Renovation of Hong Kong Museum of Art February 2014 Presentation Renovation of Hong Kong Museum of Art Programme No:- 066RE Architectural Services Department February 2014 Presentation Leisure and Cultural Services Department

Transcript of Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation...

Page 1: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Renovation of Hong Kong Museum of Art

Programme No:- 066RE

Architectural Services Department February 2014

Presentation

Leisure and Cultural Services Department

Page 2: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Five Objectives

(a)Enhance Connectivity and Accessibility of the Museum

(b)Increase Gallery Space of the Museum

(c)Increase Vibrancy of Harbourfront by relocating Food & Beverages Outlets to

harbourfront side

(d)Facelift the Entire Building to enhance and revitalize the Museum Identity

(e) Harbourfront Enhancement

Page 3: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Hong Kong

Space

Museum

Administration

Building

Exhibition

Gallery

YMCA

The Peninsula

Hotel

Sheraton

Hong Kong

Hotel

Sogo

Department

Store

Salisbury Road

Hong Kong

Cultural

Centre

Avenue of

Stars

Serenade

Chinese

Salisbury

Garden

Hong Kong

Museum of Art

Aerial Photo

Performance

Area C

Page 4: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Site Constraints

(a)Existing Underground Utilities limiting the building footprint

• MTRC Cooling Mains

• Drainage Reserve

• MTRC Protection Zone

• MTRC Cooling Pump Rooms within the premises

(b)Height Restriction under OZP

Page 5: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Existing Site Constraints

MTR Tunnel

MTR Protection Boundary

30 15

MTRC Cooling

Water Mains

MTR North Intake

Structure, Vent &

Plant Room

Drainage

Reserve

Page 6: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Connectivity and Accessibility – Problems?

Page 7: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Connectivity and Accessibility – Problems

Unwelcoming Main Entrance - at 1/F

with grand staircase & escalator

Non-provision of entrance from

Harbourfront side

Insufficient access to Podium deck -

solely by spiral staircase

Page 8: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Enhance Connectivity and Accessibility of the Museum

Total 4 entrances to be provided for the Museum

Page 9: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Main Entrance

facing the Piazza

Annex

Gallery

Entrance

Foyer

Ticketing

Harbourside

Cafe

Bookshop

MTRC Vent

Shaft

Hong Kong

Cultural

Centre Entrance to Annex

Building

Back of House &

Collection Store

Connectivity and Accessibility – New Entrances to the Museum

The Canopy

Entrance facing the

Art Square

Entrance to 1/F Multi-

functional Hall from

Harbourfront promenade

Layout Alteration – G/F (Proposed)

Page 10: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Increase in Gallery Space

Total 10,073 square meters exhibition space will be provided in the

Museum after renovation. (Around 42% increase )

This includes:-

Page 11: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Main Entrance from

Piazza

Annex

Gallery

Entrance

Foyer

Annex Building

Bookshop

Layout Alteration – G/F (Proposed)

Double

Height

Gallery

MTRC Vent

Shaft

The Canopy

Entrance

Back of House &

Collection Store

Increase in Gallery Space

New G/F Annex Gallery Building with double height gallery of 9m

Page 12: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Void over

Foyer

Void

Reception/

Multi-

Functional Hall

Balcony Restaurant

Void

Layout Alteration – 1/F (Proposed)

MTRC Vent

Shaft Staircase leading from

Harbourfront

Gallery

Extension

Restaurant

VIP

Void over Glass Corridor

Gallery

Extension

Exhibition-

related Storage

Annex Building

Increase in Gallery Space

New extension of 1/F gallery transformed from original podium deck

Newly renovated multi-function hall at 1/F to accommodate ad hoc art activities function

Page 13: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Green Roof

New Gallery

AHU New

Gallery Flat Roof

(for PV Panels)

Layout Alteration – 5/F (Proposed)

Chiller

Pump

Escalator Lobby

Increase in Gallery Space

New gallery space at R/F with height relaxation approved by TPB

Page 14: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Increase Vibrancy of the Harbourfront

Renovation of Hong Kong Museum of Art

Page 15: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Back of House &

Collection Store

Main Entrance from

Piazza

Entrance

Foyer

Bookshop

Layout Alteration – G/F (Proposed)

MTRC Vent

Shaft

The Canopy

Entrance

Kitchen

Increase in Vibrancy of the Harbourfront

A café and a restaurant on the G/F and 1/F will be provided respectively

Annex

Gallery

Annex Building

Independent

Entrance to 1/F

restaurant

Entrances from Harbourfront

promenade to 1/F F&B outlets

Independent

Entrance to cafe

Designating the annex gallery as a “co-creative” space for staging thematic “art jam” or “art house”

Café

Page 16: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Void over

Foyer

Void

Reception/

Multi-

Functional Hall

Balcony

Void

Layout Alteration – 1/F (Proposed)

MTRC Vent

Shaft Staircase leading from

Harbourfront

Gallery

Extension

Restaurant

Void over Glass Corridor

Gallery

Extension

Increase in Vibrancy of the Harbourfront

A café and a restaurant on the G/F and 1/F will be provided respectively

Multi-function Hall at 1/F can accommodate corporate / charity events

Entrances from Harbourfront

promenade to 1/F F&B outlets

VIP

Exhibition-

related Storage

Page 17: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Museum Identity – Problems?

