Report on Toronto Hydro response to December 2013 ice storm
description
Transcript of Report on Toronto Hydro response to December 2013 ice storm
STRAT
Th
TEGIES FOR COM
he Respo
The
MPLEX ORGAN
onse of Tto the
e TorontoD
NIZATIONS
Fina
Toronto e Decem
June
Pre
o Hydro IDavid J. M
SeaJosephCarlo
Pre
al Repo
Hydro‐Eber 201
e 19, 201
epared for:
ndependMcFaddenn Conwayh Pennachos D. Torr
epared By:
ort
Electric S3 Ice Sto
4
: dent Revien, Chair y hetti res
System orm
ew Panel
Limited
l
1.
1.1
1.2
1.3
1.4
2.
2.1
2.2
2.3
3.
4.
5.
5.1
5.2
5.3
5.4
5.5
5.6
5.7
5.8
5.9
Executive Su
1. Synopsi
2. Review
3. Summa
4. Moving
Introduction
1. Purpose
2. Approa
3. Evaluat
Overview of
The Decemb
Findings and
1. Overvie
2. Emerge5.2.1. Emer5.2.2. Emer
3. Resourc5.3.1. Resou5.3.2. Resou
4. Damage5.4.1. Dama5.4.2. Dama
5. Restora5.5.1. Resto5.5.2. Resto
6. Commu5.6.1. Comm5.6.2. Comm
7. Commu5.7.1. Comm5.7.2. Comm
8. Informa5.8.1. Inform5.8.2. Inform
9. Vegetat5.9.1. Veget5.9.2. Veget
ummary ___
is of the 2013
Scope and A
ary of Finding
g Forward __
n _________
e, Governanc
ch and Meth
ion Areas __
f Toronto Hy
ber 2013 Ice
d Recomme
ew ________
ency Planninggency Planninggency Planning
ce Acquisitionurce Acquisitiource Acquisitio
e Assessmentage Assessmenage Assessmen
ation Executiooration Executioration Executi
unications – Cmunications – Cmunications – C
unications – Omunications – Omunications – O
ation Systemmation Systemmation System
tion Managemtation Managetation Manage
Table
__________
3 Storm and T
Approach ____
gs and Recom
____________
__________
ce, Scope ___
odology ____
____________
ydro System
e Storm and
endations __
____________
g and Prepareg and Preparedg and Prepared
n and Allocaton and Allocatioon Recommend
t and Restorant and Restoratnt and Restorat
on _________on Findings __on Recommen
Customer ConCustomer ContCustomer Cont
Other StakehOther StakehoOther Stakeho
s and Technoms and Technolms and Technol
ment and Sysement and Systement and Syst
of Conte
___________
Toronto Hydr
___________
mmendations
___________
___________
___________
___________
___________
m __________
Toronto Hyd
___________
___________
edness _____dness Findingsdness Recomm
tion _______on Findings __dations ______
ation Plannintion Planning Ftion Planning R
_______________________ndations _____
ntact ______tact Findings _tact Recomme
olders _____olders Findingsolders Recomm
ologies _____ogy Findings _ogy Recomme
stem Hardentem Hardeningtem Hardening
ents
__________
ro’s Response
____________
___________
____________
__________
____________
____________
____________
__________
dro’s Respon
__________
____________
____________ ____________
mendations ___
______________________________________
ng _________Findings _____Recommendat
______________________________________
_________________________endations ____
________________________
mendations ___
_________________________endations ____
ing/Resiliencg/Resilience Fing/Resilience Re
___________
e _________
___________
___________
___________
___________
___________
___________
___________
___________
nse _______
___________
___________
___________________________________
___________________________________
_______________________ions ________
___________________________________
___________________________________
___________________________________
___________________________________
ce _________ndings ______ecommendatio
_________
___________
___________
___________
___________
________ 1
__________ 1
__________ 1
__________ 1
________ 1
________ 1
________ 2
__________ 2
__________ 2___________ 2___________ 3
__________ 3___________ 3___________ 4
__________ 4___________ 4___________ 4
__________ 5___________ 5___________ 5
__________ 6___________ 6___________ 7
__________ 7___________ 7___________ 8
__________ 8___________ 8___________ 8
__________ 9___________ 9ons _______ 9
4
4
6
7
9
0
10
11
13
4
6
20
20
22 23 31
34 36 41
43 44 49
51 53 59
60 62 72
76 77 81
84 86 89
90 93 97
ii
5.1
6.
Appe
Appe
Appe
Appe
Table Table Table Table Table
FigureFigureFigureFigureFigureFigureFigureFigureFigureFigureFigureFigureFigureFigureFigureFigureFigureFigureFigure
10. Toronto5.10.1. To5.10.2. To
Moving For
endix A: Glo
endix B: Util
endix C: Sum
endix D: Sum
1: Alignment o2: Alignment o3: Toronto Hyd4: Recommend5: Example of
e 1: 2013 Ice Ste 2: Event Bence 3: Utility Emee 4: Toronto Hye 5: Surface Mae 6: 2013 Ice Ste 7: Event Bence 8: Toronto Hye 9: Canada ane 10: Toronto He 11: Decembee 12: Toronto He 13: Decembere 14: Example oe 15: Restoratioe 16: Web‐basee 17: Power Oue 18: Sample Twe 19: Toronto H
o Hydro‐City oronto Hydro –oronto Hydro –
ward ______
ossary of Ter
lity Mutual A
mmary of Fin
mmary of Pu
of Toronto Hydof Toronto Hyddro System Stadations Referenan ETR Timing
torm Restoratiochmark Compaergency Managydro Service Teap of 2013 Ice Storm Restoratiochmark Compaydro Incident Cd Ontario EM IHydro Grid Disrer 19, 2013 PreHydro Grid Emer 2013 Ice Storof Mast Damagon Approachesed Contact Formutage Reportingwitter MessageHydro Vegetati
Coordination– City Coordina– City Coordina
__________
rms _______
Assistance P
ndings and R
ublic Comme
Table
dro Assessmentdro Assessmentatistics _______nce Keys _____g Matrix ______
Table
on Timeline wirison ...............gement Life Cycerritory ............Storm at Peak on Timeline wirison ...............
Command SysteIncident Manaruption Responess Release ......ergency Levels .rm Restorationge ...................s ......................m ....................g Form ............es ....................on‐Related Ou
n __________tion Findings _tion Recomme
___________
___________
Providers ___
Recommend
ents _______
e of Table
t Scope to Emet Scope to Eme_______________________________________
e of Figur
ith Key Milesto.......................cle .........................................Intensity ........ith Key Milesto.......................em Structure ..agement Systemnse Organizatio.............................................. .........................................................................................................................................utages and SAIF
_________________________endations ____
__________
__________
__________
dations ____
__________
es
ergency Managergency Manag____________________________________
res
ones .............................................................................................................ones ...............................................................m Structure .....on ...........................................................................................................................................................................................................FI (2003‐2013)
___________________________________
___________
___________
___________
___________
___________
gement Lifecycgement Lifecyc_______________________________________
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
.......................
....................... .......................
__________ 9___________ 9__________ 10
_______ 10
_________ i
_________v
_________ i
_________ x
cle _________cle ________ 1___________ 1___________ 2___________ 5
.......................
.......................
.......................
..................... 1
..................... 1
..................... 1
..................... 1
..................... 2
..................... 2
..................... 2
..................... 2
..................... 2
..................... 4
..................... 5
..................... 5
..................... 7
..................... 7
..................... 8
..................... 9
98 99 00
02
iii
vii
iv
xi
7 13 14 22 51
5 6 6
15 16 18 19 24 25 25 27 29 46 55 57 70 71 80 95
iii
1. EIn eaexecuCompemerimproconsuNorthSummToronfindin
1.1.
On Da freepreciin 3157% (the edamabreakwidescauseecono
Toronmanaresouby 8 athe stserviccustothe mafter resum2014Hydrorestofield contras the
Executive
rly January 2utive managpany’s resporgency manaovement. Toulting firm wh America, tmary to the nto Hydro’s ngs and reco
Synopsis
ecember 21ezing rain evpitation – m3,000 servic(416,000) ofevent, which age was causking the linespread poweed extensiveomic losses.
nto Hydro qagement teaurces, whicha.m. on Dectorm systemce area. Powomers who cmorning of Jathe restoratmed normal . Approximao’s core tradoration effortworkers (linractors and te company m
Summar
2014, Torontgement comonse to the 2agement praoronto Hydrowith extensivo conduct thIRP Final Reresponse; a ommendatio
s of the 20
1 and 22, 201vent that bromore than twce interruptiof the customultimately ased by tree ls. In additioer outages, te property da
uickly mobilam and calle began restoember 22, 2m departed twer was restcould receiveanuary 2, 20tion began. Toperations ately 98% of de workers st, aided by ae and forestten other utmanagemen
ry
to Hydro Sysmissioned a2013 Ice Stoactices that ao retained Dve experienche assessmeport includedescription
ons of the Pa
013 Storm
13, the Greaought betwewo‐year’s woons (at peak
mers served baffected molimbs fallingn to the event amage and
ized its d in availabloration work2013, beforethe Companyored to all e service by 014, 11 days Toronto Hydon January 3Toronto supported thanother 450 try) from ilities, as went and
E
stem Limitedn Independerm. The inteare working Davies Consuce in utility eent under thes: a brief ovof the scope
anel.
and Toron
ter Toronto een 20 and 3orth – in twok) to Torontoby Toronto Hre than one on power li
le k y’s
dro 3,
he
ell
Executive S
d (Toronto Hent Review Pention of thewell and areulting LLC, a emergency ree direction oerview of the of the revi
nto Hydro’s
Area (GTA) 30 millimetreo days. This so Hydro custHydro lost pomillion Citynes, either c
Summary
Hydro or thePanel (IRP) te review waseas in need oleading manesponse throof the IRP. The 2013 Ice Siew; and hig
s Response
was at the ees of freezinsevere ice stotomers. Appower at oneresidents. Mcreating faul
e Company) o review thes to confirm of nagement oughout his ExecutiveStorm and hlights of th
e
epicentre of g orm resultedroximately e point durinMost of the lts or
e
e
he
d
g
4
profeToron
Figurnotin
1
2
3
4
5
6
7
Figure
Whenrestoshow
essional officnto Hydro ov
e 1 shows thng the follow
. Initial wea
. Initial req
. Power resOperation
. Approximrestoratio
. Approxim
. Approxim
. All custom
e 1: 2013 Ice St
n comparedorations, Torwn in Figure 2
ce staff. Notaver the cour
he progress wing mileston
ather statem
quest for mu
stored to all ns Centre (EO
mately 86% oon);
mately 90% o
mately 99% o
mers who ca
torm Restorati
to the perfoonto Hydro’2.
ably there wrse of the res
of Toronto Hnes:
ments warnin
tual assistan
critical facilOC);
of all custom
of customers
of customers
n accept ser
ion Timeline w
ormance of o’s overall pe
E
was only onestoration an
Hydro’s rest
ng of a pote
nce issued by
ities designa
ers affected
s out at peak
s out at peak
rvice restore
with Key Milest
other utilitierformance is
Executive S
e recordable nd no deaths
oration afte
ntial ice eve
y Toronto H
ated by the C
d restored (7
k restored;
k restored; a
ed.
tones
es conductins well within
Summary
safety incids attributed t
r the 2013 Ic
ent;
ydro;
City Emerge
72 hours from
and
ng ice and snn the industr
ent at to the storm
ce Storm,
ncy
m the start o
now storm ry norm as
m.
of
5
Figure
Source
1.2.
The omanafour‐
Figure
e 2: Event Benc
e: Davies Cons
Review S
organizing fragement (EMphase cycle,
e 3: Utility Eme
chmark Compa
ulting Storm R
Scope and
ramework foM) life cycle,, anchored b
ergency Manag
arison
Response Bench
d Approach
or the Toront as adapted by a compre
gement Life Cy
E
hmark Databas
h
to Hydro revto the utilityhensive incid
ycle
The reviewHydro’s realign to thecycle.
Executive S
se, 2014
view is the wy environmedent commu
w addressed sponse. Tabe utility eme
Summary
widely‐used ent. Figure 3unications st
nine areas ole 1 shows hergency man
emergency 3 depicts thistrategy.
of Toronto how they nagement lif
s
fe
6
Table 1:
The DapprostakerevieCity aapprostakecente
1.3.
The rexecusumm
Em
Prepa
Respo
Mitig
Incide
Alignment of
Davies Consuoach to condeholders, recwed relevanand Provincioach taken beholders andered, and inf
Summar
review of Touted emergemary finding
Toronto Hmanagemapproach
Customerstatus (inc
The Compstrategy a
The Comprestoratio
mergency Ma
are
ond and Rec
gate
ent Commu
Toronto Hydro
ulting team uduct the 201ceived close nt internal pal regulationby the team d lead to findformed by le
ry of Findin
ronto Hydroency managegs for each ar
Hydro followment level, b across the C
rs could not cluding estim
pany’s incideand unity of
pany securedon and execu
anagement
cover (Resto
nications
o Assessment
used a struc13 Ice Stormto 100 publlans, reportsns, policies, apreserved tdings and receading pract
ngs and Re
o’s response ement practrea evaluate
wed an Incideut had not fCompany;
obtain timemated time
ent communmessage, m
d and deployuted the ove
Life Cycle
ore)
E
Scope to Eme
ctured, comp Review. Theic comments and documand emergehe confidencommendattice.
ecommend
to the 2013tices and areed, are:
ent Commanully develop
ly and accurof restoratio
nication perfmet or exceed
yed mutual erall mutual
Tor
EmergPrepa
Resou Dama
Planni Resto Inform
Techn Toron
VegetHarde
Comm Comm
Executive S
rgency Manag
prehensive, ey interviews through To
mentation, anency managetiality of infotions that we
dations
3 Ice Storm reas in need o
nd System‐bped, trained,
rate informaon, or ETR) d
formance, wded industry
assistance rassistance p
ronto Hydro
gency Planniredness
urce Acquisitge Assessmeing ration Execumation Systenologies to Hydro – C
ation Managening/Resilie
munications –munications –
Summary
gement Lifecyc
principles‐bawed nearly 80own Halls annd considereement practiormation prere objective
revealed botof improvem
based approa and exercis
ation about tduring the ev
with a definey best practi
esources eaprocess gene
o Review Sco
ing and
tion and Alloent and Rest
ution ems and
City Coordin
gement andence
– Customer – Other Stak
cle
ased 0 nd email, ed pertinentices. The rovided by e, data‐
th well‐ment. The
ach at the sed the
their outagevent;
d media ces;
rly in the erally well;
ope
ocation toration
ation
System
Contact keholders
t
7
The Imanaevalu
The proceleading prexecuted;
While theoverall reindustry;
Toronto Htechnologrestoratio
The circuicycle whicstandards
RP identifiedagement. Thuated:
Update ethe documand struc
Improve sETRs and
Develop cinformatioutages;
Work witsystem haand targe
Educate cresponsiboccur (e.gproperty)
Codify theequipped
Pre‐definexecuted
Update anprovide re
ess for deterractices; how;
e restorationstoration du
Hydro has imgy systems, bon support a
it‐based vegch meets or s and City of
d 25 recommhe following
mergency rementation oture;
situational afacilitate foc
capacity to pon related t
h key stakehardening andeted convers
customers anbilities and ag., impacts re);
e process fo resources;
e restoratioefficiently a
nd further ineal or near‐r
rmining restowever, the d
n approach vuration was
mplemented but has not and situation
getation manexceeds indf Toronto by
mendations flist is a sum
esponse planf key proces
wareness cacus on critic
provide custoo their outa
holders to idd resilience sion of line s
nd stakeholdre better preequiring rep
r rapid acces
n approacheand safely;
ntegrate keyreal time int
E
oration priodamage asse
varied amonsimilar to th
some advanfully integranal awarenes
nagement prdustry best p‐laws.
for considermary of thes
ns to align wsses and pro
apabilities toal priorities;
omers timelges, during d
entify, agreeinitiatives, inegments to
ders to ensuepared and pair of damag
ss to and de
es that are sc
y informationelligence du
Executive S
rities was inessment proc
g the Local Chat of compa
nced operatated them toss; and
reventive prpractice and
ration by Torse recomme
with vision ancedures, an
o enable dev;
y access to rday‐to‐day,
e upon, and ncluding vegundergroun
ure that theymore fully inged equipm
eployment of
caled to out
n and operauring major e
Summary
line with incess was not
Command Carable event
ional and info provide ade
ogram is on follows indu
ronto Hydroendations by
nd strategy, d train respo
velopment o
report and oas well as la
fund cost‐bgetation mannd constructi
y understandnformed whent on custo
f trained, ce
tage levels a
tional systemevents; and
dustry t fully
entres, the s in the
formation equate
a three‐yeaustry prunin
o y area
incorporateonse roles
of accurate
obtain criticarge‐scale
eneficial nagement ion;
d their hen incidentsomer
rtified, and
nd can be
ms to
ar g
e
al
s
8
1.4.
The 2ToronToroncoordwithiHydroCompsafe. sever
In accpresemakepowecall foof Onservepartie
Enhance coutreach,awarenes
Moving
2013 Ice Stornto residentnto Hydro pedinated, andn a reasonao performedpany’s manaAs expectedral aspects o
cordance wiented in thise to further eer outages. Aor closer coontario to pree as the startes.
collaboratio, messaging,ss of major e
Forward
rm was an uts and testedersonnel invd intensive reble timeframd the restoraagement andd with any laof the emerg
th the comm report focuenhance its Additionally,operation amepare the comting point fo
n between T, and educatevents.
unprecedentd the mettle volved in theesponse, theme given theation in a mad approach targe incidentgency respon
missioned scus mainly on ability to res, and notablymong Torontmmunity foror a more sus
E
Toronto Hydtion to impro
ed event thaof the first r
e recovery efe communitye amount ananner consisto the restort, the recovense that can
cope of the Pthe improvespond to futy, several ofto Hydro, thr future majostained, coo
Executive S
dro and the Cove citizen p
at disruptedresponders, ffort. Througy was safelyd type of dastent with inration was pery from thisbe further i
Panel reviewements thatture events tf the recomme City of Toror outage evordinated eff
Summary
City to integpreparednes
d the lives of as well as thgh a dedicat restored toamage sufferndustry normprudent, diligs ice storm amproved.
w, the recomt Toronto Hythat cause wmended impronto and thvents. This rfort among a
rate s and
most he City and ted, normalcy red. Torontoms. The gent, and also exposed
mendationsydro can widespread provements he Province eport shouldall of these
o
d
s
d
9
2. InOn Dresultcustolost pmillioextenapprocontrthe tiaccepincidethe st
2.1.
On Japublipriorand CincideindepintenareasensurIRP m
Toronwith cond
1 The pinterrudiffereIce Sto
ntroducti
ecember 21ting in approomers1. Apprpower at oneon city residensive properoximately 1,ractors (i.e., ime the restpt power by ent at Torontorm.
Purpose
anuary 9, 20c on the Comities, and coCEO of Toronent we havependent panntion of the rs in need of re the objecmembers are
David J. M
Joseph Pe
Sean Con
Carlos D. of New Yo
nto Hydro reextensive exuct the revie
peak number oupted at the saent points in tiorm.
ion
1 and 22, 201oximately 31roximately 5e point durinents. In addirty damage a250 field resoff‐system),toration begJanuary 2, 2
nto Hydro ov
e, Governa
14, Toronto mpany’s emommunicationto Hydro, re faced.” At tnel to oversereview was timprovementivity of the e:
McFadden, P
ennachetti, C
way, Visiting
Torres, Viceork, Inc.
etained Davixperience inew under th
of customer intame time. Sincme, ultimately
13, a severe 13,000 servic57% (416,000ng the eventition to wideand economsources, incl, restored sean. Crews co2014. Notabver the cours
ance, Scope
Hydro execergency preons strategy emarked thathat time, thee a review oto confirm pnt. The role review and
Panel Chair a
City Manage
g Fellow, Ce
e President o
ies Consultin utility emere direction o
terruptions repe the event lasy resulting in 41
ice storm stce interrupt0) of the cust, which ultimespread powmic losses. Toluding moreervice to 75%ompleted rely, there wase of the res
e
utives held aparedness pduring the iat the 2013 he Company of its responpractices thatof the Indepprovide guid
nd Partner,
er, City of To
ntre for Urb
of Emergency
ng LLC, a leadrgency respoof the IRP. T
presents the hsted for severa16,000 custom
Introduction
truck the greions (at peastomers servmately affecwer outages, oronto Hydro than 400 fr% of customestoration ofs only one restoration and
a press confplanning, resncident. AntIce Storm wannounced
nse to the 20t are workinpendent Revdance and s
Gowling Laf
ronto;
an Energy –
y Managem
ding manageonse throughhe effort be
ighest numberal days, additiomers experienci
n
eater Torontk) to Torontved by Toroncted more ththe event co deployed om other uters within 4f all customeecordable sad no deaths
erence to brstoration appthony Haine
was “the mosits establish
013 Ice Stormng well and tview Panel (Iubject matte
fleur Hender
– Ryerson Un
ent, Consoli
ement consuhout North Agan in late J
r of customers onal customersing an interrup
to area, to Hydro nto Hydro han one aused
tilities and 8 hours fromers who coulafety attributed t
rief the proach and s, President st disruptive hment of an m. The to identify RP) was to er expertise
rson LLP;
niversity; and
dated Ediso
ulting firm America, to anuary 2014
who were s lost power at ption during th
m d
to
.
d
n
4.
e
10
The smanafour‐
The mmana
2.2.
The Dcomp
scope of the agement (EMphase cycle,
main compoagement life
Prepared– Organ– Emerg– Emerg– Emerg– Exerci
Response– Mobil– Resou– Respo– Logist– Resto– Situat– Wires– Work – Demo
Incident C– Comm– Estima
tracki– Key m– One‐v– Social– Liaiso– Custo
Mitigatio– Veget– Pole i– Storm
Use of Su
Approac
Davies Consuprehensive, p
assessmentM) life cycle,, centered b
nents assesse cycle are:
ness nization and gency Respogency (or segency managises (table to
e and Recoveization and urce acquisitonse structutics ration stratetional awares down and cplanning an
obilization
Communicatmunication sated Time ong
message devevoice commu media n program mer call cen
n (Distributtation managnspection
m hardening
upporting Te
ch and Me
ulting team cprinciples‐ba
t included al as adapted y a compreh
sed within e
responsibilionse Plan strcond) roles gement traiop and funct
ery (Restoralevel declaration and allore and roles
egy and execness and dacut, clear annd prioritizat
tion trategy f Restoratio
elopment unication
ntre
ion Infrastrugement
echnology Sy
ethodology
conducting tased approa
l aspects of to the utilityhensive incid
ach phase o
ty for emergructure and cprocess ning programtional)
ation) ation cation /responsibil
cution efficiemage assessd make safetion
n (ETR) deve
ucture Main
ystems (Ope
y
the assessmach to evalua
Introduction
the widely‐uy environmedent commu
of the utility
gency managcompletene
m
ities
ency sment e process
elopment, d
ntenance and
erational an
ent used a sate Toronto
n
used emergeent. Figure 3unications st
emergency
gement ss
issemination
d Improvem
d Informatio
structured, Hydro’s resp
ency 3 depicts thisrategy.
n, and
ment)
on)
ponse to the
s
e
11
2013 commdocuemercore
DavieToron
1
2
Ice Storm. Tments throumentations,rgency manaprinciples gu
Transpareto Compa
Inclusivencontribut
Data‐centquantitatextent po
Informed develop inDavies Comuniciparesearch;
Confidentinterestedattributab
es Consultingnto Hydro:
. Understanthe magnsystem, uinterview
. Collect peToronto Hstakeholdprocess. CToronto HToronto efeedback (torontoicSubmittedand otherCity and Pcode, tree
They interviegh Town Ha, and consideagement prauided the wo
ency – consuany informat
ness – represe through in
tered analysive and qualossible;
by leading pnterview quonsulting’s pl utilities, paand
tiality – sourd parties is nble to individ
g used the fo
nd the impaitude of the
using weathews.
ertinent dataHydro managders in the 20Conducted inHydro managemployees; athrough thrcestorm@dad approximar program daProvincial poe trimming s
ewed nearlylls and emaiered pertineactices. Throork of the D
ultants condtion and per
sentatives onterviews, pu
sis– findings litative data
practice – knestions androject work articipation i
rce informatnot shared oduals or grou
ollowing me
ct of the stoe 2013 Ice Ster reports, To
a about Torogement and013 Ice Stornterviews wgement andand City of Tree town halaviescon.comately 50 dataata. Review olicies and restandards).
y 80 stakehoil, reviewed ent City and oughout the avies Consu
ucting fact‐fsonnel;
of stakeholdeublic town h
and recommand origina
nowledge ofto guide anawith more tn industry a
tion providedoutside Davieups.
ethodology t
orm on Toronorm’s impacoronto Hydr
onto Hydro’s the IRP, idem emergenc
with a represe front‐line pToronto elecll meetings am) for thosea requests fodocumentategulations (e
Introduction
lders, receivrelevant inteProvincial reassessment lting team:
finding and a
er groups hahalls, and em
mendations l sources of
f industry leaalysis; this kthan 35 invessociations,
d by individues Consultin
o conduct th
nto Hydro’s sct on Torontro‐provided
s performancentified particy managementative cropersonnel; Ucted leaders.and via publi who were nor operationtion providee.g., electric
n
ved close to ernal plans, egulations, pprocess, the
analysis hav
ave an oppormail feedback
are substantdata are use
ading practicnowledge isstor‐owned and proprie
ual interviewg and findin
he assessme
system. Chao Hydro’s didocumentat
ce. In collaboicipants andment and resoss‐section innion leaders. Collected pic email addnot able to anal, call centred along withsafety code
100 public reports, andpolicies, ande following
e full access
rtunity to k;
tiated by ed to the
ces is used tos drawn fromand
etary
wees and gs are not
ent of
racterized istribution tion, and
oration with other storation ncluding: ship; City of public ress attend. re, system, h pertinent , building
d
s
o m
h
12
3
4
2.3.
The Dplannthe enumeHydroevent
Table 2:
Em
Prepa
Respo
Mitig
Incide
. Analyze dof Torontand standToronto Hutilities uDatabasestrengthsrecomme
. Develop fToronto Hsummarizwithin thefor Toron
Evaluati
Davies Consuning, prepareemergency reerous and sigo and City ret like the 20
Alignment of
mergency Ma
are
ond and Rec
gate
ent Commu
data to develo Hydro’s redards, industHydro’s perfsing Davies C, which is de and opportendations to
final report. Hydro’s emezed leading oe scope of thto Hydro ma
ion Areas
ulting reviewedness, and esponse life gnificant areesponders w13 Ice Storm
Toronto Hydro
anagement
cover (Resto
nications
lop findings esponse, comtry standardormance (e.Consulting pescribed lateunities for imaddress are
Prepared a cergency manor expected he review, aanagement c
w addressed response prcycle as shoeas of overlawhen supporm.
o Assessment
Life Cycle
ore)
and recommmparing Comds, and leadin.g., restoratiproprietary Ser in this repmprovemeneas in need o
comprehensagement anpractice in end detailed consideratio
nine areas oractices. Theown on Tableap and integrting the reco
Scope to Eme
Tor
EmergPrepa
Resou Dama
Planni Resto Inform
Techn Toron
VegetHarde
Comm Comm
Introduction
mendations.mpany perfong practiceson durationStorm Respoort. Formulat. Developeof improvem
sive written nd restoratioeach of the nthe findingson.
of Toronto He first eight oe 2. The nintration that oovery of the
rgency Manag
ronto Hydro
gency Planniredness
urce Acquisitge Assessmeing ration Execumation Systenologies to Hydro – C
ation Managening/Resilie
munications –munications –
n
Evaluated eormance aga. Compared , cost) to thoonse Benchmated findingsd actionable
ment.
report that don performanine areas as and recomm
Hydro’s emeof these areath addressesoccur betwee community
gement Lifecyc
o Review Sco
ing and
tion and Alloent and Rest
ution ems and
City Coordin
gement andence
– Customer – Other Stak
each aspect inst its plansaspects of ose of othermark s of e
described nce, ddressed mendations
rgency as relate to s the een Toronto y after an
cle
ope
ocation toration
ation
System
Contact keholders
s
r
13
3. OToronToronan elecustodistriconsu
ToronincorToronmuniapprodistriterrit
Table 3:
Popul
Custo
Servic
Emplo
Distri
D(n
O
U
O
Po
Sw
Subst
Mete
Overview
nto Hydro bento Hydro owectricity distomers locatebution compumed in the
nto Hydro isrporated undnto (the “Cocipal electrioximately 65bution systetory.
Toronto Hydr
lation
omers
ce Territory S
oyees
bution
istribution cirnumber)
Overhead (mil
nderground (
Overhead tran
oles
witches
ations
rs (12/31/13)
of Toron
egan operatwns and opetribution sysed in the Citypany in CanaProvince of
wholly‐ownder the Ontaorporation”),c utilities int50,000 custoem characte
ro System Stat
ize
rcuits
es)
(miles)
nsformers
)
nto Hydro
tion on May erates $2.6 bstem which dy of Torontoada and distf Ontario.
ned by Toronario Business, its sole shato one, nearomers. Tableristics and F
istics
2.8 millio
733,800
630 squa
1,570
1,710
15,000 k
11,200 k
60,650
175,400
16,000
169 mun
648,000
OS
o System
2, 1911. Todbillion of capdelivers eleco. It is the lartributes appr
nto Hydro Cos Corporatioreholder. Inrly tripling Toe 3 provides
Figure 4 is a
on
are kilometer
km (9,321 mile
km (6,959 mile
nicipal station
distribution a
Overview oSystem
day, more thpital assets cctricity to morgest municiroximately 1
orporation, ons Act in 19 1998, Bill 10oronto Hydra snapshot map of Toro
rs (240 square
es)
es)
ns/35 transmi
and 85,800 in
of Toronto H
han 100 yearcomprised pore than 730pal electricit18% of the e
a holding co99 by the Ci03 amalgamo’s customeof Toronto Honto Hydro’s
e miles)
ission station
ndustrial/com
Hydro
rs later, rimarily of 0,000 ty lectricity
ompany ty of
mated six er base to Hydro’s s service
s (shared)
mmercial
14
Figuree 4: Toronto Hyydro Service Territory
OSOverview oSystem
of Toronto HHydro
15
4. TOn ThEnvirp.m. Hydrobetwtwo daccumtree lhavoctrans
The sof freDecewhiteDece
Figure
Powemornsyste
2 Sour
The Decem
hursday, Decronment Canon Saturdayo service ter
ween 20 and days),2 resultmulation leftlimbs acrossc across the sportation at
surface map eezing rain omber 22, 20e/blue areasmber 22, 20
e 5: Surface Ma
er outages stning when 31m continued
ce: Environme
mber 201
cember 19, nada, indicaty, Decemberrritory was a30 millimetrting in signift roads and s the region cGreater Tort one of the
of the stormover the Grea013, at 6:00 as are snowfa014.
ap of 2013 Ice
tarted short13,000 custod through th
ent Canada
13 Ice Sto
2013, Toronting the probr 21, 2013, aat the epicenres of freezinficant ice accsidewalks slcausing wideronto Area, tbusiest trav
m‐affected aater Torontoa.m. (red coll). The freez
Storm at Peak
ly after 8 p.momers were he morning o
Ta
orm and T
nto Hydro bebability of annd into Sundntre of a freeng precipitatcumulation oick and dangespread powthe storm crel times of t
rea, in Figuro Area at thelor represenzing rain sto
k Intensity
m. on Saturdwithout powof Monday,
The Decemand Toront
Toronto H
egan to trackn ice event. day Decembezing rain evtion (more ton trees andgerous and kwer outagesrippled Nortthe year.
re 5 below, se peak of thents the freezopped aroun
day and peawer. The remDecember 2
mber 2013 Io Hydro’s R
Hydro’s Re
k weather wStarting arober 22, 2013,vent that brothan two‐yead power lineknocked dow. In additionh American
shows the coe storm on Sing rain, whd 9:00 p.m.,
ked early onmnants of th23, 2013, and
ce Storm Response
esponse
warnings fromund 3:00 , the Torontought ar’s worth ins. The ice wn trees and to wreaking
oncentrationSunday ile , on Sunday,
n Sunday e weather d the
m
o
n
d g
n
16
CompUltimexpemillioon po
Toronwhichwork2014on Jaon threconsuppofrom timel
1
2
3
4
5
6
7
pany continumately, approrienced servon Toronto rower lines, e
nto Hydro qh began rest. Service wa, 11 days aftnuary 3, 201heir propertynnected to torted the recontractorsine with the
. Initial wea
. Initial req
. Power resOperation
. Approximrestoratio
. Approxim
. Approxim
. All custom
ued to experoximately 41vice interrupresidents. Theither creatin
uickly mobiltoration wors restored toter the resto14, after resy and requirehe grid. Appestoration efs and 10 othee following k
ather statem
quest for Mu
stored to all ns Centre (EO
mately 86% oon);
mately 90% o
mately 99% o
mers who ca
rience addit16,000 custoptions as a rehe majority ong faults or
ized its manrk by 8 a.m.o all customoration begatoring the reed permits fproximately 9ffort, aided ber utilities. Fkey mileston
ments warnin
utual Assistan
critical facilOC);
of all custom
of customers
of customers
n accept ser
Ta
ional outageomers, or 57esult of the Iof the damagbreaking the
nagement teon Decembe
mers who coun. Toronto Hemaining cufrom the Ele98% of Toroby another 4Figure 6 beloes:
ng of ice eve
nce issued b
ities designa
ers affected
s out at peak
s out at peak
rvice restore
The Decemand Toront
es as it bega% of all Toroce Storm, afge was cause lines.
am and calleer 22, 2013, uld receive pHydro resumstomers whctrical Safetyonto Hydro’s450 field worow shows th
ent;
by Toronto H
ated by the C
d restored (7
k restored;
k restored; a
ed.
mber 2013 Io Hydro’s R
n initial restonto Hydro cffecting mored by tree li
ed in availabwhen it was
power by Janmed normal oo experiencey Authority s core trade wrkers (line ane restoratio
Hydro;
City Emerge
72 hours from
and
ce Storm Response
oration. customers, re than one mbs falling
ble resourcess safe to nuary 2, operations ed damage (ESA) to be workers nd forestry) n progress
ncy
m the start o
s,
of
17
Figure
As paDavierestoBencof cuby thmetrindus
3 DavieThe daelectrihave timpro
e 6: 2013 Ice St
art of the reves Consultingorations, usinhmark Datastomers affee size of theics, Toronto stry norm.
es Consulting batabase currenic utilities acroto be carefully vement oppor
torm Restorati
view of Torog compared ng informatibase.3 Figureected at peae bubble). WHydro’s ove
began to develntly contains keoss North Amerevaluated, benrtunities exist.
ion Timeline w
onto Hydro’sthe Companon from its ce 7 depicts tak (on the Y‐When comparerall perform
lop its confideney statistics frorica. While eacnchmarking ca
Ta
with Key Milest
s restorationny’s responsconfidential the restoratiaxis) and thered to othermance during
ntial and proprom more than ch event is uniqn be valuable
The Decemand Toront
tones
n effort durinse to other icand proprieon duratione total cost or similar eveng the 2013 Ic
rietary Storm B95 major evenque and the coto identify are
mber 2013 Io Hydro’s R
ng the 2013 ce and snowetary Storm (on the X‐aof restorationts, accordince Storm wa
Benchmark Datnt responses byomparisons amas where pote
ce Storm Response
Ice Storm, w storm Response xis), percenton (indicatedng to these as within the
tabase in 2003y over 42
mong utilities ential
t d
e
3.
