.00 4375.20 14.15 0.362 0.327 4364.90 9.7

4375.70 4389.50 13.87 0.362 0.352 4379.60 2.8

4390.00 4404.30 14.24 0.362 0.352 4400.60 2.7

4404.80 4421.20 16.39 0.362 0.354 4412.30 2.3

4421.70 4432.00 10.32 0.362 0.355 4422.60 1.8

4432.50 4446.80 14.33 0.362 0.353 4446.60 2.5

4447.30 4463.90 16.57 0.362 0.353 4459.40 2.5

4464.40 4478.30 13.96 0.362 0.355 4464.50 1.8

4478.80 4492.10 13.21 0.362 0.353 4489.60 2.5

4492.60 4503.80 11.26 0.362 0.351 4499.30 3.1

4504.30 4517.60 13.31 0.362 0.354 4513.10 2.3

4518.10 4533.50 15.39 0.362 0.354 4530.10 2.2

Tuberia de Revestimiento de 5 pulgadas. Resultados de MTD

Page 68: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 67 of 77

2. Apendice A: Diagrama de Pozo.

Figure 18

Page 69: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 68 of 77

3. Appendix B: Tool Specification

3.1. MFC Tool Specifications & Logging Modes

Type MFC24C MFC40C MFC56C

O.D. 43 mm (1 11/16'') 73mm(2 7/8'') 90mm(3 1/2'')

Working Temperature -20- 175℃(-40-350℉)

Working Pressure ≤100MPa (15,000 PSI)

Working Voltage 90V±2

Working Current 37mA±3

Measurement Range 45-180mm

(1 3/4''-7 1/12'')

80-210mm

(3 1/8''-8 1/4'')

100-245mm

(3 15/16''- 9 13/20'')

100-350mm

(3 15/16’’-13 4/5’’

with extension fingers)

Measurement Accuracy ±0.5mm (±0.02'')

Resolution 0.1mm(0.004'')

Deviation Range 0-180º

Deviation Accuracy ±5º

Deviation Sensitivity 0.1º

Relative Azimuth Range 0-360º

Relative Azimuth

Accuracy ±5º

Relative Azimuth

Sensitivity 0.1º

Transmission Mode Mono-conductor

Speed ≦600 m/h (1968ft/h)

(Vertical Resolution =8mm or 5/16'')

Page 70: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 69 of 77

3.2. MTD Tool Specifications & Logging Modes

General

Working Temperature 0℃~175℃(32℉~347℉)/2hr

Working Pressure ≤100MPa(14,503psi)

Working Voltage 90VDC±10%

Working Current 60mA~130mA

OD φ43mm(1.69")

Shipping Length 2253.5mm (88.72")

Make-up Length 2088.5mm(82.22")

Weight 9kg

Max. Logging Speed 300 m/h (16 ft/min)

Pipe String Measuring Range 60mm~324mm (2.362"~12.756")

Single Pipe Measurement

Pipe Wall Thickness ≤12mm(0.4724")

Measurement Error ±0.5mm(0.0197")

Resolution 0.15mm(0.0059")

Double Pipe Measurement

Pipe Wall Thickness ≤25mm (0.984")

Measurement Error ±1.5mm(0.059")

Resolution 0.3mm(0.0118")

Temperature Measurement

Measurement Range 0~175℃

Sensitivity 0.01℃

Accuracy ±1℃

Page 71: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 70 of 77

3.3. Diagrama de la Herramienta.

Figure 13

Page 72: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 71 of 77

4. Apendice C: Definicion de Terminos en el Reporte de Analisis de Tubulares

Aqui se listan todas las definiciones de los resultados en la interpretacion de resultados del MFC. No se incluyen todos los

términos en este reporte debido a limitaciones de las páginas.

4.1. Dimensiones del Tubular

Tope Tubular [Top Body (pie/m)]

Profundidad procesada y medida en pies o metros del tope del tubo.

Longitud del Tubular [Body Length (pie/m)]

Longitud en pies o metros del tubo.

Promedio del Diametro Promedio [Mean mean (pulg/mm)]

Es el valor promedio del diametro promedio en pulgadas o milimetros a lo largo del tubo.

Page 73: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 72 of 77

Promedio de la Mediana del Diametro [Mean median (pulg/mm)]

Es el valor promedio de la mediana del diámetro en pulgadas o milímetros a lo largo del tubo.

Promedio de la Pared Remanente [Mean wall (pulg/mm)]

El promedio del espesor de pared remanente en pulgadas o milímetros a lo largo del tubo.

Promedio de la Pared Remanente [Mean wall (%)]

El promedio del espesor de pared remanente en % respecto al espesor nominal en ese tubo.

4.2. Maxima Penetracion

Maxima penetracion [Max.Pen] (pulg/mm)

Dos veces el radio en pulgadas o milimetros de la maxima penetracion de la pared del tubo en estudio (expresado como

un diámetro – dos veces el radio – para la comparación con el diámetro interno nominal y Drift).

