Report to LESWG: PSS meeting

21
19 Oct 2006 NAC PSS LESWG Report to LESWG: PSS meeting Report to LESWG: PSS meeting Ed Grayzeck Program Manager, PDS Co-Chair LESWG 19 Oct, 2006 PSS meeting held 25-26 Sept, 2006 SWRI, Boulder, CO

description

Report to LESWG: PSS meeting. Ed Grayzeck Program Manager, PDS Co-Chair LESWG 19 Oct, 2006 PSS meeting held 25-26 Sept, 2006 SWRI, Boulder, CO. Reporting to NASA Advisory Council. NASA ADVISORY COUNCIL Chair, Dr Harrison “Jack” Schmitt. NAC, Science Subcommittee. Astrophysics - PowerPoint PPT Presentation

Transcript of Report to LESWG: PSS meeting

Page 1: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

Report to LESWG: PSS meetingReport to LESWG: PSS meeting

Ed Grayzeck

Program Manager, PDS

Co-Chair LESWG

19 Oct, 2006PSS meeting held

25-26 Sept, 2006

SWRI, Boulder, CO

Page 2: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

Reporting to NASA Advisory CouncilReporting to NASA Advisory Council

CAPTEM

Report to subcommittee

MEPAG, OPAG, VEXAG

Report to Subcommittee

NASA ADVISORY COUNCILChair, Dr Harrison “Jack” Schmitt

LEAGReport to subcommittee, ESMD

Planetary Science

Subcommittee

Planetary Protection

Subcommittee

HeliophysicsSubcommittee

AstrophysicsSubcommittee

Earth Science

Subcommittee

NAC, ScienceSubcommittee

Page 3: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

Background to the PSS?Background to the PSS?

The Planetary Science Subcommittee ...— Provide recommendations to NAC— Hold public meetings; consider findings of the

various analysis/assessment groups— Formed in May 2006, meeting at UMUC— Met in July 2006, near HQ— Sept meeting held in Boulder, CO— Next meeting during the Lunar Science

Workshop, ASU in Feb 07

Page 4: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

Agenda for the PSS?Agenda for the PSS?

Planetary Science Subcommittee Meeting

September 2006, Boulder, CO 25 September (8:30 AM – 5:30 PM)

8:30 Planetary Science Division Update

Jim Green

9:00 Mars Exploration Program Update

Doug McCuistion

9:45 Lunar Reconnaissance Orbiter

science update including LCROSS

Gordon Chin

10:15 Discussion of LRO data archiving

Stan Scott, Ed Grayzeck

10:45 Discussion of international lunar

science plans and partnerships

Tom Morgan

11:15 LEAG report Steve Mackwell

12:30 Lunchtime science talk about

Enceladus John Spencer

1:30 NAS SSB report Carle Pieters 3:15 Lunar Workshop Planning Mark Robinson 5:30 Adjourn

26 September (8:30 AM – 12:30 PM)

8:30 Public Comment Period

9:30 Discussion with H. Schmitt on

relationship with the NAC H. Schmitt

10:00 Reports from MEPAG, OPAG, &

VExAG, CAPTEM

Ray Arvidson, Fran Bagenal,

Janet Luhman & Chip Shearer

10:45 Science implications of move of Jim Green

Page 5: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

Lunar Missions, 1992-2014Lunar Missions, 1992-2014

Lunar Meteorites

1992 1995 1998 2001 2004 2007 2010 2013

Chang’e-1

Orbital Science

Surface Science

ChandrayaanUS LRO

Clementine

Lunar Prospector

SMART-1(ESA)

US LPRP

Chang’e-2

SELENE

(??)

Page 6: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

LRO Instrument SuiteLRO Instrument Suite

Page 7: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

LRO Mission PhasesLRO Mission Phases

Page 8: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

LRO Data Management OverviewLRO Data Management Overview

Develop and maintain Project Data Management Schedule

Develop Project Data Management and Archive Plan (DM&AP)

Approve SOC deliverable documents

Coordinate SOC DM&AP development

Coordinate development of SOC-PDS ICDs

Provide Project perspective in measurement data format definition

Coordinate SOC-PDS interface testing

Help coordinate SOC and any PDS testing with ground system

Science Data Manager (SDM) is Project POC for SOCs and PDS

Page 9: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

LRO Data Delivery ScheduleLRO Data Delivery Schedule

SOCs deliver 3-6 month old, validated, initial version of LRO data to PDS every 3 months (Mini-RF: every 6 months), starting 6 months after launch.

L + 6 mos L + 9 mos L + 12 mos L + 15 mos

Data DatesL -> L+3

L+3 -> L+6

L+6 -> L+9

L+9 -> L+12

Continue similar schedule if processing funded for extended mission

Date PDS Releases Initial Data Version (L=LRO Launch date)

Notes: 1) Subsequent versions and derived data products due to PDS in next 3-month delivery after creation and validation. 2) Creation of subsequent versions and derived data products is on a time scale commensurate with the level of data processing required. 3) Final data processing and release can not exceed 6 months from end of primary mission or extended mission, as applicable.

Page 10: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

PSS PDS PresentationPSS PDS Presentation

Page 11: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

Access to PDS data?Access to PDS data?

How PDS makes data available to the public— Data archives reside at the PDS Discipline Nodes where they are

maintained by scientists who use the data and who can provide expert help.

— Most PDS archives are available online for downloading and some can also be requested on CD or DVD.

