RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE using Digital Mapping and BIM

Transcript of RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution...

Page 1: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

RENEWAL OF HIGH-SPEED

RAIL INFRASTRUCTURE

using Digital Mapping and BIM

Page 2: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

Introduction

OBERMEYER: Company data and figures

Digital collection of data: Basis for design work

Digital data model: Core of design work

BIM your Project: Working method using ProVI

AGENDA

BIM-konforme Oberbauplanung 2

Page 3: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

OBERMEYER: COMPANY DATA

AND FIGURES

Page 4: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

4

1958

1968

1970

1980

1989

1990

Foundation of the

Engineering Office OBERMEYER

Design of traffic structure

ʻStachusʼ, Munich, Germany

Foundation of branch offices

in West Germany

Expansion of business in East Germany

First international projects in Turkey,

in Saudi Arabia and China

Overall planning for the high-speed

railway line Ebensfeld–Erfurt

MILESTONES

Page 5: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

MILESTONES

5

Overall planning for the

New Munich Trade Fair Complex

Design and project management

for 1 000 km high-speed railway line

Wuhan–Guangzhou, China

Design of metro line 2 (11 km approx.)

Ho-Chi-Minh-City, Vietnam

1995

2005

2009

2014

2018

1993

Overall planning Culture Wave City and City

Balcony Hangzhou, China

Overall planning and construction supervision

Al Ain Hospital, Abu Dhabi, UAE

Intensification of foreign activities in

Russia/CIS, United Arab Emirates,

South-East Europe, North Africa

Page 6: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

BUSINESS SEGMENTS

6

Architecture & Urban Development │ Industry & Trade

Airports │ Healthcare │ Education & Research │ Security

Engineering │ Structural Engineering │ Technical Equip-

ment │ Energy Efficiency │ Building & Room Acoustics

Construction Management │Roads & Railways │ Traffic

Planning │ Traffic Structures & Bridges │ Tunnels &

Underground Engineering │ Construction Management

Energy Systems │ Water & Waste Management │ Immis-

sion Protection │ Building & Area Recycling │Site

Development Planning

Page 7: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

7

Founded in Munich in 1958

Ranks as one of the largest

independent engineering

consultancies in Germany

More than 1500 employees

throughout Germany at

20 branch offices and 18 branch

and - subsidiary offices abroad.

Core competence:

overall planning as well as

specialised standalone plannings

ISO 9001 certified since 1997

OBERMEYER GERMANY

Page 8: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

Branch offices / Subsidiaries

Countries where OBERMEYER has project experience

OBERMEYER INTERNATIONAL

8

Abu Dhabi │ Algiers │ Almaty │ Ankara │ Athens │ Baku │ Beijing │ Bratislava

Budapest │ Bucharest │ Dubai │ Guangzhou │ Ho Chi Minh City │ Istanbul │ Moscow

Munich │ Prague │ Rabat │ Shanghai │ Shenyang │ Sofia │ Tirana

Page 9: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

DIGITAL COLLECTION OF DATA:

BASIS FOR DESIGN WORK

Page 10: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

On-site surveying provides the basis for design work and technical tender documents

On-site surveying is required standard

for Deutsche Bahn AG

Enables matching of plan documents

with actual on-site conditions

Detection of obstructive objects

Photographic documentation

Logging of on-site survey according to

RiL 823.0100 A.08

Inspection speed max 1 km/h

ON-SITE SURVEYING IS PERFORMED USING DIGITAL

CAMERA AND CLIPBOARD

[4]

10

[1]

Page 11: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

Objective: Enhance the on-site surveying process

Use digital technology and ProVI to optimize planning process

BIM methodology has been integrated in planning process since 1,5 years

Consistent data model is needed

Potential digital recording technologies:

Photogrammetry

Laserscanning

FIRST IDEAS FOR IMPROVEMENT 6 YEARS AGO

11

[2]

Page 12: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

MOST AVAILABLE MAPPING SYSTEMS DO NOT PROVIDE

FOR THE ESSENTIAL HIGH ACCURACY IN MEASUREMENT

[7]

[4]

[11]

[3]

[6]

[9]

[5]

[8]

[12] [10]