Maxima penetracion % [Max.Pen (%)]

Máxima penetración en la pared del tubo, expresada como porcentaje relativo a la diferencia entre el espesor nominal en

el punto de la máxima penetración.

Profundidad de Maxima penetracion [Max.Pen.Depth]

Profundidad en metros o pies de la máxima penetración del tubo.

Brazo con la Maxima penetracion [Max.Pen arm (no.)]

Número del brazo con la máxima penetración en el tubo.

Page 74: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 73 of 77

Minima Pared Remanente [Min Wall (pulg/mm)]

Mínimo espesor de la pared en el tubo en pulgadas o milimetros. Los valores negativos implican que la pared está

totalmente penetrada.

Minima Pared Remanente % [Min Wall (%)]

Mínimo espesor de la pared en el tubo, expresado como % del espesor al punto máximo de penetración. Los valores

negativos implican que la pared está totalmente penetrada.

4.3. Perdida de Pared

Maxima Perdida [Max.Loss (pulg2 o mm2)]

El valor máximo de la pérdida de metal del tubo, expresado como la pérdida real de la pared del tubo relativo al diámetro

externo y diámetro interno nominal. Por cada muestra de profundidad la pérdida de metal (Max.Loss) es calculada

mediante:

Perdida de pared absoluta = 𝜋

4𝑛∑ (𝑆𝑖

2 − 𝐼𝐷2)𝑛𝑖=0

Donde “n” es el numero de brazos del calibrador, “Si“ es dos veces el radio medido por el brazo “i” del calibrador, ID es el

diámetro interno nominal del tubo.

El análisis del tubo reporta la máxima perdida de pared en el tubo independientemente de la máxima penetración.

Maxima Perdida % [Max.Loss (%)]

El valor máximo de pérdida de metal en el tubo, expresado como el porcentaje de pérdida de pared relativo al diámetro

externo y el diámetro interno nominal. Para cada muestra de profundidad en el tubo la pérdida es calculada por:

Porcentaje de pérdida de pared = (100

𝑛)∑ (𝑆𝑖

2−𝐼𝐷2)𝑛𝑖=1

(𝑂𝐷2−𝐼𝐷2)

Page 75: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 74 of 77

Donde “n” es el número de brazos del calibrador, “Si“ es dos veces el radio medido por el brazo “i” del calibrador e ID es

el diámetro interno nominal del tubo.

Profundidad de la Maxima Perdida [Max.Loss.Depth]

Profundidad en metros o pies de la máxima pérdida de metal en el tubo.

Perdida de Pared Promedio [Mean Loss (%)]

El valor promedio de la perdida de pared areal en relacion a los diametros nominales interno y externo a lo largo del tubo

(%).

Volumen de Restriccion (pulg3 o m3)

La restricción integrada en pulgadas cubicas o metros cúbicos del hoyo a lo largo del tubo.

Volumen de Restriccion (%)

La restriccion integrada del hoyo como un porcentaje del volume del hoyo sobre estas restricciones del tubo.

Minima Restriccion Radial [Min Res (pulg/mm)]

Lectura menor del brazo en pulgadas o milimetros en el tubo, expresado como dos veces el radio para la comparación con

valores de diámetros internos nominales.

Minima Restriccion Radial % [Min Res (%)]

Lectura menor del brazo en el tubo, expresado como un porcentaje relativo al diámetro interno (ID) nominal y el diámetro

externo (OD). Si el porcentaje es negativo, el mínimo radio es menor que el radio interno nominal del tubo.

Profundidad de la Minima Retri cion Radial [Min Res. Depth]

Profundidad en pies o metros de la menor lectura del brazo en el tubo.

Brazo de la Minima Restriccion Radial [Min. Res. arm]

Número del brazo que muestra la mínima restricción radial en el tubo.

Orientacion de la Minima Restriccion Radial [Min. Res. dirn]

Orientacion en grados del brazo con la minima restriccion radial en el tubo.

Espesor Maximo de la Pared [Max Wall (pulg/mm)]

Espesor maximo de pared en pulgadas o milimetros en el tubo.

Maxima Pared Remanente % [Max Wall (%)]

Espesor máximo de pared en el tubo como porcentaje del espesor de pared en el punto de minima restricción.

Maxima proyeccion [Max Proj (pulg/mm)].

La mayor proyeccion en el hoyo desde la pared del tubo en pulgadas o milimetros basada en el radio nominal interno.

Page 76: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 75 of 77

Maxima proyeccion % [Max Proj (%)].

La mayor proyeccion en el hoyo desde la pared del tubo en porcentaje del radio nominal interno.

Minima Restriccion Diametrica [Min Diam. (ins/mm)]

El menor diametro en pulgadas o milimetros del tubo medido sobre los brazos opuestos.

Minima Restriccion Diametrica % [Min Diam. (%)]

El menor diametro en porcentaje medido sobre brazos opuestos respecto al diámetro interno nominal.