18
Figuree 7: Event Bencchmark Compaarison
TaThe Decemand Toront
mber 2013 Io Hydro’s R
ce Storm Response
19
5. F
5.1.
The frecomrecomof thiPrepaRestoStakeSyste
Each evalu
Findings a
Overview
following secmmendationmmendationis report. Tharedness; Reoration Execeholders; Infem Hardenin
finding of a uation area.
Toronto Hmanagemapproach
Customerstatus (inc
The incidemessage,
The Comprestoratio
Restoratioassessme
While theoverall re
Toronto Htechnologrestoratio
The circuicycle whicstandards
and Recom
w
ctions descrins to addressns are groupe areas are esource Acqution; Commformation Syng/Resiliency
strength anThe followin
Hydro followment level, b across the C
rs could not cluding estim
ent communwas in line w
pany securedon and execu
on prioritiesnt process w
e restorationstoration du
Hydro has imgy systems, bon support a
it‐based vegch is in line ws and City of
mmenda
ibe the findis opportunited within thpresented inuisition and municationsystems and Ty; and Toron
d area of imng statemen
wed an Incideut had not fCompany;
obtain timemated time
nication procwith industr
d and deployuted the ove
s were in linewas not fully
n approach vuration was
mplemented but has not and situation
getation manwith industrf Toronto by
FO
tions
ngs from theties for imprhe nine evalun the followiAllocation; – CustomerTechnologiento Hydro‐Ci
mprovement ts distill the
ent Commanully develop
ly and accurof restoratio
cess, with a ry leading pr
yed mutual erall mutual
e with industy executed;
varied amonin line with s
some advanfully integranal awarenes
nagement pry practices a‐laws.
Findings andOverview
e review androvement. Thuation areasing order: EmDamage Assr Contact; Cos; Vegetatioty Coordinat
is addressedkey findings
nd System‐bped, trained,
rate informaon or ETR) d
defined medractices;
assistance rassistance p
try practices
g the Local Csimilar even
nced operatated them toss; and
reventive prand follows
d Recommen
d provide 25he findings as described imergency Plsessment anommunicatioon Managemtion.
d in detail ws:
based approa and exercis
ation about turing the ev
dia strategy
esources eaprocess gene
s; however,
Command Cts in the ind
ional and info provide ade
ogram is on industry pru
ndations
5 and n Section 2.3anning and d Planning; ons – Other ment and
within each
ach at the sed the
their outagevent;
and unity of
rly in the erally well;
the damage
entres, the dustry;
formation equate
a three‐yeauning
3
f
e
ar
20
Likewlist is
Appeoppo
For eone okey fo
wise, each re a top line su
Update ethe documand struc
Improve sETRs and
Develop cinformatievents ;
Work witsystem haand targe
Educate cresponsiboccur (e.gpremise);
Codify theequipped
Pre‐definexecuted
Update anprovide re
Enhance coutreach,awarenes
endix C proviortunities for
asy referencof the evaluaor each eval
ecommendatummary of t
mergency rementation oture;
situational afacilitate foc
capacity to pon related t
h key stakehardening andeted convers
customers anbilities and ag., impacts re
e process fo resources;
e restoratioefficiently a
nd further ineal or near‐r
collaboratio, messaging,ss of major e
ides a summr improveme
ce, each recoation areas (uation area
tion is detailthe recomm
esponse planf key proces
wareness cacus on critic
provide custoo their outa
holders to idd resilience sion of line s
nd stakeholdre better preequiring rep
r rapid acces
n approacheand safely;
ntegrate keyreal time int
n between T, and educatevents.
mary table ofent) and reco
ommendatio(e.g., EPP‐1, .
FO
led within eaendations b
ns to align wsses and pro
apabilities toal priorities;
omers timelge, including
entify, agreeinitiatives, inegments to
ders to ensuepared and pair of damag
ss to and de
es that are sc
y informationelligence du
Toronto Hydtion to impro
f all of the finommendatio
on has an alpEPP‐2). The
Findings andOverview
ach evaluatiy area evalu
with vision ancedures, an
o enable dev;
y access to rg blue‐sky an
e upon, and ncluding vegundergroun
ure that theymore fully inged equipm
eployment of
caled to out
n and operauring major e
dro and the Cove citizen p
ndings (incluons organize
pha‐numericfollowing ta
d Recommen
on area. Theuated:
nd strategy, d train respo
velopment o
report and ond full‐scale
fund cost‐bgetation mannd constructi
y understandnformed whent on custo
f trained, ce
tage levels a
tional systemevents; and
City to Integpreparednes
uding strenged by evalua
c key associaable lists the
ndations
e following
incorporateonse roles
of accurate
obtain critica major
eneficial nagement ion;
d their hen incidentsomer
rtified, and
nd can be
ms to
rate s and
ths and ation area.
ating it to e reference
e
al
s
21
Table 4:
EPP
RA
DAP
RE
CCC
COS
IT
VMSH
TH –
5.2.
Acrosreceivgrowlevel Ontaeventof emRecogeventcomp
Leadi
4 Incideffectproced
The ICsmall a
The Prstandaemerginciderespon
Recommenda
Reference K
H
C
Emergen
ss the electrving heighte
wn in frequenstorms (e.g.rio floods ofts, there aremergencies/hgnizing that t occurs, utipetency, as i
“CEA memevery aspbusiness p
ing practice
Establishi
Incorpora
dent Commandive, efficient indures, and com
CS is used to mand large situa
rovince of Ontaardized organizgency responsents and is closenders in Ontar
ations Referen
Key
E
R
D
R
C
C
In
V
T
ncy Planni
ic utility indened attentioncy and mag., Hurricane f 2013, and te growing cohazards, sucutilities playlity leaders allustrated in
mber compapect of the livpriority.”
utilities are
ng an emerg
ating the Inc
d System (ICS) incident managmmunications o
anage an incidations (Source:
ario has develozational structe in Ontario. IMely related to tio and many fi
ce Keys
mergency P
Resource Acq
Damage Asse
Restoration E
Communicat
Communicat
nformation S
Vegetation M
Toronto Hydr
ing and Pre
ustry in Norton. Over thegnitude, as ilKatrina, Hurthe arctic blaoncerns abouh as cyber‐ay an essentiaare making en the Canadia
anies undersves of Canad
strengtheni
gency mana
ident Comm is a standardizeement by integoperating with
dent or a non‐e ICS Canada).
oped the Incidures, functionsMS addresses tthe Incident Corst responders
FEP
Eva
lanning and
quisition and
essment and
Execution
ions – Custo
ions – Other
Systems and
Management
ro – City Coo
eparednes
th America, e last 10 yealustrated byrricane Sandasts of early ut and signifattacks, physal role in comemergency man Electrical
stand how imdians, makin
ng emergen
gement visio
mand System
ed on‐site mangrating a combhin a common
emergency eve
ent Managemes, processes, athe need for coommand Systes (wild land fire
Findings andEmergency PPreparednes
aluation Are
Preparedne
d Allocation
d Restoration
omer Contac
r Stakeholde
d Technologi
t and System
ordination
ss
emergency rs, weather‐y a number ody, Hurricane2014). In adicant effortssical attacks,mmunity recmanagemenl Association
mportant eleng emergenc
ncy managem
on, guiding p
m (ICS)4;
nagement systbination of faciorganizational
ent, and can be
ent System (IMnd terminologoordinated resem (ICS). ICS is e, search and r
d RecommenPlanning andss
a
ess
n Planning
ct
ers
ies
m Hardening
managemen‐related eveof recent cate Irene, the Addition to ths to address , and pandemcovery once nt a core corpn 2013 Annu
ectricity is tocy preparedn
ment by:
principles, a
em designed tilities, equipme structure.
e used equally
MS) that providgy for use at allponses to all tyused by some rescue, etc.) ac
ndations d
/Resiliency
nt is nts have tastrophic‐Alberta and e weather other typesmics. a major porate al Report:
o virtually ness a critica
nd strategy;
o enable ent, personnel
well for both
des levels of ypes of first cross Canada.
al
l,
22
The iorgantime.capab
This aprepa
5.2.1
Sincebetwthe cand R
Developinscalable, a
Designatimanaged
Conductinand enabactual eve
Coordinatexercising
Partnerinmanagemand
Tying emefor staff.
nfusion of enization take. It may takebilities.
assessment aredness cap
Adherenc
Emergenc
Emergenc
Resourcin
Emergenc
Liaison/Coelected of
1. Emergen
e 2008, Toroween one andorporate emRisk Manage
ng a set of eand address
ng formal emwithin a cen
ng annual syle the Compent;
ting with locg efforts;
g with regulment organiz
ergency man
mergency mes persistente five or mor
of Toronto Hpabilities in
ce to ICS prin
cy managem
cy managem
ng emergenc
cy training a
oordination fficials, Prov
ncy Plannin
nto Hydro hd four full‐timmergency maement Group
mergency res all‐hazards;
mergency rentral emerge
ystem‐wide epany to ident
cal and state
atory stakehzation and pr
nagement an
managementt leadership re years to fu
Hydro’s emeadvance of t
nciples and p
ment plannin
ment organiz
cy roles;
nd exercises
with externvincial agenc
ng and Prep
as had dedicme equivaleanagement fp. This group
FEP
esponse plan;
esponse roleency manag
exercises detify improve
e/provincial g
holders to enrogram is ap
nd prepared
t knowledgeattention, sully develop
ergency manthe 2013 Ice
practices;
ng;
ation and re
s; and
nal stakeholdcies, first res
paredness F
cated emergents (FTEs). Nfunction in 2p is responsi
Findings andEmergency PPreparednes
ns that are c
es and respoement organ
esigned to stement oppor
government
nsure that thppropriately
dness to key
, skills, and dignificant inplans, train
nagement ple Storm addr
esourcing;
ders (e.g., Citponders).
Findings
gency planniNotably, Tor2012, placingble for the o
d RecommenPlanning andss
comprehens
nsibilities, idnization;
ress responsrtunities prio
ts in plannin
he emergenstaffed and
performanc
discipline acvestment, astaff, and ex
anning and ressed the fo
ty of Toront
ing staff, ranonto Hydro g it within thoverall corpo
ndations d
ive, useable
deally
se processesor to an
g and
cy resourced;
ce indicators
cross an nd dedicatexercise
ollowing:
o staff,
nging centralized he Strategy orate
,
s
s
d
23
emerfacilitand cResponot inGrid addre
Emer
1. Ew
ToronHydroManaroles This a
Toronand GFigur
Figure
5 The Pstandaemerginciderespon
rgency prepatating table coordinatingonse Plan prnclude sufficResponse Pless a larger‐
rgency Plann
mergency rewhich is cons
nto Hydro uso’s ICS impleagement Teain the Emerapproach is
nto Hydro’s Grid Disruptie 8 and Figu
e 8: Toronto Hy
Province of Onardized organizgency responsents and is closenders in Ontar
aredness (altop simulatig emergencyrovides the fcient descripan defines tscale event.
ning and Pre
esponse strusidered to b
ses ICS5 to mementation am roles andrgency Operconsistent w
ICS structurion Plan. It cure 9).
ydro Incident C
ntario has devezational structe in Ontario. IMely related to tio and many fi
l hazards), inons and funy managemeframework fption of all kethree levels o
eparedness S
ucture largee the indust
manage all tywas to estabd structure aations Centrwith compar
e is describeclosely aligns
Command Sys
eloped the Inciures, functionsMS addresses tthe Incident Corst responders
FEP
ncluding devnctional exerent activitiesfor respondiey processesof emergenc
Strengths
ely aligns wittry leading p
ypes of emeblish the Crisand train exere (EOC) andably‐mature
ed in the Coms to the Cana
tem Structure
dent Managems, processes anthe need for coommand Systes (wild land fire
Findings andEmergency PPreparednes
veloping emrcises, trainin across the Cng to major s and procedcies which m
th the Incidepractice in e
rgencies. Thsis Managemecutives andd System Ope ICS program
mpany’s Crisadian and Pr
e
ment System (Ind terminologyoordinated resem (ICS). ICS is e, search and r
d RecommenPlanning andss
ergency respng staff, benCompany. Thevents; howdures. Additmay not be su
ent Commanmergency re
e initial focument Team ad managers werations Cenms at other
sis Managemrovincial ICS
MS) that proviy for use at all ponses to all tyused by some rescue, etc.) ac
ndations d
ponse plans,nchmarking,he Grid wever, it doetionally, the ufficient to
nd System, esponse.
us of Torontoand Incidentwho fill thosntre (SOC). utilities.
ment Plan models (See
ides levels of ypes of first cross Canada.
,
es
o t se
e
24
The CCommSafetAdmiHydro
1
2
At ToliaisoEmerinclud
Figure
The Goutagguidethan Figur
Company’s ICmander, Comty Officer (Sainistration Seo structure a
. Toronto Hcommon
. Omission
oronto Hydroon officer, acrgency Manading all the w
e 9: Canada an
Grid Disruptiges, also usee the 2013 Icthose definee 10Figure 10:
CS structuremmunicationafety), and gection Chiefand the Can
Hydro’s Crisiwithin a privof the liaiso
o, the Corpocting as the pagement. Lawork protec
d Ontario EM
ion Plan, whes an ICS‐basce Storm resed by ICS, th: Toronto Hydr
e includes mons (Public Ingeneral staff fs). There areada/Ontario
s Managemvate companon officer rol
orate Disasteprimary intestly, the SOCtion activitie
Incident Mana
hich governs sed responsestoration. Whey address tro Grid Disrupt
FEP
ost of the coformation Oroles (Operae two notabo structure:
ent Team inny ICS; and le.
er Preparednrface with thC Manager oes on the dis
agement Syste
the restorate structure. hile the rolethe same getion Response
Findings andEmergency PPreparednes
ommand staOfficer), Enviations, Plannle difference
cludes a leg
ness (CDP) Ahe City of Tooversees sysstribution sy
em Structure
tion of majoToronto Hydes in this planeneral staff fOrganization
d RecommenPlanning andss
ff roles suchronmental, ning, Logistices between
al officer, a
Advisor serveoronto Officetem operatiystem.
or electric disdro used thin have differfunctions (Se
ndations d
h as IncidentHealth and cs, and the Toronto
role
es as the e of ons
stribution s plan to rent titles ee Figure 10)
t
o
).
25
2. Ch
Toronall‐hain 20profeStraterespoits pr
This mopera“storadditrespo
Increorganimpoincludtrackbencelectincludemer
orporate Emazards.
nto Hydro haazards. Follo11‐2012, Toessionals froegy and Enteonsibility forrimary focus
move to estaations) is in m response”tion, this struonse, versus
asingly acronization has ortance of thde: maintening; traininghmarking wric grid is thede a grid opergency mana
mergency M
as a standalowing an unfronto Hydrom four to onerprise Risk r emergencywas on grid
ablish a discline with pra” group fromucture enabjust the ope
ss the utilitythe role of Dis function. ance and intg and exercisith utilities ae key asset oerations expagement lea
anagement
one emergefavorable rato downsizedne, centralizManagemeny response wd disruption e
rete emergeactices of leam operationsles the grouerations gro
y industry, thDirector or VThe emergetegration of ses; modelinand other indof a utility, cpert. Alternad in the elec
FEP
organizatio
ency managete case that its group ofed the functnt group. Prwas within thevents.
ency manageading utilities helps to enp to better eup.
he leader of Vice Presidenency manageemergency
ng and analytdustries andcentral emeratively, they ctric delivery
Findings andEmergency PPreparednes
on is centrali
ement organresulted in mf full‐time emtion, and plaeviously, thehe Electric Gr
ement functes. The separnsure that thengage the e
this emergent, denotingement respoplans; risk mtics; businesd ICS implemrgency manawork closelyy business u
d RecommenPlanning andss
ized and add
nization that managemenmergency maced it withine organizatiorid Operatio
tion (manageration of thehe focus is alentire corpo
ency manageg the corporaonsibilities tymanagemenss continuitymentation. Siagement groy with the grnit.
ndations d
dresses all
addresses nt restructuranagement n the on with ons group an
ed outside oe traditional ll‐hazards. Inoration in a
ement ate ypically t; weather y planning; nce the oups often rid
re
d
of
n
26
3. Tre
Toron(SMSToron
4. Pd
BuildemerDeceEnvirinformthrou
On Dwhichoutag
Figure
rained and eesponsibiliti
nto Hydro haS) – a group onto Hydro co
Two CMT
Six Grid D
Six exerci— Ex— Co— Ex— Ex
OpGr
— Ex— Th
re‐event weecisions.
ing accuratergencies. An mber 2013, ronment Canmation. Thisughout the r
ecember 19h it warned ges.
e 11: Decembe
exercised Syies prior to t
as a trainingof on‐call leaonducted th
T training ses
Disruption Pl
ses: xecutives onommunicatioxecutives andxecutives, superator (IESOrid Exercise xecutives, SMhe City of To
eather moni
e situational important cToronto Hydnada, the gos effort begaestoration.
9, Toronto Hyof severe we
er 19, 2013 Pre
ystem Operathe event.
g and exercisaders, SOC se following
ssions;
an training s
ly; ons team ond the suppoupport team,O) and NortII (GridEx II);MS, and the ronto OEM
itoring proce
awareness component idro monitorvernment soan early in th
ydro issued eather and n
ess Release
FEP
ations Centr
se program fstaff and thetraining and
sessions with
nly; rt team; , and the Indh American ; City of Toroonly.
ess in place
is critical whis the weathred weather ource of weahe week of D
the followinnoted the ris
Findings andEmergency PPreparednes
re (Comman
for Senior Me Crisis Manad exercises in
h the SMS; a
dependent EElectric Reli
nto OEM; an
and used to
hen preparinher forecast.informationather and mDecember 16
ng press relesk of potenti
d RecommenPlanning andss
nd Centre) ro
Management agement Tean 2013:
and
Electricity Syability Coun
nd
o support ac
ng for or respIn preparatn provided bmeteorologica6 and contin
ase (See Figial and exten
ndations d
oles and
Stand‐by am (CMT).
ystems cil (NERC)
ctivation
ponding to ion for the by al ued
ure 11) in nded power
27
This anot h
Emer
1. Ein
ToronDisru
The CCrisisdescradditemeremerSysteSOC rplannthe G
The oconst
6 Grid
approach to have an in‐ho
rgency Plann
mergency renclude detai
nto Hydro hauption Plan (
Crisis Manags Managemeribe as an “ational powerrgency.”6 It irgency triggeem Operatioroles, and foning, and staGDP during t
overall formatructed plan
Definitionmutual as
Different
Sufficient(e.g., the
Disruption Pla
weather moouse meteor
ning and Pre
esponse plailed descript
as two emerGDP).
gement Plan ent Plan servannex”. The Grs and authoncludes suchers and levens Centre, aorms for highand down ashe 2013 Ice
at of the GD, but curren
n of key respssistance de
response st
t detail abouLocal Inform
n, Toronto Hyd
onitoring is irologist.
eparedness
ns providedtions of key
rgency respo
describes hves as a “corGDP “outlinority accesseh informatiols, coordinatnd guidanceh‐level damassessment. TStorm.
DP (core plantly it does n
ponse procesployment);
rategies for
ut the responmation Comm
dro, October 2
FEP
in line with s
Opportuniti
d an overall sprocesses a
onse plans: a
ow the senioe” plan overes the way ied through thon as emergetion betweee for plan maage assessmToronto Hyd
n plus annexot include:
sses (e.g., da
varying incid
nse organizamand Centre
28, 2013
Findings andEmergency PPreparednes
standard pra
ies for Impro
structure foand all roles.
a Crisis Man
or executiverlaying the Gn which deche declaratioency declaran the Crisis Maintenance, ent, objectivro emergenc
es) is reason
amage asses
dent levels;
ation and roles, or LICCs);
d RecommenPlanning andss
actices of ut
ovement
r response, .
agement Pla
es work in a GDP, which mcision makeron of a grid ation procedManagemenalong with cve setting, tacy response
nable for a n
ssment, cut a
es below the;
ndations d
ilities that d
but did not
an and a Gri
crisis. The many utilities use the
dures, nt Team andchecklists foactical staff used
ewly
and clear,
e SOC level
o
d
es
d r
28
2. Ta
Toronon Figrestopublireputand p
Figure
At ththe stutilityfour‐
Manycommwhenup toexpeby so
Checklists
Communioutreach/
oronto Hydrdequately a
nto Hydro cugure 12, theoration duratc and emplotational imppotential imp
e 12: Toronto H
e federal levtandard in py sector is mlevel scale (0
y utilities havmunicate then trying to uno three days rienced in thome Canadia
s, forms, and
ications prot/liaison.
ro characteraddress full‐s
urrently dese criteria usetion, impact oyee safety, act. These epact of incid
Hydro Grid Em
vel in Canadapublic sectormigrating to t0‐3).
ve adopted e scale and cnderstand a(as plannedhe 2013 Ice Sans in the aft
d job aids fo
tocols and p
rizes grid incscale events
ignates threed to establisto customethe expectaemergency ledents where
mergency Level
a, there are r emergencythe five‐leve
a wider rangcomplexity ond commun for at ToronStorm), and termath of a
FEP
r response s
processes, in
cidents on as.
ee levels of gsh the severrs and key aation of envirevels do not restoration
s
three emerg managemeel standard a
ge of levels iof an incidennicate the imnto Hydro), iincidents tha 1998 ice st
Findings andEmergency PPreparednes
staff; and
cluding stak
a three‐level
grid emergenity of an incaccounts, theronmental dadequatelytimes will ex
gency levelsnt is a five‐leas well. The C
in order to bnt. A more exmplications oincidents thahat last up toorm.
d RecommenPlanning andss
keholder
scale, whic
ncy in the GDident include potential tdamage, and address thexceed 72 ho
. In the Unitevel scale. TCity of Toron
better underxtensive scaf emergenciat last up to o 30 days, as
ndations d
h may not
DP. As showe: expected hreat to d e complexityours.
ted States, The U.S. nto uses a
rstand and le is useful ies that last 10 days (as
s experience
n
y
d
29
3. Kle
The rrestomanarestoStormFor emanawhilefrom
4. Mm
Utilitmanyincreincideoperaperfoactivicusto
Toronand mrole, wereand l
A fewdurin
7 Diffe
Key restoratievels of the
restoration soration approagement, wooration (ETR)m response cxample, maaging an incie another LICwork in Lon
Many Torontmajor inciden
ies that use y employeesasingly calleent requiresations staff. orms tasks dities. Some eomer service
nto Hydro dmanaging emwhile some, unfamiliar oocations.
w areas that ng the 2013 I
Incident m
Damage a
Logistics s
Wires dow
Work ord
Crew suppower lin
erent restoratio
on strategieCompany w
strategy toucoach (circuitork order ma). The absencaused the Lnagers in ondent of this CC implemenng Island dur
to Hydro emnts.
ICS typicallys who are noed emergencs a level of suA person filuring emergexamples of e representa
id not have mergency re, who were por ill‐suited t
would haveIce Storm we
managemen
assessment;
support;
wn guards;
er managem
port, includie persons.
on approaches
es and procewith roles in
ches on all at‐based, areaanagement, ce of a commLICC managene LICC did nscale and conted circuit‐ring Hurrican
mployees did
y assign and ot operationacy response upport that ling an emergency conditemergency tive, materia
in place a sysponse rolespre‐assignedto the job ta
benefitted fere:
t;
ment; and
ing clearing
s are described
FEP
esses were nthe respons
aspects of tha‐based, ordand the promonly‐knowers to createnot have suffontinued to ‐based restone Sandy.
d not have a
provide traially qualifiedroles, are acexceeds thergency respotions that areroles are daals handler,
ystematic, cos. Many empd roles such asks – or did
from more e
debris in the
d under the sec
Findings andEmergency PPreparednes
not defined se.
e response, der based)7, ocess to devewn restoratio their own sficient trainiapply an ordration based
pre‐assigne
ning on a sed. These secctivated whee capacity of onse role (ore different famage assesand staging
omprehensivployees didnas LICC mann’t have acc
effective res
e field and su
ction 5.5.1. of t
d RecommenPlanning andss
or understo
including thcall volume elop estimaton strategy dtrategies anng or experider‐based apd on lessons
ed and train
econd set of ondary dutieen the magnthe day‐to‐dr “storm rolefrom their “nsor, wires dosite manage
ve process fon’t have a prnagement ancess to neces
sponse role s
upporting ce
this report.
ndations d
ood at all
he
ted time of during the Icnd processesience in pproach, learned
ed role for
duties to es, itude of an day e”) often normal” worown guard, er.
or assigning re‐assigned nd support, ssary system
support
ertified
e s.
rk
ms
30
5. TdC
Prior LICCsrespootherhowetrainemana
5.2.2
EPP‐1throu
Toronmanacomprespoand iToronimproshou
EPP‐2
The acompuse itof sevdeemline puse obroad
oronto Hydrid not perfoentres.
to the 2013s were not wonse trainingr utilities thaever, lead toed personneaged by the
2. Emergen
1 Reaffirm aughout all of
nto Hydro exagement is apelling visiononse in the fncorporate tnto Hydro stoving the prld capture a
2 Continue t
Expand th
Formalize
Update th
Expand th
adoption of Ipany to movt on a daily bveral decademed successfpersonnel usof ICS, Torondening train
ro conducteorm sufficien
3 Ice Storm, twidely traineg at the centat are implemo some breakel responsiblLICCs.
ncy Plannin
and communf Toronto Hy
xecutive leaa core compen statement future. Executhem into thtaff memberocess. The end “unify” t
to inculcate
he use of em
e the pre‐eve
he emergenc
he training a
ICS is a cultuve from espobasis. Learnies and the eful only whese it on a regto Hydro shing and exer
ed exercises nt training a
the roles andd and exercitral commanmenting ICS kdown in exele for manag
g and Prep
nicate emergydro.
dership shouetency of thand set of gutives shouldhe corporater interviewedemergency mhis interest.
the ICS‐base
mergency res
ent activatio
cy levels to i
nd exercise
ural shift for ousing the prng from thexperiences on the seniorgular basis. Iould focus orcises to incl
FEP
and trainingnd exercise
d responsibiised. The apnd level first and emergeecution if thging the dece
paredness R
gency mana
uld affirm itse Company.guiding princd communice emergencyd in this effomanagement
ed approach
sponse roles
on and comm
nclude wors
program to
any organizrinciples of I public sectoof other utilir managemen order to aon formalizinlude more fr
Findings andEmergency PPreparednes
g at the Comin the Loca
ilities as welproach to fois consistenency managehe company entralized o
Recommend
agement visi
s belief that . This can beciples that wcate these toy managemeort wanted tt vision and
h to emerge
s (i.e., second
munication p
st‐case plann
the service
ation. It canCS to havingor’s adoptioities, the depent, middle mchieve the fng the seconront‐line res
d RecommenPlanning andss
mmand Centl Incident Co
l as processeocus emergent with that oement progrhas not adeperations be
dations
ion and stra
emergency e achieved thwill drive the o the entire oent plan. Neato participateguiding prin
ency respons
d roles);
process;
ning assump
centres.
n take years fg front line pn of ICS overployment ofmanagemenrequent, mond roles procsponse staff.
ndations d
tre level, buommand
es at the ency of many rams. It can,quately eing
ategy
hrough a Company’s organizationarly every e in nciples
se.
ptions; and
for a personnel r the coursef ICS is t, and front ore “routine”cess and
t
,
n
”
31
Secon
A com
The eorga
Torondesirand ashouassigincludroste
Event
Toronto adassocscena“worcustoscenaclose
Train
ToronIncidecourscapabseconrequi
nd Roles
mprehensive
Assigning
Training a
Providingexercises
effort shouldnization, hu
nto Hydro shed competea list of one old receive a nments duride metrics rers to determ
Missing rocustomer
How well requirem
Other inte
t Levels
nto Hydro shdress full‐scciated triggearios (boundst case” wouomer impactarios in consr integration
ing and Exer
nto Hydro shent Commanses and periobilities. The nd roles, witire all emplo
e second (or
g an alternat
and/or certi
g them the os.
d be conducman resourc
hould establencies (knowor more stafsecond roleing the annuelated to semine:
oles that shor service rep
the competents; and
ernal source
hould expancale incidenters to use, Toding scenariould likely exct, and public sultation witn of planning
rcises
hould extendnd Centres aodic, plannetraining proth refresher oyees who co
emergency
te set of dut
fying emplo
opportunity t
cted via collaces, and Com
ish an “invewledge, skills,ff members s assignmenual review prcond roles. T
ould be adderesentatives
tencies of th
es of staff to
d the emergts (e.g., Leveoronto Hydroos) includingceed the 201safety risk.h the City ang and respon
d its ICS roleat a minimumed exercises gram shouldtraining offeould be enga
FEP
response) r
ies to emplo
yees to cond
to demonstr
aboration bempany opera
ntory” of se, and abilitiewho fit the rnt upon hire,rocess. IndivTo start, Tor
ed immediats);
ose current
fill roles (e.g
gency levels l 4 or greateo should cong one that de13 Ice StormToronto Hydnd Provincianse.
es and procem. This wou(table tops ad be put in pered annuallaged in eme
Findings andEmergency PPreparednes
roles process
oyees;
duct those d
rate compet
etween the eating groups
cond roles, es) or certificrequirement, and currenvidual develoronto Hydro
tely (e.g., da
ly assigned m
g., Finance,
on the grid er). When densider develetails a “worm in terms ofdro should dal emergency
ess training tld include cland functionplace to supply. Additionaergency resp
d RecommenPlanning andss
s should incl
duties; and
tency throug
emergency ms.
documentatcations desirts. New empt staff couldopment plancould review
amage asses
match with s
Human Reso
emergency etermining toping severarst case” incif damage, emdevelop the y managers t
o staff in theassroom or nal) to reinfoport staff assally, the Comonse to com
ndations d
ude:
gh periodic
managemen
tion of the red for eachployees receive ns should w current
sors,
second role
ources).
scale it usesthe al planning ident. This mployee andhazard to support
e Local on‐line orce and testsigned to mpany shouldmplete basic
t
,
s
d
t
d
32
ICS trcertif
EPP‐3implestake
Toroncontiassigexecucapabthe ofunctmanacoord
EPP‐4
In ordTorondedicgrid omanadeverepororganrelatirelatimana
EPP‐5usabi
The Eenhadurinalignithe pident
ToronoverhDisrufunctand f
raining (on lified.
3 Enhance ceementation eholders.
nto Hydro shnue to suppnment of a Dutive supporbilities acrosorganization.tions as grid agement, ICSdination with
4 Add dedica
der to supponto Hydro shcated to its coperations eagement groloping specirt directly tonization, or rionship to thionship will eagement visi
5 Update thility.
Emergency Rnced to inclng the grid ding key prepprocesses (flotifying the ro
nto Hydro shhead and unuption Plan. Etion‐specific flooding).
ine or classro
entralized eand sustain
hould maintport on an alDirector or hrt of this roless Toronto H. Ideally, it shoperations S implementh the City an
ated grid op
ort the expahould seek acentralized eemergency moup would bfic restoratioo the centralreport to thehe centralizeensure alignion, principle
e Emergenc
Response Plaude roles anisruption resparedness anow charts, fooles and resp
hould focus nderground oEventually, tand hazard‐
oom) and re
emergency mnment of ICS
ain a central‐hazards aphigher‐level e in driving eHydro. The Chould includemergency tation and snd regulator
perations em
nsion and imadequate funemergency mmanagemente responsiblon processeized organize Senior VP oed emergencnment betwees, and strat
cy Response
an should rend responsibsponse. Thisnd response orms, checkponsibilities
first on updaoutages, andthe Emergen‐specific ann
FEP
equire staff f
managemenS and ongoin
lized emergepproach to eexecutive toemergency mompany alsode full‐time, response, trustainment,s, and possi
mergency ma
mplementatinding to incrmanagementt group. Thisle for updatis, and desigzation and reof grid operacy managemeen grid opetegy.
Plan to imp
tain the curbilities of LICs effort will bfunctions aclists) in the Eof all who a
ating functiod other relatncy Responsnexes (e.g., p
Findings andEmergency PPreparednes
filling key co
t group resong relationsh
ency managmergency mo lead the grmanagemeno should seededicated straining and e emergencybly strategy
anagement
on of the Grrease the nut organizatios grid operating the Grid ning trainingeside within ations with a
ment group. Terations and
prove compr
rent, all‐hazC and field rbe substanticross the orgEmergency Rre responsib
on‐specific pted documene Plan shoulpandemic, p
d RecommenPlanning andss
ommand role
ources to suhips with ke
gement orgamanagementroup would it discipline aek to increastaff responsexercise, play managemeand analysis
resources.
rid Disruptioumber of reson as well astions emergeResponse Pg curriculumthe grid opea dotted lineThis dotted lemergency
rehensivene
ards focus aresponse staal since it wiganization, dResponse Plable for execu
process descntation in thld include othysical secu
ndations d
es to be ICS‐
pport full ey
nization andt. The ndicate and se the size ofible for suchn nt s.
on Plan, sources s a specific ency lan,
m. It could erations e reporting line
ess and
and should baff, especiallyill include documentingan, and uting them.
riptions for he Grid ther rity attacks,
d
f h
be y
g
33
5.3.
Whenresouefficihigheskillestaffiusingexpedmeal
Respoto secassoccompservicdevas
The mNorthassistincre
In theRegioamonrestoidentneedmoreagree
8 Sour
Resourc
n a major incurces (i.e., peency of restoer than exped workers, png needs mag engineers tdite deliverys.
onses to largcure peopleciation that rpanies, “Mutce restoratiostating weat
Tens of thand CanaNor’easte
30,000 utAtlantic w
Nearly 50the restor
mutual assisth America thtance is needase the size
e U.S., the monal Mutual ng electric utoration assisttifying availaed (e.g., treee RMAGs, moement throu
ce: Edison Ele
ce Acquisit
cident occurersonnel andoration. Adderienced dayproficient suay be met thto conduct dy of equipme
ger events, h and equipmrepresents atual assistanon process ather events
housands of da were deper Athena in
tility workerswest to Ohio
0,000 line woration effort
tance netwohat is commided. Electricof their wor
mutual assistAssistance Gtilities withitance througable crews, ce trimmers, ost U.S. utilitugh the Ediso
ectric Institute
tion and A
rs, the readid equipmendressing a nuy‐to‐day, is apervisors, sphrough rededamage asseent and serv
however, typment. As notall United Stance is an esseand contingebear this ou
utility workployed durinOctober/No
s responded, including c
orkers and cts in respons
ork is a volunitted to helpc utilities imprkforce by ‘b
ance netwoGroups (RMAn the same rgh the RMAGcoordinates call centre sties also paron Electric In
FR
Allocation
ness of a utit) directly afumber of ou complex taspecialized toployment ofessments. Cuvices, such as
pically necesed by the Edates (U.S.) shential part oency plannint:
ers represenng the respoovember 201
d to the Junecrews from C
rews, includse to Hurrica
ntary partneping restore pacted by a borrowing’ c
rk, initiated AGs) that mregion. MemG, which thelogistics, andsupport). In rticipate in anstitute.
