Repair/ Rehabilitation of School Buildings
(Cluster 2)
![Page 2: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/2.jpg)
May 12, 2014Date Prepared
Estimated Cost by Item of Work(Materials/ Equipment and Labor Only)
![Page 3: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/3.jpg)
Camp Aquino Elem. School
Demolition/ Restoration 10,000.00
Tinsmithry Works 25,260.30
Window 152,352.00
Ceiling Works (Interior Only) 141,479.00
Project Billboard 5,000
TOTAL 334,091.30
![Page 4: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/4.jpg)
Lourdes Elem. School
Demolition 5,000.00Roof Framing Works 146,299.40Tinsmithry Works 103,642.50Project Billboard 5,000
TOTAL 259,941.90
![Page 5: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/5.jpg)
Cut-Cut II Elem. School
Demolition 5,000.00Roof Framing Works 113,890.40Tinsmithry Works 65,158.60Window 70,932.00Project Billboard 5,000.00
TOTAL 259,981.00
![Page 6: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/6.jpg)
Mapalacsiao Elem. SchoolDemolition/ Restoration 8,000.00Excavation 1,200.00Concrete Works 74,224.80Form Works 12,597.00Masonry Works 61,326.20Roof Framing Works 57,769.40Tinsmithry Works 40,365.00Project Billboard 5,000.00
TOTAL 260,482.40
![Page 7: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/7.jpg)
Atioc-Dela Paz Elem. School
Demolition/ Restoration 10,000.00Windows 13,018.00Ceiling Works 90,433.20Tile Works 106,301.00Electrical Works 35,925.50Project Billboard 5,000.00
TOTAL 260,677.70
![Page 8: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/8.jpg)
C.A.T. Elem. SchoolDemolition 5,000.00
Roof Framing Works 143,468.00
Tinsmithry Works 106,454.40
Project Billboard 5,000.00
TOTAL 259,922.40
![Page 9: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/9.jpg)
Buenavista Elem. SchoolCarpentry Works 178,594.00
Tinsmithry Works 9,906.00
Painting Works 66,384.00
Project Billboard 5,000.00
TOTAL 259,884.00
![Page 10: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/10.jpg)
San Carlos Elem. SchoolTinsmithry Works 111,835.10Ceiling Works 75,506.60
Miscellaneous (Steel Post/ Wood Beam)
21,827.00
Painting Works 45,816.00
Project Billboard 5,000.00
TOTAL 259,984.70
![Page 11: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/11.jpg)
Paraiso Elem. SchoolDemolition/ Restoration of Roof 7,000.00
Embankment 1,560.00Masonry Works 101,267.40Roofing & Roof Framing Works 74,724.00Doors & Windows 52,670.00Painting Works 12,645.00Form Works 5,019.30Project Billboard 5,000.00
TOTAL 259,885.70
![Page 12: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/12.jpg)
Total Material Cost 1,844,767.00
Total Labor Cost 570,084.10
Direct Cost 2,414,851.10
Mark-Ups 480,603.45
VAT 289,545.45
ENG’G SUPERVISION 65,000.00
COST OF PROJECT 3,250,000.00
![Page 13: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/13.jpg)
School Total AmountCamp Aquino Elem. School 334,091.30Lourdes Elem. School 259,941.90Cut-Cut II Elem. School 259,981.00 Mapalacsiao Elem. School 260,482.40 Atioc-Dela Paz Elem. School 260,677.70
C.A.T. Elem. School 259,922.40
Buenavista Elem. School 259,884.00
San Carlos Elem. School 259,984.70 Paraiso Elem. School 259,885.70
TOTAL 2,414,851.10
![Page 14: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/14.jpg)
Repair/ Rehabilitation of School Buildings
(Cluster 1)
![Page 15: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/15.jpg)
August 4, 2014Date Prepared
Estimated Cost by Item of Work(Materials/ Equipment and Labor Only)
![Page 16: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/16.jpg)
Sapang Maragul Elem. SchoolDemolition 7,000.00
Concrete/Masonry Works/ Plastering 23,823.80
Doors & Windows 121,440.00
Ceiling Works 111,813.00
Painting Works 25,200.00
Form works 2,808.00
Project Billboard 5,000.00
TOTAL 297,084.80
![Page 17: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/17.jpg)
Paradise Elem. SchoolDemolition/ Restoration 20,000.00
Masonry Works 2,412.80
Ceiling Works 291,155.80
Windows 90,965.00
Painting Works 33,957.00
Roofing works 1,913.60
Project Billboard 5,000.00
TOTAL 445,404.20
![Page 18: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/18.jpg)
Suizo Resettlement Elem. School
Excavation 400.00
Concrete Works 7,433.40
Masonry Works 17,258.80
Roof Framing Works 136,791.20
Tinsmithry Works 93,520.70
Project Billboard 5,000.00
TOTAL 260,404.10
![Page 19: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/19.jpg)
Suizo Bliss Elem. SchoolDemolition 10,000.00Anay Treatment 11,648.00
Masonry Works 9,872.20
Doors & Windows 24,748.00
Ceiling Works 103,922.00
Tinsmithry 66,894.10
Electrical Works 9,171.50
Painting Works 18,684.00
Project Billboard 5,000.00
TOTAL 259,939.80
![Page 20: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/20.jpg)
Bacuit Elem. SchoolDemolition 10,000.00
Roof Framing Works 99,013.20
Tinsmithry 70,613.40
Ceiling Works (Interior Only) 68,255.20
Electrical Works 7,351.50
