Report GPON

37
S. No. IBA-1 F-8 1 2 Main Cabinet at Nazim ud din road F-8/4 is low. 3 Frequest disconnections, 4 5 6 7 8 9 10 11 12 13 14 Low network in G-8/4, G-8/3, F-8/1, F-8/2, F-8/3 i.e. max 2MB and max 4MB can be provided at these places. Power Backup issue at St # 66, Mezban and Abbasia Restaurant and Gali # 77 in G-9/3

description

all about GPON related issues

Transcript of Report GPON

Page 1: Report GPON

S. No. IBA-1 F-8

12 Main Cabinet at Nazim ud din road F-8/4 is low.3 Frequest disconnections,

456789

1011121314

Low network in G-8/4, G-8/3, F-8/1, F-8/2, F-8/3 i.e. max 2MB and max 4MB can be provided at these places.

Power Backup issue at St # 66, Mezban and Abbasia Restaurant and Gali # 77 in G-9/3

Page 2: Report GPON

F-11

Power Issue at G-10OSS (NGN) at F-10DC 112, 112, 123, Metro Issue, working on generator. Not stable

E-11 Noor Café MSAG, PPPOE Dialing BB IPTVG-11/1 MSAG card no 2 frame 13 card IPTV configuration occurs mostly in a weekE-10 DC ONU cable breakdown for last two daysONU 101 Tower is not stable and gets down day by dayLow Network issue at Golra and Shah Allah dittaCPEI Installers Required15 Laptops RequiredMeters for testingIPTV flickering issueSlow browsing issue

Page 3: Report GPON

I-10

DSLAMs in I-10 Exchange are 99%Loaded expansion or NGN activation is required.

MSAG in I-9/2 is installed from last 2 months but not operationalMSAG H-8 is not combo, Manual Jumper is the issue.

Tie Pairs from MSAG are required in I-9/4 beacause of low copper network area.

I11/4 Fruit Mandi MSAG is required beacause of High Customer potential.I-10/3 Factory area having low copper network, Secondary netwrork rehabilitation is required.Farm House Nursery Area H-9 MSAG is required.

Page 4: Report GPON

City

dhok ratta/ ratta amral MSAG Commissioning is delayed. Low network area.issues of breakdown due to metro effected MSAGs, Committee chowk, Kohati bazar20 CPEI Installers required

MSAG required at Mohalla Workshopi

Page 5: Report GPON

Chaklala

MSAG required at RMC colony and Zafarul Haq Road and secondary netwotk is badly damaged and is high potential area.ONU sir syed chowk/ RMC conversion to MSAG because of high potential area.Jang building plaza 150+50 connections are pending due to unavailability of MSAG

ONU Gulzar e Qaid is having issue and also maxed out , Conversion of MSAG required due to high potential areaONU Water filtration plant is damaged badly and High VIP area so MSAG RequiredAmmar Shahed Chowk is high VIP area, and conversion to MSAG is required due to maxed outShakrail ONU/MSAG is required as very high potential area but is copper network area.Haji Chok MSAG is required, Copper netowork are is very low, its very high potential area.Railway Scheme 1 MSAG required, high churn area due to non availabilty of MSAG.ONU raja property, rehmat jan, conversion to MSAG is required

Page 6: Report GPON

Cantt East

Backend Support Issues 1212 is not fully operational, call are not attendance is not proper.

Morgah Exchange Was down and still having issues.

Lalkurti ONU is Badly Damaged, Conversion to MSAG is required.

Tie Pair is required on Munawar Colony MSAG to DC-15

Page 7: Report GPON

Cantt Tulsa

SD Number 1212 is not properly operational, we are unable to get help from SD from last many days.ONU Ghakkar Plaza,Askari-11,Ghaffar Kayani, Jami Road remains down mostly in a week time.Ghaffar Kayani is Maxed out and as per ROC team Expansion cannot be done, Conversion to MSAG is required because of high potential area.

Shalley Valley MSAG is maxed out and Customers are waiting for services.MSAG Dhoke Chaudriyan and Tench Bhata are Installed but not operational from last 3 Months.Secondary Network in Tench Bhata is badly damaged and customer base is high, Rehabilitation is required.Seconday network of DC-153,154,144,144A is damaged and customer base is very high.Tie pairs are required on DC-7,4 are required and same is pending from last 3 months.DC-145 Secondary Nework is required.

Page 8: Report GPON

IBA Rural

Delayed Authentication issue after wapda load shetting in all services (BB and IPTV)

MSAG Ghouri Town is having IPTV issue from last many days.ONU Taramari,Razia Bridge,Thandapani are maxed out and Cards expansion is required.

Shahzad Town ONU Outdooor is maxed out and expansion is required.