Findings andResource Ac
ility to securffects the sautages that issk requiring ools, gear, anf internal resurrent vendos standard g
ssitate the udison Electrichareholder‐oof the electrig.“ The rece
nting 80 utilinse to Hurri12;
e 2012 DerecCanada; and
ding crews frane Irene in
ership of elecpower whenmajor outagrews from o
decades agoanage the vombers initiaten facilitatesd locates speaddition to b nationwide
d Recommencquisition an
re and deplofety, speed,s orders of msignificantlynd materialssources, for ors may be agauge wire, p
use of mutuac Institute, towned electc power indent series of
ities from accane Sandy
cho that hit t
rom Canada,August 2011
ctric utilitiesnever and wge event areother utilities
o, is organizeoluntary agre requests fos the processecialized resbelonging toe mutual ass
ndations nd Allocation
oy sufficient and magnitude y more s. Some example, able to poles, and
al assistance the tric ustry’s widespread
cross the U.Sand
the mid‐
, assisted in 18.
s across wherever e able to s.
ed into reements or s of sources as o one or istance
n
,
S.
34
Memauthowithiprima2013 and sMutua foruborde
Othesuppcrewdrawagreecapabstand
As reinfrastransmobistaginhave suppospecihazarto suprocerelev
The afollow
9 Cana
mbers of the oritative voicn Canada anarily the Nor through a msevere weathual Assistancum for sharier mutual as
r sources of ly contract ps, tree trimm
w upon additiements tendbilities of thedardized.
source procstructure to sportation, plization, supng sites. Lea“turn‐key” cort). Pre‐estalization of rds. It is imppport restoress. They arant RMAGs.
assessment owing:
Resource
Determinrestoratio
Procuremagreemen
adian Electricity
Canadian Elece of the elend the U.S. Arth Atlantic Mmerger of thher events tce Working Gng leading pssistance. 9
personnel tpersonnel. Omers, call ceional resourd to be tailore contractor
urement gesupport mo
personal carepervision, anding practiccontracts (i.etablished plaresources neortant to noration at anore allocated a
of Toronto H
acquisition
ation of typon;
ment of off‐synts;
y Association,
ectricity Assectrical indusA number of Mutual Assisree smaller hat tax RMAGroup (NWApractices and
to meet outaOften utilitiesntre represeces in the evred to reflectr, whereas m
ars up, utilitore personnee (lodging, fod demobilize is to pre‐ee., where a vans and agreeeded to supote that contother utility according to
Hydro’s reso
strategy;
es and quan
ystem suppo
Electricity Mat
FR
ociation (CEstry in CanadCanadian utstance GrouRMAGs. In rAG capabilitiAWG) in Febd improving
age restorats use contraentatives), avent of an emt the particumutual assist
ties need to el, such as eqood, laundryation procesestablish agrvendor handeements propport respotractor resouare considero the agreem
urce acquisi
ntities of reso
ort, including
tters, January 2
Findings andResource Ac
EA), the natioda, have beetilities are mp (NAMAG) response to es, the CEA ruary 2013.all aspects o
ion demandctors to fill bnd may havemergency. Tular needs oftance agreem
have in placquipment, my, etc.), alonsses, and alteements witdles significavide for the nse to all incurces that arred a part ofments betwe
tion proficie
ources need
g mobilizatio
2013.
d Recommencquisition an
onal forum aen active in members of Rwhich was fincreasinglyconvened a This group wof coordinat
s are organiblue sky rolee agreementThese kinds of the utility aments are m
ce the essentmaterials, fueg with crew ternate workth multiple vant portions “scaling” ancident levelsre released bf the mutualeen or amon
ency address
ded for an ef
on criteria, p
ndations nd Allocation
and RMAGs RMAGs, formed in frequent National will serve as ing cross‐
zations thates (e.g., line ts in place toof and more
tial el,
k and crew vendors, or of logistical nd s and by one utilitl assistance g the
sed the
fficient
process, and
n
t
o
y
d
35
5.3.1
Nearofficefollowline, sourcin plaassistused supp
The Can exthe eThe awithiequip
Whileprocedetaipartyeventappli
Reso
1. SaH
Toronstartiutilitilist ofrestocontrrespo
Procuremand care o
On‐board
Deploymecoordinat
Demobiliz
1. Resource
ly all of Toroe staff, alongwing the 201undergrounced the suppace to providtance from omutual assilied approxi
Company calxpediter, andequipment, marrangementn 48 hours. pment, lodgi
e the mutuaess, most of l the mutuay vendors to t, Toronto Hed to join th
urce Acquis
afely deployHydro history
nto Hydro ming with an eies providedf utilities thaoration followractors, and onse conduc
ment of equipof crews, an
ding process
ent of off‐sytion with int
zation of res
e Acquisitio
onto Hydro’sg with 450 m13 Ice Stormd line, foresplemental crde support), other utilitiestance. Ten mately 250
lled upon exd corporate materials, ants for peopleThese including, and food
l assistance the procedul assistance accommoda
Hydro did nohe Northern
ition and Al
yed the largey.
managementemail to oth approximatat supplied mwing the 201mutual assiscted by Toro
pment, matend all other lo
and proced
stem resourernal crews;
sources, incl
on and Allo
s core trade mutual assistm. A wide rantry, construcrews throughother contr
es. Notably, tutilities fromlinemen.
xisting relatiofood servicend meals to se and the resded the provd for mutua
process worures were deprocess andate a large int belong to aAtlantic Mu
location Str
est number
t began to reer utilities otely 250 linemutual assist13 Ice Stormstance, was nto Hydro.
FR
erials, transpogistical nee
ures, includi
rces such as; and
uding criteri
ocation Find
workers (98tance field renge of crew tction, and trh sustained cractors, the Cthis was the m within and
onships withe provider tosupport the sources neevision of flighl assistance
rked well aneveloped jusd proceduresnflux of resoany of the Utual Assistan
engths
of resource
each out to on Decembereman and fortance. The t
m, including inearly 1,400
Findings andResource Ac
portation aneds;
ing safety tra
work assign
ia and proce
dings
8%), manageesources suptypes was usrouble shootcontractors City of Toronfirst time thd outside the
h its third‐pao quickly souincoming anded to suppht transportcrews from
nd acceleratest‐in‐time. Ts or include cources. Also,.S. RMAGs. Tnce Group (N
es for any re
off‐system rer 22, 2013, arestry workeotal numbernternal staff0 – the large
d Recommencquisition an
nd fuel, hous
aining;
nment, super
esses.
ement and ppported restsed, includinters. The Co(who have anto, and muthat Toronto e Province o
arty warehouurce and mand Toronto Hport them wetation, trucksManitoba H
ed the restohe current pcontracts wi at the time The CompanNAMAG).
sponse in To
esources imat 3:40 p.m. ers. See Appr of resourcef and field pest number o
ndations nd Allocation
sing, feeding
rvision, and
rofessional toration ng overheadmpany agreements tual Hydro had of Ontario
use providerke available Hydro crewsere in place s, Hydro.
ration plan does noith third‐of the ny has since
oronto
mediately, In total, 10 pendix B for aes supportinersonnel, of any
n
g
r,
s.
ot
a ng
36
Durinrecorstatisstormlocat
2. Dw
ToronrecenDerecsuppoToronreque
Toronmutuwith suppowereexpanprocunot e
BeginoutagHydroOntacrewin theconstto nowereto Toresto
MutuDeceon sitSundTuesd
Afterthe H
ng the courserdable is defstic is notewm made worions requirin
Developed anworked.
nto Hydro crnt years inclucho (June 20orted the lento Hydro haested mutua
nto Hydro exual assistancother utilityort daily ope able to call nd food servure other seexist.
nning on Sunges started ao Planning Srio and in ths. This decise field. The struction worote that som restoring thoronto Hydroored outages
ual assistancmber 24. Cote by Sundayay, Decembday, Decemb
r securing mHuman Reso
e of the restfined as an inorthy as thek locations (ng ladders to
nd applied m
rews have puding restor012), and Hungthy restoras experiencal assistance,
xecutives ane intake andy executives erations to bupon currenvices, and prrvices, such
nday afternoand after theSection Chiefhe neighbourion was basesustained cork) was conte of the neigheir own syso. Some of ths to their cus
e crews (incontractor crey, Decemberer 22, and fober 24.
utual assistaurces and Sa
toration, onlncident that e persistent iuneven surfo access) haz
mutual assis
rovided mutrations followurricane Sanration effortce offering m, was for the
nd the Logistd support proand agreembring on andnt vendors trovide fuel. Tas lodging, w
oon Decembe Company df initiated caring Provinced on the nuontractor (a cacted at 4:0ghbouring utems and thhese compastomers.
cluding someews (rangingr 22. Contracorestry crew
ance crews fafety, Power
FR
ly one recordcauses a woice and freezfaces, back yzardous.
stance proce
tual assistanwing Hurricady (Octobert following thmutual assiste response t
tics Resourceocesses, reli
ments, practic support muo expedite mThe logisticswhen pre‐ex
ber 22, 2013,declared thealls to other e of Manitoumber of cucompany wi0 a.m. on Sutilities wereherefore not nies eventu
e forestry creg from 2‐4 crctor‐providews provided b
from externar Systems, an
Findings andResource Ac
dable safetyorker to misszing temperyards, heavil
esses in real
nce to other ane Irene (Aur 2012). Manhe 1998 Quetance, the fio the 2013 I
e lead, who ied upon estces, and proutual assistamaterials an group also wxisting agree
, approximate Level 3 emutilities withba, to requestomers affeth an agreemunday, Dece impacted bin the positally sent res
ews) began rews, with 3ed forestry cby the City o
al sources, Tnd Operatio
d Recommencquisition an
y incident ocs work timeatures followy canopied a
time that g
utilities seveugust 2011),ny linemen aebec ice storrst time the ce Storm.
was responstablished relocesses in plance provided equipmenwas able to ements or pr
tely 12 hourergency, thehin the Proviest line and fected and thment in placmber 22. It iy the same eion to providources after
to arrive on ‐6 memberscrews began of Toronto e
oronto Hydrn Support Se
ndations nd Allocation
curred. A . This wing the areas,
enerally
eral times in, the also rm. While Company
sible for ationships ace to rs. They nt deliveries,quickly rocesses did
rs after the e Toronto ince of forestry he conditionce for daily is importantevent and de assistancr they
Tuesday, s each) werework on ngaged on
ro staff fromervices
n
s
t
ce
e
m
37
DivisiHurrimutu
Also, arrivi(apprthe nrestocoord
3. Flw
Whenspecicontinumbproteneedand ssafet
ToronwithiToronintakDecein cresignif
4. C
Uponrespean exlevel trainisessioadditdispa
5. Sta
The CStorm
ions drew upcane Sandy)ual assistanc
Toronto Hyng) mutual aroximately 6number of reoration (e.g.,dination with
lew in, equiwithin 48 hou
n feasible, malized tools,ngent from ber sent by aective equipmed to supposupervisors),y equipmen
nto Hydro trn two days onto Hydro ree of the Mamber 25. Thews from theficant barrie
onducted th
n arrival, muective hotelsxtensive oriework protecing staff fromons. The Mation, each daatched to wo
trong collabctivities.
City of Toronm was to pro
pon experie) to quickly de and forest
dro provideassistance c60) were expesources nee work proteh other crew
pped, and durs.
mutual assist, clothing, etManitoba Ha respondingment and taort the restor, equipmentt requested
ransported, of placing thesource leadnitoba Hydrhis was a unie West Coasrs and delay
horough mu
tual assistans, conveyed tentation briection code inm the Humaanager of theay, mutual aork locations
boration bet
nto Urban Foovide resour
nces from redevelop the try crews.
d “bird‐dog”rews. Superperienced in eded and proction clearaws, etc.).
deployed mu
tance crews tc.). In orderydro was flog utility. Creailboards. Toration. This it, tools, mate.
outfitted, anhe call for assds began to po workers. Cque feat. Byst during theys.
utual assista
nce crews wto the LICC fefing that adnformation, n Resourcese Mutual Assssistance cres.
tween City a
orestry’s topces to Toron
FR
esponding tocontent for
” supervisoryvisors identiresponding ocesses requnces, access
utual assista
arrive with tr to expediteown to Torow membersoronto Hydroincluded bucerials, supple
nd deployedsistance to Mprepare on MCrews were oy contrast, a e Hurricane S
nce on‐boar
ere transporfrom which tdressed locaand what tos and Safety sistance LICCews would r
and Toronto
p priority durnto Hydro to
Findings andResource Ac
o other Leveonboarding
y support toified to fill thto emergenuired to kees to tools and
ance resourc
their own eqe their arrivanto. This wa arrived witho supplied evcket and pasemental clot
all ManitobManitoba HyMonday, Deout and wornumber of uSandy restor
rding proces
rted and chethey would al safety ruleo expect on tDivision conC conductedreceive safet
Hydro tree
ring the afteo restore pow
d Recommencquisition an
el 3 incidentsg briefings to
o all but a fewhese roles ncy situationp crews fullyd equipmen
ces from Ma
quipment (eal, the 42‐meas the secondh their own verything elsssenger tructhing, and a
ba crews andydro managecember 23, rking by midutilities atteration, but ra
ss and safety
ecked‐in to tbe dispatchees and condithe streets. Tnducted 14 td 2 training sty briefings p
crews on re
ermath of thewer. The City
ndations nd Allocation
s (e.g., o off‐system
w (later
s. They knewy engaged int,
anitoba
.g., trucks, ember d largest personal se they cks (for crewdditional
d supervisorsement. for the ‐day on mpted to flyan into
y briefings.
their ed, and giveitions, high‐Trades training sessions. In prior to bein
estoration
e 2013 Ice y Director of
n
w n
ws
s
y
n
g
f
38
Foresexecudirec
Reso
1. Ma
As a m(NMAto estimproappliwritteregioHydroto‐pe
This lin proneedStormadditNorthand/oinade
2. Tn
The 2turn cof theblue‐crewcrew,throuresto
UrbaIn theday, aUrbaplanncomm
stry participautives, to revtly to the LIC
urce Acquis
Mutual assistnd North Am
member of tAWG), Torontablish a natove cross‐bocation to joien mutual aonal or natioo obtained meer contacts.
ess formal aoviding mutued, billing fom had been tional line anh American uor a nationwequate numb
he process tot defined i
2013 Ice Storcausing signe damage ca‐sky day, Tors and one Co, and the Citugh mutual aoration.
n Forestry Oe course of tare familiar n Forestry wning, they dimunicating s
ated in dailyview progreCCs, or to wo
ition and Al
tance procemerica were
the CEA‐sponto Hydro is tional mutuaorder mutuan NAMAG. Gssistance agnal mutual amutual assis.
approach woual assistancor just expenmore widespnd forestry rutilities partwide mutual bers or type
to acquire an advance.
rm affected ificant and palled for depronto Hydro ompany forety forestry reassistance, e
Operations otheir work, Cwith the terwere participd not mutuastrategic prio
y planning coss and identork locations
location Op
sses and agre not formal
nsored Natiengaged in al assistanceal assistanceGoing into thgreements inassistance grtance from o
orked in largce, could qunses incurredpread, it likeesources to ticipate in onassistance as resources
nd coordina
large portioprolonged oployment of typically useestry crew. Iesources, apexecuted tre
f the City ofCity forestry rritory, and apating in perally define anorities, estab
FR
onference catify needs. Ts, as directe
portunities
reements wized.
onal Mutuadiscussions e agreement. Toronto Hyhe 2013 Ice Sn place with roups. For thother Canad
ge part becauickly agree td), and had cely would harestore in ane or more ragreement toto execute a
ate the deplo
ons of the treutages for Ta significantes between n addition topproximatelye cutting an
f Toronto wacrews commare local. Altiodic discussnd documenblishing wor
Findings andResource Ac
alls that incluhe City provd by Toronto
for Improve
with other ut
l Assistance with other u, share leadydro also is aStorm, the Cother utilitiehe 2013 Ice Sdian utilities
use other utto terms (e.gcrews availaave taken lon reasonable regional muto mitigate tha restoration
oyment of C
ee canopy ofToronto Hydrt number of seven and eo the compay 200 forestrd clearing w
as a logical somunicate witthough Torosions about nt processesk hours, assi
d Recommencquisition an
uded Torontvided forestro Hydro.
ement
tilities acros
Working Grutilities acroing practicesawaiting appCompany dides, nor did itStorm respothrough per
tilities were eg., right to leable. If the 2nger to secuamount of ttual assistanhe risk of non safely and
City forestry
f the City of ro customerforestry creeight contracany contractry resourceswork, in supp
ource for thth Toronto Hnto Hydro aemergency and guideliigning super
ndations nd Allocation
to Hydro ry crews
s Canada
oup oss Canada, s, and proval of its d not have t belong to onse, Torontrsonal, peer‐
experiencedeave if 013 Ice re the time. Most nce groups, ot having reasonably.
y crews was
Toronto, in rs. The naturws. On a ctor forestrytors and obtained port of the
is assistanceHydro every nd City and work nes for rvisory roles,
n
o ‐
d
re
y
e.
,
39
or shalongamon
3. Ta
Ten urestocompworkaspecpersodemoresoulogist
Toronthe aaccominternproviQuebenoucrewequip
Whilethe aVirtubeento the
4. T
Leadimanause o(ongomutuand ccollecaddre
Toronrelea
aring contrag with the dang the middl
oronto Hydrssistance re
utilities sent oration. As opany.” Utilitiers typicallycts of crew monal care, eqobilization. Durces are netical support
nto Hydro’s bsence of demmodated inal staff whoding mutuabec ice stormgh experiens, secure adpment.
e interviewsdditional resally all availa a shortage e Manitoba
he demobili
ing mutual aagement, froof mutual assoing outagesual assistanccriteria for recting equipmess demobili
nto Hydro mse mutual a
actor‐supplieaily SOC callsle and field r
ro has limitesources.
approximatne manageres experieny have in placmanagemenquipping, traDuring a respeded for orit.
Grid Disruptefined and tncoming muo were able l assistance m). They werced trades pequate lodg
with mutuasources welable internaof bucket anHydro crew
ization proc
assistance prom acquisitiosistance crews) from a stoe portion ofeleasing crewment and coization guide
managementssistance cre
ed crews. Ths worked weranks.
ed ability to
tely 250 liner interviewedced in manace compreht, including ansporting, wponse to a laentation/tra
tion Plan dotrained procutual assistato draw upoto other utilre able to pupeople to seging, and equ
al assistancel, the approal supervisorynd commercs).
ess for mutu
ractices addon through rws can be diorm, like Torf an Emergenws along witnducting a felines and au
t did not havews. In the a
FR
he initial conell, but comm
accommod
personnel td observed, aging large nensive plansonboarding,work assignmarger event,aining, off‐sy
es not addreedures and nce crews thon personal lities (e.g., dut together trve as “bird‐uip crews wh
providers inach used may resources cial vehicles
ual assistanc
ress the full release. Detifficult, esperonto Hydro ncy Responsth procedureormal checkuthorities as
ve a shared uabsence of c
Findings andResource Ac
tact to “get munication b
ate a large i
o support To“This is the numbers of ms, processes,, lodging, fooment, superva significantystem crew s
ess mutual aroles, Toronhrough “justexperience uring Hurrictraining and ‐dogs” for mho arrived w
ndicate that ay not scale were used ahad crews b
ce crews wa
lifecycle of oermining whecially when experiencedse Plan shoues, checklistk‐out. Mutuas well.
understandinclear directio
d Recommencquisition an
crews on thbecame less
influx of mu
oronto Hydrsize of a smamutual assist, and roles tood, laundry vision, and t number ofsupervision,
assistance spnto Hydro t in time” asand lessons cane Sandy asafety briefi
most mutual without truck
Toronto Hyto an even land there wobeen flown in
as not clearly
off‐system rhen to wind there are lad after this sld describe ts, and formsal assistance
ng of how anon, the utiliti
ndations nd Allocation
e road,” effective
utual
ro’s Ice Stormall tance o support aland other
f host utility and
pecifically. In
signment oflearned and the 1998ings, roster assistance ks or other
dro handledarger event.ould have n (in addition
y defined.
resource down the sting effectsstorm. The the process s for e agreement
nd when to ies providing
n
m
l
n
f
8
d .
n
s
s
g
40
mutucrewwere
5.3.2
RA‐1 availasupe
Builddurinsuppo
As pautiliti
Also,overtrain
The mdesirassistdamaagree
With includcreat
ual assistancs from one u brought ba
2. Resource
Adopt a resable resourcrvisory span
ing on the inng the 2013 Iort emergen
All likely s
Numbers
Criteria fo
art of the emies, contract
Detail thefeeding, e
Establish
Provide c
Include te
, the plan wosight supporned internal
Estabpotencontra
mutual assisted to suppotance will beage assessorements with
utilities, thiding U.S. RMting individu
e resources utility decideck from the
e Acquisitio
source manaces, seamlesn of control.
nformal procIce Storm, Toncy response
sources of m
and types o
or triggering
mergency plators, and City
e mutual assequipping, d
roles and re
riteria for de
emplate and
ould specifyrt to mutualand contrac
lish mutual ntial sourcesactors, and C
tance stratert all levels ae limited to lrs and underh identified p
s may be doMAGs), partical agreemen
determineded to leave, airport to w
on Recomm
agement strss integratio
cesses and roronto Hydre that addre
mutual assist
of resources
mutual assi
an documenty agencies. T
istance proceployment,
esponsibilitie
emobilizatio
d job aids (e.
the number assistance ctor staff.
assistance ps of crews: reCity.
egy will distinand types ofine and forerground crewprimary and
one through cipating in thnts. Toronto
FR
d when they with Toront
work another
mendations
rategy that pon and coord
relationshipsro should forsses:
ance;
needed for
istance requ
tation, agreeThe compan
cesses, (i.e., supervision
es and autho
on and polici
g., standard
r of superviscrews, along
process and egional, nat
nguish typesf likely hazarestry crews, ws. Toronto backup prov
joining one he national mHydro shou
Findings andResource Ac
would be leo Hydro’s cor day.
provides fordination of c
s used to accrmulate a re
all incident l
uests.
ements shouion mutual a
mobilization, demobiliza
orities;
es; and
expense for
sors needed g with a rost
agreementstional, cross‐
s and sourcerdous incidebut could inHydro shouviders.
or more RMmutual assisuld continue
d Recommencquisition an
eaving. In ononcurrence,
r deploymencrews, and o
cess mutual esource strat
levels; and
uld be put inassistance p
n, onboardination);
rms).
for “bird‐doer of qualifie
s that encom‐border utili
s of mutual nts. Primarilnclude otherld put in pla
MAGs (withinstance agreeto pursue m
ndations nd Allocation
e case, the and then
nt of all optimal
assistance tegy to
n place with plan would:
ng, care and
og” and otheed and
mpass all ities,
assistance ly, this roles, like ce written
n Canada or ement, or membership
n
er
41
in NALakes
With includplansToronavaila
Toronactiviassistorderrequecritercould
As a ctrain and/omutushoueach crew on mcontr
RA‐2 Resp
AMAG and exs Mutual Ass
City departmde terms ans (or in a joinnto Hydro shability of res
Documdemo
nto Hydro’s ities, decisiotance. Since rs crews, andesting utilityria to guide td include:
Number o
Number o
Projected
Capacity t
Availabilit
Skills nee
Public per
Sourccrew s
corollary prointernal stafor supervisoual assistancld be large ewith 5‐7 birsupervisorsodified assigractors.
Create a coonse Plan.
xplore joininsistance Gro
ments, Torod expectationt emergenchould reviewsources whe
ment the probilize mutua
Emergency ons, roles, anactivating md the crews y), it’s importhe responsi
of outage sp
of customers
d level of dam
to effectivel
ty of interna
ded (e.g., fo
rception (e.g
ce and prepascale‐up.
ocess to instff that are qors. These ade are unableenough to prrd dogs per s currently emgnments (du
omprehensiv
ng other RMoup (GLMAG
nto Hydro sons in the recy response pw current tern significant
ocess, with al assistance
Response Plnd infrastrucmutual assiststart mobilitant that Toible parties t
ots;
s affected;
mage;
y deploy off
al crews and
restry); and
g., Why are c
are supplem
ituting secoualified to sdditional supe to send a srovide adequsupervisor).mployed in oue to medica
ve, scalable
FR
AGs in the U).
hould acceleespective Complan). With srms and addtly more crew
pre‐definede
lan should incture neededtance can bezing and traronto Hydroto make tim
f‐system reso
supervision
crews leavin
mental super
nd roles, Toerve as mutpervisors masuitable numuate span ofSources of qother positioally‐docume
logistics pla
Findings andResource Ac
United State
erate currenmpany and Csustained and “scaling” rews are need
d decision cr
nclude docud to supporte costly (i.e.,veling, all tho establish spely, appropr
ources;
;
ng when my
rvisors to acc
ronto Hydroual assistancay be neededmber. The sizf control (1‐2qualified perons, retireesnted reason
n as part of
d Recommencquisition an
s, including
nt discussionCity emergend other conequirementsded.
riteria, to mo
mentation ot incoming m as soon as the costs are pecific, comriate decisio
power is off
commodate
o should idence crew “bird if utilities pe of the inte2 crews for brsonnel coulds, former tras), and susta
the Emerge
ndations nd Allocation
the Great
ns and ncy responsntractors, s to ensure
obilize and
of all mutual the utility borne by theprehensiblens. Criteria
f still?).
e maximum
ntify and d‐dogs” providing ernal pool bird‐dogs; d be formerdes people ained
ency
n
se
e
42
A logparticroles exambut n
Agreethat vinformscale risks proviassist
5.4.
Effecrestothe p
The ofirst tcond
The i(OMSdeveasses
istics plan dcularly with detailed in t
mple, a staginnot for a Leve
ements withvendors canmation to ve response, e(e.g., potentde “turnkeytance.
Damag
tive planninoration. The planning team
Determinrestoratio
Create thdamage a
Develop a
Support d
Identify sa
objective is ttwo to threeucted by fee
nformation S) and used lop ETRs. A lssment:
First, a quand
Second, aon each creplaced
escribes theregard to mthe plan shong site may bel 3 ice storm
h vendors sh plan accordendors, helpensure that ptial materialy” support, t
ge Assessm
g and damainformationm with the i
e the type aon;
e most efficand available
accurate res
daily work pl
afety issues/
to perform de days after ieder (circuit)
captured in by the Plannlarge inciden
uick, higher‐l
a more thorocircuit, includat each spec
e infrastructumutual assistaould scale in be needed inm.
ould be negdingly. Thesep Toronto Hypriority is givs shortages)aking care o
ment and R
ge assessme gathered thnsights nece
and number
ient restorate resources;
toration est
lan developm
/dangerous
damage asseit is safe to b) according t
the field is ening Section nt may nece
level scan to
ough assessmding the numcific location
FDR
ure and servance resourcaccordancen the wake o
gotiated in ade discussionsydro assess vven to Toron). Some utilitof virtually al
estoration
ent are essenhrough a damessary to:
of resources
tion plan ba
imates (ETR
ment and cu
conditions.
essment as ebegin work ito a pre‐esta
entered intoin the SOC tssitate more
o understand
ment to captmber of polen.
Findings andDamage AssRestoration
vices neededces. The proe with the incof a large hu
dvance (at les will providevendor capanto Hydro, aties contractl logistical n
n Planning
ntial for a ramage assess
s required to
sed on the e
s);
ustomer com
early as possn the field. Aablished prio
o the outage to prioritize e than one c
d the amoun
ture detailedes, wire span
d Recommensessment anPlanning
d to support cesses, agrecident level.urricane, or s
east in part) e valuable pbility to supnd uncover t with vendoeeds related
apid and effesment proce
o support th
extent and ty
mmunication
ible, often wAssessmentsority.
managemerestoration cycle of dam
nt and type o
d damage inns, and equip
ndations d
restoration,eements, and For super storm,
to ensure planning port a large‐any issues oors that d to mutual
ective ss provides
he
ype of
s; and
within the s are usually
nt system work and age
of damage;
nformation pment to be
, d
,
‐or
y
43
DurinpatroDamathe dSomedamaOMS
Durinhandprocedesigpersoexclu
In adforenstrucoutagoptio
The rcomp
5.4.1
FollowrestoCompcommplann
ng major eveollers, to evaage assessordamage. Thee of the morage assessorsystems.
ng day‐to‐dale damage aess when a mgners, or retionnel to conusively on rep
dition to connsic analysis ture failuresges during mons to harde
review of Topetency add
Definition
Capture a
Developm
Establishm
Work plan
Use of sta
1. Damage
wing the indoration and rpany maintamunicating tning activitie
ents, utilitiesaluate damagrs patrol circy documentre advanced rs to enter th
ay operationassessment, major event ired linemenduct damagpairing the d
nducting damprocess to cs. They use tmajor eventsn the distrib
ronto Hydroressed the f
n and execut
and use of da
ment of ETRs
ment and ad
nning practi
andard plann
Assessmen
dustry leadinrestored cusained focus tthe specific pes, however,
s use damagge before a cuits to identt what they futilities havhe informati
s or minor ebut additionoccurs. Othn or supervisge assessmendamage and
mage assesscollect detaithis data in ss, which thenbution system
o’s damage aollowing:
tion of a dam
amage asses
s;
dherence to
ces; and
ning tools.
nt and Rest
ng practice, Ttomer servicthrough freqpriorities for, were not co
FDR
ge assessmenline crew is tify trouble find on a preve implemenion directly i
events, line cnal resourceer pre‐qualifsors may pernt allows tro restoring po
sment, leadiled informatstatistical ann supports sm for future
assessment a
mage assessm
ssment data
restoration
toration Pla
Toronto Hydce in accordquent Commr the subseqonducted co
Findings andDamage AssRestoration
nt teams, oftdispatched tlocations ane‐developednted tools, suinto a system
crews or “troes are usuallyfied resourcrform this roouble and linower.
ng utilities htion on specalyses to deubsequent aevents.
and restorat
ment proces
;
priorities;
anning Find
dro establishance with th
mand Centreuent planninonsistently b
d Recommensessment anPlanning
ten referredto perform rnd assess thed form or a cuch as tabletm linked to t
ouble crews”y needed to ces, such as eole. Using otne crews to f
have implemcific equipmetermine cauanalysis of d
tion planning
ss;
dings
hed prioritieshose prioritieconference ng period. Thy all of the L
ndations d
d to as repairs. e extent of ircuit map. ts, that allowthe GIS and
” typically conduct thiengineers, her suitablefocus
mented a ent and uses of ifferent
g
s early in thees. The calls and he overnighLICCs.
w
s
e
t
44
Toronservelocatthemused the p
Toronaccoron prthe s
Dama
1. O
Toronrespo
Sincesystethat afrom locatcustothe m
The rindivi
10 “Triareportresourdamagequipm
nto Hydro used other neeions being re
m safe for puundergroun
physical resto
nto Hydro esrdance with riorities thropecific prior
age Assessm
Overall resto
nto Hydro esonse that fol
Public saf
Critical cu
Substatioprovide se
Lateral sesingle pha
Customertransform
e Toronto Hym has a numallow them tone feeder ions that coomers designmorning of D
restoration cidual custom
age” refers to ts received frorce. As a part oge (e.g., pole, tment are dispa
sed its “triageds, apart froeported by tblic and utilind crews, seroration of th
stablished rethose priori
ough frequenrities for the
ment and Re
oration prior
stablished allowed typic
fety (911 cal
ustomers (e.
n and feedeervice to lar
ections of thease lines tha
r service dromer and typic
ydro serves amber of connto quickly reto another. uld compromnated as critDecember 24
continued bymer connect
the process dem customers aof the process, transformer, watched to repa
ge”10 procesom damage the customeity employeervice crews, he electric sy
estoration pties. Responnt Commandsubsequent
estoration Pl
rities were in
nd followedal industry p
ls and live d
g., hospitals
er backbone ge blocks of
e circuits (i.eat serve seve
ops (i.e., linescally service
a densely ponection poinestore servicThe initial fomise public stical by the C4,, 2013.
y restoring feions. It is im
eveloped by Toand either makthe resources
wire) to ensure ir the damage.
FDR
s to gather dassessmenters, crews anes participatand designeystem) to co
riorities earnse leads at td Centre cont planning pe
lanning Stre
n line with i
restorationpractices. Th
own wires);
s, water pum
restoration f customers)
e., branches eral streets in
s that conneone or two
opulated urbnts between e to a portioocus of restosafety. The sCity of Toron
eeder backbportant to u
oronto Hydro tke the location dispatched tothat, subsequ.
Findings andDamage AssRestoration
damage info, including end first respoting in the reers (who arenduct the tr
ly and restothe SOC andnference calleriod.
engths
ndustry pra
priorities duhese prioritie
mping station
(i.e., portion;
of the circun a neighbou
ect the houscustomers).
ban area, its different ciron of customoration was second priornto. The City
bones, then understand t
o conduct fieldsafe or escala
o the location gently, the right
d Recommensessment anPlanning
ormation. Thevaluating thonders, and esponse. Tore not directlyriage process
red customed LICCs mainls and comm
ctices.
uring the 20es were:
ns, 911 call c
ns of the sys
it that are tyurhood); and
e to the ove.
electric distrcuits (i.e., cmers by switcto secure anrity was to rey identified t
laterals, andthat in order
d evaluation ofte it to a moregather data on t resources an
ndations d
his process he wire downmaking ronto Hydroy involved ins.
er service in tained focus
municating
013 Ice Storm
centres);
stem that
ypically d
erhead
ribution ircuit ties) ching load ny known estore this group by
d lastly, r to keep
f downed wiree appropriate the specific d the required
n
n
s
m
y
d
45
crewThis i
By foHydrothe 7
Figure
2. Tinre
OncemornthreeToronthe ic
Theserestoprogrparticas the
s productives especially
llowing theso was able t72 hours from
e 13: Decembe
he Commannformation aestoration p
e the Commaning, Deceme hours. The nto Hydro chce storm.
e calls were oration priorress updatescipants on the leads from
e during a lartrue during
se priorities,o restore pom the start o
er 2013 Ice Sto
nd Centre coand maintaipriorities.
and Centre (ber 22, 2014standard inhose to hold
essential to ities. They ps and readjuhe calls inclum the LICCs.
rge restoratperiods of t
which addrower to 86%of the field r
rm Restoratio
oordination ined alignme
System Ope4, the Incidedustry practd them more
maintainingprovided a plst plans for uded the gen
FDR
ion, some prransition be
essed larger% of the custoestoration (S
n
calls (every ent of Local
erations Centnt Commantice is to cone often given
g response olatform for pthe subsequneral staff w
Findings andDamage AssRestoration
riorities are etween categ
r blocks of cuomers who wSee Figure 1
three hoursIncident Co
tre) was actder held coonduct these cn the degree
organizationparticipants uent planninwithin the Co
d Recommensessment anPlanning
addressed igories of prio
ustomers firwere out at 13).
s) provided uommand Cen
ivated on Suordination cacalls twice ae of damage
alignment tto share resg period. Th
ommand Cen
ndations d
n parallel. orities.
rst, Toronto peak within
useful ntres to
unday alls every day. caused by
to storation he ntre as well
46
3. Sofa
A utilassigday scoordthe reprovi
In somspeciovern
Dama
1. Lab
A critof theof thesuppoassesand dassocevent
2. Da
Toronbut dcaptuotherGrid procecheckpart o
3. R
DurinCentrthe inprogrresto
ome Local Inacilitate wor
lity industry nments for tshift managedination withestoration dde the over
me of the LIfic work for night. This p
age Assessm
ack of real, oelow the fee
tical elemene current stae restorationort decision ss the outagedispatch anaciated damat.