12

Page 13: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

2 laser scanners

6 infrared cameras

2 colour cameras

LED-spotlights

4 ground penetrating radar sensors

IMU, GNSS system and odometer

HIGH LEVEL OF PRECISION REQUIRES EMPLOYMENT OF

INDIVIDUALLY COMPOSED SURVEYING EQUIPMENT

13

[16] [14] [13]

Page 14: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

MOBILE MAPPING OF THE HIGH SPEED LINE (HSL) 4080

FROM MANNHEIM TO STUTTGART

Initial operation: 1991

Double track line

Total length: 98,8 km

vmax: 280 km/h

52.000 metric tons / day

15 tunnel (31 km)

Over 90 bridges

14

[15]

Page 15: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

MOBILE MAPPING OF THE BLACK FOREST RAILROAD LINE

BETWEEN HORNBERG AND ST. GEORGEN

Initial operation: 1870s

Double track line since 1888

Total length: 30 km

vmax: 110 km/h

Less than 10.000 metric tons/day

About 10 km tunnel

Lots of bridges and support structures

Complex route layout

15

[16]

Page 16: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

THE TRAIN-MOUNTED SURVEYING EQUIPMENT RECORDS

COMPLETE DIGITAL IMAGE OF THE EXISTING RAILROUTE

[17]

16

Page 17: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

THE DENSITY AND PRECISION OF THE ACQUIRED DATA

VARIES HIGHLY BASED ON THE MEASURING SPEED

17

[18]

Page 18: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

DIGITAL DATA MODEL:

CORE OF DESIGN WORK

Page 19: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

Owner and consultants perform joint

inspection of infrastructure using the

photographic documentation

Participants of inspection

Project Manager

Construction Supervisor

Technical Specialists

Site Operator

Engineering Consultant

Achieved inspection-speed averages

15 km/h

19

MOBILE MAPPING AND BIM ALLOW FOR DESIGN WORK

SOLELY BASED ON THE COLLECTED DIGITAL DATA

[20]

[19]

Page 20: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

FOR FURTHER PLANNING LINE AND GRADE OF RAILROAD

ARE EXTRACTED FROM POINT CLOUD USING PROVI

20

Chainage and track axis are imported from

inventory data

Automatic detection of actual position of rail-

head in cross profiles from point-cloud

Manual adjustment

on critical positions

Generation of actual track axis, line and grade

Acquired data refers to actual chainage

[21]

[22]

[23]

Page 21: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

DATA-MODEL-BASED APPROACH FACILITATES COMPLETE

DOCUMENTATION OF OBJECTS AND DESIGN PARAMETERS

[23]

[22]

[24]

21

[26]

[25]

[24] Picking of obstructive and other relevant objects

Consistent attribution of all picked objects in database

for further processing and documentation

Automated generation of design documents

Page 22: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

DATA-MODEL-BASED APPROACH FACILITATES COMPLETE

DOCUMENTATION OF OBJECTS AND DESIGN PARAMETERS

[23]

[22]

[24]

22

[26]

[25]

[24] Picking of obstructive and other relevant objects

Consistent attribution of all picked objects in database

for further processing and documentation

Automated generation of design documents

Page 23: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

23

PLANNING DOCUMENTS CAN BE GENERATED FROM DATA

MODEL DUE TO APPLICATION OF BIM

Page 24: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

CROSS SECTIONS AND DIGITAL TERRAIN MODEL OF SITE

CAN BE GENERATED FROM DATA MODEL

24

Page 25: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

Pilot project on 400 m track on HSL 4080 and 30 km track of the Black Forest route

Conventional surveying of control points outside track line

Required accuracy of point clouds compliant to RiL883.4000 (DB standard)

Comparison of results from point cloud with conventional surveying

Vision:

Elimination of conventional

surveying within danger area

of tracks

IN FUTURE INCREASED ABSOLUTE PRECISION THROUGH

SMART COMBINATION WITH CONVENTIONAL SURVEYING

[25]

25

[27]

Page 26: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

[18]

26

[28]

RENEWAL OF TRACK INFRASTRUCTURE USING BIM

REQUIRES A CONSISTENT DATA-MODEL

Page 27: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

Implement data-model in tender process

Update data-model during construction through contractor and construction supervisor