Project Billboard 5,000.00
TOTAL 260,233.30
![Page 21: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/21.jpg)
Samberga Elem. School
Demolition 4,000.00Concrete Works 57,974.80Ceiling Works 94,161.60Electrical Works 47,765.90Painting Works 51,345.00Project Billboard 5,000.00
TOTAL 260,247.30
![Page 22: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/22.jpg)
San Pablo Elem. School
Demolition 10,000.00Roof Framing Works 99,013.20Tinsmithry 70,613.40Ceiling Works (Interior Only) 68,255.20Electrical Works 7,351.50Project Billboard 5,000.00
TOTAL 260,233.30
![Page 23: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/23.jpg)
School Total AmountSapang Maragul E/S 297,084.80Paradise E/S 445,404.20Suizo Resettlement E/S 260,404.10Suizo Bliss E/S 259,939.80Bacuit E/S 260,233.30Samberga E/S 260,247.30San Pablo E/S 260,233.30
TOTAL 2,043,546.80
![Page 24: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/24.jpg)
Total Material Cost 1,543,350.00 Total Labor Cost 500,196.80 Direct Cost 2,043,546.80 Mark-Ups 406,453.20 VAT 245,000.00 ENG’G SUPERVISION 55,000.00 COST OF PROJECT 2,750,000.00
![Page 25: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/25.jpg)
Repair/ Rehabilitation of School Buildings
(Cluster 3)
![Page 26: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/26.jpg)
August 6, 2014Date Prepared
Estimated Cost by Item of Work(Materials/ Equipment and Labor Only)
![Page 27: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/27.jpg)
Laoang Elem. SchoolDemolition/ Excavation/ Restoration
20,000.00
Concrete/ Masonry Works 114,821.20
Roof Framing Works 89,845.60Tinsmithry Works 67,223.00Project Billboard 5,000.00
TOTAL 296,889.80
![Page 28: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/28.jpg)
Baras-Baras Elem. School
Demolition 10,000.00Roof Framing Works 90,069.20Tinsmithry Works 55,573.70Ceiling Works 67,709.20Tile Works 23,012.60Painting Works 20,931.00Electrical Works 24,567.40Project Billboard 5,000.00
TOTAL 296,863.10
![Page 29: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/29.jpg)
Sinait Elem. SchoolCeiling Works 148,623.80Windows 132,480.00Electrical Works 44,133.70Roofing Works 3,827.20Project Billboard 5,000.00
TOTAL 334,064.70
![Page 30: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/30.jpg)
Tariji Elem. SchoolDemolition 5,000.00Roof Framing Works 112,634.60Tinsmithry Works 69,958.20Ceiling Works 67,412.80Project Billboard 5,000.00
TOTAL 260,005.60
![Page 31: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/31.jpg)
Capulong Elem. School
Demolition/ restoration of Roof
30,000.00
Roof Framing Works 112,634.60
Ceiling Works 103,508.60
Electrical Works 9,171.50
Project Billboard 5,000.00
TOTAL 230,314.70
![Page 32: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/32.jpg)
Balibago I Elem. SchoolDemolition 7,000.00Concrete Works 68,684.20Masonry Works 25,214.80Doors and Window 107,640.00Painting Works 46,666.50Project Billboard 5,000.00
TOTAL 260,205.50
![Page 33: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/33.jpg)
School Total AmountLaoang Elem. SchooL 296,889.80Baras-Baras Elem. School 296,863.10Sinait Elem. School 334,064.70Tariji Elem. School 260,005.60Capulong Elem. School 230,314.70Balibago I Elem. School 260,205.50
TOTAL 1,708,343.40
![Page 34: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/34.jpg)
Total Material Cost 1,282,808,00Total Labor Cost 425,535.40Direct Cost 1,708,343.40Mark-Ups 340,747.51VAT 204,909.09ENG’G SUPERVISION 46,000.00COST OF PROJECT 2,300,000.00
![Page 35: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/35.jpg)
Repair/ Rehabilitation of School Buildings
(Cluster 4)
![Page 36: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/36.jpg)
August 7, 2014Date Prepared
Estimated Cost by Item of Work(Materials/ Equipment and Labor Only)
![Page 37: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/37.jpg)
Matatalaib-Bato Elem. School
Demolition/ Restoration 20,000.00Concrete/ Masonry Works & Partition Wall
40,266.20
Doors & Window 138,828.00Painting Works 56,073.00Project Billboard 5,000.00
TOTAL 260,167.20
![Page 38: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/38.jpg)
San Juan Bautista Elem. School
Anay Treatment 4,290.00Concrete Works 99,010.60
Ceiling Works 121,815.20Form Works 10,868.00Painting Works 19,188.00
Project Billboard 5,000.00
TOTAL 260,171.80
![Page 39: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/39.jpg)
School Total AmountMatatalaib-Bato Elem. School 260,167.20 San Juan Bautista Elem. School 260,171.80
TOTAL 520,339.00
![Page 40: Repair/ Rehabilitation of School Buildings (Cluster 2)](https://reader034.fdocuments.us/reader034/viewer/2022052312/56649cfe5503460f949ce4a0/html5/thumbnails/40.jpg)
Total Material Cost 388,394.00Total Labor Cost 131,945.00Direct Cost 520,339.00 Mark-Ups 103,297.36VAT 62,363.64ENG’G SUPERVISION 14,000.00COST OF PROJECT 700,000.00