Damage Assepplied acros
nto Hydro’s does not proure of infrastr stakeholdeDisruption Pess. Lacking klists, and otof the triage
Restoration e
ng an incidenre is responsncident respress, utilitiesoration progr
ncident Comrk assignme
leading practhe subsequers and supeh external stdata from conight shift p
CCs at Toronthe next dayractice aided
ment and Re
or near realeder level.
t of a major ate of the syn status andmaking aroe status at thalysis) systemge assessme
essment pross the Local
triage procevide for the tructure damers (e.g., PlanPlan does noinformationther job aidse process, or
estimates w
nt, the Restosible for devponse. At thes can provideresses, plann
mmand Centnts and crew
ctice is to usuent day shifrvisors moretakeholders mpleted joblanners with
nto Hydro, ty, making crd the deploy
estoration Pl
‐time situat
event restoystem. This in field conditund prioritiehe feeder lem, the outagent informat
ocess was noIncident Co
ess addressesystematic emage informnning Sectioot include a cn about the ps, some LICCr developed
were not dev
oration Plannveloping estie start of a ree this informners can refi
FDR
tres conductw deployme
se the overnft. Conductine time for crthat typicalbs is updatedh the most a
he leads estrew assignmyment of the
lanning Opp
ional aware
ration procencludes havitions, as weles and resouvel, primarilge status belotion were no
ot defined, dmmand Cen
es portions oevaluation o
mation, or timn, ETR devecomprehensprocess flowCs addressedad hoc guida
veloped at va
ning sectionmated timesestoration, wmation at a hine estimate
Findings andDamage AssRestoration
ted planningents for the
ight shift to ng work planrew support ly occurs dud at the end accurate job
ablished a pents and cree day crews.
portunities f
eness of outa
ess is maintaing real or nl as any otheurces. While ly through itow that leveot readily ava
documentedntres.
of the damagof the systemmely provisiolopers, and Csive, detailedw, roles and rd elements oance in real
arious levels
within the Cs of restoratwhile the dahigh‐level ones, providing
d Recommensessment anPlanning
g activities osubsequent
plan and ornning at nighand for the ring the dayof the day sstatus infor
process for peating job pa
or Improvem
ages and wo
aining an undear‐real timer informatiToronto Hyts SCADA (reel (e.g., streeailable throu
d, or consiste
ge assessmem condition on of that inCommunicad damage asresponsibilitof damage astime.
s of specifici
Central Comtion (ETRs) thmage assess
nly – a globalg information
ndations d
overnight tot shift.
ganize ht affords theextensive
y. In additionshift to mation.
planning the ackets
ment
ork progress
derstanding e knowledgeon that can dro could emote controet) and ughout the
ently
nt process in the field,formation totions). The ssessment ies, forms, ssessment as
ity.
mmand hroughout sment is in l ETR. As then at a
e
n,
s
e
ol
o
s
e
47
substof infdocuspeci
tation, circuiformation tomented proficity (e.g., c
it, or individo a customercess for creacircuit, custo
ual customer. The Compating accuraomer).
FDR
er level. An Eany did not te and time
Findings andDamage AssRestoration
ETR usually ihave in placly ETRs at m
d Recommensessment anPlanning
s the most cce a systemaultiple level
ndations d
critical pieceatic and s of
48
4. W
The pfor thincludcollecdevemultithey
5. Tst
A leaconsoacceland mdoes Sectioinform
5.4.2
DAP‐procewithi
Toroncondincludand t2 eveeventworkfor earespo
Specisepargatheaddredata Compassesqualif
Work plannin
planning actihe next periode print‐outcted by the aloped” workiple jobs for completed t
he Central Ctandard plan
ding practicolidate plannerates informade availabnot referenon should usmation.
2. Damage
‐1 Institute aedures, and in the specif
nto Hydro shucting the inde the timefthe level of ient, the globt within 48 h with selecteach key decionsibilities fo
ific to damagrate the wireering procesessing both wcollection sppany should ssment withfied personn
ng practices
ivities that tod and creatts of the OMassessors. Ak planning prthe crews intheir work.
Command Cenning tools.
e in the utilining informamation exchble to all resce specific tse to collect
Assessmen
a damage ascompetencfied timefra
hould set obnitial damagframe withinnformation bal ETR shouhours. Once ed stakeholdision througor capturing
ge assessmees down inves. There showires down pecificationsdetermine tin the pre‐denel, which ca
varied acro
ook place atting associatS outage rect Toronto Hyrocess. Somn advance, w
entre and Lo
ty industry iation throughange and entoration parools and for, consolidate
nt and Rest
ssessment pies to estabme (e.g., wi
bjectives for e assessmenn which the required to ld be made ait has estabders, such ashout the eveg that inform
ent, within thestigation coould be a cleand damages, and requirthe number efined timefan include th
FDR
oss Local Inci
t the LICCs inted work paccord, a circuydro, each Le generatedwhile others
ocal Inciden
s to use stanghout an evensures that trticipants. Torms (e.g., Ince, and share
toration Pla
process that lish situatiothin 48 hou
establishingnt in major einitial damagsupport keyavailable witlished theses the City, toent, then cre
mation in a ti
he current tromponent frarly definede assessmenred competeof assessorsframes and ihird‐party co
Findings andDamage AssRestoration
ident Comm
ncluded devckets. Theseit map, and LICC managed assignmentassigned ne
nt Command
ndard formsent. Using a cthe same levoronto Hydrcident Actione commonly‐
anning Reco
defines the onal awareners).
g overall situevents. Thesge assessmey decisions. Fthin 24 houre objectives, o identify theeate a procemely and ac
riage procesrom the damd, end‐to‐endnt with pre‐aencies and trs required toidentify poteontractors a
d Recommensessment anPlanning
mand Centre
eloping the e packets typany damage
er used an “its overnight ew jobs to th
d Centres did
s to capture common temvel of detail ro’s Grid Disrn Plan) that t‐used planni
ommendat
required apess and plan
ational awae objectivesent will be coFor examplers and for a fthe Compane informatioess and assigccurate mann
ss, the Compmage informd processes assigned respraining, Alsoo complete tential sourcend mutual a
ndations d
es.
work plan pically e informationdividually‐and planne
he crews as
d not use
and mplate is captured ruption Planthe Planninging
tions
pproach, nning inputs
reness and s should ompleted e, for a Level full‐scale ny should on required gn ner.
pany should ation for ponsibilitieso, the the es of ssistance.
on
d
n g
s
,
49
In adshouassesasses
DAP‐
Mostplan. refrigvulne
Toronthe cthen the ahurricreasoHydro
Torongloba(e.g., restotool t
Build data c
dition to insld evaluate dssment field ssors to use t
‐2 Develop a
t customers They need tgeration, heaerable popul
nto Hydro shourse of an develop reaftermath of cane, a utilitonable restoo could prov
nto Hydro shal level) as w neighbourhoration and fthe Compan
a stronger dcapture proc
tituting the different optdata. One eto identify s
a process to
experiencinto have a reat, or air conations.
hould develoevent. The Calistic goals fa particularty has to speration estimvide an initia
hould set spwell as the timhood/sub‐stafor different y could deve
damage datacesses and t
process for tions for autexample is prpecific equip
establish (c
g an extendeasonably accnditioning. T
op a more riCompany shfor creating rly damagingend some timmates. So, foral ETR may b
ecific threshmeframes foation, circuitlevels of eveelop to supp
FDR
a reporting tools.
conducting tomating theroviding tabpment in the
alculate) tim
ed outage wcurate senseThis informat
gorous procould first unETRs. Customg event, like me assessingr example, tbe within 48
holds for issuor refining tht, individual ents. Table 5port the ETR
Findings andDamage AssRestoration
interface wi
damage asse capture anlets with GPe Company’s
mely and acc
want to be abe of how lontion is espec
cess for devenderstand stmers generathe 2013 Iceg the situatiohe earliest thours in a fu
uing the initihat estimatecustomer) a5 below provprocess.
d Recommensessment anPlanning
ith OMS and
essment, Tond integratioPS capabilities GIS system
curate ETRs.
ble to develong they may cially critical
eloping ETRsakeholder nally understae Storm or aon in order time by whicull‐scale eve
al ETR (usuae to more deat different pvides an exa
ndations d
d alternate
oronto Hydroon of damagees to m.
.
op a coping be without for
s throughouteeds and and that in major to provide ch Toronto ent.
ally at the tailed levelspoints of ample of a
o e
t
s
50
Table
Sto
De
ComGu
CInf
Also, ETRs,addre
DAP‐respo
Toronworkpriorand cproce
Also, the reincidewith proceprogrunde
5.5.
The ksafetavoid
5: Example of
orm Level
efinition
ETR munication uidelines
Coping formation
the Compan, so that anyessed or adj
‐3 Establish onse person
nto Hydro sh planning duities, develocreating woress.
the Companequisite coment. The Gridthe standardess, the emeram, includinrstand and p
Restora
keys to succey, sustainedd bottleneck
an ETR Timing
Level 1
Estimaterestoration8 hours or
Individuspecific E
available atcall
Specificinformatiabout locdamage
ny should asy potentially usted in adv
standard wnnel to drive
hould develouring major eoping incidenrk packets. A
ny should dempetencies, d Disruptiond forms andergency manng a table topractice the
ation Execu
essful restor focus on res, and effect
g Matrix
1 L
ed ns of less
Esrestmorles
al ETR t first
Inspe
avail
c ion cal e
Sinfabd
ssign responexpiring estvance.
work planning consistency
op, documenevents. This nt action plaA set of stand
etail the roleand pre‐assin Plan should other job ainagement grop exercise, tir roles.
ution
ration are pestoration prtiveness of c
FR
Level 2
stimated orations of re than 8 & ss than 24 hours
ndividual ecific ETR able at first call
Specific formation bout local damage
sibilities for timates are e
g processes y across cen
nt, and comwould incluns, assigningdard forms a
es and respoign personned include proids. In orderroup should to provide a
ersistent atteriorities, abilcrew deploym
Findings andRestoration
Level
Estimatrestorations than 24 hou
than 3 d
Post Asses12 hrs.– g24 hrs. – c36 hrs. – c
48 hrs. – ind
General infoto begin increasgranula
developing evaluated ah
and procedntral and loca
municate thude activitiesg work to thand tools sho
onsibilities foel to fill thesocess and ror to ensure cdevelop andadequate op
ention to emity to decenment throug
d RecommenExecution
3
ted of more rs & less days
Es
ssmentglobal county circuit dividual
ormation with ing rity
Gb
and monitohead of time
dures; train aal command
e process tos such as: idee available fould accomp
or this procese roles duriole documencompliance wd execute a tportunities f
mployee andtralize restoghout the ev
ndations
Level 4 or Gr
stimated restogreater than 3
Post Assessm24 hrs. – glo48 hrs. – cou72 hrs. – circ
96 hrs. – indiv
eneral informabegin with incr
granularit
ring the e and either
and exerciseds.
o be used forentifying field crews, pany this
ss, specify ng an ntation alongwith the newtraining for staff to
public oration and vent.
eater
orations 3 days
mentobal unty cuit vidual
ation to reasing ty
e
r
g w
51
Preserestoincludshift,proviby of
Effecresoucarrieof respre‐p
In larrestobottlehave a dec
A resinfrasfacilitwhensubstnumbwoul
As mhandchalledifficdownlocatresou
Sincefirst oare vlocatpriorthe p
Servirestomulti
erving the saoration execude safety or and daily sade an overvff‐system cre
tive restoraturces. This ines out the dasources requplanning of t
rge events thoration functenecks, suchdifferent swcentralized m
toration typstructure firsties, utilitiesn restoring atation, and mber of other d be restore
entioned ealing downedenges. Fallenult to differened electric wions throughurces.
e downed wion those locisibly arcing,ions so that ities. The utpublic on the
ce lines thatored at the eiple days at t
afety of publution. Methoientations foafety bulletinview of their ews to famili
tion of largenflux can creay‐to‐day wouires carefulhe work.
hat affect sigtion and manh as processwitching procmodel in ord
pically followst. In some c may have t hospital thamain sectioncustomers w
ed along with
rlier, public d wires and mn overhead wentiate electwires are enhout the ser
re locationsations that a, smoking, orestoration ilities use pue dangers of
t serve singlend of the evthe end spen
lic and utilityods that utilor incoming ns. Some utisystem confiarize thems
e outage eveeate a workfoork. Efficient coordinatio
gnificant pornage the woing switchincedures, it iser to ensure
ws a set of agcases, howevo restore lesat is at the ens of the distwho are noth the hospit
safety is themaking the swires that atric wires fronergized. Thervice territor
can often nare reportedor on fire. At crews can rublic campaiapproaching
e residencesvent, resultinnt restoring
FR
y workers is ities use to ccrews, dailyilities also hafiguration anselves with t
nts often reorce that is ft and safe deon, effective
rtions of the ork locally. Thg orders or ds important e the safety
greed upon pver, in orderss critical paend of a circutribution circt deemed to al.
e number onsystem safe re energizedom telecommerefore, a lary creates an
number in thd though 911these locatiepair the dagns and comg downed w
s or small grong in a long “very small e
Findings andRestoration
the most imconduct resty safety briefave developnd typical hahe potentia
quires the ufar larger in eployment ofield manag
system, utilhe intentiondispatching to carefully of public an
priorities, star to re‐energrts of the syuit, crews mcuits (i.e., febe part of t
ne priority dua high priord pose a pubmunicationsrge numbern urgent dem
he thousands1 emergencyions, crews camage accormmunicationwires during m
oups of cust“tail” on theenclaves of c
d RecommenExecution
mportant asptoration effofings at the sed handbooazards, whicl field condit
use of off‐syssize than thof such a larggement, and
lities decentn is to reducecrews. Sincemanage thed utility wor
arting with tgize certain eystem first. Fay need to reders). As a he critical in
uring restoraity that presblic safety th wires, or ev of downed mand for res
s, utilities tyy calls and wcut, clear, anding to the rns channels tmajor event
omers are fre restorationcustomers. S
ndations
pect of the orts safely start of eachoks that ch are used tions.
stem e one that ge number d adequate
tralize the e e utilities e transition trkers.
the critical essential For example,restore the result, a
nfrastructure
ation, with sents severareat. It is valuate if wire toration
pically focuswhere wires nd make saferestoration to educate ts.
requently n curve, withSome utilitie
h
to
,
e
l
s
e
s
52
have lines restoon re
The a
5.5.1
Whendurinshowdepicparam2013 the e
In adsituatcustothereoppoacrosappro
Resto
1. Sa
Amonday pmajoperforank
In ordfor thsuper
service crewand an effec
oration of theestoring prim
assessment o
Safety pe
Restoratio
Cut, clear
Wires dow
Dispatch;
Coordinat
1. Restorat
n comparedng the 2013 Iws the numbects the rate omount, it is i Ice Storm reevent.
dition, the Ction based oomers. It alsoe were no unortunity in thss the Local Ioach and use
oration Exec
afety perfor
ng the approperiod, therer events is bormance of oamong the b
der to ensurhe off‐systemrvisors held
ws and electctive restorae service dromary lines.
of Toronto H
rformance;
on strategy a
r, and make
wn;
and
tion with ext
tion Executi
with similarIce Storm waer of customof restoratioimportant toestoration w
Company woon safety risko managed tnusual delayhe restoratioIncident Come of standar
cution Stren
rmance was
oximately 1,e was only obetter than dother utilitiebest.
re safe restom crews thatsafety briefi
ricians who ation practicops, which a
Hydro’s resto
and executio
safe process
ternal stake
ion Finding
r events in thas in line witmers out oveon (See Figureo note that Twas excellent
orked with thk for reconnthe work proys in restorinon process ismmand Centrd dispatchin
gths
excellent.
250 field resne recordabday‐to‐day saes during sim
ration, Torot included a ings at the s
FR
are not quace is to deplore typically
oration exec
on efficiency
s;
holders (e.g
gs
he past, the th industry eer time throue 13). Since pToronto Hydt. There was
he ESA to intecting servicotection andng the customs the inconsistres, includinng practices.
sources invoble incident. afety perfor
milar events,
onto Hydro ccomprehentart of each
Findings andRestoration
lified to woroy these resohandled last
cution addre
y;
., City, Provi
overall custexperience. Tughout the rpublic and wdro safety pes only one re
troduce flexces to reducd special reqmers. The sinstent coording adherenc
olved in the rTypically, samance. Whehowever, To
reated an osive safety oshift to upd
d RecommenExecution
rk on primarources earlyt, while line
essed the fol
nce)
tomer restorThe restoratrestoration pworker safetyerformance decordable in
xibility depene the hardshuests well tongle largest ination of thce to restora
restoration oafety performen comparedoronto Hydr
n‐boarding corientation. ate crews o
ndations
ry voltage y to begin crews work
lowing:
ration curve tion curve period and y is during the cident durin
nding on hip by the o ensure thaarea of
he work ation
over an 11‐mance durind to the ro’s results
curriculum The n safety
ng
at
ng
53
hazarexcepgreatnotabnorm
2. Dth
In linservicCentrfunctThrou2013 the oaccor
3. Cp
Standcustomast perfoqualif
rds and empptional workter Toronto able outcomemalcy to the r
Dispatch funche restoratio
e with leadince territory ires (LICCs). Ttion, therebyugh decentr Ice Storm. Moutage manardance with
oordinationremises was
dard ESA guiomer premiswith the me
orm repairs bfied electric
phasize the nker safety rearea that wee for all the Cresidents.
ctions were on process.
ng industry pinto local areThis providey reducing thalization, ToMost of thesagement systlocal restora
n with the Els adjusted d
idelines for rse to be safeeter head mbefore servician hired dir
need to follocord during ere directly aCity staff and
decentraliz
practices, dueas that are s the Compahe potential oronto Hydrose dispatchetem (OMS) aation priorit
ectrical Safeduring the ev
restoring ser in order to ay be damagce can be rerectly by the
FR
ow safety prothe restoratattributed tod first respo
ed to Local
uring major managed thany with thefor bottleneo doubled thers were locaand could peies at the tim
ety Authoritvent to redu
rvice connecreconnect pged (See Figstored. The e customer.
Findings andRestoration
ocedures. Intion, there wo the 2013 Icnders who c
Incident Com
events Torohrough Locae ability to deecks at the che number oated in the Lerform dispame.
ty (ESA) to reuce hardship
ctions requirpower. Duringure 14), reqwork is typi
d RecommenExecution
n addition towere no deatce Storm. Thcame togeth
mmand Cen
nto Hydro sl Incident Coecentralize tcentral dispaof dispatcherLICCs and haatch function
econnect cup.
re the equipng major eveuiring the cucally perform
ndations
the ths in the his is a er to restore
ntres early in
eparates its ommand the dispatchatch locationrs during thed access to ns in
ustomer
ment on theents, the ustomer to med by a
e
n
n. e
e
54
Figure
Whencustoto disToronequipserviccustoprocetheir discobeen
4. S
Durinothersoonerequeplan. goverestabemer
e 14: Example o
n utility woromer premissconnect thento Hydro crpment was nces. The Comomers who dess, creatingequipment
onnected. Th fully adopte
pecial reque
ng major resr influential er than the est could cauDuring the rnment for tblished priorrgencies. In t
of Mast Dama
rkers attempse to not to be customer srews found snot in propempany quickdidn’t lose pog a form for cwithin a cerhe new proceed for future
ests were ha
torations, utstakeholderrestoration suse a utility 2013 Ice Stothe most parrities and onthose occasi
ge
pt to restore be in properservice. In thsome instanr condition akly realized tower. Toroncustomers tortain period oess worked we events.
andled withi
tilities oftenrs to restore strategy woto deviate frorm, membert allowed Tly interveneions when a
FR
a service whr condition, the initial dayces where tand they wehat this wounto Hydro woo sign acknoof time, so twell for the
in the pre‐d
receive reqa specific cuuld dictate. rom focusiners of the Tooronto Hydrd when therspecial requ
Findings andRestoration
here they dethey are direys of the 201he customeere forced tould create anorked with towledging ththeir service majority of c
efined prior
quests from eustomer or cAs a result, rg on the prioronto City Cro to restorere were trulyuest was ma
d RecommenExecution
eem equipmected by ESA13 Ice Storm rs had poweo disconnect n unnecessathe ESA to amhat they wouwould not bcustomers, b
rity order.
elected officcommercial responding torities in theCouncil and loe according ty life‐threateade that did
ndations
ment on the A regulation response,
er but their customer ry burden omend the uld repair be but has not
cials and premise to a special e restorationocal to the pre‐ening not seem to
n
n
o
55
be waresto
5. T
Acconormprotecrew poweof resnumbcontrdeperelatito issdelay
6. “B
Off‐sywith proviterritaccesline wopera
ToronassistThey papeIntervexecu
Resto
1. R“f
Durinorderseverutility
Orderesou
arranted, Tooration strate
he work pro
rding to intemal and expeection (i.e., “can operateer to portionstoration whber of switchrol centre) anding on theively small gsue switchingys beyond th
Bird‐dogging
ystem crewsthe local elede them wittory, coordinssing food). Tworkers and ate the switc
nto Hydro adtance crews,dealt with srwork, and fviews with uuted the bird
oration Exec
Restoration afeeder‐base
ng major ever‐based, arerity and amoy could appl
r‐based resturces and wo
oronto Hydroegy.
otection pro
erviews withected delays “switching ane different dns of customhere utilitieshing requestt the same te number ofroup of quag orders withose that are
g” of mutua
s that are brectric distribth a local resnating work These resourecent retirching device
dopted the p, particularlysystem contrfacilitated wutilities provd dog role p
cution Oppo
approach waed.”
ents utilities a‐based, or ount of damay these appr
torations areork based on
o executives
ocess did not
the field crein performinnd tagging”)evices that aers more qus typically ents from the ftime. Sometf orders simulified systemhin a reasone typical for
al assistance
rought in thrution systemsource to hewith other curces, referrerees who arees in the field
practice of py those arrivrol for work work assignmviding mutuaroficiently.
ortunities fo
as not consi
typically cancircuit‐basedage across throaches acro
e typically limn individual
FR
s stayed firm
t cause unus
ews from Tong the work ) provides clallow it to reuickly as theyncounter delfield arrive aimes, these ultaneously m operators.nable amouna restoratio
e crews work
rough mutuam. A leading elp with dailycrews, ensured to as “bire familiar witd. Bird dogs
providing birving during tprotection,
ment, in cooral assistance
r Improvem
stent, varyi
n use one ofd. The choiche service teoss a range o
mited to smaoutage man
Findings andRestoration
m and did not
sually long d
oronto Hydroprotection. ear guidelineconfigure ty repair the ays becauseat the centradelays can erequested w Toronto Hynt of time win effort of th
ked well.
al assistancepractice is fy work needring the safed dogs,” areth the systemmay suppor
rd dogs to mhe first few completed crdination witindicate tha
ment
ng between
f three restoce of approacerritory. Figuof incident le
all events, wnagement sy
d RecommenExecution
t deviate fro
delays in res
o, there werThe practicees under whhe circuit andamage. The a substantil location (i.exceed one hwhich are haydro operatoithout causinhis magnitud
e often are nfor the host ds (e.g., navigty of the woe typically locm and are trrt one or mo
any of the mdays of the customer‐prth dispatcheat Toronto H
n “order‐bas
oration approch correspoure 15 illustrevels.
where the utstem (OMS)
ndations
om the
storation.
re some e of work hich a line nd restore is is an areaally larger e., system hour andled by a ors were ableng any de.
ot familiar utility to gating the ork site, cal companyrained to ore crews.
mutual restoration.remise ers. Hydro
ed” and
oaches: nds to the rates how a
ility manage orders. In
e
y
es
56
area‐or divfeedethe dresou
A circgreatdeliveentiresysteenerg
Figure
Toronrestocircuiused restohave an encrewappro
2. Lain
Restosignifneces
‐based respovisions. A ceer lockouts adecentralizedurces, and de
cuit‐based ater), where tery infrastrue circuit or pm to ensuregize portions
e 15: Restoratio
nto Hydro dooration approit‐based appan order‐ba
oring all of thbeen more ntire area (i.es and enableoach varied
ack of full conefficiency i
oration folloficant amounssary resour
onses, a utilintral systemand respondd region. Theevelop ETRs
pproach is tythe widespreucture. In cirportions of ae that it doess of the circu
on Approache
oes not haveoaches. Duriproach to staased approache remainingappropriatee., substatioed better coslightly acro
oordination n crew depl
wing a largent of ad‐hocrces are bein
ty will decenm operationsing to 911 ce regions pri.
ypically usedead devastatcuit‐based ra circuit. Thes not becomuit as work i
es
e a formally‐ing the 2013art, restoringch once it mg damage one to use an aon). This migordination ooss the LICCs
among deceoyment.
e, unplannedc coordinationg mobilized
FR
ntralize crews group retaialls, but all mioritize work
d in the hightion requirerestorations,e circuit is usme energizeds completed
‐defined pro3 Ice Storm rg the feeder
moved into ren that circuitrea‐based aht have minof work assigs.
entralized d
d event, like on. The reaso, the amoun
Findings andRestoration
w and work mins control omajor restork, identify re
hest level eves complete r, crews are aually isolate during the wd.
ocess to tranrestoration, r sections of estoring latet. In this storpproach andimized the tgnments. Las
dispatch func
the 2013 Iceon for this isnt and locati
d RecommenExecution
managemenover crews reration work esource need
ents (Level 3rebuilding oassigned to red from the rwork. The fi
nsition amonthe Companthe circuits,eral sections rm responsed repair the travel time bstly, the rest
ctions led to
e Storm, reqs that initiallon of damag
ndations
nt to regions estoring is referred tds, manage
3 and f the electricrebuild an rest of the eld crews
ng different ny used a , and then instead of
e it might damage in by multiple toration
o some
quires a y, while the ge is largely
o
c
57
unknbe cahelp t
At thinto tthe ddispacrew
One coutagthis prestoend o
3. Lolo
Durincentrthe se
Two and tmututhe thresoudispa
own. This caarried out in to reduce th
e start of resthe LICCs, wdispatch procatch, and thes. This result
Crews we
Different different
Customer
Crews hadthe dispat
challenge toge managemproblem duroring power aof the day in
ocal Incidenocations) ad
ng the 2013 res were reservice territ
Monogra
Milner – e
Commissi
LICCs handlethe other forual assistanchree geograurce assignmatch process
aused the plparallel withhese inefficie
storation, Tohich is in linecess was note supervisorsted in some
ere dispatche
types of creaspects of th
rs didn’t und
d to wait afttcher.
o the dispatcment systeming an eventas quickly asstead of cal
nt Commandded comple
Ice Storm reponsible forory:
m – western
eastern part
ioners – the
ed externallyr contractor e crews) wophically‐bas
ments and av.
anning phash some leveencies, but c
oronto Hydre with leadint fully synchs who were actual and p
ed to a locat
ews would behe necessary
derstand wh
ter completi
h process w once crewst the size of s possible anling them in
d Centre struexity to crew
esponse, Torr Toronto Hy
n part of the
t of the territ
downtown
y‐provided ccrews. The
orked across ed LICCs didvailability. Th
FR
se and the exl of inefficiecannot comp
ro quickly deng industry pronized amoworking witperceived in
tion that had
e dispatchedy repairs wit
y crews left
ng a job to r
was a delay in completed the 2013 Icend tend to tuas repairs a
ucture (threew deploymen
ronto Hydro ydro crews re
service terr
tory; and
area.
crews, with ooff‐system rthe service d not have fuhis lessened
Findings andRestoration
xecution phant work exepletely elimin
ecentralized practice. It aong the LICCth mutual asefficiencies
d been resto
d to the samth a significa
before resto
receive their
n closing trothe work. Me Storm. Fielurn in their cre complete
e geographint and work
activated fivestoring dist
ritory;
one for the mresources (bterritory, buull visibility intheir ability
d RecommenExecution
ase of the recution. Emenate them.
its dispatch appears, howC dispatcherssistance andsuch as:
ored already
me location toant time lag
oring power
r next assign
uble tickets Most utilitiesld crews foccompleted tied.
ic and two fuk coordinatio
ve LICCs. Thtinct geogra
mutual assisoth contractut dispatchento all the oy to fully coo
ndations
estoration toergency plan
functions wever, that s, central d contractor
;
o perform in between;
r; and
ment from
in the experience us on ickets at the
unctional on.
ree of the phic areas o
stance crewstors and rs in each ofoff‐system ordinate the
o s
r
e
of
s
f
58
4. RIn
The Spriorexamappliand tflexibfrom Hydroresto
5. TPp
Toronfeedsthroucontiup thproficadditmadeplacenetwdiffer
The kdevicemercrewproceplace
5.5.2
RE‐1
ToronmajoCompdifferaffec
Restoration encident Com
SOC establishities, but the
mple, some oed an order‐type of damability to detethe 2013 Iceo’s territoryoration appro
oronto Hydrrovince of Oerform.
nto Hydro’s s most of theugh redundanue to operhe lost load).ciencies thattion, during ae to adopt the at that timework system orent from th
key differencces controllergency restos to isolate aesses to reste, it was not
2. Restorat
Pre‐determ
nto Hydro shr distributiopany should rent levels oted, numbe
execution apmmand Cent
hed the ovee LICCs appliof the LICCs u‐based apprage may varermine what e Storm, how. This suggesoach.
ro has differOntario, limi
electric diste downtownancy of poweate without . It also requt are differeamalgamatiohe switchinge on the legaoperation. Aose of other
ces are in thed by field peration throua section of ttore that secable to use t
tion Executi
ine best res
hould reassen outages athen refine
of response. r of trouble
pproaches wres.
rall restoratied differentused a feedeoach when ry across a seapproach bwever, was ssts that the
rent work priting the typ
ribution systn area. This ner sources (icausing cus
uires a uniqunt from thoson of the utg and taggingacy TorontoAs a result, Tr utilities in t
e coding andersonnel. Thugh the provthe system action. As Torthe full capa
ion Recomm
storation ap
ess the emernd consider or establishActivation cspots, and e
FR
were not foll
ion strategyt approacheer‐based resresponding tervice territoest meets resimilar acrosLICCs should
rotection prpe of work th
tem includenetwork pro.e., if one fetomer outague set of skillse required tilities operatg (i.e., system Hydro systeToronto Hydrthe province
d coloring ofhese differenvision of guidand then useonto Hydro abilities of of
mendation
proach for e
rgency level adding a Le
h criteria (witriteria couldexpected dur
Findings andRestoration
lowed consi
y and monitos to implemtoration appto similar coory, LICCs shestoration oss the affectd have been
rocesses thahat mutual a
s a large undovides reliabeder is interges becausels to operateto operate ating in Toronm protectionem, to providro’s system e.
f signage thances can be adelines that e their own did not haveff‐system re
ns
each emerge
scale it currvel 4 or greath ranges) fod include numration of res
d RecommenExecution
istently by a
ored progresent the stratproach, whilonditions. Sinhould have sobjectives. Thted areas witfollowing th
an other utilassistance c
derground nle service torrupted, the other feedee ‐‐ demandian overheadnto, the decn) practices de continuitprotection p
at is used to addressed dallow externswitching ane guidelines sources.
ency Level (e
rently uses toater event dor activatingmber of custstoration.
ndations
all Local
ss against tegy. For e others nce the leveome he damage thin Torontohe same
ities in the rews can
network thato customers network wiers will pick ing system. In ision was that were inty for the practices are
mark the uring an nal utility nd tagging like these in
e.g., 1‐4).
o categorizeefinition. Thg the tomers
l
o
t
ll
n
e
n
e he
59
This rof thebasedconsimean
The CeventWhilenumbeventcontr
For ecommincludtrackcentr
RE‐2 Centr
Toroncontrrestoassistbasedtake withi
Afterforesfor as
5.6.
