Report on Activities of WVCCS Working Group
Presented by:
David M. Flannery
Jackson Kelly PLLC
Presented at:
CCS Capacity Building Workshop
Charleston, West Virginia
October 25, 2011
![Page 2: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/2.jpg)
INTRODUCTION
Regulatory drivers for carbon capture and sequestration (CCS) - President’s goal for 83% reduction in CO2 by 2050 - USEPA’s BACT Guidance (November 2010) - Potential Congressional action Early movers - IOGCC - States - USEPA Class VI UIC rules Recent developments - National Coal Council - West Virginia CCS Working Group
2
![Page 3: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/3.jpg)
USEPA BACT GUIDANCE
3
![Page 4: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/4.jpg)
USEPA BACT GUIDANCE*
• CCS is not in widespread use • CCS is considered “available” for: - “fossil fuel-fired” power plants - industrial facilities with high-purity CO2 streams (e.g., hydrogen
production, ammonia production, natural gas processing, ethanol production, ethylene oxide production, cement production and iron and steel manufacturing)
• CCS may be presently available where CO2 can be sold for EOR • Research may make CCS more widely applicable in the future
*http://www.epa.gov/nsr/ghgdocs/ghgpermittingguidance.pdf (December 2010)
4
![Page 5: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/5.jpg)
IOGCC
5
![Page 6: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/6.jpg)
IOGCC MODEL STATUTE*
• Agency approval
• Eminent domain
• Trust Fund
• Liability Release
• Cooperative Agreements
• EOR Exemption
*Interstate Oil and Gas Compact Commission, CO2 Storage: A Legal and
Regulatory Guide for the States, at
http://iogcc.publishpath.com?Websites/iogcc/pdfs/Road-to-a-Greener-Energy-
Future.pdf (Dec. 2007)
6
![Page 7: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/7.jpg)
UIC RULES
7
![Page 8: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/8.jpg)
CLASS VI UIC RULES*
Goals • Protect underground sources of drinking water • No requirement to capture/sequester CO2
Safe Drinking Water Act does not provide authority to address: • Capture and transport of CO2 • Property rights • Liability transfer • Accounting for GHG reductions New Category – Class VI
*75 Fed. Reg. 77230 (December 10, 2010)
Exemption from RCRA (proposed) 76 Fed. Reg. 48073 (August 8, 2011)
8
![Page 9: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/9.jpg)
NATIONAL COAL COUNCIL
9
![Page 10: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/10.jpg)
NATIONAL COAL COUNCIL*
- CCS has not progressed fast enough due to
• Technical issues
• Funding incentives
• Regulatory and permitting (including pore-space ownership and liability
- Use of coal with CCS provides opportunity to
significantly reduce GHG emissions
*“Expedited CCS Development: Challenges and Opportunities”, March 18, 2011
10
![Page 11: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/11.jpg)
NATIONAL COAL COUNCIL
SELECTED RECOMMENDATIONS:
• Accelerate near term (2015-2020) development of commercial scale
CCS for coal-based generation • Promote CO2 storage opportunities for EOR • Exempt CCS from RCRA and CERCLA • Reduce regulatory barriers with PSD and NEPA • Allow a CCS permit to authorize use of pore space which is not being
used by its owner • Limit an operator’s legal liability during operation phase • Transfer liability during post closure phase
11
![Page 12: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/12.jpg)
WEST VIRGINIA
12
![Page 13: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/13.jpg)
INITIAL WEST VIRGINIA LEGISLATION*
• Legislative findings.
– (6) There is increasing pressure, both nationally and worldwide, to produce electrical power with an ever-decreasing amount of carbon dioxide emissions;
– (7) West Virginia is a state rich in natural resources, and its economy depends largely upon the demand for energy produced from materials found within the state, not the least of which is coal;
– (8) As demand for energy produced from alternative and renewable resources rises, new technologies are needed to burn coal more cleanly and efficiently if West Virginia is to remain competitive as an energy producing state; …
– (11) Although the state is committed to expanding its portfolio of alternative and renewable energy resources, electricity generated from these resources is insufficient in the near term to meet the rising demand for energy;
– (12) It is in the public interest to advance the implementation of carbon dioxide capture and sequestration technologies into the state's energy portfolio;
* W. Va. Code 22-11A-1, et seq. (2009)
13
![Page 14: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/14.jpg)
INITIAL WEST VIRGINIA LEGISLATION
Addressed: 1. UIC Permitting 2. Financial responsibility 3. Exempted EOR 4. Established Work Group
Did not address: 1. Pore space usage 2. Property issues 3. Liability 4. Eminent domain
14
![Page 15: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/15.jpg)
CCS Working Group Mandate*
• To “develop a long-term strategy for the regulation of carbon dioxide sequestration in West Virginia.”
