SMO BLOCK B1Remain Reserve

Page 3: Report R3MMP B1 SMO upload

SMO BLOCK B1SPO

NO DESCRIPTION Sep-15 Oct-15 Nov-15 TOTAL1 Calendar Day 30 31 30 1222 Holiday Day 1.5 0 0 33 Available Day 29 31 30 119 4 Hour per day 720 744 720 29285 Available Hour 24.00 684 744 720 28566 Standby hour per day 7.19 197 224 218 856

S1 Rain/Smog/Fog 1.46 39 45 45 174 S2 Slippery 0.82 17 27 27 98 S3 Flood - - - - - S4 Dust - - - - - S5 Rest & meal 1.54 45 47 46 183 S6 Daily shift change 1.86 53 58 56 221 S7 Weekly Over Shift - - - - - S8 Holiday 0.14 4 5 4 17 S9 No Operator - - - - - S10 Operator Absen (Sakit, ijin, alpha) - - - - - S11 No loader/No Hauler 0.53 16 16 16 63 S12 Hopper/Crusher shutdown - - - - - S13 Stoppage - - - - - S14 Front, Road, Disposal Maintenance - - - - - S15 Wait for Blasting 0.53 15 16 16 64 S16 P5M, Safety Talk 0.15 4 5 5 18 S17 Production Re-schedulling - - - - - S18 Pit, Front, Disposal Movement - - - - - S19 Pre Use Check, Greasing, Refueling, Washing 0.15 4 5 5 18 S20 No Order, No Material (OB & Coal), No Area - - - - -

7 Breakdown Hour per day 3.12 89 97 94 371 8 Schedule Hour 13.69 487 520 502 1,629

Page 4: Report R3MMP B1 SMO upload

SMO BLOCK B1Production Detail

Seam Desc Sep-15 Oct-15 Nov-15 TotalAll Pit Waste (Bcm) 2,425,635 2,509,689 2,322,236 7,257,560

Coal Exposed (MT) 289,096 272,745 254,808 816,649Coal Getting (MT) 288,030 272,772 250,757 811,559Mining Strip Ratio 8.39 9.17 9.08 8.89Contract Strip Ratio 8.42 9.20 9.26 8.94Opening Inventory 0 1,066 1,039 0Closing Inventory 1,066 1,039 5,090 5,090Waste Distance (m) 0 0 0 0Coal Distance (m) 0 0 0 0TM (ar) 21.29 21.57 21.26 21.37IM (adb) 16.69 17.09 16.90 16.89Ash (adb) 4.75 4.84 4.79 4.79VM (adb) 38.34 37.99 37.95 38.10FC (adb) 40.98 40.91 41.13 41.00TS (adb) 0.61 0.49 0.54 0.55CV (adb) 5,641 5,603 5,635 5,627Na2O (%) 3.77 4.95 4.82 4.49AFT IDT RED (deg) 1,112 1,113 1,101 1,109AFT FLOW RED (deg) 1,242 1,232 1,224 1,233Relative Density 1.25 1.25 1.25 1.25Hardgrovability Index 47 47 48 47

SIS

Page 5: Report R3MMP B1 SMO upload

SMO BLOCK B1Land Clearing and Soil Removal

Sept Oct Nov(Ha) (Ha) (Ha)

Blok B1-Pit C2 - - - -IPD C - - - -OPD B14 - - -

Total land clearing area - - - * boundary clearing 20 meter dari boundary desain

Land Clearing2015

Sept Oct NovBCM BCM BCM

Pit C2 Volume 20,692 1,859 70

Lokasi PenimbunanOPD B14 & OPD

B3OPD B14 & OPD

B4OPD B14 & OPD

B5

20,692 1,859 70 Total volume soil removal

Soil Removal

Blok B1

2015

Page 6: Report R3MMP B1 SMO upload

SMO BLOCK B1Material Balance

Code Data Field Name Sep Oct Nov 2015 *

Sambarata Dump ReportB1 Sambarata B1OPD_14 OPD14 - Out Pit DumpWst Total Insitu Waste 483,905 496,713 465,701 1,446,319totptd Total Distance (Pit to Dump) During Schedule 2,525 2,714 2,704 2,648IPD_C IPDC- In Pit DumpWst Total Insitu Waste 2,005,487 2,051,743 1,907,775 5,965,005totptd Total Distance (Pit to Dump) During Schedule 2,637 2,791 2,845 2,756

Tot Total Dumping - Sambarata B1WstD Total Insitu Waste Dumped on Dumps 2,489,392 2,548,456 2,373,476 7,411,324IWstOF Insitu Dump Shortage(Overflow)WstOF Dump Shortage(Overflow)totptd Total Distance (Pit to Dump) During Schedule 2,615 2,776 2,817 2,735VB Volume Balance 0 0 0 0

Page 7: Report R3MMP B1 SMO upload

SMO BLOCK B1Face Posisi EOP Sept

Page 8: Report R3MMP B1 SMO upload

SMO BLOCK B1Face Posisi EOP Okt

Page 9: Report R3MMP B1 SMO upload

SMO BLOCK B1Face Posisi EOP Nov

Page 10: Report R3MMP B1 SMO upload

SMO BLOCK B1Face Posisi EOP Des

Page 11: Report R3MMP B1 SMO upload

SMO BLOCK B1General Issue :

• Proses land compensation untuk area radius blasting di Enau harus sudah selesai pada awal tahun 2015 untuk menghindari terjadinya issue masalah blasting dan menghindari turunnya productivity unit karena ketidaktersediaan material blasting. (aktual blasting maks 50 hole)

• Rekomendasi IPD C 2015 masih menunggu kajian dan release GnH.

• Lokasi dumping material rawa/lunak diarea sump C.

• Pemotongan Mineout atau floor seam H 1 meter sesuai rekomendasi GnH.

• Performa slurry pump tidak maksimal pada pit G1 sehingga mengharuskan adanya manual handling, impactnya ada kenaikan SR karena perhitungan material blending 1:1.5

• Start Pumping di Sed Pond WMP 29 ( Slurry pump ) dan kontinyu pembentukan WMP 33

Page 12: Report R3MMP B1 SMO upload

PT. SIS - Pit C2

Page 13: Report R3MMP B1 SMO upload

PT. SIS - Pit C2