The amajostormas co
refined define preferred d, or area‐baistency in reningful differ
Amencrewsoutag
Company shots to allow oe it is unreasber of utilitiets, so mutuarol sections o
For eaand se
ach pre‐estamensurate nde a descriping, and closralized and d
Eliminate ceres and enco
nto Hydro shractors to faoration procetance and cod on the neecontrol of thn their porti
r a LICC has cstry), it can rssigning off‐
Commu
ability of a utr outage is em, or other empared to t
nition and chrestoration ased). The pstoration exrences in fie
nd work prots to “take ovge.
ould consideoff‐system crsonable to ees have creaal assistanceof the circuit
ach restoratecure adequ
ablished restnumber of qution of the psing work dudecentralized
entralized mompass thos
hould elimincilitate cooress is decentontractors) sed (capabilithe off‐systemion of the sy
completed release themsystem reso
unications
tility to handessential to aevent causinthe expected
haracterizatiapproach fore‐determinxecution, butld condition
tection and ver” and res
er amendingrews to takexpect outsidated process resources cts without c
tion approacuate resourc
toration appualified dispprocess procuring major ed dispatch fu
mutual assistse resources
nate the centdination of dtralized to LIshould be asies and numm resources ystem.
estoration om to another ources should
– Custome
dle a significa successful g widespread daily volum
FCC
ion of eventor each evenned approact provide enns among the
restorationtore portion
g its switchine over the code crews to les to isolatecan support ompromisin
ch, provide sces to exped
proach, Toroatchers neecedures and events. The unctions.
tance and cos within the
tralized LICCdispatch acrICCs, the offssigned to onmbers). At thaand use the
or no longer LICC. The prd be clearly
er Contact
cantly largerrestoration.ad outages, ime. Although
Findings andCommunicaContact
s should prot level (e.g., hes should bough flexibie Local Incid
guidelines tns of the sys
ng and tagginontrol of porlearn local ce parts of themore aspectng safety.
standard prodite dispatch
onto Hydro sded. The Grassociated fprocesses sh
ontractor Lo three geog
Cs for mutuaross the geogf‐system resone of the thrat point, theem as requir
needs certarocess, critedefined in t
t
volume of c. During the ncoming calh the Interne
d Recommentions – Cust
ovide a clearorder‐basedbe used to dlity to accoment Control
to enable ofstem in a cat
ng rules durtions of the ompany proe system duts of the rest
ocesses andh work.
should identid Disruptionforms for ashould addre
ocal Incidentraphic LICCs
l assistance graphic LICCources (mutree geographe geographiced to restor
in types of cria, and resphe Grid Disr
customer calfirst few daylls increase det has provid
ndations omer
rer indicationd, circuit‐rive mmodate Centres.
ff‐system tastrophic
ing major system.
ocedures, a ring major toration and
d procedures
ify the n Plan shoulsigning, ess both
t Command s.
and Cs. Once the ual hic LICCs c LICCs woule outages
crews (e.g., ponsibility uption Plan.
lls during a ys of a majodramaticallyded
n
d
s,
d
d
.
or y
60
additemaiexten
It is ccustocustoavoidinclud
SucceappliinformthrouIVR c
An emproactexts,elimicustoapplimediinform
Utilitoutagcall cgenefunctsupp
The a2013
tional channl or websitended outage
critical that tomer calls. Tomer frustrad complaintsde:
Training iaccess, to
Contractirepresent
Establishi
essful plans cations. Themation. Oveugh contractapacity, incl
mergency plctively reduc, or emails) tnate numeromers can recations allowa avenues (emation in lie
ies use a fewge calls fromentre whichral inquiriestion within filemental sup
assessment o Ice Storm a
Availabilit
Plan effec
els for custo), many still e.
he utility hahese emergtion, reduces to regulato
n‐house resoo take outage
ng in advanctatives; and
ng mutual a
are usually aese allow cuserflow telecots with technuding interf
an for custoce incoming to individuaous incomineduce call vow customerse.g., Twittereu of calling.
w different om customers also handle. Others rouield operatiopport.
of Toronto Hddressed th
ty of a plan t
ctiveness an
omers to comwant to talk
ve plans in pency respone the likelihoors. Actions t
ources frome calls;
ce with vend
assistance ar
anchored bystomers to sommunicationology compfaces to outa
omer commucalls. For exl customers ng calls. Provolume as wes to report o, Facebook) .
organization. For exampes business cute customerons. Many u
Hydro’s mane following:
to address th
d thoroughn
FCC
mmunicate wk to a repres
place to satinse plans muood of repeato handle the
m outside the
dors to supp
rrangements
y effective inelf‐report oons capacitypanies that sage managem
unication mixample, outbabout expecviding additioll. Website, outages and provide way
al models tole, some utilcalls related r calls relatese third‐par
agement of
he increased
ness of imple
Findings andCommunicaContact
with utilitiessentative, pa
sfactorily adust be execut calls to rese anticipate
e call centre,
ly trained cu
s with other
nteractive voutages and ry for these syspecialize in ment system
ght also inclbound messacted or actuonal channeemail, mobitrack outageys for custom
o conduct thlities place tto customer
ed to outagety call centr
customer co
d volume of
ementation;
d Recommentions – Cust
s during outaarticularly du
ddress this spted swiftly tsolve probled increase in
, who have s
ustomer serv
utility call ce
oice responsereceive restoystems can bproviding utms.
lude a strateaging (i.e., roal outage stels of commule, and textie status. Alsomers to obta
e function ohe responsibr billing and s to their dises for prima
ontact throu
calls from cu
;
ndations omer
ages (e.g., uring an
pike in to minimize ms, and n calls could
system
vice
entres.
e (IVR) oration be provided tilities with
egy to obo calls, atus can unication forng o, social ain
of answeringbility in the other spatch ary or
ughout the
ustomers;
r
g
61
5.6.1
The dDistriSystenumbthrououtagqualitthat aavera
Whenresouincomincomthe cansw
Torontotal Decewereresidall otcalls 2013
On Dgreat
11 Callssignificexpectincludreport
Availabilitcan repor
Process foscripts; an
Process fosystems a
1. Commun
day‐to‐day reibution Grid em Planning ber to reporugh the IVR. ge in the IVRty call goes iare not succages 135 cal
n a major ouurces from Cming calls. Thming outageall centre an
wer emergen
nto Hydro exof 397,500 cmber 21, 20 storm calls ential and coher business(127,800) w.
ecember 22ter than the
s to areas of thcantly higher tted calls as stoe storm calls ated as being tra
ty of alternart an outage
or reporting nd
or providing and applicati
nications –
esponsibilityManageme& Logistics ot a power ouIt directs thR, or enter thinto the queessfully comls per day du
utage occursCustomer Cahis allows so calls to dispnd, as needecy calls in 8‐
xperienced acalls entered013, throughand 23,300 ommercial qs functions were received
2, 2013, the naverage of 1
he Company otthan during noorm calls. The eanswered in thansferred from
tives to speaor receive i
outages, inc
accurate anions.
Customer C
y for handlinent Division, organizationutage, wire dem to “seleche queue to eue for the cmpleted in thuring blue sk
s, however, dre to augmeome of the dpatching fielded, from othe‐ or 12‐hour
an unprecedd the IVR froh January 2, 2were non‐stqueues and awithin the Cod the first fu
number of c135 received
ther than disparmal operationestimated nume residential am those queues
FCC
aking with anformation
cluding ease
nd timely me
Contact Fin
ng outage caspecifically in. All customdown, or poct 1,” which speak with aller to speahe outage apky condition
dispatch reqent the dispadispatchers td crews. Cuser areas of Cshifts, 24‐ho
dented call vom the main2014. Of thotorm calls (i.an estimatedompany). Jull day of the
alls enteringd during nor
atch and the rens. Toronto Hymber of storm cnd commercias to the dispat
Findings andCommunicaContact
representatabout resto
e of use and
essages on a
ndings
lls at Torontin the dispat
mer calls to thwer quality allows a cala dispatcherak directly topplication. Ths.
quests a specatch team anto be reassigstomer serviCustomer Caours‐a‐day.
volume durin customer pose, it is esti.e., 14,300 cad 9,000 callsust over one‐ storm on Su
g the dispatcmal operatio
esidential/comydro categorizecalls likely is col queues (othech queue).
d Recommentions – Cust
tive by whicration;
clarity of na
all customer‐
to Hydro restch section ohe main custproblem areler to self‐rer. A wire dowo a dispatchehe dispatch
cific numbernd help respgned from haice represenare, are assig
ng the 2013 phone numbmated that 3alls were dirs were non‐s‐third of theunday, Dece
ch queue waons. For the
mmercial queueed the numberonservative becer than those w
ndations omer
ch customers
avigation
‐facing
sides in the of the Powertomer e handled eport an wn or powerer, as do calvolume
r of pond to andling ntatives fromgned to
Ice Storm. Aer from 374,20011 rected to thestorm calls to total stormember 22,
as 947 timesfollowing
es were r of higher thacause it doesn’which were
s
r
r ls
m
A
e o
n ’t
62
five dcalls
Comm
1. T
Sincecall cagentp.m. reprehand
Call vschedend obeginHydro
The cstaff easilyfamilmanarendecontr
2. Tp
Thereits “kor higaccou
The kcustoof abcontrservicbasishours
Durintheir when
days the incohandled in t
munications
he ability to
e 2007, the Tentre outsots answer caThe outsouresent the males the more
volumes varydules. The hof each monnning or endo calls.
contract withto answer cay from the Ciar with Toroagement, theers the Tororactor site at
he Key Accorocess to inf
e is a group wkey” accountgher annuallunts.
key account omer questioout 15 empractors fromce to their k, one persons.
ng the 2013 customers an power was
oming stormhe dispatch
s – Custome
o use an exte
Toronto Hydurcer, to proalls to the rercer’s staff isajority of cale complex co
y dependingighest call voth, and the d of the mon
h the outsoualls during tiCompany to oonto Hydro ere is anothnto Hydro ct another loc
ounts organiform key an
within Toronts. Key accouly (at one sit
managers seons and facilloyees (the k
m the Conservey accountsn from the g
Ice Storm, kadvised of res restored to
m calls averagqueue durin
er Contact St
ernal contra
ro Customeovide call hasidential qus trained to tls to Torontommercial c
g on the day olumes typicday followinth, the outs
urcer provideimes of majooutsourced procedures.er major advall centre incation.
ization withnd commerc
nto Hydro reunts are custte or in aggre
erve as an aclitate solutiokey accountvation Dema during normroup is assig
ey account restoration efo all key acco
FCC
ged 40,800 (ng non‐crisis
trengths
act call centr
r Care organndling and ceues weekdtake all non‐o Hydro. Thecalls.
of the weekcally occur ong holidays. Oourced call c
es a potentior outages. Ecall centre a. From the pvantage: geoaccessible, c
in Customerial accounts
esponsible fotomers withegate). Ther
ccess point ions. The key s staff plus aand Managemal businessgned to take
representatifforts. This counts. In add
Findings andCommunicaContact
(302 times ths times).
re as a back‐
nization has clerical serviays between‐outage resie Toronto H
k, time of theon Mondays,On a typical centre answ
ally reliable Equipment iand some caerspective oographic divcalls can be
r Care imples of outage s
or managing consumptiore are appro
into Torontoaccounts pra group of emement team)s hours. Eache calls outsid
ives workedcontinued undition to pro
d Recommentions – Cust
he average n
‐up call cent
contracted wces. The outn 8:00 a.m. adential callsydro in‐hous
e month, an, at the begiMonday ne
wers about 2,
source of ads in place toll centre stafof emergencversity. If an readily direc
emented an status.
g the relationon of 1 megaximately 550
o Hydro to hrogram inclumployees an), who provih week, on ae of normal
12‐hour shintil January oviding exten
ndations omer
number of
tre site.
with a local tsourcer and 4:30 , which se call centr
d holiday nning and ar the ,500 Toronto
dditional o route calls ff are cy incident cted to a
effective
nships with awatt hours 0 such
elp answer udes a groupnd de on‐call a rotating business
ifts to keep 2, 2014, nded call
re
o
p
63
coveraboureceiv
RecogthresCare progrlettercommto 4,5the p
Whenof theenrolcomm
3. Te
At thaccoudispaface‐emernot hemermorecustoindivi
Comm
1. Tsost
Telep
The tlines Recogare dthe nin use
rage, key acct Toronto Hyving this add
gnizing that shold) had a had been deram in the mrs asking themunications500 customeprogram wou
n the ice stoe planned prllees via groumunication w
he control rnabling mor
e time of theunts functioatchers, custto‐face comrgency respohave as muchrgency timese timely acceomers. Likewidual custom
munications
here was ino that the mtatus.
phony Capac
telephone sywhich are lignition portedicated to number of cae) the custom
counts sent ydro’s plansditional info
other commsimilar needeveloping a months priorem to enroll . On Decembers who haduld start in th
orm hit the nrogram. It coup emails. Awith these c
room, dispatre effective
e 2013 Ice Sns were all lomer servicmunication.onse, when kh time to mos. The nearness to updatewise, Custommer situation
s – Custome
sufficient ovmajority of ca
city
ystem associmited to 152s. Thus 152 the IVR andalls into the mer will hea
daily group s and progrermation.
mercial custod for restoraproactive cor to the 2013in the progrber 20, 2013 enrolled, thhe spring.
next day, CusommunicateAlso, Customustomers.
tch, call centinformation
torm, the coocated at the, and key a. In‐person ckey staff is foonitor the chess to contres on restormer Care supns.
er Contact O
verflow capaallers were
iated with th2 channels tcustomers c others to thmain numbear a fast busy
FCC
emails to cuss. Key custo
omers (with ation informaommercial cu3 Ice Storm.ram and pro3, the day behanking them
stomer Careed general reer Care set u
tre, and keyn exchange.
ontrol room,he same facilaccounts percommunicatocused on cohannels of cool and dispaation statuspervisors had
pportunities
acity (systemnot able to
he main custto match thecan be servehe queues toer exceeds ty signal. Toro
Findings andCommunicaContact
ustomers witomers gave
usage belowation duringustomer outCommercialovide an emaefore the stom for registe
was able toestoration inup an email
y accounts st
, dispatch, cality. The prorsonnel provtion is especompleting aommunicatiatch allowed, improving d access to d
s for Improv
m and staffireport or ge
tomer phonee number of d concurreno be answerhis thresholdonto Hydro
d Recommentions – Cust
th general inpositive fee
w the key acg an outage, tage commul customers ail address foorm, an emaering and inf
o initiate a “lnformation tinbox to allo
taff are co‐lo
all centre, anximity of covided for easially importassigned taskon they use d key accountheir respondispatch to d
vement
ng) to take oet informatio
e number haIVR Integratntly. Some ofed by represd (i.e., whendoes not ge
ndations omer
nformation dback about
count Customer unications received or outage ail was sent orming them
ight” versionto the ow two‐way
ocated,
nd key ntrollers, sier, quicker ant during aks and may during non‐t managers nsiveness to discuss
outage callson on outag
as eight T1 ted Voice f the ports sentatives. In all ports art
t
m
n
y
n
‐
s, ge
f e
64
informnumb
To adToronhigh ccan bcustoits maadvisnon‐eof cuoutagprogr
Toronsignif(31%compraised
IVR O
Whenthemoutagto seself‐spoweservicassocoutagthe in
If thein thethe 3outagstormmajoservic70%.
CommIVR th
mation regaber of custom
ddress the isnto Hydro adcall volume be handled bomers enter aximum usased that due emergency ostomers getge. This mesresses.
nto Hydro dficant increa of storm caplete a call tod at the tow
Outage Self‐S
n Toronto Hm to select “1ge; wire dowlect “1” to reservice applier quality issce IVR leads ciated with tge managemnformation r
e IVR systeme interaction374,200 totage applicatiom database cr storms. Acce IVR outag
ments from hat could be
rding the numers who he
sue of telepdjusts systemmessage.” Cby the capacthe IVR systge. For examto the largeor power outing a busy sssage varies
id not have aase in call vollers) heard o report an o
wn halls and t
Service Appl
ydro custom1”, which takwn; or other eport an outcation. (If thsue, the call the caller ththe outage. Bment systemrequired, a t
cannot undn, the call is tl storm callson without tcontains comcross all the ge applicatio
employees ae improved t
umber of cuseard busy si
phone port cm parameteCallers hear tity of the system to informmple: “Thane volume of otage calls atsignal and independing o
a plan in plalume. So, duthis initial houtage was through ema
ication
mers call to rkes them dopower qualtage and thahe customer is put into thhrough a proBecause the (OMS), whetrouble ticke
derstand a cutransferred s, 13,800 (4%he assistancmpany‐reporstorms, at leons. The com
and custometo improve it
FCC
stomers whognals during
onstraints ders to play a this messagestem. This mm them thatk you for caloutages acrot this time.” nform callerson the situat
ace to add teuring the 201igh call voluone of the mail feedback
report outagwn a path toity issue. That selection pselects “2” he queue foocess to prov IVR outage en the custoet is automat
ustomer’s anto the queu%) were comce of a reprerted self‐serveast 50% of impletion rate
ers pointed ts containme
Findings andCommunicaContact
o get fast bug the 2013 Ic
uring high cmessage, ree when volumessage is plt the telepholling Torontooss the city wThe intent iss Toronto Hytion and is u
elephone line13 Ice Stormume messagemost commok.
ges, the initiao report onee second meputs the cusfor a wire dor a dispatchevide the accapplication mer successtically create
nswers or the to speak to
mpleted in thesentative. Tvice IVR outincoming cae in three of
out featuresent rate (i.e
d Recommentions – Cust
usy signals, sce Storm is u
all volume pferred to as umes are grelayed as sooone system o Hydro. Plewe cannot as to reduce tydro is awarpdated as a
es to accomm, 117,800 cue. The inabilon problems
al IVR menu e of three thenu instructstomer into town or selecer.) The outaount numbeinterfaces wsfully finisheed in OMS.
here are otheo a represene Company’he Davies Coage statisticlls were hanthe storms
s of the Toro., the percen
ndations omer
so the unknown.
periods, the “initial
eater than on as has reachedase be ccept any the number e of the restoration
modate the ustomers ity to s customers
instructs ings: an s the caller the outage cts “3” for a age self‐er or addresswith the es providing
er problems ntative. Of s self‐serve onsulting cs for eight ndled in self‐exceeded
onto Hydro ntage of calls
d
s
‐
s
65
succeexamtryingrecog
Staffi
The CanswToronhave call cfrom
Lack resoudurinemploutsothis s
A fewfor bato takstaff and aoutagEntryto ha
Of thcompstormfrom stormhouse
Dispa
A largstill hThoseaccepinto tsucce
essfully commple, providig to completgnition syste
ing to Answe
Customer Cawer calls durinto Hydro emrotated fromentre staff. Toutsourcer)
of prior trainurces to answng the 2013 Ioyee who hourced call cstorm.
w days into tack‐up suppke calls in thprovided traabout whichges. The supy. Toronto Hyndle the sha
e total stormparison, the m, 24% of ththe affected
m calls were e and contra
atch Queue H
ge number oheard a messe callers exppted by the the dispatchessfully com
pleted in theng an accoute their outaem does not
er Calls
are organizatng periods omployees (tm the call ceThe full com) was fully de
ning on handwer calls. It Ice Storm beas no expericentre emplo
he 2013 Ice ort to handlhe dispatch qaining to the informationpervisors weydro did notarp increase
m calls, 21,0Davies Conse 1.1 milliond company aanswered bacted call ce
High Call Vo
of customerssage that theperienced a hIVR and they queue. (If tplete the re
e IVR withount number iage in the audistinguish
tion can draof high volumhose workinentre into cumplement of eployed unt
dling outageprecluded thecause of unience in the oyees had no
Storm, Torole storm callqueue, include outsourcedn to pass to tre given mot have other in custome
00 (5%) wersulting Stormn storm callsand its sisterby a pool of ontres.
lume Messa
s who callede Company chigh call voluy made a selhey selectedport in the s
FCC
ut the assistas cumbersoutomated syaccents wel
w from apprme. This numng in the in‐hustomer billiavailable reil December
e calls causedhe use of a fnion rules whspecific roleot been train
onto Hydro cs. The outsoding the pood agents on htheir supervre detailed tr agreementsr calls.
re handled bm Benchmar were answer company. Iover 500 em
age
d when therecould not reume messaglection withid “1” to repoself‐service I
Findings andCommunicaContact
ance of a repme and discstem. Anothl.
roximately 8mber includehouse call ceng and collepresentativer 27, 2013.
d some of thfew Toronto hich restrict e. And, as noned to answ
contacted thourcer providol of 50 notehow to answvisors to entetraining and s in place to
by company k Database sered by a pon another ca
mployees from
e was an avaeceive any mge after theirin the outagort an outagVR, they we
d Recommentions – Cust
presentativeourages somher is that th
80 representes approximaentre and thoections functes (both inte
he delay in dHydro empoffering oveoted previouwer outage ca
he outsourceded 66 addited above. Tower customeer tickets foraccess to O access addi
representatshows that iool of 350 emase, 31% of m the comp
ailable telephmore calls at tr calls had bge menu whige and were ere transferre
ndations omer
e). For me from he IVR voice
tatives to ately 30 ose who tions) and 50ernal and
deploying loyees ertime to ansly, the alls prior to
ed call centretional agentoronto Hydroer questions r new MS Web itional staff
ives. By in one majormployees the 194,000any’s in‐
hone port that time. een ch put themnot able to ed to the
0
e s o
r
0
m
66
dispaalso w
Durinapprooutsicalls aenteraccep2013 caller
Aban
Durintalk wwhenthe cnumbvolum
Althoconsieven abanBencstorm
Avera
Averasecontime dispa
Manymakegoal iemerat twoutaghandcentr
atch queue. Cwere placed
ng normal opoximately 30de of busineand staff avared the queupted at this t Ice Storm, 1rs) received
ndoned Calls
ng the 2013 with a represn the caller, all is answerber compareme message
ough abandoidered accep10%. The Todoned calls hmark Datams, the perce
age Speed o
age Speed onds from thethe represeatch queue d
y different ces it difficult is at or abourgency. Daviwo utilities wges. At both led in the seres provided
Callers who in the dispa
perations wh0 calls in theess hours. Adailable to haue, the next time.” Of the136,000 (84%this messag
Ice Storm, 2sentative abafter enterinred. At Toroed to the tot.
oned call goaptable withinoronto Hydrduring non‐base includeentage of ab
f Answer
f Answer (ASe time a custntative answduring the 20
ompanies acto establish
ut 40 secondes Consultinhich accompthose utilitielf‐service oud a significan
selected “2”atch queue.)
hen there are queue to ddjustments aandle calls. Acustomer he total caller% of callers ee.
20% of callerbandoned thng the queuento Hydro, ttal calls ente
als vary amon the call cenro call centreemergency es data on abbandoned ca
SA) is a call ctomer requewers the call013 Ice Storm
cross a varieh a “standards, but this gong has evaluaplished 43 sees, 50% or mutage IVR aptly larger po
FCC
” or “3” to re)
re not many ispatchers dare made deAfter the maears a messars that enterentering the
rs who were eir calls whie to speak tothe percentaering the que
ong companintre industrye, for exampperiods. Thebandoned caalls is 12% or
centre measests to be tra. The overalm period wa
ety of industd” ASA goal.oal normallyated call cenecond and 6more of the pplication anool of repres
Findings andCommunicaContact
eport a wire
outages, thduring busineepending onximum numage that “nored the dispae dispatch qu
able to entele waiting. Ao a represenage of abandeue that do
ies, a range oy, with a toleple, has a scoe Davies Conalls for eightr less.
sure of the aansferred tol average ASas 7 minutes
ries use call A frequently would not ntre perform62 second ASincoming cand their in‐hosentatives to
d Recommentions – Cust
down or ot
e system is sess hours an the number
mber of callero additional atch queue dueue or 36%
er the outagAn abandonentative, hangdoned calls isnot receive
of up to 5% erance of uporecard goal nsulting Stort storms. For
average numo a representSA for customs and 14 seco
centres. Thiy seen compapply during
mance for maSAs during mlls were sucouse and ouo handle call
ndations omer
her issue
set to allow nd 10 calls r of incominrs has calls can be during the % of all storm
e queue to ed call is onegs up befores this a high call
or 6% is p to 8% or of 3% m r these
mber of tative to themers in the onds.
is variation pany ASA g an ajor storms major cessfully utsource calls.
g
m
e e
e
67
2. Ta
As noCompcompgleanfollow
3. O
Dispaencofrom discuresto
In adToronintegto ca
DurinmakeneedanswInfor
The Integratnd did not e
oted above, pany’s self‐spletion ratesned from intwing gaps:
The outagthe statusthat theiran increastickets in The IVR’s associateto be bumThe outagis cumbercompleteThe IVR dconfirm tOnce a cureturn to address. Wback to st
Outage statu
atchers and cuntered weathe necessitssed above,
ored to their
dition, custonto Hydro wgrated with Oll the Compa
ng any outage decisions r to know wh
wered custommation rega
ed Voice Reeffectively su
14,000 (4%)ervice outags of 50% or merviews with
ge IVR provids of their outr power had se in call volthe OMS anvoice recogd with langumped out of ge IVR initialrsome to ent their outagoes not provhat an outagustomer selethe previouWhen somettart over.
us informatio
customer seary, impatiety of calling large numbhomes whe
omers receivwebsite. This OMS. As a reany.
ge, and partiegarding thehen their powmer calls, thearding estima
ecognition syupport custo
of the totalge applicatiomore. Compah employees
ded inaccuratages. Largebeen restorumes. Contrnd inadequatgnition systemuages commthe self‐servlly asks for ater. Often the reports in vide a servicge is recordeects the paths menu if, fothing like th
on was inad
ervice represnt, sometimmultiple timbers receiveden, in fact, it
ved inaccuramap is crea
esult, it displ
cularly durineir living arrawer will be rey had minimated restora
FCC
ystem was domers who
incoming oon, as compaarisons to ots familiar wit
ate informate numbers ofred causing cributing factte interface m does not only spokenvice outage customer’shis discouragthe automace order (“ticed; and h to report aor example, is occurs, th
equate and
sentatives anmes angry, cumes before red informatiowas not.
ate informatted using poayed errone
ng extendedangements arestored. Whmal informatation times w
Findings andCommunicaContact
difficult to nare non‐nat
utage calls wared to othether utilitiesth the IVR sy
tion to manyf customers confusion antors were debetween thdistinguish mn in the Toroapplication; account nuges customeated system;cket”) numb
n outage, tha mistake ise customer
often inacc
nswering ouustomers. Meaching a reon from the I
ion from theostal codes aeous informa
d outages, cuand busineshen Torontotion to satisfwas not avai
d Recommentions – Cust
avigate, nottive English s
were compleer utilities wis and informystem indica
y customers received falnd frustratioelays in closine IVR and OMmany of the onto area cau
mber, whichers from tryin ber to custom
here is no op made whenmust hang u
curate.
tage calls ofany were fruepresentativeIVR that pow
e outage maand is not fuation, driving
ustomers mases. Fundamo Hydro reprfy customerlable. For th
ndations omer
t intuitive, speakers.
eted in the ith ation ate the
regarding lse messageon, as well asng outage MS.); accents using callers
h, if in hand,ng to
mers to
ption to n entering anup and call
ften ustrated e. As wer had bee
p on the lly g customers
ay have to mentally, theresentatives s’ needs. e most part
s s
s
n
n
s
ey
,
68
dispafrom custo
Whenspeciinformenouwereinform
4. Aw
In adconta
Custoconta(See billinghoweto ouand/o
Durinscannand oThe ion no
atchers and cpress releas
omers.
n calls were fic informatmation abough informat physically lomation to us
Alternate patwere not mo
dition to calact the Comp
Free‐form
Website c
Website p
omers sent cactus@toronFigure 16). Tg, other accoever, the mautages. Day‐tor student in
ng this stormning them fooutages not nterns monion‐holiday w
customer seses and gene
escalated toion. Althougut what was tion to respoocated at wose in conver
ths to contaonitored freq
ling, Torontopany during
m email;
contact form
power outag
comments ontohydro.coThe intendedount informajority of conto‐day, a dednterns from
m, student inor wire downpreviously ritored the emworkdays.
ervice represeral commun
o supervisorgh ETR informhappening
ond to the cuorkstations isations with
act Toronto Hquently eno
o Hydro custthe 2013 Ic
m; and
ge reporting
r inquiries um or a contad use of the ation, and gntact forms (dicated teamthe Toronto
nterns responn or other saeported. Thmails and co
FCC
sentatives hanications to
s, they couldmation was in the field customer inqin dispatch ah customers.
Hydro (e.g., ugh.
tomers usede Storm:
form.
using an unstact form procontact form
general ques(and free‐fom of three cuo Hydro call
nded to the afety concerey would creontact forms
Findings andCommunicaContact
ad to use theemployees
d access dispnot usually acould be garuiries. Someand could als.
email, web
d three web‐
tructured foovided on thm is for custtions. Durinrm emails) sustomer sercentre respo
emails and rns which meeate an outas only during
d Recommentions – Cust
e Company’swhen speak
patch to try available, otrnered to pue of the reprso glean som
) were in pla
‐based optio
rmat to the e corporate omer inquirg the 2013 Isubmitted wvice represeond to these
contact formerited prioritage ticket asg normal bus
ndations omer
s messagingking with
to get morether t together esentatives me additiona
ace, but all
ons to
Company viwebsite ies related tce Storm,
were related entatives e inquiries.
ms by ty reportings indicated. siness hours
al
ia
to
69
Figure
The nteamtotalsDeceweek
Custoform outagmanyform using
e 16: Web‐base
number of em for responss for those dmber 24. Nokdays and 50
omers also ushown in Figge reportingy utilities todto OMS. Du
g this form.
ed Contact For
mails and cose from Decedates rangedormally, the 0 or fewer pe
used the Torgure 17. The g forms, whicday, Torontouring the 201
rm
ontact formsember 22, 2d from a lowteam receiver day on we
onto Hydro dispatch groch involves mo Hydro has 13 Ice Storm
FCC
s forwarded 013, throug of 42 on Janves 80 to 120eekends.
corporate woup is respomanually ennot develop, customers
Findings andCommunicaContact
to the Toronh January 2,nuary 1, to a0 account re
website to reonsible for fotering each ped an autom forwarded
d Recommentions – Cust
nto Hydro ca 2014, was 2a peak of 392elated emails
eport an outaollowing up oform into Omatic interfa106,000 out
ndations omer
all centre 2,028. Daily 2 on s per day on
age using thon the poweMS. Unlike ace from thetage reports
e er
e
70
Durinfew rOMSforms
Figure
5. T
As thinformthey custoutilitireporapplithrou
6. Tce
Durin311 creprecustoelect
ng the stormrepresentativ. Resources s throughou
e 17: Power Ou
oronto Hydr
e penetratiomation theyprefer. In reomers to do ies (includingrt and checkcation and dugh text mes
here was noentre.
ng the 2013 call centre toesentatives homers. They ricity outage
m response, fves to reviewwere not asut the restora
utage Reportin
ro does not
on of smart dy need and wesponse, mabusiness witg Hydro Onek the status odid not provissaging.
o capability t
Ice Storm, soo report theihad no inforhad not beees, nor had t
from time‐tow these formsigned to reation.
ng Form
provide mo
devices increwant, at any ny companieth them moe) offer free of power ouide custome
to transfer T
ome Torontir outage or mation or pen trained onthey been m
FCC
o‐time, dispams and inputegularly revie
obile capabil
eases, so dotime, and thes have devere easily on mobile appltages. Toroners with the a
Toronto Hyd
o Hydro cusget restoratrocedures ton the restora
made aware o
Findings andCommunicaContact
atch supervit outages noew the powe
lity to repor
o customer ehrough the celoped applicell phoneslications thanto Hydro doability to rep
dro‐related c
tomers calletion informao use in ordeation procesof the outag
d Recommentions – Cust
sors would rot already reer outage re
t or track ou
expectationscommunicatications to aand tablets.at allow custoes not haveport their ou
calls from th
ed the City otion. The caer to help thss for widespe reporting
ndations omer
request a eported to porting
utages.
to receive ion channel allow their . Many omers to e a mobile utages
he 311 call
of Toronto ll centre hese pread form
71
availacapabtwo e
5.6.2
The vresultinsufftrainitechnhandreprecomm
CCC‐1durin
Toronits pecustoaddit
In redotherfeatu
In conproceOMS
able on the Tbility to tranentities.
2. Commun
volume of cuting from thficient scalaing. During wnological solle the vast mesentative. Smunications
1 Secure capng an inciden
Enhansignifi
nto Hydro sherformance domers had sutional 172,10
designing orr utilities witures would b
Upgradingcomplete
Deleting t
Providingand/or ot
Providinghas been informati
Correctin
ncert with thedures to mo. With syste
Toronto Hydnsfer calls to
nications –
ustomer inque 2013 Ice Sbility of telewidespread utions (self‐majority of cSpecific recoare:
pacity (peopnt:
nce the custicantly more
hould investduring emeruccessfully c00 calls wou
r replacing thth high contabe most effec
g the voice r their transa
the request
options for ther points in
the customrecorded anon; and
g issues in th
he technologore frequenm improvem
dro website.the Toronto
Customer C
uiries and thStorm revealphony and soutages Torservice IVR austomer conmmendatio
ple and tech
omer self‐see calls.
in improvinrgencies is incompleted 5ld have bee
he applicatioainment‐ratctive. These
recognition tactions in the
for an accou
a customer n the interac
mer a ticket ond to allow q
he current in
gical enhanctly (in near rments and im
FCC
No technoloo Hydro call
Contact Re
he sustainedled gaps in estaffing, andonto Hydro and web‐basntacts withons to improv
nology) to s
ervice IVR o
ng its self‐sern line with pe0% of incomn satisfactor
on, Toronto te systems tocould includ
technology te IVR;
unt number
to return toction;
or reference quicker, easi
nterface to t
cements, Toreal time) upmplementati
Findings andCommunicaContact
ogical interfcentre) wer
commenda
need for ouemergency pd the need fomust be ablsed applicatout the interve customer
support time
utage applic
rvice IVR outeer utilities.ming storm crily complete
Hydro shoulo determinede:
to enable m
to identify t
o the front o
number to cer access to
the OMS.
ronto Hydropdate restoron of those
d Recommentions – Cust
faces (such ae available b
ations
utage status preparednesor additionalle to rely on tions) to accuvention of ar contact
ely custome
cation to ha
tage applicaIf Toronto Halls in the IVed.
ld consider se what chang
ore custome
he outage lo
f the outage
confirm thato outage stat
o should adoration informprocedures,
ndations omer
as the between the
informations, l and broade
urately a
r contact
ndle
tion so that Hydro VR, an
surveying ges and new
ers to
ocation;
e IVR menu
t the outagetus
opt mation in the, customers
e
n
er
w
e
72
callinrepre
ToronIVR, othat tcompadeqavailacapacIVR. Ufast b
For eprovisuccerecencompCommthe uinform
The cneedtransansw
The uimprofor ththe ic
The DneedCustosatisfanalyhousecusto
ng for outageesentative.
Securhigh c
nto Hydro shor contractinthe customepanies can puate to handable from thcity, so moreUtilities contbusy signals
xample, a thded additionessfully handnt major stopleted 19,80municationsutilities’ OMSmation.
call transfer ing to reporsferred to thwered by tele
use of a thirdoved Toronthe initial highce storm.