— PDS provides online search tools to help locate data of interest.PDS Discipline NodesAtmospheres Node, Reta Beebe, New Mexico State University in Las Cruces, NM

Geosciences Node, Ray Arvidson, Washington University in St. Louis, MO

PPI (Planetary Plasma Interactions) Node, Ray Walker, UCLA, Los Angeles, CA

Rings Node, Mark Showalter, SETI Institute, Mountain View, CA

Small Bodies Node, Mike A’Hearn, University of Maryland, College Park, MD

Imaging Node, Lisa Gaddis, U.S. Geologic Survey in Flagstaff, AZ and JSue LaVoie, Jet Propulsion Laboratory in Pasadena, CA

PDS Support NodesNAIF (Navigation and Ancillary Information Facility) Node, Chuck Acton, Jet Propulsion Laboratory, Pasadena, CA

Engineering Node, Dan Crichton, Jet Propulsion Laboratory, Pasadena, CA

Page 12: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

PDS Involvement in LROPDS Involvement in LRO

Geosciences as lead node— Advises the LRO Data Working Group (LDWG) lead, Stan

Scott— Provided templates/examples for Archive Plan, ICDs, and SISs— Reviewing the draft SOC DM&AP and relevant ICDs— Assigned to LOLA, LEND, Diviner, and Mini-RF (SAR)

instrument teams Other node activities

— PPI is assigned to CRaTER, contact made— Imaging is assigned to LAMP and LROC— Discussions with LROC and LOLA Data Node commenced— NAIF has begun discussion of SPICE kernel requirements,

attends LDWG telecons

Page 13: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

Results of the PSS?Results of the PSS?

The PSS official report posted to...— http://science.hq.nasa.gov/strategy/NAC_sci_subcom/— Announcements by HQ staff: Lunar Science Analysis

Program (not clear if fundamental or data analysis)— Directive from Jim Green (Acting Director of the

Planetary Science Division) for PDS to review pre-LRO data to see what gaps there may be and report back on the next step for restoration

— Request for LEAG to develop a straw man set of prioritized objectives (consistent with ESMD work) for the PSS to consider before the Feb 07 lunar workshop

— Thirteen recommendations; #s 2&3, 10&11&12 are lunar

Page 14: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

Page 15: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

Page 16: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

More about the LSW?More about the LSW?

The Lunar Science Workshop ...— Key goals: prioritize lunar exploration objectives— Dates: Feb 27-March 2, 2006— Location: Arizona State University— Chair: Brad Jolliff, NAC Science Subcommittee— LOC: Mark Robinson (ASU), NAC member— Audience: 200 scientists, NAC, subcommittees,

AGs, center participation, university/institutes— Timeline: Organize now, announce in Jan 07,

report to NAC in April; NAC conclusions by July

Page 17: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

Goals of LESWGGoals of LESWG

The Lunar Exploration Science Working Group’s job is to (LL, Aug 2006)...

— Provide a forum for interaction, collaboration, brain-storming, invention

— Hold discussions of lunar science activities and results

— Respond to existing proposal opportunities … and probably future Lunar Fundamental Research, LRO Data Analysis and participation in international lunar missions …

So What can we do? (JG, Aug 2006)...— Formation of GSFC internal “Lunar Special Action

Teams” for key issue areas…

Page 18: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

Lunar Focus Group (LFG)?Lunar Focus Group (LFG)?

The LESWG steering committee ...— Looked over the 100+ sign-ups from Aug 25— Formed set of topics for Lunar Science Groups— Broadened the composition of LESWG to include

non-690 and non-600 people— Included engineering topics, renamed LFGs— Combined set of 15 possible topics— Identified data contacts for most, volunteers?— Present at the Oct 19th general LESWG— Will then post to the public LESWG web page

http://ssedso.gsfc.nasa.gov/initiatives/lunar/LESWG/

Page 19: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

Charter for the LFGsCharter for the LFGs "Serve as a center for GSFC activities focused on the subject area that will provide subject-matter expertise for the Center, galvanize interest in the subject, stimulate possible responses to mission opportunities, and foster partnerships to help improve GSFC's competitiveness in such responses.

The working group will, as needed, assess available personnel and capability within Goddard, organize workshops, post information on the LESWG web site, make presentations at LESWG general meetings, and encourage smaller group meetings and other interactions between interested parties to help grow the capability within the Center to meet the above objectives. The working group leader(s) will regularly report to the LESWG steering group on the activities of the action group."

Page 20: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

Topics for the LFGsTopics for the LFGs

Data Assimilation (Dave Williams) Ice and Geochemistry (Pam Clark) Surface science/solar wind interactions (Mike Collier, John Keller) Dust/dust mitigation (Bill Farrell, Tim Stubbs) Planetary protection (Danny Glavin) Astrophysics from the moon (Drake Deming, TBD) Geology and Geophysics (Paul Lowman, Pat Taylor) Geodesy, Cartography and Navigation (Scott Mest, Greg Neumann) Power systems (Tom Yi - 563) Data systems (Steve Talabac, Julie Loftis - 586) Communications (Brian Gosselin - 567) Thermal control (Ted Swanson - 540) Robotics, e.g., tet walkers (TBD) Sensors/instrument systems (Frank Kirchman - 556) Outposts/infrastructure (Ruthann Lewis - 432) Education/Public Outreach (Thomas Riley - 556)

Page 21: Report to LESWG: PSS meeting

19 Oct 2006 NAC PSS LESWG

Next Step: LFG?Next Step: LFG?

Lunar Focus Groups ...— Goals: share information— Participate: email lead contact person or— Check on web site for lead and contact— Chair: identified as contact person— LESWG contacts: Herb and Ed— Audience: any one at GSFC— Timeline: Organize now, report to LESWG

steering group or by next general meeting