Profundidad de la Minima Restriccion Diametrica [Min Diam. Depth]

Profundidad del menor diametro en el tubo medido sobre brazos opuestos.

Brazo de la Minima Restriccion Diametrica [Min Diam. arm]

El primer brazo con el menor diámetro en el tubo medido sobre brazos opuestos.

Orientacion de la Minima Restriccion Diametrica [Min Diam. dirn]

Orientacion en grados del primer brazo con el menor diámetro en el tubo medido sobre brazos opuestos.

Page 77: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 76 of 77

5. Apendice D: Procesamiento y Presentacion de la Data

5.1. Procesamiento de la Data

La data de los registros MTD y MFC ha sido procesada con el programa MIPS.

1) Flujograma del Procesamiento del MTD

Cargar la data cruda en el programa MIPS es el primer paso para la interpretacion del MTD. Luego, la data debe

ser pre-procesada incluyendo la correccion de profundidad y edicion de valores anormales que son pasos

opcionales y no necesariamente deben ser realizados. La detección de cuellos es luego utilizada por la data

procesada con MIPS para ubicar las profundidades del tope y la base de cada tubular. El próximo paso es el

calculo de espesor y para ello se deben seleccionar las curvas correctas. Y luego hacer anotaciones del diagram

del pozo y defector de la tuberia deacuerdo con los resultados del calculo de espesores. Por ultimo, se sacan

las tablas del análisis de tubulares para los diferentes tubulares y el resultado es un archivo LAS.

Figura 7 – Flujograma de Procesamiento del MTD

2) Flujograma del procesamiento del MFC

Cargar la data cruda en el programa MIPS es el primer paso para la interpretacion del MFC. Luego, la data debe

ser pre-procesada incluyendo la correccion de profundidad y edicion de valores anormales que son pasos

opcionales y no necesariamente deben ser realizados, Si es necesario también se realiza la centralizacion. La

detección de cuellos es luego utilizada por la data procesada con MIPS para ubicar las profundidades del tope

y la base de cada tubular. Y se determinan los radios promedio, minimo, y máximo con la perdida de metal

para cada tubular. Los resultados se guardan en archivos csv para la rata de corrosión. Finalmente, MIPS puede

general la imagen 3D del intervalo danado.

Figura 8 – Flujograma de Procesamiento del MFC

Data Cruda

MIPS-MTD Pre - procesamiento Deteccion de Cuellos

Calculo de Espesores Anotaciones Tabla de Analisis

Tubulares

Data Cruda

MIPS-Caliper Pre - Procesamiento Deteccion Cuellos

Calculo de Corrosion Tubos

Archivo CSV

Vista 3D

Tabla Analisis

Tubulares Reporte

Reporte

Page 78: Reporte de Evaluación de Integridad de Tubulares (MTD/MFC)vincoenergy.com/.../2016/11/reporte-final-mfc-y-mtd-samaria-6117.pdf · Pozo : Samaria -6117 07 –Nov 2014 Pagina 3 of

Interpretacion de Registro MTD y MFC

Compañia: PEMEX Exploracion y Produccion

Pozo : Samaria -6117 Referencia: 07 – Nov – 2014

Pagina 77 of 77

5.2. Descripcion de la Presentacion Post Procesada

1) Resultado del Registro MTD

Pista Multi-dedos: Curvas Normalizadas y mapa de color VDL, i.e B1_n, BB1_n, B2_n, BB2_n, C1_n, C2_n, A1_n,

A2_n, C3_n, C4_n, A3_n, A4_n, C5_n, A5_n, A6_n, A7_n, A8_n, A9_n, A10_n, A11_n.

Panel 1: GR, verde; TEMP, marron; Tubing_Nom_Thick, negro; Tubing_Thickness, verde; Casing 1_Nom_Thick,

negro; Casing 1_Thickness, rojo; Casing 2_Nom_Thick, negro; Casing 2_Thickness, azul; sombreado entre

Tubing_Nom_Thick y Tubing_Thickness, verde; sombreado entre Casing 1_Nom_Thick y Casing 1_Thickness,

rojo; sombreado entre Casing 2_Nom_Thick y Casing 2_Thickness,azul.

Panel 2: Diagrama del Pozo y Defectos

2) Resultados del Registro MFC

Pista Multi-dedos: Curvas del Multi-dedos y mapa VDL a color.

Panel 1: Maximo, rojo; Minimo, azul; Promedio, verde; Mediana, azul claro; sombreado entre Maximo y

Promedio, rojo; Sombreado entre Promedio y Minimo, azul.

5.3. Lista de Archivos & Medios

Los archivos entregados por GoWell son:

1. Reporte Final en formato word;

2. Tabla Resumen de Tubulares, la cual describe todos los danos de los tubulares o condicion de corrosion;

3. Registros Resultantes con escalas de 1:200 & 1:1000 en formato tiff;

4. Archivo formato LAS luego del procesamiento con MIPS-MTD.

5. Archivos de Contexto MIPS y el visualizador MIPS (MIPS viewer).