Identioutsoincide
Dispatch Groed under vaomer Care thfactorily hanysis should ce or contracomers report
e status coul
e sufficient call volume t
hould explorng with a thiers do not rerovide a cosdle infrequehese compane customerstracting withduring full‐s
hird‐party conal telephondled over 23rm. On the p00 calls in ans ports. In boS systems, p
to the third‐rt a wire dowe dispatch qephony at th
d‐party call pto Hydro selfh call volum
ify and trainourcer to serents.
oup should aarious emerghat would alndle the maxonsider factct call centreting outages
ld receive ac
capacity anto eliminate
re alternativrd‐party higeceive busy sst‐effective aent high call vnies, but mos can be handh these comscale events.
ompany specne ports and3,000 of thepeak call volother utilityoth cases, throviding cus
‐party call prwn or talk to queue in the he utility rath
processor tof‐service oute message w
n customer rrvice outage
analyze how gency scenarlow them toximum numbors such as:e facilities, tes and seekin
FCC
ccurate infor
d surge capae busy signa
ves through egh‐volume casignals durinalternative tovolumes. Thst frequentlydled concurpanies have.
cifically set ud using the ce 1.1 million ume day in ay’s self‐service outage repstomers with
rocessor is sa representsame way ther than at t
o handle ovetage IVR, couwhich was he
representatie calls and w
many custorios and devo deploy theber of estimahow the cri
elephony capg outage sta
Findings andCommunicaContact
rmation with
ability durinls.
either expanall processinng full‐scale eo purchasinghere are a nuy utilities corently throu reduced or
up for outaglient utility’scalls the utianother storce IVR using ports were sh accurate o
eamless fortative for oththat they wothe third‐par
rflow calls, wuld potentiaeard by 31%
ives within Twebsite conta
omer contactvelop a plan amount of ated calls ansis impacts tpacity, IVR catus informa
d Recommentions – Cust
hout the ass
ng periods of
nding the capg company tevents. Call g telephony umber of serontract for adgh self‐servicompletely
ge communics IVR applicality receivedrm, custome21st Centurysuccessfully utage status
customers. her purposeould be if therty call proce
when pairedally eliminate% of storm ca
Toronto Hydacts during
t resources win collaboratresources nend website cthe use of eiontainmentation, estima
ndations omer
istance of a
f extremely
pacity of its to ensure processing capacity rvices dditional ice outage eliminated
cations ation, d during a ers y interfaced tos
Customers s are eir call was essor.
d with an e the need allers during
dro and at major
would be tion with eeded to ontacts. Theither the in‐ rates for ates of how
o
e
73
manythe o
Usingresouensur
The oformsmustneedan intticketoutag
The Ccustophonfree aprovias oftstatu
CCC‐2acroslow t
The pwhenprocewww
y customers outage form
g this evaluaurces will bere this level
The use o(self‐serviwebsite oto allow c
Communi
Handling representthem to r
Refresher
Implemenself‐servic
outage infors does not a be manuall for staff to terface is det number toge had been
Company shoomers the abnes and tableapplications de outage mten as everys, and estim
2 Improve thss every modtech channe
previous recon customers edural changw.torontohyd
will report ois interfaced
tion as a bas needed at aof readiness
of all automaice outage IVoutage map, customers to
icating ETRs
of difficult ctatives who role‐play han
r courses; an
nt web‐basece.
mation that utomaticallyy entered toinput outageveloped, co customers w recorded an
ould also debility to repoets. This shothat allow c
maps, searchy 15 minutesmated time o
he process fde of commls).
ommendatiouse the selfges for outagdro.com and
outages usind to OMS.
se, Toronto all times, ans. Training to
ated systemsVR, OMS, Wand any otho report outa
to custome
customers. (Tare able to bndling calls.)
nd
ed and mobil
customers ry feed into to OMS. An oe informatioonsideration when they snd provides
evelop and imort outages auld reduce ccustomers tohable by adds. In a few caof restoration
for ensuringmunication to
on suggests f‐service outge status accd to any mob
FCC
ng the websi
Hydro can dd implemenopics should
s involved ineb Access, ther systems ages or rece
rs;
Toronto Hydbetter handl;
le outage ap
report on thhe OMS. Eacn‐line interfon during anshould be gsuccessfully sa reference
mplement mand track rescalls to repreo report outdress, which ases, these an (when it is
g accurate ano customers
methods totage IVR. Macuracy shoubile applicati
Findings andCommunicaContact
te outage fo
determine hot a training pd include:
n outage rephe website othat may beeive restorat
dro training le customers
pplications to
e corporatech form comface would r emergencygiven to provsubmit a for number.
mobile outagstoration staesentatives.ages and finare updatedpplications known).
nd uniform os (e.g., IVR, w
improve ouany of the sald be applieons implem
d Recommentions – Cust
orm and whe
ow many traprogram and
orting at Tooutage forme developed ion informat
staff might is during a st
o support hi
power outampleted by aeduce or eliy (and day‐toviding a servrm, to assure
ge applicatioatus from thVarious util
nd outage stad with OMS provide caus
outage statuweb, mobile
utage status me programd to the outented in the
ndations omer
ether or not
ained d schedule t
ronto Hydrom, the in the futurtion);
dentify torm and ask
gh volume
age reportin customer minate the o‐day). Whenice order or e them the
ns to provideir smart ities offer atus. Some informationse, crew
us messagese application
accuracy mming and age form one future. The
to
o
e
k
g
n
e
,
s n,
n e
74
keys enter
A procall cimproneedsuccewhichrepre
CCC‐3other
ToronReceprovicalls tcamprepre
The ueffecoutboforecfeedearea,
Custoproacutilitiin pladesig
CCC‐4
The Tdiscuideasreprerepreacces
to consistenring restorat
ocess also, shentre staff. ove the ETR to properlyessfully implh more granesentatives a
3 Employ our pertinent i
nto Hydro usivable. A leade messaginto customerpaigns designesentative.
use of outbotiveness in mound callingcasted majorers that have and asking
omer Care active use of oies regardinganning and dgned and tes
4 Work with
Toronto Cityss ways to ims being discuesentatives oesentatives tss to the Inte
The capac
The know
nt accuracy ation informa
hould be putImplementaprocess are
y serve custoemented, diular informaanswering ca
utbound callinformation
ses outbounding practicng to customrs, with or wned for outa
ound calling bmeeting comg to give custr storm. Anoe been restothem to con
nd Corporatoutbound cag their use odesigning camsted to ensur
h City of Toro
311 call cenmprove the ussed includeon a regular to complete ernet during
city needed
wledge and s
are enhancination to OMS
t in place to ation of reco essential toomers duringispatch and ation regardalls and Inte
ling/texting .
nd calling sofce employedmers during swithout a repage purposes
before and dmmunicationtomers pertiother commoored, tellingnfirm if they
te Communialling and teof outbound mpaigns. Thre timely exe
onto to eva
ntre and Torhandling of e providing obasis duringwebsite out
g the outage
to meet ant
kills needed
FCC
ng the automS on a near r
provide fielommendatioo providing rg outages. UCustomer Cding field actrnet inquirie
to inform c
ftware to su by some utstorms. Thispresentative s normally d
during incidens objectivesinent informon use is to mthem the Cohave or hav
cations staffexting duringcalling and tose selectedecution whe
luate option
onto Hydro outage‐relaoutage commg extended otage forms f. The evalua
ticipated call
to support
Findings andCommunicaContact
mated interfreal‐time bas
d status infons elsewherrepresentativntil those reare need to ivities can bes.
ustomers of
pport the coilities is to u applicationattending th
do not requir
ents could es. For exampmation to betmessage cusompany has ve not been
f should devg extended otexting techd for implemen needed.
ns for using
Customer Cted calls durmunicationsoutages and for customeration should
l volumes at
single call re
d Recommentions – Cust
ace with OMsis.
ormation to re in this repves the inforecommendatdevelop a me communic
f outage sta
ollection of Ause this softwcan push tehe call. Outbre interface
nhance the ple, some utitter preparestomers servrestored serestored.
velop plans foutages. Survnology migh
mentation sh
311 capabil
are staff havring an incids updates to training 311rs who may address:
t all incident
esolution;
ndations omer
MS and
dispatch andport to rmation theytions can bemethod by cated to all
tus and
Accounts ware to elephone bound callingwith a
Company’s ilities use for a ved by rvice in thei
or the veying otherht be useful hould be
ities.
ve begun to dent. Some the 311 1 not have
levels;
d
y e
g
r
r
75
5.7.
A utila majordermainmust
Whilethis a2013
Durincommthe reconfiissuinadditmessthen resto
When
The potenthat the 3
Ways to alarge‐scal
Comm
lity’s ability tjor incident r to return thtain custom:
Demonstr
Convey a
Provide co
Provide c
e the first anarea of revie Ice Storm, s
Have procmajor eve
Was Torostakehold
ng an event, municating westoration. Tned to helping safety advtional “voicesaging. This cmust be add
oration.
n incidents o
Are consis
Reach the
Are undeobjectives
ntial impact 311 call cent
automate coe incidents.
munication
to effectivelis equally ashe communer and stake
rate that it k
sense of urg
onsistent an
ustomers w
nd fourth pow focuses ospecifically a
cesses been ents and are
onto Hydro aders of the re
the utility swith the medThe content ing stakeholvisories, delies” during a mcan create codressed in a
occur, leadin
stent and ef
e proper aud
rstood by sps.
on service letre serves; an
ommunicatio
ns – Other
y communics important aity back to “eholder satis
knows the cu
gency about
nd accurate i
ith accurate
oints are addn the broadanswering th
put in placee these proce
able to maintestoration a
hould designdia and publof the messders undersivering progmajor restoronfusion am“clarificatio
ng utilities en
ffective acro
diences; and
pokesperson
FCS
evels to othend
on between
r Stakehold
cate to interas the efficie“normalcy” isfaction duri
ustomer is w
t restoring po
information
and reason
dressed in ther aspects ohe following
e to ensure “esses follow
tain a sense pproach and
nate a singlelic, leaving thsages delivertand the priress updateration effortmong customon” effort wh
nsure that m
ss all comm
d
ns and comp
Findings andCommunicaStakeholder
er City agen
Toronto Hyd
ders
nal and exteency of the pn the shorteing major po
without powe
ower;
on restorat
able estimat
e previous sof crisis commquestions:
“one voice” ced?
of control ‐d progress?
e individual whe rest of thred during thoritization as, and providt can lead tomers and othhich can draw
messages:
unications c
liment overa
d Recommentions – Others
cies and org
dro and the
ernal stakehophysical restest time possower outage
er;
ion progress
ted times of
section of thmunications
communicat
continually
who is respohe staff free he restoratioand restoratiding ETRs. In inconsistener stakeholdw resources
channels;
all communi
ndations er
ganizations
City during
olders durintoration. In sible, and es, a utility
s; and
f restoration
is report, s during the
tion during
apprising its
onsible for to focus on on should beion process,ntroducing t, disjointedders, which away from
ications
g
.
s
e
d
76
Toronthe cof co
The r2013
5.7.1
Throudemostakeimpowereabilitmore
Toronmesscustoprovidoor
nto Hydro haommunicatimmunicatio
review of To Ice Storm re
Communi
Execution
ETR proce
Methods
Alignmen
SynchronProvince;
Outreach
1. Commun
ughout the eonstrate theeholders withortant to reco somewhat y to report te details.
nto Hydro wsaging to theomers did node alternatihangers to r
ad the proceions strategyon.
ronto Hydroestoration a
ications stra
n of “one voi
ess;
and modes
t of internal
ization of mand
to vulnerab
nications –
event, Torone level of undh a clear undognize that tmuted by ththeir outage
worked closee public and ot have acceve sources oreach these
ess in place ty (evaluated
o’s communiddressed th
tegy and rol
ice” commu
of communi
l and externa
essaging and
ble populatio
Other Stak
nto Hydro wderstanding derstanding the strengthhe Companys and receiv
ly with City used social ss to radio, Tof informatiopopulations
FCS
to ensure thd daily) and p
ications to oe following:
les;
nication;
ication, inclu
al communic
d communic
ons.
keholders F
as able to mand control of the resto
hs in the com’s shortcomve updates o
and Provincmedia to disTV, and socion such as tos.
Findings andCommunicaStakeholder
hat messagesperformed w
other stakeho
uding social
cations;
cations proc
indings
maintain unitover the inc
oration priormmunicationings in provion their statu
ial officials tstribute the al media, anown meeting
d Recommentions – Others
s were consiwell in severa
olders throu
media;
esses with t
ty of messagcident, and prities and pron process to iding customus. See Secti
to coordinatmessage. Sond the officiags, loudspea
ndations er
istent with al channels
ughout the
he City and
ge, provide ogress. It is stakeholdermers with theon 5.6 for
e the ome als did not akers, or
rs e
77
Comm
1. Ah
WhenincideExecuface oconsibetwpressstakespoketo lea
2. Pin
ToronchanThe Ccraftecommcomm
On thcommRepocommmessmess
All inwereused confeapprorespothrou
One aexpeccommreporinform
munications
As the face ois role well.
n used, the eent and crisiutive Officerof the Compistent in his ween, Decems release coneholders. Theesperson, giading practic
roactive mencluding coo
nto Hydro pnels, aligningCompany alsed by the memander. Tormunications
he whole, mmander and ort, a form ofmunications sages of the sages were u
ternal and e distributed them to craerences, inteoved messagonse. The spughout the e
area of criticctation that munication irts, and intemation. The
s – Other Sta
of the Compa
executive spis communicr (CEO) servepany, he wasexternal com
mber 19, 2013ntent, mainte frequency ven the infoce within the
edia campaigordination w
resented a cg with the “oso used a souedia and comonto Hydro’channels di
essages werwere part of an incidentmeeting thaday were crupdated thro
external comto the medi
aft messageserviews, e‐mges to ensurokesperson event.
cism was thathe restoratssued at thernal messag Grid Emerg
akeholders S
any and the
pokespersoncation. Durined as the pris present, onmmunication3, and Januaaining a senand quality
ormation avae industry.
gn and conswith the Syst
consistent mone voice” cund commummunicatio’s communicsseminated
re coordinatof the daily dt action planat occurred eated in preoughout the
mmunicationia. Once pres for differenmails to key sre the entirewas consist
at messagingtion would te time, includging and plangency Report
FCS
Strengths
executive s
is the most ng the 2013 mary spokesn‐message, en. Conductinary 2, 2014, se of consistof communailable about
sistent messtems Operat
message acroconcept, whinication mens lead and cation deparconsistent m
ed with anddiscussion in n (IAP). This wat 6 a.m. eveeparation forday.
stemmed frss releases wnt communicstakeholders Company wtent in conve
g on the firsttake 72 hourding the prens, has not rt noted the k
Findings andCommunicaStakeholder
spokesperso
visible and Ice Storm, tsperson for empathetic, ng upwards ohis messagetency that wication provt restoration
aging (use otions Centre
oss all of its cich is considthodology, dapproved byrtment ensumessage con
ultimately athe SOC andwas accompery day. Durr the 7 a.m.
rom approvewere issued,cations chans) and emplowas in alignmeying the me
t day of restrs. An in‐depess conferenevealed the key message
d Recommentions – Others
on, the CEO p
important rohe Presidentthe Compantransparentof 25 intervies were alignwas receivedvided by the n status, was
of “one voicee, worked w
communicatered a leadidelivering my the incidenred that all ntent.
approved byd the Grid Emplished throuring this meenews cycle.
ed press rele, communicannels (e.g., poyees were sment with reessages of th
oration creapth analysis oce footage, source of the on the first
ndations er
performed
ole in t and Chief ny. As the t, and ews ned with well by the executive s comparabl
e”), well.
tion ng practice.
messages nt
y the incidenmergency ugh a eting, the The
eases that ations staff ress sent spect to its he day
ated an of all the the media his t day was
e
nt
78
that temerundethe e
3. Tco
ToronCompcommTorongoverPark aboucomp
Manyprovibecammemfor threpeacomm
4. Tm
Torongroupthe cmediToroncommnew fis a vindicamess
the restoratrgency levelsrstandable wearly stages o
oronto Hydrommunicati
nto Hydro copany spokesmunicate jointo Hydro tornments. Ththat the CEOt different aplementary.
y citizens turde them infme overwhe
mbers. They whe Councilloatedly notedmunication t
oronto Hydrmedia.
nto Hydro usps. These chorporate wea proved to nto Hydro’s ments while followers analuable metates the potsages posted
ion would tas used 72 howhy the Comof the respo
ro was viewions.
ontinuously sperson avaintly is a leado be seen as ere were at O attended waspects of th
rned to the Cormation thelmed with iwere prolificrs about thed that Toronto the public
ro used a va
sed various annels incluebsite, as webe the chanFacebook fathe Compan
nd 20,633 retric as it indictential numbd during this
ake “at leastours as the lompany wouldnse, before
wed as an eff
communicalable for Cityding practicean effectiveleast 15 prewith City leae emergenc
City Council rough its ownquiries, thec communicae restorationto Hydro wac throughout
ariety of met
communicatude broadcasell as phone nnel with thean page garnny’s Twitter tweets durincates the vaber of ultimastorm.
FCS
t 72 hours.” ower threshd consider mthe damage
fective partn
ted with they press confe for a utilitye partner witess conferenders. While cy, their mes
for answerswn Call Centey turned toators with thn. Throughouas a strong at the event.
thods to rea
tion channest media, prand email foe biggest gronered 3,000 account accng the 2013 lue of the mate views. Fig
Findings andCommunicaStakeholder
Given that told for the lamessaging the assessment
ner in City a
e City of Toroerences. They during majth the City ances betweethe City andssages were
s when Torore. When tho one of a fewhe City Counut the intervand committ
ach the publ
ls to reach eint media, raor some stakowth and stanew fans ancumulated aIce Storm. T
message to thgure 18 show
d Recommentions – Others
he Toronto argest eventhe 72‐hour tit was compl
nd Provincia
onto and mae level of effor events annd Provincian City Hall ad Toronto Hyconsistent a
nto Hydro coe City Councw Toronto Hcil, answerinviews, particted partner i
lic, including
external stakadio, social mkeholder groakeholder ennd over 6,00pproximatelThe number he subscribews samples
ndations er
Hydro ts, it is imeframe ineted.
al
ade the fort to nd enabled al nd Queen’s ydro spoke and
ould not cillors Hydro staff ng questionsipants n
g social
keholder media, and oups. Social ngagement.0 unique ly 24,000 of retweets
er as well as of Twitter
s
s
79
Figure
Comm
1. Pre
Toronestimoutagfar thoutagoutsiutilitibeco
On DSysteestimleast’ETR wlevel pointbecauestimprovi
e 18: Sample Tw
munications
rocess for destoration) w
nto Hydro dmated times ge that occuhe most sougges. The prode of normaies, providinming an exp
ecember 22em Operatiomate was tra’ reference fwas not alignof damage ot on, Torontouse it did nomates at the ded any spe
witter Messag
s – Other Sta
eveloping awas not clea
id not have aof restoratiorred as a resght after pieocesses at Toal or blue‐skyg customerspectation du
2, 2013 (the fns Centre wnslated intofrom the 72‐ned with theor the efforto Hydro wiseot have a strotime of the ecific estimat
ges
akeholders O
nd issuing tarly defined
an effective on consistensult of the 2ece of informoronto Hydroy day outages with an accring major e
first day of rwas that the r a restoratio‐hour restore key messagt that would ely did not isong process event. As a rtes of their o
FCS
Opportuniti
imely and a.
process or tntly and auto013 Ice Stormation wheno do not cures. While thicurate and tevents.
restoration),restoration won time of 72ation message of the daybe requiredssue any othfor developresult of thisoutage dura
Findings andCommunicaStakeholder
es for Impro
ccurate ETR
the technoloomatically form. Across thn a utility exprently suppois is not uncoimely restor
one of the would last at2 hours, esseage. It was soy and it did nd to restore ther projectioping and valids decision, ctions.
d Recommentions – Others
ovement
Rs (estimated
ogy in place or the magnihe industry, periences wiort the proviommon in mration estima
key messaget least 72 hoentially omitoon apparennot accuratethe damageons for restodating restoustomers we
ndations er
d times of
to provide itude of ETRs are by idespread ision of ETRsmany other ate is
es from the ours. This tting the ‘at‐nt that this ely reflect th. From that oration, ration ere not
s
‐
he
80
2. Li
OveraslightEmerguidemempubliand wpubliprefededic
Torontype wantCity Ocommthat lwas uthe nengag
Due tan unCouncalls.
3. Ma
Durininformpoputhis, ainformsufficmeet
5.7.2
COS‐of sp
Toronenab
iaison roles
all, Toronto t disconnectrgency Manaelines to addmbers. Torontc sector verywas responsc safety reqerential restocated contac
nto Hydro stof informatied from TorOffice of Emmunication alost primaryunable to prneed for an ege Toronto H
to shortcomnexpected nncillors and t
Messages weccess to TV,
ng an extendmation chanulation includalong with tmation on ociently for altings, neighb
2. Commun
1 Develop aecificity.
nto Hydro shle the autom
with some s
Hydro’s liais in the expeagement. Address informto Hydro didy well. It resive to the Ofuests. Additoration. Thect people wh
taffed liaisonion that stakronto Hydro ergency Maand solved e and back‐uovide its liaiexecutive preHydro execu
ings in Toroumbers of reheir staff in
ere not alwa radio, or so
ded power onnels, such ades a significhe inaccessioutage statusternative wabourhood up
nications –
a process to
hould updatmatic provisi
stakeholder
son presencectations betdditionally, tation and otd, however, sponded proffice of Emeionally, Toro Company aho were very
n positions akeholders newere not denagement eemerging resp generationson to the Oesence increutives to reso
nto Hydro’s equests fromapproximat
ays accessiblocial media)
utage, manyas radio, telecant portion bility of the s. During theays to commpdates, louds
Other Stak
communica
e its entire eon of estima
FCS
r groups wer
e was seen itween the Cohere were nther assistanmanage critmptly to burgency Manonto Hydro also providedy responsive
at the Office eeded and thefined in adveffectively mstoration prin. As the eveOEM with aceased. Becauolve issues.
call centre, m citizens. Tely 7,000 em
le to all stak.
y customersevision, and sof people wcall centre,e 2013 Ice Stmunicate witspeaker mes
keholders R
ate timely an
estimated timates to custo
Findings andCommunicaStakeholder
re not clearl
in a favorablompany andno clearly dence needed btical restoratilding fires aagement’s cavoided ‘sped Council mee, according
of Emergenhe level of invance. The oaintained oporities incluent progresstionable, opuse of that, t
City of Torooronto Hydrmails and ov
keholders (e
lost access social mediawho are not tleft them wtorm, the Coth the customssaging or do
Recommend
nd accurate
me of restoromers. This
d Recommentions – Others
ly defined.
le light, but td the City Offefined expecby the City Ction requestat Toronto Ficritical infrasecial’ requesembers withto the interv
ncy Managemnteraction thoperational lperational ding City critsed and Toroperational inthe City OEM
onto Councillro corresponer 100 direc
e.g., custome
to habituallya. In additiontechnology sith little or nompany did mers, such aoor hangers
dations
ETRs at diffe
ration (ETR) process will
ndations er
there was a fice of tations and Council s from the ire’s requeststructure ants for three views.
ment, but thhat they iaison at the
tical facilitieonto Hydro formation, M had to
lors receivednded with ct phone
ers with no
y‐used n, Toronto’s savvy and no not provideas town hall s.
erent levels
process to require
t d
he
e
es
d
81
Toronof incthe ucreat
The Cvarioand acommor do
COS‐improprepa
Toronan edEducaof thegas) uOfficecond
ToronorganstakeHydroemeron th
nto Hydro tocidents to seunavoidable te communic
Company shous stakeholdaccurate acrmunicating to not have ac
2 In collaboove stakehoaredness.
nto Hydro shducation camating the poe public emeutility restore of Emergeuct joint or c
nto Hydro, innizations, sheholder grouo companiesrgency manahe following:
Deliveringgeneral u
Specifyingand durincustomer
Respondiillustrate complexit
UnderstaToronto H
Ensuring sto accept
o provide a ret expectatiolimitations ication strate
ould identifyders and devoss all venueto address thccess to trad
ration with older literacy
hould work wmpaign abouopulation on ergency manration is the ncy Managecomplement
n partnershiould develoups. The Cans across Canagement org:
g electricity nderstandin
g what stakeng a Torontors, use of ele
ng to outagethe complexty changes w
nding prioritHydro respo
stakeholderservice from
realistic timeons with its sn ETR deliveegies around
y all potentiavelop a proces. These chhe needs of tditional med
the City of Ty of: restora
with the Cityut the powerpersonal prnagers. Provresponsibilitement and Ttary persona
ip with the Cop a public edadian Electrnada to creatganizations. T
from the pong of how th
eholders are Hydro respoectricians to
es during bluxity of respowhen multip
ties and hownds to incide
s are aware m Toronto H
FCS
eframe for restakeholdersery immediad these limita
al channels fcess to ensurannels shouthose populia due to an
Toronto, devation proces
y of Torontor restorationreparedness viding educatty of the utiToronto Hydral preparedn
City and Provducation proric Associatiote an educatThe annual
ower plant toe system wo
e responsibleonse to an inrestore the
ue sky days vonding to a sle outages o
w they play aents; and
of what theydro.
Findings andCommunicaStakeholder
estoration fos. It should ately followinations.
for providingre that the muld include nations that an extended o
velop an edss, customer
o to develop n process to and resilientional informlity. Workingro should deness educati
vincial Emerogram for exon may constion e in conprogram sho
o the meter orks;
e for and whncident, incldamage on
versus duriningle outageoccur;
a role in the
ey need in or
d Recommentions – Others
or varying leadvise custong a complex
g the ETR upmessaging is on‐traditionare not techoutage.
ucation progr responsibil
a program athe citizens ncy is the resmation on elg together, Tetermine howon.
gency Manaxternal custosider bringinnjunction witould educate
in order to p
at they shouluding speciacustomer pr
ng an incidene and how th
manner in w
rder for their
ndations er
evels or sizesmers about x outage and
pdates to consistent nal ways of nically savvy
gram to lity, and
and execute of Toronto.sponsibility ectric (and Toronto’s w best to
agement omer and g together th national e customers
provide a
uld do beforal needs roperty, etc.
nt to he
which
r residence
s
d
y
s
re
.;
82
A prorealissafet
COS‐with incide
One orelatiAccorecenof 20shou
COS‐4
ToronreleaextermessprocelessoManafollow
ogram like thstic expectaty, and comfo
3 Expand liakey commuents.
of the most ionships witrding to pubntly improve013 and markld further im
Operationtransport
An avenu
Executive
An abilityand publi
A processcommuni
Pre‐estab
Appropriamessage
4 Formalize
nto Hydro’s ses issued tornal and empsaging proceess for develns learned. Tagement Plawing:
All of the
The most external s
Commonl
his would eqtions, so theort during a
aison role tounity stakeho
critical resph public andblic safety pred its capabikedly improvmprove its ca
nal informatation);
e to review
e level interfa
to embed ac works asse
s for coordincation chan
blished guide
ate interfaceand support
process for
communicao the media ployee commss were devloping key mThis documean going forw
internal and
appropriatestakeholders
ly requested
quip stakehoy can make n outage.
o address edolders (e.g.,
onsibilities od private secrofessionals lities in the lved during aapability to p
tion to City o
restoration
ace in the m
and coordinaets, and vice
nating publicnels;
elines for ha
e/liaison to Ct other speci
r developing
tions team wwere the bamunicationseloped “justmessages, anentation showard. For ex
d external st
e channels tos;
d informatio
FCS
lders with ininformed de
ducation, com elected lea
of the utility tor emergenin the Toronliaison role. and after theprovide the f
of Toronto (O
priorities in
most demand
ate Toronto e versa, durin
c communica
ndling speci
City Councillific informat
g, approving,
was deliberaasis of inform. Some of tht in time.” Tond potentiallould becomeample, the p
akeholder to
o disseminat
n for each to
Findings andCommunicaStakeholder
nformation tecisions to p
mmunicatioders, public
emergency ncy partnersnto governmThis effort se July 2013 ffollowing:
OEM, police
real time;
ding respons
Hydro assetng a respons
ation and lev
al requests;
ors to arm ttion and out
, and dissem
ate in ensurimation usedhe processesoronto Hydry enhance ite a part of thprocess shou
ouch points;
te informati
ouch point;
d Recommentions – Others
that will helpprotect their
on, and coorc safety) dur
manager is s prior to an ment, Torontstarted at thfloods. Toron
and fire,
ses;
ts with City pse;
veraging eac
and
hem with threach needs
minating key
ng that the d to develop s used to supro should dot further, bahe Emergenculd capture t
;
on to those
ndations er
p them set health,
dination ring major
to create emergency.o Hydro hase beginning nto Hydro
public safety
ch other’s
he unified s.
y messages.
press all other pport the ocument the sed on any cy the
internal and
s
y
d
83
Documessprepa
5.8.
The rThey critichave provideplorespothe st
The omajo
The imana(CSR)reprefrom initiareclo
Specific romessage
Process mprocess; a
Pre‐scriptToronto A
menting thesaging duringaration for a
Informa
role of the inprovide incial restoratiooperated, lode data andoyment and onse team’s trategic, ope
operational ar events are
Outage m
Geograph
Customer
Superviso
Integrate
Mobile Da
Automate
Radio com
ntegration oage outages.) or the IVR tesents that inthe IVR or ol call, OMS wser, or break
oles for the developmen
map depictinand
ted messageArea.
ese processeg major evenan event.
ation Syste
nformation aident managon informatioocation of crd intelligenceintegration ability to maerational, an
and informae:
management
hic Informati
r Informatio
ory Control a
d voice resp
ata System (
ed metering
mmunication
of the differe. For examplto report a pndividual cuother CSRs inwill use algoker) operate
message devnt and appro
ng a step‐by‐
es in the key
es and procents and cons
ems and Te
and operatiogers with theon (e.g., cusrews) in ordee to inform rof these sysake timely and tactical le
ation techno
t system (OM
ion System (
n System (C
and Data Acq
ponse system
(MDS);
infrastructu
ns, web sites
ent systems le, when a cpower outagstomer’s oundicating morithms to deed to interru
FIT
velopment toval;
‐step messag
languages u
edures will esistency in th
echnologie
onal technoloe ability to idtomers out,er to establirestoration dstems and toand informedevel.
logy system
MS);
(GIS);
IS);
quisition sys
m (IVR);
ure (AMI, sm
s and web‐e
provides theustomer calge, a troubleutage. As addore customeetermine whpt service to
Findings andInformation Technologie
team, includ
ge developm
used by the r
nsure the cohe training o
es
ogies in majdentify, proc location of sh “situationdecision makools can dired command
s commonly
tem (SCADA
mart meters)
nabled appl
e utility withls a custome ticket is proditional notifer outages inat upstreamo the entire
d RecommenSystems an
es
ding respons
ment and app
residents of
onsistent useof new team
or events is cess, and comoutages, denal awareneking. The levctly affect thand control
y used by uti
A);
; and
ications.
h an end‐to‐eer service reoduced in OMfications aren the same am device (e.ggroup of cus
ndations d
ibilities for
proval
the Greater
e of members in
two‐fold. mprehend vices that ess” and vel of he incident decisions at
lities during
end ability tpresentativeMS that e received rea as the g., fuse, stomers.
r
n
t
g
o e
84
OMS dispawithocrew clear
The Otrackand Coutaginformthe st
Durininterflevel numb
GIS issome
MDS MDS enaband dcaptucrewCurreinstause h
SCADoperaday‐tcircuiremoproviswitc
Sincemeteutilitiused premobjec
will then creatchers sendout MDS, a dwill then inithe ticket fr
OMS plays a s the status CIS to generages, and genmation aboutatus of outa
ng major evefacing with tof activity ober of transa
s used to enhe cases, view
aids the devterminals inle restoratiodispatchers ture damage s in the fieldently, all of tlled MDS terhandheld mo
DA systems pators to remto‐day basis its that haveote restoratiodes supportch circuits as
e the early 21ering infrastries with the to “ping” a
mise. While thctive in insta
eate an outa the troubledispatcher witiate a paperom OMS.
critical role of outages aate outage rnerates outaut electric diages across
ents, there isthe OMS andoften createsactions appr
hance a utiliw tree canop
velopment onstalled in linon crews to ito streamlinassessment d to customehe grid resprminals on tobile units.
provide an umotely open aand can be e ties to otheon can result throughouts repairs are
1st century, uructure (AMability to cameter (i.e., shis is a functalling AMI wa
age ticket foe tickets to trwill typically rer ticket proc
in the end‐tacross the serecords for inge tickets foistribution sythe system f
s an exponend the numbes the risk of aroach or exce
ty’s ability ty in relation
of situationane trucks prointerface dire execution informationers. A drawbponse vehicleheir vehicles
nderstandinand close deused early iner feeders thlt in faster ret a restoratiomade.
utilities haveI), also knowrry out two‐send a signationality thaas to suppor
FIT
or that specifrouble or linradio the ticcess to prov
to‐end proceervice territondividual cuor repair. It lystem connefor further a
ntial increaser of transaca system sloeed the capa
o track assen to the syste
l awarenessovide GPS anrectly with wof operation, or as a tooback is the coes and supers. In addition
ng of the scoevices in then a large evehat have notestoration ofon by allowi
e been adopwn as smart ‐way commual) to determt the smart rt energy eff
Findings andInformation Technologie
fic device. Ine crews’ MDcket informavide the requ
ess. It capturory. It integrstomers tracinks to the Gectivity, andanalysis.
se in the numctions that Oow‐down or acity of the s
ts, develop cem’s equipm
and operatnd trouble swork managenal decisionol to better cost to outfit rvisors at Ton, meter tec
ope of the ou field. This iment responset been affectf some custong the syste
pting and immeters. Theunication witmine whethemeters provficiency initia
d RecommenSystems an
es
n companies DS terminal. tion to the cuired inform
res, evaluaterates with thcks group caGIS system p generates r
mber of peopOMS has to hshut‐down wsystem.
circuit mapsment and ass
ional decisiopot informaement systes. MDS can bcommunicatan entire veoronto Hydrohnicians and
utages and amproves rele to re‐energted by the oomers. SCADem operators
plementing se systems pth meters, ar there is povide, the primatives and e
ndations d
with MDS, In utilities crew and theation to
es, and he IVR systemalls related toprovides reports on
ple handle. This when the
s, and, in sets.
on making. tion and ms, OMS, be used to te ETRs fromehicle fleet. o have d inspectors
allow iability on a gize those utage. This DA also s to remotel
advanced provide and can be ower at the mary nable
e
m o
m
ly
85
custocapabstatu
The IV
The asuppo
5.8.1
Like msysteblue proficstressinfras
Infor
1. O
In 20meteOntafundiretailsysteremois notmanuan ou
2. A8
Over conn
omers to mable of condus of the outa
VR and CIS a
assessment oort the 2013
Systems s
Systems i
Availabilit
Accommo
Use of mo
Alternativ
1. Informat
most other ums describesky day opeciency. The vsed the capastructure to
mation Syst
One of the ea
06, Toronto er technologyrio Energy Bing for the Cl customer am. This exteotely outagest set up to suual process tutage for a g
An extensive5,000 contro
the years, Tectivity to m
nage their eucting mass sages.
are describe
of the Toron3 Ice Storm r
scalability;
ntegration;
ty of critical
odation of ne
obile‐based
ves when tec
tion System
utilities, Toroed above, to rations and volume of tracity of the stheir limits.
tems and Te
arly adopter
Hydro was y, called AutBoard (OEB) Company to iand 85,800 inensive smarts. Since eneupport a largto ping eachgroup of cust
e Supervisoryol points on
Toronto Hydmore than 90
energy usagesurveys (“pin
d in Section
nto Hydro infrestoration e
data (e.g., fo
ew users;
technologie
chnology is d
ms and Tech
onto Hydro hsupport daysmaller outaransactions asystem, push
echnology St
rs of smart m
one of the fitomated Meinitiative to install the Andustrial/cot meter netwrgy efficiencge‐scale rest meter, requtomers (e.g.
y Control ann more than
ro has imple0% of its dist
FIT
e. As a resultngs”) of cust
5.6 Commu
formation syencompasse
or accurate
s; and
down/unava
hnology Fin
has implemey‐to‐day opeage events (and interfaching some p
trengths
meter techn
irst utilities ietering Infrasimprove eneMI infrastrummercial smwork providecy was the ptoration. Foruiring excess, an entire c
nd Data Acq4,000 devic
emented an tribution circ
Findings andInformation Technologie
t, most of thtomer mete
unications – C
ystems and ted the follow
situational a
ailable.
ndings
ented and inerations. Geni.e., Level 1 ces generateortions of th
nology.