Automatic computation of cubage and quantities from As-Built-Model

Comparison between design model and As-Built-Model for supplement validation

Document inventory data in model

As-Built-Model for maintenance

Model as base for rail operations

Use of data for follow-up projects

IN FUTURE THE 3D- / 4 D-DATA MODEL SHOULD BE USED

OVER COMPLETE LIFE-CYCLE OF THE TRACK

27

[29]

Page 28: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

BIM YOUR PROJECT:

WORKING METHOD USING PROVI

Page 29: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

29

other

3D systems

Navis-

works

Siemens

NX

Revit

Desite

MD

4D & 5D

Desite

MD iTWO 5D

Navis-

works

SOFTWARE LANDSCAPE AT OPB INFRA

[30]

Page 30: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

30

Awarding authority

DB Netz AG

Process time

2018

Contract price (construction)

ca. 1,8 Mrd. €

Output

Basic evaluation and preliminary

planning, generation of an existing

overall model, modelling of up to 10

alternatives in the fields of railway-,

road-, tunnel- and bridge-

infrastructure

Technical specifications

3D/4D/5D modelling of a 15 km long

new built railway especially for

freight service including a 10 km

tunnel in two one-tracked tunnel

tubes and 6 km of expansion railway

as well as a 3 km connection

between the railways. Issue of

visualisations for public

communication. [34]

[31]

[32]

[33]

BIM-PILOT PROJECT – OFFENBURG TUNNEL

Page 31: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

31

Awarding authority

DB Netz AG

Process time

2018

Contract price (construction)

ca. 1 Mrd. €

Output

Generation of an existing overall

model, design engineering and

approval planning of railway-, road-

and bridge-infrastructure

Technical specifications

3D/4D/5D modelling of 50 km new

built railway especially for freight

service as part of the HSL Karlsruhe

– Basel.

[35]

[36]

BIM-PILOT PROJECT – KENZINGEN TO MÜLLHEIM

Page 32: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

32

Awarding authority

ARGE Freie Strecke Rastatt

c/o Reif Bauunternehmung GmbH &

Co.KG

Process time

2016 - 2022

Contract price (construction)

ca. 40,5 Mio. €

Output

execution planning and execution of

underground engineering, railbed

and track, drainage system,

underground cable and sound

protection walls.

Technical specifications

3D/4D/5D modeling of an existing

execution planning for a 10 km, two

tracked section of the HSL Karlsruhe

– Basel. BIM project management

on the construction site.

[37]

[38] [39]

[40]

BIM-PILOT PROJECT – BASHAIDE TO RASTATT

Page 33: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

BIM (BUILDING INFORMATION MODELING) IS A

WORKING METHOD IN THE CONSTRUCTION INDUSTRY.

IT IS NOT AN IT PROJECT.

ITS FOCUS IS ON THE

CENTRIC AND COMMUNITY

MAKE AVAILABLE FROM

PROJECT INFORMATION AND THE ASSOCIATED

INCREASE IN PRODUCTIVITY AND QUALITY.

BIM-DEFINITION AT OBERMEYER

33

Page 34: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

Your Contact Dipl.-Ing. Marc Kückmann, M.Sc.

Head of Department

OBERMEYER Planen + Beraten GmbH

Railway Infrastructure Consulting

Zur Gießerei 18

76227 Karlsruhe

Tel.: +49 721 98 02 – 313

Mobil: +49 151 14050 306

[email protected]

www.opb.de

34

Maximilian Bade, M.Sc

BIM-Manager

Tel.: +49 721 98 02 – 330

Mobil: +49 151 14050 498

[email protected]

www.opb.de

THANK YOU VERY MUCH!