Page 9: Report GPON

SE Ops Rural

Sihala Exchange Copper network is very low and also Churn Rate is high, MSAG is required due to high customer base.

Bahria Exchange (Phase-1,2,3,4,5,6) DSLAM is maxed out, expansion or NGN activation is required.Koran Town Network is very poor, MSAG is required.

Low secondary network at Dhok Chodhrian. Smart TV issues are being faced. Max 1MB can be given to user.

Smart TV cant be provided at the first 17 streets of Korang TownNo smart tv provisioning at Basti MehfoozThere is smart tv provisioning but it do not work at Sihala ExchangePakistan Town Phase 1 is faced with partial issues regarding Smart tv. Maximum 1MB can be providedNetwork is required at Media Town and Jinnah Garden as customers base is increasing in the area.Conversion from MSAG to NGN is recommended at Sihala and Humak as the cards are getting full.15 Laptops required

Page 10: Report GPON

S-Town IBA2 Westridge

2 computer are urgently required Work Required to Achieve Business targets for the month of March-20

laptops are reuired for 7 CPEI Installers Completation of work f-15 by developmentVfone connections needed for 5 CPEI Installers Expansion or any other solution of MSAG G-15

6 CPEI Installers are required TIE Required between MSAG zaman plaza DC-104-103

4 ONUs be upgraded to MSAG TIE Required between MSAG Dhoke Hassu DC-13215 toolkits are required TIE Required between MSAG Chur chakki DC-116

Provision of 10 LDPs in the area of DC-125 Dhoke Mustqeem ( Already

Provision of 300 pairs in the area of DC-114 APS Westridge 3Provision Expansion of LDPs in the area of DC-110 Dhoke Gujran ( Already Planned) where more than 230 case are Pending

Page 11: Report GPON

Westridge

Work Required to Achieve Business targets for the month of March-20

Completation of work f-15 by developmentExpansion or any other solution of MSAG G-15

TIE Required between MSAG zaman plaza DC-104-103

TIE Required between MSAG Dhoke Hassu DC-132TIE Required between MSAG Chur chakki DC-116Provision of 10 LDPs in the area of DC-125 Dhoke Mustqeem ( Already

Provision of 300 pairs in the area of DC-114 APS Westridge 3Provision Expansion of LDPs in the area of DC-110 Dhoke Gujran ( Already Planned) where more than 230 case are Pending

Page 12: Report GPON

S.No. IBA-1

1234

Page 13: Report GPON

S.No.1234

Page 14: Report GPON

F-8Low network in G-8/4, G-8/3, F-8/1, F-8/2, F-8/3 i.e. max 2MB and max 4MB can be provided at these places. Main Cabinet at Nazim ud din road F-8/4 is low.Frequest disconnections, Power Backup issue at St # 66, Mezban and Abbasia Restaurant and Gali # 77 in G-9/3

Page 15: Report GPON

S.No.123456789

10111213

Page 16: Report GPON

F-11Power Issue at G-10OSS (NGN) at F-10DC 112, 112, 123, Metro Issue, working on generator. Not stableE-11 Noor Café MSAG, PPPOE Dialing BB IPTVG-11/1 MSAG card no 2 frame 13 card IPTV configuration occurs mostly in a weekE-10 DC ONU cable breakdown for last two daysONU 101 Tower is not stable and gets down day by dayLow Network issue at Golra and Shah Allah dittaCPEI Installers Required15 Laptops RequiredMeters for testingIPTV flickering issueSlow browsing issue

Page 17: Report GPON

S.No.1234567

Page 18: Report GPON

I-10DSLAMs in I-10 Exchange are 99%Loaded expansion or NGN activation is required.MSAG in I-9/2 is installed from last 2 months but not operationalMSAG H-8 is not combo, Manual Jumper is the issue.Tie Pairs from MSAG are required in I-9/4 beacause of low copper network area.I11/4 Fruit Mandi MSAG is required beacause of High Customer potential.I-10/3 Factory area having low copper network, Secondary netwrork rehabilitation is required.Farm House Nursery Area H-9 MSAG is required.