in North Amstructure (Aergy efficiencture. Todaymart meters es Toronto Hrimary objecr example, tsive time to ircuit).
uisition (SCAes.
extensive SCcuit breakers
d RecommenSystems an
es
he AMI systers to provide
Customer Co
technologiewing:
awareness, E
ntegrated eanerally, theyor 2) with grd by the 201he technolog
merica to depMI). As a pancy, regulatoy, there are on Toronto
Hydro with thctive for AMhe current sdetermine t
ADA) system
CADA systems. Approxim
ndations d
ms are not e immediate
ontact.
s used to
ETRs);
ach of the y support reat 13 Ice Stormgy
ploy smart rt of an ors provided 648,000 Hydro’s he ability to I, the systemsystem uses the status of
m with
m with ately 140
e
m,
m a f
86
circuiHydrooverh
This aelectsystewereopera24 hothe Olocko
3. M
Approand wTheseautomTechntheir time,so th
Infor
1. Oco
ToronenououtagHydroefficitrans
In adweb‐by “sdaily outagreporconnand psophexpe
it breakers oo’s SCADA syhead system
allows Toronrical distribum was used completelyations. Thesours from whOutage Manaouts were cre
Mobile Data
oximately 20were equippe mobile unimatic vehiclenology, allowtruck and p, GPS locatioat they can a
mation Syst
OMS hardwaoncurrent u
nto Hydro’s gh bandwidge events. Po decentraliently managsactions exce
dition, the vinterface fouper users” work. In addge tickets, asrts, this “supectivity modpurge incorristicated interience to ma
on the 4kV syystem provid
m of its size a
nto Hydro toution system to initially d out of powee resulted inhen the eveagement Syseated imme
Terminals a
0% of Toronped with full its, typically e locating tew the crews rovide a moon provides tassign work
tems and Te
are and intersers during
OMS licenseth to operater the Emerzed the dispge the restoreeded the ca
version of thr managing – staff who dition to enassigning ETRper‐user” intdel, ‘un‐nestectly createderface that taster. A mor
ystem do nodes relativelnd construc
o perform rem. During an determine ther) and perfon some portint started. Sstem (OMS),diately for f
available in a
to Hydro truMDS terminlaptops loca
echnology (Ato receive, are timely stathe dispatchto the crew
echnology O
rfaces werethe 2013 Ice
e can accomte the systemgency Respopatch functioration work.apacity of th
e OMS systebasic transaneed broadabling basic Rs for individterface prov’ outages thd outage tictypically reqre basic inter
FIT
ot have SCADly strong penction.
emote sensinevent like thhe number oorm remoteion of customSince the SCA, the outageield review a
a portion of
ucks used dunals and anoated in eachAVL) or Globaaccept, updaatus of eachhers with reaws that are cl
pportunities
not scalablee Storm.
modate 33 cm on a blue onse Plan, duon to local in As a result,he system an
em that was ctions. The cer access toOMS transadual customeides the abilat the OMS kets. Super uires traininrface for ma
Findings andInformation Technologie
DA controls. netration of
ng and contrhe 2013 Ice Sof feeder loce switching amers being rADA system tickets assoand restorat
Toronto Hy
uring the 201other 30% ha vehicle withal Positioninate, and clos outage in thal‐time visibiosest to the
s for Improv
e to handle
concurrent usky day and uring the 20ncident comm the volumend caused a b
implementecurrent OMS system funcctions, suchers, and runnlity to make has logicallyusers accessng and signifnaging the o
d RecommenSystems an
es
As a result, the devices
rol of deviceStorm, the Sck outs (i.e., and restoratirestored witfeeds inform
ociated with tion.
ydro vehicles
13 Ice Stormad mobile coh cellular tecng Satellite (Gse outage tiche OMS. At tlity into crewe outage.
vement
the number
users, whichduring Leve
013 Ice Stormmand centree of concurrebrief outage
ed does not S was designctions to con as opening ning basic ouchanges to y tied to a sins OMS throuficant on‐theoutage ticke
ndations d
Toronto for an
s on the SCADA circuits thation thin the firstmation into the circuit
s.
m restorationonnectivity. chnology anGPS) ckets from the same w locations
r of
h provides el 1 and 2 m, Toronto es to more ent e.
include the ned for use nduct their and closing utage statusthe ngle device, ugh a more e‐job ts and
t
n
d
s
87
runni“supe
2. Gst
As mcomptime efficireadican bcommproceassist
In adapprotechnan ou
3. T
Similaprovithe ctransterritmeteconfiabilitespec
4. Lain
Leadikey othrouToronto‐darequiprovi
ing basic reper user” vers
Groups of smtatus and a
entioned eaprising the smthe AMI sysency initiativngs, so that be used to idmunication (ess. This prot in identifyi
dition to thioximately twnology.” Thisutage occurs
he GIS syste
ar to leadingdes connectustomer mesformer is aptory) and 95%er connectiviguration, thy to ensure cially during
ack of connenaccuracy of
ing utilities houtage informugh a varietynto Hydro syay operationired to proceding timely
ports would sion.
mart meters portion of t
rlier, Torontmart meter tem was insves through customers c
dentify or ve(one meter aocess does nong “nested”
s limited capwo‐thirds of s technologys on the met
em does not
g electric utitivity of its eeter. Currentpproximately% across theity may not be current levaccurate pre major even
ectivity amof outage sta
have integramation, analy of channelsystems are ins. In a large‐ess informatand accurat
require muc
could not behem do not
to Hydro wahardware, sstalled, the pthe provisiocan better mrify outagesat a time) onot support e outages.
pability to prToronto Hydy sends an ater and enab
t have fully a
lities, Toronelectric netwtly, the accuy 85% in thee rest of the be achievabvel of accuraediction of tts.
ong differentus informa
ated their malyze the datas (e.g., web‐ntegrated to‐scale eventtion and trante informatio
FIT
ch less traini
e pinged quhave “last g
s one of theoftware, andprimary purpon of highly manage their, the existingnly, which is effective (ne
rovide outagdro’s smart utomatic nobles the OMS
accurate con
to Hydro hawork from thracy of mete core of the system. Whle, because acy does nothe outage le
t informatiotion availab
ain IT and OTa, and provid‐site, text, mo a level that, however, tnsactions preon to custom
Findings andInformation Technologie
ing and use
ickly to detegasp” techn
e early adoptd communicpose was to reliable consr energy usag system allodone througar real‐time
ge status on meters do notification toS to match p
nnectivity at
s an integrae substationer connectivCity (legacy
hile maintainof the frequt provide theevels and cu
on technologble to custom
T systems tode status up
mobile app, ot provides suthe level of mevents Toromers regardi
d RecommenSystems an
es
less bandwid
ermine the oology.
ters of AMI tcation netwosupport enesumption usge. While smows for seriagh a highly m) “pinging” o
a large scaleot have “las
o the OMS thpremises wit
t the meter
ted GIS systn breaker levvity to the coy Toronto Hyning 100% acent changese Company wstomer coun
gy systems cmers.
o automaticapdates to cusoutage map, ufficient supmanual internto Hydro frng their out
ndations d
dth than the
outage
technology ork. At the ergy sage mart metersal manual of meters to
e, st gasp he moment th outages.
level.
em that vel through orrect ydro service ccuracy of s in system with the nts,
caused
ally collect stomers IVR).
pport for dayrvention rom age status.
e
y‐
88
5.8.2
IT‐1 Itechn
As Totechn
Toronroad syste
ToronautomProviintegreceivtimel
With Toronexpedcosts
The Oinfras“readinclud
2. Informat
nclude IT/Onology strat
oronto Hydronologies cou
Identify wcustomerManagemduring an
Update anof this inf
Identify awhen syst
nto Hydro shmapping prms.
Expantermi
nto Hydro shmate the excding more sgrated with Ove work ordy manner, w
Evaluaaware
the advancento Hydro shdite the abil of upgradin
Upgra(thin ccontro
OMS at Torostructure, shd only” needde:
tion System
OT technologegic roadma
o updates itsuld support la
what informars, and key stment, first re large scale,
nd automateformation to
lternatives ttems are do
hould develoojects. Ther
nd mobile plnals, mobile
hould expanchange of insmart deviceOMS and GISers remotelywith minima
ate enhanceeness during
ement of smhould continity to “ping”ng the meter
ade the outaclient or weol.
onto Hydro, ihould accomds) and a larg
ms and Tech
gies that proap.
s strategic roarger‐scale r
ation is needtakeholders esponders, p complex re
e, where indo those grou
to support cwn or unava
op cost estime could be n
latforms fore platforms f
d the use ofnformation bes supportedS would allowy, estimate l human inte
ements to smg large‐scale
mart meterinnue with its p” groups of mrs that curre
age manageb‐based) ve
including hammodate diffger number
FIT
hnology Re
ovide real or
oadmap for restorations
ded by Toronlike the Cityublic safety storation;
dicated, the ps; and
ommunicatiailable.
mates for thenew systems
r operationafor damage
f mobile techbetween thed by a back‐ew field persorestoration tervention in
mart meter e outage.
ng technologplan to replameters. Alsoently don’t h
ment systemersion to sup
rdware, softferent types of concurre
Findings andInformation Technologie
commenda
r near real‐t
IT/OT system, it should:
nto Hydro dey of Toronto agencies, an
processes th
ion and infor
e priorities cs or enhance
al communicassessment
hnology to ae field and coend softwareonnel to enttimes, and cthe comma
technologie
gy and the coace the data the Companave the “las
m (OMS) andpport decent
tware, serveof users (sunt users. Enh
d RecommenSystems an
es
ations
ime intellige
ms and inve
ecision makeOffice of Emnd other pub
hat support t
rmation man
confirmed thements to cu
cation (e.g., t).
all crews to fommand cene system thater damage iclose work ond and cont
es to improv
ommunicatio collectors, wny should int gasp” tech
d create an tralized com
ers, and otheuper users, uhancements
ndations d
ence in the
sts in new
ers, mergency blic officials
the delivery
nagement
hrough the urrent
mobile data
further ntres. at is information,rders in a trol centres.
ve situationa
ons networkwhich will vestigate th
hnology.
OMS‐lite mmand and
er associatedusers with s to consider
y
a
,
al
k,
he
d
r
89
The a
ToronpointCIS, wwheran acaccesinclud
5.9.
The iexpecutiliti(durathe imdamatechnabilitIt encoutagresoucomm
12 EdisstabiliBefore 13 The rathernorma
ImplemenArrangingand Providing
access to this
Ensurintegr
nto Hydro shts between kwebsite). There informatioccurate portrssible at all. de needed e
Vegetat
ncreased frectations andies to explorability and rempacts of stage, the arranologies thaty to continucompasses tges, reconfigurces to contmonly used d
Improving
Burying o
son Electric Insty of infrastruce and After the
Edison Electricr they enable faal operations,”
nting a moreg access to p
a scaled‐do
s version co
re that primarate to prov
hould assesskey operatioe Company son links are srayal of systOnce criticaenhancemen
tion Manag
equency of sd lower tolerre ways to imesilience). Duorms withouangement oft help proteue to operatehe configuraguration of ttinue servicedurability an
g the strengt
overhead line
titute (EEI) defcture to withste Storm, March
c Institute alsoacilities to con Before and Af
e current verprovisional lic
own version
uld be throu
ary data syside key data
s the currentonal systemsshould addrslow, whereem or outagl gaps are knnts on the te
gement an
severity of wrance for lonmprove stormurability12 reut damage af existing eqct the systeme despite daation of systthe system te to customend resilience
th of poles a
es;
fines hardenintand the impach 2013.
o defines resilietinue operatinfter the Storm,
FVS
rsion of the censing to s
of OMS for n
ugh a termin
stems (i.e., Ga for custom
t system arcs (e.g., OMS,ess the intere needed infoge status, or nown, Toronechnology ro
nd System
weather evenng duration om performaefers to the aand includes uipment to rm from dammage to somtem compono maintain sers while thee enhanceme
and structure
g as those acticts of severe w
ence as those “ng despite damMarch 2013.
Findings andVegetation MSystem Hard
OMS softwaupport a sho
non‐super u
nal or it can b
GIS, OMS, CImers and dec
hitecture, pa GIS) and infrface point bormation isnwhere criticnto Hydro shoadmap.
Hardening
nts, along wioutages by cnce of their ability of thematerials oresist or avo
mage. Resilienme parts of tnents to reduservice, and e electric sysent techniqu
es;
vities that: “imweather events
“measures (thamage and/or pr
d RecommenManagemendening/Resil
are; ort‐term upt
sers.
be web‐base
S, outage mcision maker
articularly information sybetween man’t available cal informatihould identif
g/Resilien
ith changingcustomers, hdistributione system to wr equipmentoid damage, nce13 is definthe distributuce the numapplication stem is restoues include:
mprove the durwith minimal
at) do not prevomote a rapid
ndations nt and ience
tick of users;
ed.
map) rs
ntegration ystems (e.g.,ain systems to provide ion isn’t fy and
nce
g have spurred systems withstand t that resist and ned as the tion system. mbers of of system ored. Some
rability and damage,”
vent damage; return to
;
,
d
90
Syste
Mostinvesstakeand bdurabthis wand bmeth
Each by histo fulthe imresou
Conv
Over outagexpreconsthigh wexposrelate
In adthat hU.S. hprelim(appr$16 bincondrivetrans
As anseleccriticcentr
Enhancingautomatio
Increasing
em Hardenin
t system harstment to yieeholders (in pbenefits for ebility and reswork. There benefits assohodologies a
of these mestorical datally assess thempact of eacurces on rest
erting Overh
the past deges, customeess interest itruction. Unwind, fallingsed than oveed to heat a
dition to thehave been chave deememinary estimroximately 5billion dollarnveniences pway removasformers pla
n alternativeted overheaal infrastrucres, etc. Usu
g flexibility oon; and
g vegetation
ng/Resilience
dening initiaeld improvemparticular, reeach option,silience of this no standaociated withre: probabil
ethods requia if it is availae benefits ofch event cantoration acti
head Lines to
cade and imers, regulatoin the convederground fg trees, and ierhead linesnd flooding
e potentiallyommissioned widespreamates for con58% of circuis. Another cproperty owal and replacced on custo
to implemead circuits orcture facilitieally sections
of the electr
n clearances
e
atives span mment. Leadinegulators) to, determine heir distributard approach hardening oity based; re
ires the use able. It’s a chf each harden vary substaivities, rathe
o Undergrou
mmediately aors, legislatoersion of ovefacilities reduice accumulas to other haoften requir
y higher costed by differead “undergronverting thet lines) at Toconcern is thners and crecement, damomers’ prop
enting large r sections of es. These incs that are tar
FVS
ic system th
around pow
multiple yeang utilities ho identify ththe optimaltion systemsh within the options, butelative comp
of a set of ahallenge forening optionantially, and er than data
und
after a majorors, and otheerhead distriuce, if not eation. On thazards such ares more tim
t of undergront regulatorounding” to e remaining ooronto Hydrohat the actuaeates aesthemage to treeerty.
conversionscircuits to im
clude hospitargeted for co
Findings andVegetation MSystem Hard
rough circui
wer lines.
rs, involvinghave workede best optiol portfolio ofs, and ultimautility indus the three mparison; and
ssumptions r utilities to hn. There are utilities havgathering.
r event that er external stbution facililiminate, thee other handas heat and fme and highe
ound restorars and state be cost prooverhead info to undergral conversionetic issues – y root system
, some utilitmprove the als, water filonversion to
d RecommenManagemendening/Resil
it ties and sy
g sequential d with their kons, evaluatef projects to ately securestry to evalumost commorecent even
that can be have enoughnot many mve tended to
causes extetakeholdersties to undee risk of failud, they are mflooding. Daer cost to res
ations, all oflegislators ahibitive. Somfrastructureround rangen process yard excavatms, and padm
ties have conreliability oftration plano undergrou
ndations nt and ience
ystem
cycles of key e the costs enhance th funding for ate the costonly‐used nt baseline.
supported h actual dataajor events,o focus
nsive power tend to erground ure due to more amage store.
f the studies cross the me of the e from $11‐
tion, mount
nverted f service to ts, 911 call nd are
e
s
a
r
91
locatprone
Vege
Vegeand lincludvegetoutagway (
SomeclearaROWto exto norespooutso
Also, utilitistandnegatmainsomemay trees
Pole
In adpole to‐15methare stcond
Utilityguideutilition hi
14 A sepremi
ed in heavilye to flooding
tation Mana
tation is typimbs tend toding poles, ctation arounges in major(ROW).
e utilities havance specific
W. Aggressiveecute since ote that mosonsibility of aourced to co
VM programies serve urbdard definestively affect taining vegee neighbourhprescribe ths, and somet
Maintenanc
dition to invinspection a5 years and ihods for assetratified by pition?) and r
y hardeningelines, too. Fies adhere tostoric weath
ervice drop is ases. It is the po
y‐treed areag.
agement
pically the sino fall into discreating intend lines, typir events tend
ve expandedcations, reme VM programthey requiret of the utilia property oontractors w
ms often muban areas wi proper prunthe health oetation arouhoods, have e amount oftimes even a
ce
vesting in vegand replacemnclude a comessing the inpriority (i.e.,replaced wit
programs uFor example,o electric safher patterns
an overhead eleoint where elec
s, in back‐lo
ngle largest cstribution linerruptions tocally using ad to fall in fro
d their vegetmove overhams can redue access andties do not towner. Mostho specialize
ust comply with denser trning techniqof the tree. Wnd distributispecific reqf clearance aaccess to tre
getation mament programbination otegrity of wo, When do ththin a pre‐de
usually must , in order to fety codes w by geograp
ectrical line ructric utilities p
FVS
ots with diffic
culprit of ounes and takeo customer sa pre‐definedom outside
tation manangs, and takuce damage d approvals btrim around t of the utilite in maintain
with externalree canopy. Tques to ensuWorkers muion lines. In uirements taround a linees that are o
anagement, mms. The inspf visual, souood poles. They need to efined target
comply withensure the
which establihic area. The
nning from a urovide power t
Findings andVegetation MSystem Hard
cult access,
utages duringe down wire service. Mosd cycle. Treethe typical c
agement proke out hazardduring majoby property service dropty vegetationning line cle
l regulationsThe arboricure that any ust follow theaddition, mao protect the, how to reon private pr
most utilitiepection cyclending, grounThe poles whbe replacedt period.
h externally‐safety of eleish guidelineey are expre
utility pole to ato their custom
d RecommenManagemendening/Resil
and areas th
g major evenand equipmst utilities clees and limbsclearances o
ograms to incd trees fromor events, buowners. It isps.14 This is un managemearance for u
s, particularlulture industpruning doeese standardany municipheir tree canomove dying roperty.
es conduct pees typically rnd line, and hich do not pd based on th
‐imposed poectric utility es for pole loessed in term
a customer's bumers.
ndations nt and ience
hat are not
nts. Trees ment, ear that cause r rights‐of‐
crease m outside theut are difficus important usually the ent work is utilities.
y when try pruning es not ds when palities, and opy. These or deceased
eriodic woodrange from 8boring pass the testheir
olicies and constructionoading basedms of the
uilding or othe
e lt
d
d 8‐
t
n, d
r
92
minimUtilitstandinsta
The rresilie
5.9.1
The dcausethe ewoodbrokereplaCompdurinof thePole
ThroupowerenegbasedpractToron
15 Can
ANSI A
City By
mum wind sies are expedards and strllation.
review of Toence progra
Program s
Conformapractices;
Adherenc
Resiliency
1. Vegetati
damage thated by tree limentire storm,d poles on iten during thcement propany’s woodng this storme Company’sInspection p
ughout the Cer lines usinggotiated its vd cycle for mtice. The curnto Line Clea
adian Standard
Flashover dA300 – Standar
RecommenIndustry As
y‐Laws – City o15 cm (0.5 f30 cm (1 ft.90 cm (3 ft.
peeds and icected to folloructures, inc
ronto Hydroms addresse
scope and m
ance to indu;
ce to local by
y‐building ap
on Manage
t Toronto Hymbs falling o, the Compas distributioe ice storm gram in placd pole plant m and may has asset manaprogram (PW
Company’s hg different mvegetation mmaintaining crent VM proarance Guid
d Association (distance for ACrd Practices foded standard sociation (TCIAof Toronto Foreft.) clearance f) clearance fro) clearance fro
ce loading thow these guicluding wood
o’s vegetatioed the follow
management
stry standar
y‐laws; and
pproaches an
ement and
ydro experieon distributiony had to ren system. Gand the welce, it can be did not contave actually agement effWPI) on a 10‐
history, Toromethods andmanagemenclearances aogram followelines15.
(CSA) C22.3 No System Condur Tree Care Opby the InternaA) estry Cycle Prufrom house serom secondary com primary con
FVS
hat the strucidelines to ed poles, mee
on managemwing:
t;
rds and perfo
nd methods
System Ha
nced duringon lines andeplace only 1iven the smal‐defined woconcluded ttribute to thprevented afort, Toronto‐year cycle.
onto Hydro hd programs. t contract ancross its sysws the CSA a
o. 1‐10 uctors to treesperations tional Society
uning Guidelinervice conductors nductors
Findings andVegetation MSystem Hard
ctures are exnsure that tet loading st
ment and syst
ormance as
.
ardening/Re
g the 2013 Ic breaking th17 out of appall fraction oood pole insthat the stree number ofa larger amoo Hydro cond
has maintainIn 2008, Tornd establishtem, which nd ANSI stan
of Arboricultur
es
d RecommenManagemendening/Resil
xpected to wheir construtandards at t
tem harden
compared t
esilience Fi
ce Storm washe conductorproximately of poles thatpection andngth and intf outages exount of damaducts a Plan
ned clearancronto Hydro ed a three‐yis an industrndards as we
re (ISA) and th
ndations nt and ience
withstand. uction the time of
ing and
o leading
ndings
s mostly rs. During 101,000 t were tegrity of thexperienced age. As a parned Wood
ces around it
year, circuit‐ry leading ell as City of
e Tree Care
e
rt
ts
f
93
In 20optioeffortfibergthe pdeveportio
Vege
1. Ta
In 20approlines confiwherstill mstand
2. Vp
The dnumbelectthreeclearafive yconsi
3. Overe
As mcontrcontrin‐hoa cert
16 Inclu17 Fibe
08, Toronto ons. As a resuts including,glass brackepast 30 yearslopments. Ton of the co
etation Mana
oronto Hydrnd adheres
08 the Compoach. The apby geographguration. Thre it will provmaintained idards. Simila
Vegetation mractices (i.e
duration of tber of factorric system coe and seven ances on a tyears, depenidered a lead
Over the pastegetation meducing the
entioned earactors that ractor for allouse that foctified arbori
udes installing erglass bracket
Hydro condult of that st, but not limts for pole lis, Toronto Hhis has beenost.
agement an
ro has beento accepted
pany re‐negpproach usehic areas (i.ehe circuit‐basvide the besn adherencear to most ut
management., three‐yea
the vegetatiors, such as tronfigurationyears on thethree‐year avnding on theding industry
t six years, Tmanagementcost of the
rlier, most uspecialize in preventive cuses on cusst in‐house.
a tensioned wts are not subje
ducted a studtudy, the Coited to betteine equipmeydro has been a standard
nd System Ha
following ad industry an
otiated its Vd until then e., sections osed approact reliability ie with the actilities, the C
t preventiver cycle).
on trim cycleree species, n. The cycle fe distributionverage cycleir reliability y practice.
Toronto Hydt program (eprogram.
utility vegetan electric linetrimming. Ittomer reque
wire on poles, dect to as much
FVS
dy to explormpany begaer pole guyinent support.1
en installing industry pra
ardening/Re
a circuit‐basend City of To
VM programwas grid baof the City) irch focuses thmprovemenccepted induCompany doe
e maintenan
e for an eleclocal by‐lawfor line clearn system. Toe, meaning tperformanc
dro has maine.g., clearan
ation manage clearance. t has retaineests and cor
designed to ad decay as the w
Findings andVegetation MSystem Hard
e different san to implemng,16 stronge17 It is imporg undergrounactice, with
esilience Str
ed trimmingoronto prun
and implemsed, focusedrrespective ohe yearly VMnt while ensuustry and Cites not trim a
nce program
ctric distributws, customer rances typicoronto Hydrohat circuits ace. This VM p
ntained a coces, miles co
gement workToronto Hyded one vegetrective main
d stability to a wood brackets
d RecommenManagemendening/Resil
system hardement severaler insulatorsrtant to notend systems idevelopers
rengths
g program siing standard
mented a circd on clearingof the electrM spending ouring that thty of Torontoaround servi
m is in line w
tion utility dpriorities, aally ranges bo maintains are pruned epreventive c
onsistent scoompleted) w
k is conductedro uses an tation manantenance wo
free‐standing s.
ndations nt and ience
ening hardening s, and e that over n all new bearing a
ince 2008 ds.
cuit‐based g distributionric system on circuits he system is o pruning ice drops.
ith industry
depends on and the between its circuit every two toycle is often
ope of the while
ed by outsidoutside gement crework. There is
structure.
n
a
o n
e
w
94
When2008overawith reducday r
Figurthe pFrequtreesand it12‐mincludfluctuindicaslightcontr
Figure
4. T
For myear
n Toronto H, it requesteall cost of thindustry andced the costeliability.
e 19 depictsperiod 2003 tuency Index s. SAIFI is a stt represents
month periodde outages ruations in peate that the tly improvedract in 2008.
e 19: Toronto H
oronto Hydr
more than 15cycle. The w
ydro transited bids from e program wd City of Tors of the ove
s Toronto Hythrough 201(SAIFI) and ttandard indus the numbed. The calcularelated to anerformance fvegetation‐d for Toronto.
Hydro Vegetat
ro’s wood p
5 years, Torowork is perfo
ioned from toutside conwhile continuonto standarall program
ydro’s vegeta13. The red lthe blue lineustry metricr of interrupations do nonnual weathfrom year‐to‐related reliao Hydro sinc
tion‐Related O
pole program
onto Hydro hrmed by con
FVS
the area‐basntractors. Thuing to mainards) on a thm while prov
ation‐relatedine represene shows the used to evaptions that aot include maher patterns o‐year. Despability perforce the implem
Outages and SA
m is in line w
has been conntractors spe
Findings andVegetation MSystem Hard
sed to circuihe Company ntain the samree‐year aveiding the sam
d reliability onts the Systetotal numbealuate the rean average cajor outage and smallerpite these flurmance has mentation o
AIFI (2003‐2013
with industry
nducting a Pecializing in
d RecommenManagemendening/Resil
t‐based appwas able to me clearanceerage cycle. me (or bette
on a blue skem Average er of outageeliability perfustomer woevent days, events, whiuctuations, sremained coof the change
3)
y leading pra
PWPI prograthis field. Th
ndations nt and ience
proach in reduce the es (in line This strateger) day‐to‐
y day over Interruptions caused by formance ould have in but they doich cause thestatistics onstant or es to the
actice.
m on a 10‐he program
y
n
a o e
95
includstandCompaddreindus
VegeImpro
1. Cp
With the Cbetwwidesclearato prowind,
2. Cin
Toronand sworkto resCity dresoucrew
18 The signs oused thammpoles. integr
The seon anyFor thThe retechnomeasuconsuleaves
des a two‐stdard remediapany has estessed. The cstry leading
etation Manaovement
ity of Toronreventing o
the recent iCity of Toronween tree canspread, prolance aroundotect the lin, heavy snow
oordinationncident and
nto Hydro crstreet‐side tr differ), Comstore powerdid not haveurces and exs to Toronto
first step alwaof decay, feathto strike the pomer blow help dFor poles less ity of the pole
econd step is ay other poles te bore test, a 1esultant shavinology to the bouring instrumemption can bes only a very sm
tep assessmeation alternatablished timycle and scopractices.
agement an
nto line clearutages durin
increase in fto line clearnopy objectionged powed primary linnes during mw, or wind.
n of clearing day‐to‐day.
rews focus oree maintenmpany and Cr to City reside a standard xpected worko Hydro, or a
ays is a visual ahering, throughole from the grdetermine if ththan 20 years (barring obser
bore test or ahat are suspec13mm diametengs are examinore test is a resnt is used to de analyzed to idmall hole in the
ent (visual aatives for womeframes wiope of the Co
nd System Ha
rance by‐lawng major inc
requency ofrance guideliives and theer outages. Tnes and 1’ armajor weathe
efforts with.
on power linance. While
City forestry dents. Durinprocess to cking hours ea consistent
and sounding ah‐checks, mechround level up here are internold, a visual arved defects).
resistograph tcted to have aner bit is used toed for signs of sistograph testrill into the podentify internae pole that doe
FVS
nd soundingood poles ththin which tompany’s PW
ardening/Re
ws are defincidents.
f major weatines may no need for larThe current round seconer incidents,
h City vegeta
e clearance e the scope acrews often ng the 2013 Icommunicateach day, a papproach fo
assessment of thanical damageto eight feet aal cavities causnd sounding in
test. This is pern internal defeo bore into thedecay and thet, in which a 2mle. The resultal cavities. Thees not require p
Findings andVegetation MSystem Hard
g assessmenhat do not pathe rejected WPI program
esilience Op
ed for blue s
ther events at provide forger clearanclearance gudary wires. Twhether the
ation manag
only, and Ciand primary work togethIce Storm, Toe the availabprocedure toor requesting
the pole. The pe, insect infestabove; the sounsed by decay. Tnspection is ad
rformed on poct, even if theye pole on a 45‐en the hole is pmm diameter dant graph showadvantage of tplugging.
d RecommenManagemendening/Resil
nt and a boreass the inspepoles have
m are in line
pportunities
sky reliabilit
across Northr an adequaces to reducuidelines proThese are noey are relate
gement crew
ty crews focobjectives oher during moronto Hydrbility of City o transfer cog and assign
pole is inspectetation, etc. A hnd characteristThis is done onequate to conf
oles older than y are less than ‐degree angle, plugged. An altdrill bit connecwing drill positithe resistograp
ndations nt and ience
e test)18 withection. The to be with
for
ty, not for
h America, te balance ce the risk ofovide for a 3ot sufficient ed to ice,
ws during an
cus on parks of their dailymajor eventsro and the forestry ntrol of the ing crews.
ed for externalammer is also tics of the n all wood firm the
20 years, and 20 years old. at ground leveternate cted to a ion and powerph test is that i
h
f 3’
n
y s
el.
r t
96
5.9.2
VMSHmajocircufacilit
Toronenhashoubest cThe Cand caroun
Initia
Theseenhahurricplant
VMSHrelate
The corderworkgroup
2. VegetatiRecomm
H‐1 Evaluateor weather eits where it ties.
nto Hydro shncing the dild quantify tcombinationCompany wicost‐effectivnd power lin
tives that th
Increase rmanagem
Install bre
Increase s
Replace s
Improve c
Convert o
Upgrade o
Convert o
Convert e
Develop m
e measures,nce the reliacane) to critts, and 911 c
H‐2 Gain suped funding.
costs associar to impleme with the Onps to gain ag
on Managemendations
e all viable oevents, incluwill enhanc
hould condustribution sythe value ann of projectsll need to woe options renes.
he Company
right‐of‐wayment);
eakaway disc
structure loa
mall conduc
circuit sectio
overhead ba
overhead st
overhead lat
entire overhe
micro‐grids.
including thability of sertical infrastrucall centres.
pport from k
ated with iment the imprntario Electrgreement on
ement and
options to imding converce the reliab
uct an in‐depystem resilied costs assos to improveork with theelated to incr
should cons
y width or re
connects on
ading to with
ctors;
onalization t
ck‐lot to und
ructures/cir
eral (tap) lin
ead circuits
he conversiorvices duringucture and f
key stakeho
proving distrovements idicity Board, n the level of
FVS
System Ha
mprove distrting lines toility of servi
pth study to ence during mociated with system perfe City of Tororeasing vege
sider include
moval of “o
the pole sid
hstand high
o provide m
derground, o
cuits to heav
nes to under
to undergro
on of overheg major weatfacilities such
olders on the
tribution sysdentified in tthe City of Tf resilience d
Findings andVegetation MSystem Hard
ardening/Re
ribution syso undergrouices to critic
identify andmajor weatheach alternaformance duonto to idenetation mana
e, but are no
verhang” (ag
de of the ser
wind and ice
more flexibilit
or move to t
vy loading st
rground;
ound; and
ad lines to uther events h as hospita
e level of res
tem resilienthe study, TToronto, anddesired – an
d RecommenManagemendening/Resil
esilience
tem resilienund for sectioal infrastruc
d evaluate opher events. Tative and ideuring these itify mutuallyagement cle
ot limited to:
ggressive ve
rvice lines;
e;
ty;
the front lot
tandard;
underground(e.g., ice, wils, water filt
silience requ
ce are signiforonto Hydrd other staked the amoun
ndations nt and ience
nce during ons of cture and
ptions for The study entify the incidents. y acceptableearances
:
egetation
(street side
d, can nd, ration
uired and
ficant. In ro should eholder nt of
e
);
97
invesresiliecost r
5.10
Over reveabeneIndeprecomcould
19 See
stment requiency and therecovery me
0. Toron
the course oaled various fit from a clopendent Revmmendationd improve em
Personal groups ofpower ouand houseclothing aup supplyup genera
Commun(e.g., restmessagestelevision
Support fresidents economicthe home
Shelters/alternativ
Planning critical facthrougho
Explanatipremise –homeownfix equipmarrange fo
Appendix D fo
ired. Once the costs assocechanism.
nto Hydro‐
of the assessaspects of eoser collaboview Panel rens for areas wmergency pr
preparednef citizens to butage. This coehold suppliand blanketsy of medicatator.
ication wheoration prios) when chann, cell phone
for vulnerabwho have lically disadvaeless, those w
warming ceve housing, a
and commucilities to re‐ut the resto
on of custom– clearer defner/dweller,ment on his/or repairs ea
or a summary o
here is a shaciated to ach
‐City Coord
sment, stakeemergency moration betwequested Dawhere joint reparedness
ess – advancbe able to mould includeies; alternats to withstanion and othe
n technologorities and stnnels power, radio).
ble populatiomited abilityantaged, the with serious
entres – locaa place to re
unication of ‐energize firration.
mer responsfinition and c, as establish/her propertarly in the ev
of public comm
FT
ared understhieve it, stak
dination
eholder intemanagementween Torontoavies Consulefforts betw and respon
e planning umeet basic live having: a seive living arrnd lack of heer critical he
gy is “down”tatus, availabred by electr
ons – availaby to cope duuninsured, health cond
tions made ‐charge dev
restoration st and mess
sibility for ecommunicathed by the Oty, such as stvent.
ments.