• To issue a final report to the Legislature July 2011 which, among other things,
– “*r+ecommend*s+ any legislation that the working group may determine to be necessary or desirable to clarify issues regarding the ownership and other rights and interest in pore space”
– “*r+ecommend*s+ methods of facilitating the widespread use of carbon dioxide sequestration technology throughout West Virginia.”
*W.Va. Code 22-11A-6 (2009)
15
![Page 16: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/16.jpg)
MEMBERS OF WEST VIRGINIA CCS WORKING GROUP
Experts in carbon dioxide sequestration or related technologies: Grant Bromhal – National Energy Technology Laboratory Cal Kent, Ph.D. – Marshall University Ken Nemeth – Southern States Energy Board Richard Winschel – Consol Energy, Inc. Expert in environmental science: Stephanie R. Timmermeyer, Esquire – Timmermeyer PLLC Expert in geology: Tim Grant - National Energy Technology Laboratory Attorneys with expertise in environmental law: David M. Flannery, Esquire - Jackson Kelly PLLC Leonard Knee, Esquire – Bowles Rice McDavid Graff and Love, LLP
16
![Page 17: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/17.jpg)
MEMBERS OF WEST VIRGINIA CCS WORKING GROUP
Expert in engineering: Paul Kramer – Allegheny Energy, Inc. Experts in the regulation of public utilities in West Virginia Billy Jack Gregg Earl Melton - WV Public Service Commission Representative of a citizen’s group advocating environmental protection: Vickie Wolfe – WV Environmental Council Representative of a coal power electric generating utility advocating carbon dioxide
sequestration development: Tim Mallan – Appalachian Power
17
![Page 18: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/18.jpg)
MEMBERS OF WEST VIRGINIA CCS WORKING GROUP
Engineer with an expertise in the underground storage of natural gas: John Leeson – Dominion Chairman of the National Coal Lessors: Nick Carter – Natural Resource Partners Representative of the Coal Association: Jim Laurita – MEPCO Representative of West Virginia Land and Mineral Owners Association: Alan Dennis – Penn Virginia Coal Company Representative advocating the interest of surface owners of real property: David B. McMahon, Esquire
18
![Page 19: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/19.jpg)
19
REPORT TO THE LEGISLATURE
Findings and Recommendations with Respect to the Development and Widespread Deployment of Carbon Dioxide Sequestration throughout
West Virginia
By:
West Virginia Carbon Dioxide Sequestration Working Group
July 1, 2011
http://www.dep.wv.gov/executive/Documents/WVCCS%20Working%20Group%20Final%20Report%20-%20June%2030,%202011.pdf
![Page 20: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/20.jpg)
WVCCS Working Group Feasibility Conclusions
• Significant reduction in GHG likely
• CCS is only part of solution
• Public safety / still needs to be resolved
• Cost impact in early stages of development
20
![Page 21: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/21.jpg)
WVCCS Working Group Geology and Technology Conclusions
• CO2 storage up to 226 years
• Storage below 2500 feet needed for supercritical CO2
• Once injection ceases, pressure will return to pre-injection levels
• Site characterization takes only a few years with some cost estimates of $60 million
• Sequestration operations are similar to oil and gas operations
21
![Page 22: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/22.jpg)
WVCCS Working Group Legal Conclusions
• An alternative to the wholesale conveyance of property rights is necessary
• Not all use of private land results in a compensable taking
• Use of pore space below 2500 feet should generally be considered public use
• A trust fund should be linked to liability transfer
• A robust regulatory program is necessary
• New legislation is required
22
![Page 23: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/23.jpg)
RECOMMENDED CCS LEGISLATION
23
![Page 24: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/24.jpg)
KEY ELEMENTS OF RECOMMENDED LEGISLATION
1. Permitting 2. Pore space usage 3. Eminent domain / pooling 4. Other property interests 5. Operational liability 6. Post-closure liability 7. Post-closure management 8. CCS Working Group 9. Cooperative agreements 10. Legislative reports 11. Penalties 12. Groundwater exemption 13. PSC
24
![Page 25: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/25.jpg)
PERMITTING
25
![Page 26: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/26.jpg)
DISCUSSION DRAFT WEST VIRGINIA CARBON DIOXIDE
SEQUESTRATION ACT
Environmental Permitting
• State permit required
• State permit would implement UIC