Page 18: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Museum Outlook

(a) Homogeneous façade treatment of the Cultural Complex

group

• Museum looks like ancillary building to Cultural Centre

• Monolithic tiled façade reinforced the massiveness and

rigidity of the building

(b) Problem of Visual Transparency

Page 19: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Facelift of the Entire Building –

New Identity of the Art Museum of Hong Kong

• Create a 3D profile to reduce the bulk of the building, add Light &

shades and take reference to the existing tiles)

• Durable material

• Light weight material – Existing structural constraint

• Sustainable design (Modular system)

• Add values to the façade - Insulated layer and Art intervention

(a) New façade cladding system

Page 20: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

(b) Transparent Building Design (For newly added areas)

• New Glass façade for Main Entrance Foyer

• New Glazed wall at G/F Annex Gallery

• New Curtain wall façade for the public lobby zone from 2/F to

4/F

• New Glass façade for roof top Gallery

Page 21: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Photomontage – View from Avenue of Stars (South-East)

Page 22: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Photomontage – View from Public Pier (South West)

Page 23: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Harbourfront Enhancement

Page 24: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Study on Site Accessibility

MTR Station

(Tsim Sha Tsui)

MTR Station

(East Tsim Sha Tsui)

Bus Terminal

Site

Proposed Pedestrian Crossing

Scheduled to be completed by

end June 2014 (from TD)

Harbourfront Enhancement

New at grade crossing on Salisbury Road to enhance

accessibility to the Museum and Harbourfront promenade

Page 25: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Photomontage – View from Salisbury Garden

Harbourfront Enhancement

Enliven the Open Piazza and Harbourtfront area surrounding the Cultural Complex:

by transforming the Salisbury Garden into the Art Square at the northern east of the Museum

which forms the forecourt of the Museum

Page 26: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Photomontage – View towards piazza between Museum of Art and Space Museum

Harbourfront Enhancement

Enliven the Open Piazza and Harbourtfront area surrounding the Cultural Complex:

by transforming the piazza into a “Forum of Art” leading from the Art Square at the

northern east of the Museum to the HKCC piazza at the western side of the Museum

Page 27: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Rendering – Annex Gallery

Harbourfront Enhancement

Enliven the Open Piazza and Harbourtfront area surrounding the Cultural Complex:

by designating the annex gallery as a “co-creative” space for staging thematic “art jam”

or “art house” exhibitions through collaboration with guest curators, artists and art groups

Page 28: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Rendering – Annex Gallery

Harbourfront Enhancement

Enliven the Open Piazza and Harbourtfront area surrounding the Cultural Complex:

by designating the annex gallery as a “co-creative” space for staging thematic “art jam”

or “art house” exhibitions through collaboration with guest curators, artists and art groups

Page 29: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Rendering – Harbourside Cafe

Harbourfront Enhancement

Enliven the Open Piazza and Harbourtfront area surrounding the Cultural Complex:

F&B outlets will remain open when the museum is closed

Page 30: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Landscape Layout Plan – G/F

Transplanting Palm

Existing Palm

New Tree

Existing Tree

Harbourfront Enhancement

Installing a flexible & movable planter pallet system around the museum premises to

enhance the greenery of the waterfront

Page 31: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Lawn Pallet

Lawn / ground cover

planting

Concrete block with

anchors for

Sculpture/ Artwork

Concrete display

platform Lawn

Attachable/

Detachable Seat

1500 x 1500 x 308mm or 1500 x 1500 x 608mm stainless steel (3mm thick) tray cladded with GMS (1.5mm thick) powder coated cladding

Page 32: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Perspective View from Hong Kong Museum of Art 1/F

Page 33: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Master Landscape Plan

Harbourfront Enhancement

a green garden on the roof-top and a green wall facing the harbour

Page 34: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Works Area & Hoarding Layout

Hong Kong

Space

Museum

Administration

Building

Exhibition

Gallery

Sogo Department

Store

Salisbury Road

Hong Kong

Cultural

Centre

Avenue of

Stars

Serenade

Chinese

Salisbury

Garden

Performance

Area C

Covered Walkway

Victoria Harbour Extent of Hoarding

Hong Kong

Museum of Art

Works Area

Page 35: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

HKMA M+

• Pre-historical to

contemporary

• Visual art

• art historical / aesthetic

development

• Hong Kong / regional

• 20th and 21st century

• Visual culture

• Transnational cultural

connections

• International and global

Page 36: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Project Timing

(a) Promotion of Hong Kong Art

(b) Capacity Building

(c) Audience Building

(d) Master Planning of TST Harbourfront

Page 37: Renovation of Hong Kong Museum of Art · Renovation of Hong Kong Museum of Art Presentation February 2014 Back of House & Collection Store Main Entrance from Piazza Entrance Foyer

Renovation of Hong Kong Museum of Art February 2014 Presentation

Spring & Autumn Display

The Open Museum @ Salisbury Garden