A REPORT
ON PRACTICAL TRAINING
TAKEN AT
BHILAI STEEL PLANT STEEL AUTHORITY OF INDIA LTD. BHILAI, CHATISHGAD
Date:- 06-06-2005 to 02-07-2005
Submitted To:- Submitted By:-
Prof. M.R.Baid Mr.Rahul Godara
HOD, Mech. Engg. II B.E. (Mech. Engg.)
J.I.E.T., Jodhpur
DEPARTMENT OF MECHANICAL ENGINEERING
JODHPUR INSTITUTE OF ENGINEERING & TECHNOLOGY
MOGRA, JODHPUR (RAJ.)
Ore handling plant
OBJECTIVES OF OHP: -
1. To reduces interferences of internal traffic movements and to
unload raw material.
2. Blending by making homogenous pile of raw material.
3. Keeping buffer stock of raw material and their uninterrupted
supply.
THE RAW MATERIAL ARE TRANSFERRED TO CONSUMERS SUCH AS: -
· Iron ore fines to SP2 & SP3.
· Iron ore to blast furnace. · Low silicon limestone to RMP2 & SMS2.
· High silicon dolomite to SP2, SP3 & SMS2.
EQUIPMENTS
· PADDLE FEEDER · WAGON TIPLLER · PUSHER CAR · STACKER · BLENDER BARAL
RECLAIMER · TRANSFER CAR · EXCAVATOR · TRAVELING FEED BINS · TRIPLER CAR · CRANE (EOT) · DOZER
· 3D EXCAVTOR
Blast furnace
There are 2 main section of the department:
1. Raw material section
2. Furnace section
Raw material section: Ø The raw materials used for the production of pig iron are:
Ø Coke (fuel), Iron Ore, Sinter (Fe-bearing material), Limestone
(Flux) & Mn-Ore and Quartzite (additives).
Furnace Section: Ø Blast Furnace is a vertical shaft furnace, enclose in a welded
shell, lined with fire-clay bricks of high alumina content.
Ø The walls of the furnace top are protected by steel refractory
lined plates cooling the shaft,
TOP CHARGING EQUIPMENT
The bell type chaging device (exhisting in BF 1,2 & 3) has a big bell, small bell with hoppers, gas seal, and receiving hopper; and receives raw material from an oval shaped receiving hopper. In BF-3 RCU (Rotating Charging Unit) is provided, by means of which charging can be distributed in desired sector inside the furnace BFs. #4,5,6 & 7 are equipped with paul gate, upper sealing valve, lower material gate and lower sealing valve. This system also has a gearbox to operate a rotating chute. The latter distributes the material inside the furnace peripherally in different rings. This facilities better distribution of charge inside the furnace.
CHARGING PROGRAMME: -
To facilitate smooth working of furnaces, the following
charging programme is normally practiced.
‘A’. Programme COC / COOCC / CCOOC
‘B’. Programme CCOO
Each charging cycle consist of 3 programmes of A & B
exclusively or in combination depending on peripheral
conditions. Generally in Bell-less Top Furnace the programme
selected is ‘B’ i.e. CCOO, C=COKE; O=NON-COKE i.e. ore,
sinter, Mn ore, lime atone or quartzite.
STOVES
Form bottom of the furnace the hot blast is blown into
the furnace through tuyers with the help of turbo-blowers &
hot blast stove.
Blast of Air reaches as follows: Cold blast CB Main Stoves HB Main Bustle pipe Gooseneck pipe Tuyer stock Furnace.
FLUSHING OF SLAG: TAPPING AND DISPOSAL OF HOT
METAL
Ø The furnace is provided with a tap hole, which is enclosed in a steel
cast frame and is cooled by two Tap hole coolers, which have their
own supply of water.
Ø The hot metal is tapped out at an interval of 1-2 hrs depending upon
the furnace condition.
Ø The usual way of opening the tap hole is to drill the tap hole until the
skull is reached. Oxygen lancing is carried out melt the skull.
Ø The hot metal continues to flow down the bend runner form,
which it is diverted into individual metal ladles.
At the end of tapping the tap hole is closed with mudgun, which is electrically or hydraulically operated
Fleets of 78-iron ladles car are available, out of which normally 48 are in circulation in cases all seven furnace are in operation.
Source of Raw Materials:
1. Iron Ore …. Dalli, Rajahara Mines
2. Lime Stone …. Nandini Mines
3. Manganese …. Balaghat Mines
4. Sinter …. Sintering Plants (SP-2, SP-3)
5. Coke …. Coke Ovens (Coke sorting
plants)
6. Converter Slag …. SMS – l l
Requirements for producing of one ton of Hot Metal
(Specific Consumption)
Iron Ore …. 459 Kg
Lime Stone …. 850 Kg(Depending on Sinter
Usage)
Manganese …. 800 Kg(50% in burden)
Sinter …. 35 Kg
Coke …. 08 Kg
Converter Slag …. 30kg
WORKERS TAKING OUT
MOLTEN IRON
FROM THE BLAST FURNACE
THIS IRON IS CALLED AS
PIG IRON