• Existing facilities deemed to have permit
• Experimental wells authorized
• No injection into formation with minerals
• EOR wells exempt
• Other agencies pre-empted, except PSC
• Permit application fee authorized
26
![Page 27: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/27.jpg)
DISCUSSION DRAFT WEST VIRGINIA CARBON DIOXIDE
SEQUESTRATION ACT
Regulatory Fee
• Cover reasonable cost of regulation
- WVDEP
- WVPSC
- Other states
• May not exceed lesser of:
- $150,000 per year; or
- 1 cent per tonne of injected CO2
27
![Page 28: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/28.jpg)
PORE SPACE USAGE
28
![Page 29: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/29.jpg)
DISCUSSION DRAFT WEST VIRGINIA CARBON DIOXIDE
SEQUESTRATION ACT
Additional legislative findings (13) …ensure that geologic formations throughout the state can be used
for the purpose of carbon dioxide sequestration; (14) …declare as a public use the use of certain deeper geologic
formations …so long as those geologic formations do not have a current or reasonably foreseeable use for a qualifying purpose;
(15) …provide for a coordinated statewide program authorizing access to and use of specific areas of the geologic formations, regulating the injection, storage and withdrawal of carbon dioxide, and fulfilling the state’s primary responsibility for assuring compliance with the federal Safe Drinking Water Act…
29
![Page 30: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/30.jpg)
DISCUSSION DRAFT WEST VIRGINIA CARBON DIOXIDE
SEQUESTRATION ACT
Required property rights • Must have (or anticipate) all necessary rights. • Not necessary to take formations below 2500 feet
which are not currently being used • Property rights are addressed during permitting • If no current use of formation below 2500 feet,
then permit allows use • If another use possibility arises after permitting,
parties are authorized to negotiate a plan for development of new use if it would not interfere with CCS
30
![Page 31: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/31.jpg)
DISCUSSION DRAFT WEST VIRGINIA CARBON DIOXIDE
SEQUESTRATION ACT
Rationale for public use (a) too costly to acquire rights not necessary - title work: $100 million / project - transaction costs related to taking - payment for usage rights (b) public interest in removing GHG outweighs private land use (c) not all use of private land results in compensable taking: See, - Causby [328 U.S. 258 (1946)] – aircraft over-flights - Penn Central [438 U.S. 104 (1978)] – landmark preservation - Loretto [458 U.S. 419 (1982)] – television antenna - FPL Farming [2003 WL 247183 (Texas)] – waste injection - Lucas [505 US 1003] – land use regulation
31
![Page 32: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/32.jpg)
EMINENT DOMAIN / POOLING
32
![Page 33: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/33.jpg)
DISCUSSION DRAFT WEST VIRGINIA CARBON DIOXIDE
SEQUESTRATION ACT
Eminent domain / pooling
• not necessary for pore space below 2500 feet which does not have a current use
• if CCS project impairs use of a “necessary” right • alter CCS project, • negotiate acquisition of rights, or • condemn or pool • condemnation / pooling not allowed for • mineral formations • geologic storage more shallow than 2500 feet • pipelines used to withdraw CO2
• other CCS facilities • compensation may not consider value for CO2 sequestration • tax records are sufficient to initiate condemnation / pooling • eminent domain authority created under other law is preserved
33
![Page 34: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/34.jpg)
OTHER PROPERTY INTERESTS
34
![Page 35: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/35.jpg)
DISCUSSION DRAFT WEST VIRGINIA CARBON DIOXIDE
SEQUESTRATION ACT
Other property interests • Inverse condemnation preserved for per se physical
taking of necessary property • CCS operator relieved of tort liability for any taking • Allowable for others to drill through CCS formation • Correlative rights not altered • CO2 owned by operator during operational phase • CO2 owned by owner of right-to-use the geologic
formation post-closure (surface owner – if not known) • Extraction of CO2 for profit requires agreement of owner
of right-to-use geologic formation
35
![Page 36: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/36.jpg)
OPERATIONAL LIABILITY
36
![Page 37: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/37.jpg)
DISCUSSION DRAFT WEST VIRGINIA CARBON DIOXIDE
SEQUESTRATION ACT
Operational Liability
a. Operator retains liability
b. Liability limitations
• Cap compensatory damages ($250,000)
• Cap punitive damages ($1,000,000)