Page 19: Report GPON

S.No. City1 dhok ratta/ ratta amral MSAG Commissioning is delayed. Low network area.2 issues of breakdown due to metro effected MSAGs, Committee chowk, Kohati bazar3 20 CPEI Installers required4 MSAG required at Mohalla Workshopi

Page 20: Report GPON

S.No.123456789

10

Page 21: Report GPON

ChaklalaMSAG required at RMC colony and Zafarul Haq Road and secondary netwotk is badly damaged and is high potential area.ONU sir syed chowk/ RMC conversion to MSAG because of high potential area.Jang building plaza 150+50 connections are pending due to unavailability of MSAGONU Gulzar e Qaid is having issue and also maxed out , Conversion of MSAG required due to high potential areaONU Water filtration plant is damaged badly and High VIP area so MSAG RequiredAmmar Shahed Chowk is high VIP area, and conversion to MSAG is required due to maxed outShakrail ONU/MSAG is required as very high potential area but is copper network area.Haji Chok MSAG is required, Copper netowork are is very low, its very high potential area.Railway Scheme 1 MSAG required, high churn area due to non availabilty of MSAG.ONU raja property, rehmat jan, conversion to MSAG is required

Page 22: Report GPON

S.No. Cantt East1 Backend Support Issues 1212 is not fully operational, call are not attendance is not proper.

2 Morgah Exchange Was down and still having issues.

34 Lalkurti ONU is Badly Damaged, Conversion to MSAG is required.

Tie Pair is required on Munawar Colony MSAG to DC-15

Page 23: Report GPON

S.No.123456789

Page 24: Report GPON

Cantt TulsaSD Number 1212 is not properly operational, we are unable to get help from SD from last many days.ONU Ghakkar Plaza,Askari-11,Ghaffar Kayani, Jami Road remains down mostly in a week time.Ghaffar Kayani is Maxed out and as per ROC team Expansion cannot be done, Conversion to MSAG is required because of high potential area.Shalley Valley MSAG is maxed out and Customers are waiting for services.MSAG Dhoke Chaudriyan and Tench Bhata are Installed but not operational from last 3 Months.Secondary Network in Tench Bhata is badly damaged and customer base is high, Rehabilitation is required.Seconday network of DC-153,154,144,144A is damaged and customer base is very high.Tie pairs are required on DC-7,4 are required and same is pending from last 3 months.DC-145 Secondary Nework is required.

Page 25: Report GPON

S.No.1234

Page 26: Report GPON

IBA-RuralDelayed Authentication issue after wapda load shetting in all services (BB and IPTV)MSAG Ghouri Town is having IPTV issue from last many days.ONU Taramari,Razia Bridge,Thandapani are maxed out and Cards expansion is required.Shahzad Town ONU Outdooor is maxed out and expansion is required.

Page 27: Report GPON

S.no.123456789

1011

Page 28: Report GPON

Se Ops RuralSihala Exchange Copper network is very low and also Churn Rate is high, MSAG is required due to high customer base.Bahria Exchange (Phase-1,2,3,4,5,6) DSLAM is maxed out, expansion or NGN activation is required.Koran Town Network is very poor, MSAG is required.Low secondary network at Dhok Chodhrian. Smart TV issues are being faced. Max 1MB can be given to user.Smart TV cant be provided at the first 17 streets of Korang TownNo smart tv provisioning at Basti MehfoozThere is smart tv provisioning but it do not work at Sihala ExchangePakistan Town Phase 1 is faced with partial issues regarding Smart tv. Maximum 1MB can be providedNetwork is required at Media Town and Jinnah Garden as customers base is increasing in the area.Conversion from MSAG to NGN is recommended at Sihala and Humak as the cards are getting full.15 Laptops required

Page 29: Report GPON

S.No. S-Town (IBA2)1 2 computer are urgently required2 laptops are reuired for 7 CPEI Installers 3 Vfone connections needed for 5 CPEI Installers4 6 CPEI Installers are required5 4 ONUs be upgraded to MSAG6 15 toolkits are required

Page 30: Report GPON

S.no. Westridge1 Work Required to Achieve Business targets for the month of March-20152 Completation of work f-15 by development3 Expansion or any other solution of MSAG G-154 TIE Required between MSAG zaman plaza DC-104-1035 TIE Required between MSAG Dhoke Hassu DC-1326 TIE Required between MSAG Chur chakki DC-1167 Provision of 10 LDPs in the area of DC-125 Dhoke Mustqeem ( Already Planned)89 Provision of 300 pairs in the area of DC-114 APS Westridge 3

Provision Expansion of LDPs in the area of DC-110 Dhoke Gujran ( Already Planned) where more than 230 case are Pending

Page 31: Report GPON

WestridgeWork Required to Achieve Business targets for the month of March-2015Completation of work f-15 by developmentExpansion or any other solution of MSAG G-15TIE Required between MSAG zaman plaza DC-104-103TIE Required between MSAG Dhoke Hassu DC-132TIE Required between MSAG Chur chakki DC-116Provision of 10 LDPs in the area of DC-125 Dhoke Mustqeem ( Already Planned)

Provision of 300 pairs in the area of DC-114 APS Westridge 3Provision Expansion of LDPs in the area of DC-110 Dhoke Gujran ( Already Planned) where more than 230 case are Pending