Findings andToronto Hyd
tanding of thkeholders wi
erviews and pt at the como Hydro andting to revieween Torontse. These in
undertaken bving needs deveral‐day srangements;eat; a batteryealth supplie
” – disseminbility of city ricity are not
bility of assisuring an emelow‐incomeditions, and
available byices, and acc
priorities –aging of prio
lectrical eqution of the oOntario Electtandpipes, so
d Recommendro‐City Coo
he target levill need to ag
public commmmunity leve the City of Tew and makeo Hydro andclude:
by individuauring an extupply of foo; an evacuaty‐powered rs; and (poss
ating copingservices, saft available (i
stance for grergency, incl children, ththe mentally
y the City thacess to heat
joint identiforities to the
uipment repaobligation of trical Safety o that custo
ndations rdination
vel of gree to a
ments19 el that could Toronto. Thee d the City
l citizens or tended od, water, tion plan; radio; a backibly) a back‐
g informatiofety .e., Internet
roups of uding the he elderly, y impaired.
at provide .
fication of e public
airs on theirthe Authority, tomers can
e
k‐‐
n
,
r
o
98
5.10.
City oHydrocondToroneffortcoursand o
The w
Explanatienable oremergenc
Use of 31Toronto f
Coordinatreliable aCity, Toroprocedure
Emergencnot continmajor pow
.1. Toronto
of Toronto sto respondeditions, and ento recognizt. They werese of the eveoutreach.
ways in whic
Identificaplace a prHydro’s reparticipatprovided
Sharing onumber othe systemresourceseffort.
Public comcommuniconferencthousand
on of buildir hamper ingcy power su
11 call centrefacility to ha
tion of urband more resonto Hydro, aes to manag
cy responsenuous, contawer outages
o Hydro – C
taff and pubd to the 2013extensive, trezed that this e able to accent to coord
ch Toronto H
ation of criticre‐determinestoration pted on daily updates on
of vegetationof additionalm. In additios, the City of
mmunicatiocation efforces, attendas of emails r
ng codes – sgress or egrepply.
e for back‐undle overflo
an forestatiosilient electriand other kege the urban
coordinatioact betweens.
ity Coordin
blic officials i3 Ice Storm ee‐related dwas a comm
complish botinate restor
Hydro was ab
cal load prioed list of critplans alignedplanning calrestoration
n manageme forestry reson to the Cof Toronto pro
on – Torontots of the Citynce at Provireceived by C
FT
standards mess within hig
p support –ow calls for T
on policies aicity distribuey stakehold tree canopy
on (police, fin Toronto Hy
nation Find
interviewed,given the exdamage. Botmunity recovth through aation priorit
ble to work e
orities – Thetical facilitied with these lls with the Cprocess.
ent resourcesources to admpany contovided many
o Hydro execy of Torontoncial meetinCouncillors.
Findings andToronto Hyd
maintained bygh rise build
feasibility oToronto Hyd
nd plans ‐‐ mution systemders when dey and forest
re, other) –ydro and firs
ings
, uniformly nxtreme cold,h Toronto Hvery, as wellan effective cties, public c
effectively w
e City and Tos to be restopriorities. ToCity and oth
es – Torontoddress the tractors whoy City forest
cutives and so through pangs, and resp
d Recommendro‐City Coo
y Toronto Budings and pro
of using the Cro during an
mindful of thm, joint consieveloping station efforts
maintainingst responder
noted how w hazardous wydro and th as customecollaboratioommunicati
with the City
oronto Hydroored first anoronto Hydrer stakehold
o Hydro needree‐related o supplied adry crews to s
staff supportarticipation iponding to t
ndations rdination
uilding that ovide for
City of n emergency
he needs forderation of tandards ands.
g frequent, ifrs during
well Torontoworking e City of er restoration over the ion, forestry
include:
o had in d Toronto ro ders where it
ded a damage to dditional support the
ted the n daily pressthe
y.
r
d
f
o
n
y,
t
s
99
5.10.
THC‐Toron
Publitoronoutrenot TmediCustoinformemer
As a cToronsuppoinformshouliaisoin rea
ToronsupponeighHydropoputargeenco
In areknowrespeguidea che“passserviccommmobireinfo
.2. Toronto
1 Strengthento Hydro.
Identi
c commentsntoicestorm@each and supToronto Hydcal needs, womers volunmation provrgency, Toro
central and vnto Hydro short to the Cimation withld consider wons and otheaching those
nto Hydro coort outreachhbour,” locato could incluulations whoeted outreacurage them
Educa
eas where mwledge of or ective websielines to helpecklist for a 7sive” source ce announcemunity on‐linle applicatioorce the imp
o Hydro – C
n emergenc
ify and mon
s received at@daviesconpport to vulnro. Toronto would be in atarily providvided to aleronto Hydro s
visible partichould considty. Balancin the need toways to use er employeese most in nee
ould use its ch to vulnerabtions of shelude reminde need more ch to high risto check in
ate custome
major eventshave becomtes of both Tp customers72‐hour emeof informatements on rane bulletin bons. Also, Coportance of p
ity Coordin
cy managem
nitor vulnera
t three town.com indicatnerable popuHydro does a life threatede this informt effected cuhares this in
cipant in theder offering ag the requiro ensure theits customes who routined.
communicatble groups dlters and waers in personsupport. Alsse building oon neighbou
ers/citizens a
, are infrequme complaceToronto Hyds and citizenergency kit. ion with a madio and telboards, partiouncillors’ copersonal em
FT
nation Reco
ment coordin
able and spe
n hall meetinte that residulations is a maintain a lening situatiomation to thustomers of nformation t
e communityadditional coement to me safety and r database anely interfac
tion channeduring an evearming centrnal preparedso, the City aowners and nurs and tena
about emerg
uent, it’s easent about emdro and the Cs better copBoth shouldmore active oevision, bill icipation at tommunicatiomergency rea
Findings andToronto Hyd
ommendati
nation betwe
ecial medica
ngs and throdents may noresponsibililist of customon in the evehe Company.planned outto the City fo
y recovery afommunicatiaintain privahealth of cuand knowlede with the p
ls (e.g., webent (i.e., “chres). Prior todness command elected neighbourhoants during a
gency prepa
sy for peoplemergency preCity of Toronpe when pow consider suoutreach caminserts, annotown meetinons may be aadiness.
d Recommendro‐City Coo
ions
een City of T
l needs pop
ugh emails tot understanty of the Citmers who, bent of a pow. The Compatages. In casor follow up.
fter a majorons and outacy of customstomers, Todge of its extpublic, to ass
site, social meck in on yo an event, Tunications dofficials shoood associatan emergenc
aredness.
e to have litteparedness.nto include twer is out. Anupplementinmpaign, suchouncementsngs, and proa useful cha
ndations rdination
Toronto and
pulations.
to nd that ty of Torontobecause of wer outage. any uses these of .
event, treach mer oronto Hydroternal sist the City
media) to our oronto directed to ould consideions to cy.
tle The tips and n example isg this h as public s on oviding nnel to
d
o,
o
r
s
100
Leaditrainistakefunctmanacoopfunctconsiplannplans
THC‐2fores
In urcomnumstansuffilike twithrelia
THC‐3back‐
The “inteof a The needpublneigresidrequa lonvuln
20 Brie
Condu
ing practice ing programeholders, esption as first ragement orgerative plantional exerciider increasining scenarios, and sched
2 In collabostry plans to
rban areas wpeting objec
mber of vegetdards set focient clearanthe 2013 Ice the Torontobility of cust
3 Request th‐up generat
Provincial buended to accfire emergeregulation dds (e.g., refriic commenthbours, anddences. The uirement for nger period oerable popu
efing Note, Chie
uct joint pla
utilities ensms and exercipecially locaresponders, ganizations, ning, agreemses. The Cityng the frequos (i.e., the tule joint exe
ration with o ensure ade
with dense trctives betwetation‐relaterth by the CSnces to redue Storm. Theo Hydro staftomer servic
he Province ion within t
uilding codecommodate ncy and assidoes not addigeration, hets expressed elderly peoIRP recommall new andof time. Thisulations that
ef Building Off
nning, train
ure that theises are closl governmennecessitatinpolice, and fment on plany of Torontouency of curtype and severcises to tes
the City of Tequate line c
ree canopy, een increasined outages. TSA, ANSI, anuce the likeli City of Toroff to update ce is incorpo
to require ahe next 10 y
e that regulathe safe evast in firefighdress the proeat, phone s concern forople who hadmends that thd existing bus will allow folive in high‐
icial, Toronto B
FT
ing, and exe
ir emergencely aligned wnts. During ang a seamlesfire/rescue pnning scena and Torontrent planninverity of incist readiness.
Toronto (Urbclearances to
like the Greang the numbToronto Hydnd the City ohood of treeonto urban fthe Urban Forated in the
all new and years.
tes emergenacuation of ohting operatiovision of emervice) durinr the safety ad limited abihe Provinciailding to proor the safe e‐rise building
Building, July 1
Findings andToronto Hyd
ercises.
cy managemwith those oa major evenss coordinatiprofessionalrios, and joio Hydro shong discussiondent), share.
ban Forestryo withstand
ater Torontober of trees adro forestry f Toronto, we‐related ouorestry teamorestry Plane plan.
existing bui
ncy power suoccupants wions in case mergency pong an extendand health olity to leave l governmenovide a meanevacuation ogs.
11, 2013
d Recommendro‐City Coo
ment strategyof key, externnt, utility woion with locas. This requint participatould continuns. They shoe and vet em
y), update red major even
o area, thereand decreascrews adher
which do nottages duringm should won to ensure t
ldings to ha
upply for buwithin the buof a fire emeower supply ded outage. of family, frietheir high rnt consider ans for back‐uof and access
ndations rdination
y, plans, nal orkers al emergencires tion in e and uld agree to
mergency
elated urbannts.
e are often ing the re to t provide forg incidents ork closely hat the
ave adequate
ildings is uilding in casergency.”20 for essentiaMany of theends, ise a up power fors to
y
o
n
r
e
se
l e
r
101
6. MThe 2ToronToroncoordwithiHydroCompsafe. sever
In accpresemakepoweSectiocoopimprolargesustamean
Moving Fo
2013 Ice Stornto residentnto Hydro pedinated, andn a reasonao executed tpany’s manaAs expectedral aspects o
cordance wiented in thise to further eer outages. Aon 5.10 Toroeration amoove the com‐scale eventained, coordiningful impro
orward
rm was an uts and testedersonnel invd intensive reble timeframthe restoratagement andd with any laof the emerg
th the comm report focuenhance its Additionally,onto Hydro‐Cong Toronto mmunity’s cat in the futurinated effortovement in
unprecedentd the mettle volved in theesponse, theme given theion in a mand approach targe incidentgency respon
missioned scus mainly on ability to res, and notablyCity CoordinHydro, the Cpability to bre. This repot among all ocommunity
M
ed event thaof the first r
e recovery efe communitye amount annner consisteto the restort, the recovense that can
cope of the pthe improvespond to futy, there are nation, wherCity of Toronbetter cope wort should seof these parpreparedne
Moving Fo
at disruptedresponders, ffort. Througy was safelyd type of daent with indration was pery from thisbe further i
panel reviewements thatture events tseveral areare heightenento, and thewith and maerve as the strties, the outess for future
orward
d the lives of as well as thgh a dedicat restored toamage sufferustry practicprudent, diligs ice storm amproved.
w, the recomt Toronto Hythat cause was, primarily ed attention e Province ofnage the restarting pointtcome of whe major outa
most he City and ted, normalcy red. Torontoces. The gent, and also exposed
mmendationsydro can widespread described infrom and f Ontario cansponse to a t for a morehich will be age events.
o
d
s
n
n
102
App
Bird D
Backb
Blue
Cana(CEA)
Circu
Circu
Dama
EHS O
Estim
pendix A:
Term
Dog
bone
Sky
dian Electric)
it
it sectionaliz
age Assessm
Officer
mated Time o
Glossary
m
c Association
zation
ment
of
y of Term
A local usystem/needs (ework wiwork sittypicallyretirees trained tBird dog
The maithat is cobreakerfrom thephase lin
Refers to
n The indu
A continload or lmain (ussingle phsubstati
The praccircuit inof the cicustomealso alloto the cianotheravailable
The procinformaplanningrestorat
Environm
An estim
AT
ms
utility resour/mutual assise.g., navigatith other cree, accessingy local compwho are famto operate tgs may suppo
n three phaonnected di. All load in ae backbone nes (laterals
o day‐to‐day
ustry associa
nuous flow oloads. In utisually 3 phashase sectionon circuit br
ctice used bynto sections ircuit in caseers from getows the utilitircuit from or during an oe.
cess for systtion in the fg, resource ation estimate
mental, Hea
mate of the r
AppendixTerms
Descriptio
rce dedicatestance crewing the territws, ensuringg food). Thesany line wormiliar with ththe switchingort one or m
se portion orectly to thea circuit is seor from thres) tapped off
y, normal op
ation for Can
of electricity lity distributse) line and ns (laterals) sreaker.
y utilities to that can be e of an outagting an outaty to switch tone feeder ooutage, if ano
tematically cield to suppoacquisition, aes.
lth, and Safe
restoration t
x A: Gloss
on
d to helpings with daily tory, coording the safety se resources rkers and reche system ang devices in more crews.
of a distribute substation erved eitheree, two and f the backbo
perations
nadian elect
from a sourtion, a circuiall three, twserved by a s
break an eleisolated froge to protectage as a resuthe source oor substationother source
collecting daort the restoand develop
ety Officer
time. The ET
sary of
g off‐work nating of the are cent nd are the field.
ion circuit circuit directly single one.
ric utilities.
rce to a it is the wo, and single
ectric m the rest t all of the ult. This of power n to e is
mage oration pment of
TR can be
iii
Resto
Funct
Incide(ICS)
Last G
Later
Mutu
Off‐S
Pole
Term
oration (ETR
tional Exerci
ent Comman
Gasp Techno
ral
ual Assistanc
ystem Resou
Guying
m
)
ise
nd System
ology
ce
urces/Crews
providedneighbocustome
A functiomost reapeople asuggestsof one oemergen
A standadesignedmanagefacilitiescommunorganizaincidentequally w
When thinformasignal thNot all sthis tech
A three,(backboloads thline. Latthrough
The procresourceefforts. Tcrucial fsingle utrestore
s Individusystem dcompanthe restocompletcompan
The pracon poles
AT
d at multipleourhood/suber.
onal exercisalistic mannand equipmes, its goal is tor more funcncy event.
ardized, on‐sd to enable ment by intes, equipmentnications opational struct or a non‐emwell for both
he smart metion to flashhat it has lossmart meterhnology.
two or singne) of the ciat are not dterals are ty fuses or rec
cess by whices to each otThis processor respondintility has adenormalcy af
als who do nday‐to‐day by (a contracoration effoted, these rey.
ctice of instas designed to
AppendixTerms
Descriptio
e levels, inclubstation, circ
e simulates er possible, ent to an actto test or evctions in the
site manageeffective, efegrating a cot, personnelerating withcture. ICS is umergency evh small and
eter loses poh memory ort power—ths on Toronto
le phase secircuit, constrirectly in thepically connclosers.
ch electric utther to supps is unique tong to large eequate resouter full‐scale
not work onbut who arector or anothrt. Once theesources retu
alling one oro add stabili
x A: Gloss
on
uding globalcuit, and indi
an emergenshort of motual site. Asvaluate the ccontext of a
ement systemfficient incidombination , procedurehin a commoused to manvent, and canlarge inciden
ower, it recor sends out ahe meter’s “o Hydro’s sy
ction off the ructed to exe path of theected to the
tilities providport major reo the industemergenciesurces to quice events.
Toronto Hydeployed byher utility) toe restorationurn to their
r more tensioity to a free‐
sary of
l, regional, ividual
ncy in the oving real s the name capability an
m ent of s, and on age an n be used nts.
rds state a wireless last gasp.” ystem have
main line tend to e main e main line
de estoration ry and is s since no ckly
ydro y their o support n is home
oned wires ‐standing
iv
Servi
Smar
Storm
Syste(SOC)
Table
Triag
Vege(VM)
Term
ce Drop
rt Meter
m Hardening
em Operatio)
etop Exercise
e Process
tation Mana
m
g
ns Centre
e
agement
structurwithout
An overto a custpoint whcustome
Usually aelectric communthe utilitmeters emeter a
Activitiedurabilitthe impadamage
A facilitymanagethe abilisystem. Hydro u
A tabletin an infparticipaemergenproblememergenfamiliariresponsis that itsituationcommun
Process verify thcustomelive, mapossibleappropr
Refers tomaintainfrom the
AT
e so that it cblowing ove
head electritomer's builhere electricers.
a digital devenergy in intnicates that ty for monitenable two‐wnd the centr
es that a utility and stabilacts of sever.
y that housement systemty to remoteThe Incidenses an SOC d
op exercise formal, stresants – usualncy – gatherms and procency scenarioization with ibilities. An at can allow pn without canity.
used by Torhe downed wers. The “triakes the locae, or collects riate resourc
o the cyclicaning trees ane distributio
AppendixTerms
Descriptio
can withstaner.
cal line runnding or othec utilities pro
vice that recotervals of aninformationoring and biway commural system.
ity may undeity of infrastre weather e
es system opm, providingely operate tnt Managemduring majo
simulates anss‐free envirly the decisir around a taedures in theo. The focusroles, proceadvantage opeople to tesausing disrup
ronto Hydro wire reports age” crew detion safe by the data ance to resolve
al and reactivnd tree limbn power line
x A: Gloss
on
nd higher sp
ning from a uer premises. ovide power
ords consumn hour or lesn, at least dalling purposunication bet
ertake to imtructure to wevents with
perators andg real‐time stthe distributent Team atr events.
n emergencyonment. Thon‐makers dable to discue context of is on traininedures, or of a tabletopst a hypotheption in the
during stormreceived froetermines if grounding id refers thee.
ve program bs at a safe des. A VM pro
sary of
eed winds
utility pole It is the r to their
mption of ss and ily, back to es. Smart tween the
prove the withstand minimal
data tatus and tion t Toronto
y situation he during an uss general an ng and
p exercise etical
ms to om the wire is t if job to the
for istance ogram is
v
Termm
guided bby‐laws guidelin
AT
by a set of inas well as thes.
AppendixTerms
Descriptio
ndustry stanhe electric d
x A: Gloss
on
dards and loistribution c
sary of
ocal City company
vi
App
The fresto
pendix B:
following 10 oration of po
Brant Hyd
Entegrus;
Enwin;
Horizon;
Hydro On
Manitoba
Norfolk H
Ottawa H
Sault Sain
Sudbury H
Utility M
utilities proower outages
dro;
ne;
a Hydro;
Hydro;
ydro;
nt Marie PUC
Hydro.
Mutual As
vided mutuas caused by
C; and
AA
ssistance
al assistancethe 2013 Ice
AppendixAssistanc
Provider
e to Torontoe Storm:
x B: Utilityce Provide
rs
Hydro durin
y Mutual ers
ng the
vii
AAppendix C
Evaluation Areas
Emergency Planning and Preparedness
: Summary
1. Emergenlargely aligCommand to be the inemergency
2. Corporatorganizatioaddresses
3. Trained Operationsroles and revent.
4. Pre‐evenprocess in activation d
y of Findings
Strengths
ncy response strgns with the InciSystem, which ndustry leading y response.
te Emergency Mon is centralizedall hazards.
and exercised Ss Centre (Commresponsibilities p
nt weather monplace and used decisions.
Append
s and Recom
Findin
ructure ident is considered practice in
Management d and
System mand Centre) prior to the
nitoring to support
dix C: Summ
mmendation
ngs
Opportuniti
1. Emergency rprovided an ovresponse, but detailed descrprocesses and
2. Toronto Hydincidents on a which may notevents adequa
3. Key restoratprocesses werunderstood at company with
4. Many Torondid not have a trained role fo
5. Toronto Hydexercises and tCommand Cenperform sufficexercise in theCommand Cen
mary of Findi
ns
ies for Improve
response plans verall structure did not include iptions of key all roles.
dro characterizethree‐level scalt address full‐scately.
tion strategies ae not defined oall levels of theroles in the res
nto Hydro emplopre‐assigned ar major inciden
dro conducted training at the ntre level, but dient training ane Local Incident ntres.
ngs and Rec
i
ment
for EPP‐1emerstrateHydr
es grid le, cale
EPP‐2basedrespo
and r e sponse.
EPP‐3EmerresouimpleICS akey s
oyees nd ts.
EPP‐4emer
id not d
EPP‐5Respcomp
commendati
iv
Recommen
1: Reaffirm and rgency managemegy throughouto.
2: Continue to ind approach to eonse.
3: Enhance centrgency Managemurces to supportementation andnd ongoing relatakeholders.
4: Add dedicatergency managem
5: Update the Eonse Plan to imprehensiveness
ons
ndation
communicate ment vision and all of Toronto
nculcate the ICSemergency
tralized ment group t full d sustainment ofationships with
d grid operationment resources
mergency prove and usability.
d
S‐
f
ns .
Evaluation Areas
Resource Acquisition andAllocation
Damage Assessment anRestoration Planning
d
1. Safely deof resourceToronto Hy
2. Developassistance generally w
3. Flew in, mutual assManitoba w
4. Conductassistance safety brie
5. Strong cand Torontrestoration
nd
1. Overall rline with in
Strengths
eployed the larges for any respoydro history.
ed and applied processes in reworked.
equipped, and sistance resourcwithin 48 hours
ted thorough mon‐boarding prfings.
ollaboration beto Hydro tree crn activities.
restoration priondustry practice
Append
Findin
gest number onse in
mutual al‐time that
deployed ces from s.
utual ocess and
etween City rews on
orities were in es.
dix C: Summ
ngs
Opportuniti
1. Mutual assisagreements wacross Canadawere not form
2. The processcoordinate theforestry crewsadvance.
3. Toronto Hydto accommodamutual assista
4. The demobimutual assistaclearly defined
1. Lack of real,situational awawork progress level.
mary of Findi
ies for Improve
stance processeith other utilitie and North Ame
malized.
to acquire and e deployment of was not define
dro has limited aate a large influxnce resources.
lization processnce crews was d.
or near real‐timareness of outabelow the feed
ngs and Rec
v
ment
es and es erica
RA‐1stratedeploresoucoordsupe
f City ed in
RA‐2scalaEmer
ability x of
s for not
me ges and der
DAP‐assesrequicompawarwithiwithi
commendati
v
Recommen
: Adopt a resouegy that provideoyment of all avurces, seamless dination of crewrvisory span of
: Create a compble, logistics plargency Respons
1: Institute a dassment process ired approach, ppetencies to estreness and plannn the specified n 48 hours).
ons
ndation
rce managemenes for: vailable integration and
ws, and optimal control.
prehensive, an as part of thee Plan.
amage that defines theprocedures, andtablish situationning inputs timeframe (e.g
nt
d
e
e d al
.,
Evaluation Areas
Restoration Execution
2. The Comcalls (everyuseful infoalignment Centres to
3. Some LoCentres coovernight tassignmenthe subseq
1. Safety p
2. DispatchdecentralizCommand restoration
3. CoordinaSafety Authcustomer pduring the
Strengths
mmand Centre cy three hours) prmation and maof Local Incidenrestoration prio
ocal Incident Conducted plannito facilitate worts and crew depquent shift.
erformance wa
h functions werezed to Local InciCentres early inn process.
ation with the Ehority (ESA) to rpremises was adevent to reduce
Append
Findin
coordination provided aintained nt Command orities.
mmand ng activities rk ployments for
s excellent.
e ident n the
Electrical reconnect djusted e hardship.
dix C: Summ
ngs
Opportuniti
2. Damage Assnot defined, doconsistently apIncident Comm
3. Restoration developed at vspecificity.
4. Work planniacross Local InCentres.
5. The Central Local Incident not use standa
1. Restoration consistent, varbased” and “fe
2. Lack of full cdecentralized dto some inefficdeployment.
3. Local Comm(three geograplocations) addedeployment an
mary of Findi
ies for Improve
sessment procesocumented, or pplied across thmand Centres.
estimates werevarious levels of
ing practices vancident Comman
Command CentCommand Centard planning too
approach was nrying between “eeder‐based.”
coordination amdispatch functiociency in crew
mand Centre struphic and two funed complexity tnd work coordin
ngs and Rec
v
ment
ss was
e Local
DAP‐estabaccur
e not f
DAP‐planntrain persocentr
ried nd
tre and tres did ols.
not “order‐
RE‐1:appro(e.g.,
mong ons led
RE‐2:assistencothe th
ucture nctional to crew nation.
commendati
vi
Recommen
2: Develop a prblish (calculate) rate ETRs.
3: Establish stanning processes aand exercise reonnel to drive coral and local com
: Pre‐determineoach for each e 1‐4).
: Eliminate centtance and contrmpass those rehree, geograph
ons
ndation
ocess to timely and
ndard work and proceduresesponse onsistency acrommands.
e best restoratiomergency Level
ralized mutual ractor LICCs andsources within ic LICCs.
;
oss
on l
d
Evaluation Areas
Communicatio‐ Customer Contact
4. Special rwithin the
5. The worcause unusrestoration
6. “Bird‐docrews work
ons
1. The abilicontract cacentre site
2. The Key within Custeffective pcommercia
3. The contcentre, andlocated, eninformatio
Strengths
requests were hpre‐defined pri
k protection prosually long delayn.
ogging” of mutuked well.
ity to use an extall centre as a ba.
Accounts organtomer Care improcess to informal accounts of o
trol room, dispad key accounts snabling more effn exchange.
Append
Findin
handled ority order.
ocess did not ys in
al assistance
ternal ack‐up call
nization plemented an m key and utage status.
atch, call staff are co‐fective
dix C: Summ
ngs
Opportuniti
4. Restoration were not followLocal Incident
5. Toronto Hydprotection proutilities in the limiting the typassistance crew
1. There was incapacity (systeoutage calls, socallers were noinformation on
2. The Integrat(IVR) system wnavigate, not ieffectively supare non‐native
3. Outage statinadequate an
mary of Findi
ies for Improve
execution apprwed consistentlCommand Cent
dro has differenocesses than othProvince of Ontpe of work that ws can perform
nsufficient overem and staffing)o that the majoot able to reporn outage status.
ted Voice Recogwas difficult to ntuitive, and didpport customerse English speake
us information wd often inaccur
ngs and Rec
v
ment
roaches ly by all tres.
nt work her tario, mutual .
flow ) to take rity of rt or get .
CCC‐techncusto
gnition
d not s who ers.
CCC‐2ensuoutagmodecustoappli
was rate.
CCC‐3callinof ouinfor
commendati
vii
Recommen
1: Secure capacnology) to suppoomer contact du
2: Improve the ring accurate ange status messae of communicaomers (e.g., IVR,cation, low tech
3: Employ outbong/texting to infutage status andmation.
ons
ndation
city (people and ort timely uring an inciden
process for nd uniform ages across everation to , web, mobile h channels).
ound form customers d other pertinen
t.
ry
nt
Evaluation Areas
Communicatio‐ Other Stakeholders
ons
1. As the faexecutive sperformed
2. Proactivconsistent voice”), incSystems Opwell.
3. Toronto effective pcommunic
4. Toronto methods to
Strengths
ace of the compspokesperson, td his role well.
e media campamessaging (usecluding coordinaperations Centr
Hydro was viewartner in City anations.
Hydro used a vo reach the pub
Append
Findin
pany and the the CEO
ign and e of “one ation with the re, worked
wed as an nd Provincial
variety of blic, including
dix C: Summ
ngs
Opportuniti
4. Alternate paHydro (e.g., emplace, but all wfrequently eno
5. Toronto Hydmobile capabiloutages.
6. There was nToronto Hydro311 call centre
1. Process for dtimely and accclearly defined
2. Liaison rolesstakeholder grdefined.
3. Messages waccessible to acustomers witradio, or socia
mary of Findi
ies for Improve
aths to contact Tmail, web) werewere not monitoough.
dro does not prolity to report or
no capability to to‐related calls fre.
developing and curate ETRs wasd.
s with some roups were not
were not always all stakeholders h no access to Tl media).
ngs and Rec
v
ment
Toronto in ored
CCC‐4evalucapab
ovide track
transfer rom the
issuing not
COS‐commETRs
clearly COS‐of Toprogrliteracustoprepa
(e.g., TV,
COS‐educcoordstakepubli
COS‐4deve
commendati
viii
Recommen
4: Work with Ciuate options forbilities.
1: Develop a promunicate timelyat different lev
2: In collaboratioronto, develop ram to improveacy of: restoratomer responsibiaredness.
3: Expand liaisoation, commundination with keeholders (e.g., ec safety) during
4: Formalize proloping, approvin
ons
ndation
ty of Toronto tor using 311
ocess to y and accurate els of specificity
ion with the Cityan education stakeholder tion process, ility, and
on role to addreication, and ey community lected leaders, g major incident
ocess for ng, and
o
y.
y
ss
ts.
Evaluation Areas
Information Systems and Technologies
Vegetation Management and System Hardening/ Resilience
social med
1. One of tmeter tech
2. An extenand Data Awith 85,004,000 devic
3. Mobile Dportion of
1. Toronto circuit‐base2008 and aand City of
Strengths
ia.
he early adoptehnology.
nsive SupervisorAcquisition (SCA0 control pointsces.
Data Terminals Toronto Hydro
Hydro has beened trimming proadheres to accef Toronto prunin
Append
Findin
ers of smart
ry Control ADA) system s on over
available in a vehicles.
n following a ogram since pted industry ng standards.
dix C: Summ
ngs
Opportuniti
1. OMS hardwwere not scalanumber of conthe 2013 Ice St
2. Groups of smbe pinged quicoutage status ado not have “la
3. The GIS systaccurate connelevel.
4. Lack of conndifferent inforsystems causestatus informacustomers.
1. City of Toronlaws are definereliability, not during major in
mary of Findi
ies for Improve
are and interfacable to handle thncurrent users dtorm.
mart meters couckly to determinand a portion oast gasp” techn
tem does not haectivity at the m
nectivity amongmation technold inaccuracy of ation available to
nto line clearaned for blue sky for preventing oncidents.
ngs and Rec
i
ment
disse
ces he during
IT‐1: proviintellstrate
uld not ne the f them ology.
ave fully meter
g ogy outage o
ce by‐
outages
VMSHto imresilieeventundewherof seand f
commendati
ix
Recommen
minating key m
Include IT/OT teide real‐time or igence in the teegic roadmap.
H‐1: Evaluate almprove distributence during mats, including conerground for secre it will enhancrvices to criticalfacilities.
ons
ndation
messages.
echnologies thanear real‐time
echnology
ll viable optionsion system jor weather nverting lines toctions of circuitsce the reliability l infrastructure
at
s
o s
Evaluation Areas
Toronto HydroCity Coordination
2. Vegetatimaintenanindustry prcycle).
3. Over theHydro has scope of thprogram (ecompletedthe progra
4. Toronto is in line w
o‐
Strengths
ion managemennce program is inractices (i.e., thr
e past six years, maintained a cohe vegetation me.g., clearances,) while reducingm.
Hydro’s wood pith industry lead
Append
Findin
nt preventive n line with ree‐year
Toronto onsistent management miles g the cost of
pole program ding practice.
dix C: Summ
ngs
Opportuniti
2. Coordinatiowith City vegetcrews during aday.
mary of Findi
ies for Improve
n of clearing efftation manageman incident and
ngs and Rec
x
ment
forts ment day‐to‐
VMSHstakeresiliefundi
THC‐manaCity o
THC‐of Torelateensuwiths
THC‐requito hagene
commendati
x
Recommen
H‐2: Gain suppoeholders on the ence required aing.
1: Strengthen eagement coordiof Toronto and T
2: In collaboratioronto (Urban Foed urban forestre adequate linestand major eve
3: Request the ire all new and eave adequate baration within th
ons
ndation
ort from key level of and related
mergency nation betweenToronto Hydro.
ion with the Cityorestry), updatery plans to e clearances to ents.
Province to existing buildingack‐up he next 10 years
n
y e
gs
s.
AppAn obinsighIce StProviinviteprepaoppofeedb
ApproCity ofollow
IRP mmemeitheHydro
Over FebruConsthese
The
pendix Dbjective of thhts and suggtorm. Alongncial staff, fed input fromaration for aortunity to prback via a de
oximately 50of Toronto awing locatio
North Yor
Etobicoke
Scarborou
members momber. Each ater verbally, oo were not p
80 commenuary 27, 201ulting monite comments
prevalent th
Praise abotheir perf
Poor or inavailable given by cgeneral (eaccess to television
Limited‐torepresenton the weupdates;
D: Sumhe Independgestions fromg with collectirst respondm Toronto reand responserovide verbaedicated add
0 people in tnd held on Tns:
rk Civic Cent
e Civic Centr
ugh Civic Ce
oderated eacttendee whoor by submittpresent at th
nts were sub13, and Marctored this em, along with
hemes from
out the effoformance un
naccurate coestimated ticall centre ree.g., maps); messages w
n);
o‐no access tative by phoebsite; and l
mary of dent Review m representating input frders, and othesidents ande to the Decal or writtendress monito
total, attendThursday Ma
tre, 5100 Yon
e, 399 The W
ntre, 150 Bo
ch meeting, o wished to ating written he meetings
bmitted via tch 31, 2013, mail addressthose receiv
the public co
rts of the Tonder adverse
ommunicatioimes of restoepresentativlack of inforwhen techno
to call centeone; long waimited on‐lin
AP
f Public Panel (IRP oatives of eacom Torontoher parties ind business owember 2013 comments ored solely b
ded the townarch 6, from
nge Street, C
West Mall, C
orough Drive
with the assaddress the comments. , so that Tor
orontoicestothe period fs daily. Teamved at the To
omments w
oronto Hydroe conditions;
on to the puoration (ETRves; inabilitymation abouology was do
er, including ait times if ane alternativ
AppendixPublic Co
Commeor Panel) wach stakehold Hydro empnvolved withwners on To3 Ice Storm. at a town haby Davies Co
n hall meetin 7:00 p.m. to
Council Cham
Council Cham
e, Council Ch
sistance of aPanel had thRepresentarontonians c
orm@daviesfor public com members cown Halls.
ere:
o linemen, c;
blic, includinRs); incorrecty to see outaut restoratioown (e.g., no
prolonged ible to conneves to report
x D: Summomments
ents as to consideder group affloyees, City h the recoveoronto HydroCitizens hadall meeting, onsulting.
ngs, coordino 9:30 p.m.
mber
mber
hamber
Davies Conhe opportuntives from Tcould speak f
scon.com, bomment. Dacollated and
ommending
ng: inaccuratt restorationge informaton priorities;o internet, ra
inability to rect; lack of it outages an
mary of
er feedback, fected by thand ry, the Paneo’s d an or email
ated by the at the
sulting teamnity to do so Toronto freely.
etween avies reviewed
g them for
te or not n informatiotion in ; and limitedadio or
each a nformation nd receive
e
el
m
n
d
xi
The Pdeve
Tree trimmanagem
Communiidentificapopulatioand cleare
Panel considloped the fin
ming and prment budget;
ication and otion of thoseons after an eer communi
ered the comndings and r
runing, inclu; and
outreach to e with criticaevent; proviication of loc
mments andrecommenda
ding the ade
vulnerable pal needs; dirsions for bacations of w
d suggestionations prese
equacy of cle
populations,rect outreacck‐up powerarming cent
s offered byented in this
earances an
, including: h to vulnerar to high‐risetres and she
y the public areport.
d vegetation
pre‐ble e buildings; lters.
as it
n
xii