Renovation of Building 4950 Fort Stewart, GA
![Page 2: Renovation of Building 4950 Fort Stewart, GA. Corridors New HVAC system, drop ceiling, lighting, and textured walls. Before: Exposed block walls, industrial.](https://reader036.fdocuments.us/reader036/viewer/2022070307/551b5b41550346ae7a8b57f3/html5/thumbnails/2.jpg)
CorridorsNew HVAC system, drop ceiling, lighting, and textured walls.
Before: Exposed block walls, industrial lighting. No HVAC in corridors. Newly Renovated Corridor
![Page 3: Renovation of Building 4950 Fort Stewart, GA. Corridors New HVAC system, drop ceiling, lighting, and textured walls. Before: Exposed block walls, industrial.](https://reader036.fdocuments.us/reader036/viewer/2022070307/551b5b41550346ae7a8b57f3/html5/thumbnails/3.jpg)
StairwellsNew stairwells, railings, and finishes
Professional signage and way-finding plan
BeforeAfter
![Page 4: Renovation of Building 4950 Fort Stewart, GA. Corridors New HVAC system, drop ceiling, lighting, and textured walls. Before: Exposed block walls, industrial.](https://reader036.fdocuments.us/reader036/viewer/2022070307/551b5b41550346ae7a8b57f3/html5/thumbnails/4.jpg)
Guestrooms completely renovated to include modern kitchens bathrooms, upgraded HVAC, and finishes.
Before After
![Page 5: Renovation of Building 4950 Fort Stewart, GA. Corridors New HVAC system, drop ceiling, lighting, and textured walls. Before: Exposed block walls, industrial.](https://reader036.fdocuments.us/reader036/viewer/2022070307/551b5b41550346ae7a8b57f3/html5/thumbnails/5.jpg)
Newly Renovated Breakfast and Lobby
New automatic entry doors and passenger elevator provide easy
access for guests to the 3-story facility.
![Page 6: Renovation of Building 4950 Fort Stewart, GA. Corridors New HVAC system, drop ceiling, lighting, and textured walls. Before: Exposed block walls, industrial.](https://reader036.fdocuments.us/reader036/viewer/2022070307/551b5b41550346ae7a8b57f3/html5/thumbnails/6.jpg)
Project Team
• FMWRC Project Manager – Patti Richardson• FMWRC Contracting Officer – Del Dreano• FMWRC Interior Design – Mary Ann Miller• Ft Stewart Lodging Manager – Connie Parks• Contractor – Stellar Construction, Jacksonville, FL