Patrick Schneider, M.Sc

BIM Project Engineer

Tel.: +49 721 98 02 – 316

[email protected]

www.opb.de

Page 35: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

SOURCES

2

Open Technology Ltd „An introduction to Building Information Modelling

(BIM)” https://www.opentechnologyuk.com/an-introduction-to-building-

information-modelling-bim/ (Zugriff am 23.03.2018)

10 GI-Consult GmbH. „Angebot Strecke 4080 MobileMapping-Befahrung mit

Trimble MX8, OBERMEYER intern.“ 07. März 2017

3

iNovitas AG. Innovativ und Mobil - Unser Stereobildbasiertes

Erfassungssystem. 2017.http://www.inovitas.ch/technologi/

erfassungssystem/ (Zugriff am 31. August 2017)

11 Leica Geosystems AG. Leica ALS80-CM City Mapping Airborne LIDAR

Product Specifications. Heerbrugg, September 2016, S. 1

4 Aibotix GmbH. Der Aibot X6 Version 2. Kassel, August 2016 12

Leica Geosystems AG. Mobile Kartierungslösung. 2017. http://leica-

geosystems.com/de-de/products/mobile-sensor-platforms (Zugriff am 18.

September 2017)

5 Leica Geosystems AG. Leica Pegasus:Backpack Mobile reality capture.

Heerbrugg, Juni 2016, S.1 16

Drehscheibe online, 2018, https://www.drehscheibe-

online.de/foren/read.php?004,8552016 (Zugriff am 11. Juni 2018)

6 Kremer, Jens. LiDAR Mobile Mapping with centimeter accuancy in long

tunnels. Lausanne, 02. November 2016. S. 23 31

OBERMEYER Planen+Beraten GmbH auf Basis von OpenStreetMap.org-

Mitwirkende

8 Fugro Consult GmbH. FUGRO RailData RILA operations and approvals.

August 2015, S.1 35

DB Netz AG, Großprojekt Karlsruhe–Basel, Building Informa-

tion Modeling (BIM) Leistungsbeschreibung Entwurfs- und Ge-

nehmigungsplanung im BIM-Pilotprojekt StA 8A, Januar 2018, Seite 9

9

Wirth, Holger. „Der neue Lichtraummesszug LIMEZ III der Deutschen Bahn

AG.“Zeitschrift für Geodäsie, Geoinformation und Landmanagement, März

2008, S.182

40

DB Netz AG, Ausbau- und Neubaustrecke Karlsruhe-Basel, 2016, Seite 4f,

https://www.karlsruhe-Basel.de/files/page/02_aktuelles/06_downloads/06_

einzelne_pfa/Broschuere-StA1-16-11-03.pdf (Zugriff am 11. Juni 2018)

Alle weiteren Abbildungen von OBERMEYER Planen+Beraten GmbH

35

Page 36: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

Dear reader,

We are glad that you wish to use our presentation. We would like to point out that, despite careful

processing, all the information in this presentation is given without any guarantee for the correctness and

completeness of the content.

Content and rights of third parties are marked as such. Downloading and making copies is only

permitted for personal, private and non-commercial use. For all other purposes the presentation and

individual texts, graphics or photos may only be used or distributed with the explicit permission of the

author.

If you are interested in a release for business purposes, please contact us by e-mail at [email protected].

NOTE ON COPYRIGHT

36

Page 37: RENEWAL OF HIGH-SPEED RAIL INFRASTRUCTURE€¦ · Enables matching of plan documents ... execution planning and execution of ... „Angebot Strecke 4080 MobileMapping-Befahrung mit

Lieber Interessent,

wir freuen uns, dass Sie unsere Präsentation nutzen. Wir möchten Sie darauf hinweisen, dass trotz

sorgfältiger Bearbeitung alle Angaben in dieser Präsentation ohne Gewähr für die inhaltliche Richtigkeit

und Vollständigkeit erfolgen.

Inhalte und Rechte Dritter sind als solche gekennzeichnet. Der Download und die Herstellung von

Kopien ist nur für den persönlichen, privaten und nicht kommerziellen Gebrauch erlaubt. Für alle

anderen Zwecke darf die Präsentation sowie einzelne Texte, Grafiken oder Fotos nur mit ausdrücklicher

Genehmigung des Autors genutzt bzw. weiterverbreitet werden.

Wenn Sie an einer Freigabe für Geschäftszwecke interessiert sind, wenden Sie sich bitte per E-Mail an

[email protected]

HINWEIS ZUM HAFTUNGSAUSSCHLUSS/COPYRIGHT

37