• 10 year statute of limitations
• Limit medical monitoring
37
![Page 38: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/38.jpg)
POST-CLOSURE LIABILITY
38
![Page 39: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/39.jpg)
DISCUSSION DRAFT WEST VIRGINIA CARBON DIOXIDE
SEQUESTRATION ACT
Post-closure Liability
• Liability transfers to Carbon Dioxide Management Authority 10 years post-closure
• Trust fund established
• 7 cents per tonne of injected CO2
• $50 million cap
• Account for multiple facilities
• Adjust to reflect risk assessment
39
![Page 40: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/40.jpg)
Schematic Risk Profile for a CO2 Storage Project (Benson, 2007; WRI presentation)
40
![Page 41: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/41.jpg)
POST-CLOSURE MANAGEMENT
41
![Page 42: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/42.jpg)
DISCUSSION DRAFT WEST VIRGINIA CARBON DIOXIDE
SEQUESTRATION ACT
Post-closure management
• WVDEP assumes Stewardship responsibility
• WVDEP costs paid by trust fund
• Trust fund can also be used for: - Plugging - Insurance premiums - Claims - Reimbursing cooperating agencies
42
![Page 43: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/43.jpg)
CCS WORKING GROUP
43
![Page 44: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/44.jpg)
DISCUSSION DRAFT WEST VIRGINIA CARBON DIOXIDE
SEQUESTRATION ACT
CCS Working Group
• continued involvement for 5 years
• advise secretary
• recommend rules
44
![Page 45: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/45.jpg)
COOPERATIVE AGREEMENTS
45
![Page 46: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/46.jpg)
DISCUSSION DRAFT WEST VIRGINIA CARBON DIOXIDE
SEQUESTRATION ACT
Cooperative agreements
• Reciprocal agreements would allow for border states to agree on:
– Public use of pore space
– Rights to amalgamate property
46
![Page 47: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/47.jpg)
LEGISLATIVE REPORTS
47
![Page 48: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/48.jpg)
DISCUSSION DRAFT WEST VIRGINIA CARBON DIOXIDE
SEQUESTRATION ACT
Legislative reports
• DEP to submit reports to the Legislature.
• The Carbon Dioxide Management Authority to submit reports to the Legislature.
• Both trust funds will be subject to yearly accounting.
48
![Page 49: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/49.jpg)
PENALTIES
49
![Page 50: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/50.jpg)
DISCUSSION DRAFT WEST VIRGINIA CARBON DIOXIDE
SEQUESTRATION ACT
Penalties
• Same as water pollution laws
- Civil - $25,000 / day
- Civil administrative - $5,000 / day (max: $20,000)
- Criminal - $10,000 - $25,000 / day; imprisonment
50
![Page 51: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/51.jpg)
GROUNDWATER EXEMPTION
51
![Page 52: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/52.jpg)
DISCUSSION DRAFT WEST VIRGINIA CARBON DIOXIDE
SEQUESTRATION ACT
Groundwater Protection Act • Expand exemptions to include Class VI CCS wells
52
![Page 53: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/53.jpg)
PSC
53
![Page 54: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/54.jpg)
DISCUSSION DRAFT WEST VIRGINIA CARBON DIOXIDE
SEQUESTRATION ACT
PSC
• Jurisdiction expanded to include CO2 pipeline or facilities.
• Certificates convenience and necessity.
- Required for “public utility”; and “certified private operator”
- Not required for “private operator”.
- Certificate authorizes eminent domain authority; private operators would have no such authority
54
![Page 55: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/55.jpg)
DISCUSSION DRAFT WEST VIRGINIA CARBON DIOXIDE
SEQUESTRATION ACT
Gas and Pipeline Safety
• PSC authorized to regulate CO2 gas and pipeline safety
• Carbon dioxide included in definition of “gas” and “transportation of gas”
55
![Page 56: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/56.jpg)
CONCLUSIONS
• West Virginia Legislature has indicated its intention to provide leadership in CCS
• 2009 law provided the initial framework for CCS development
• WVCCS Working Group recommendations are intended to provide additional legislative authority needed for next generation projects
56
![Page 57: Report on Activities of WVCCS Working Group...Oct 25, 2011 · • To issue a final report to the Legislature July 2011 which, among other things, –“*r+ecommend*s+ any legislation](https://reader034.fdocuments.us/reader034/viewer/2022050215/5f6185ef76d74e3f1e39a8aa/html5/thumbnails/57.jpg)
CONTACT INFORMATION
David M. Flannery
Jackson Kelly PLLC
PO Box 553
Charleston, WV 25322
Telephone: (304) 340-1017
Email: [email protected]
57