Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems...

43
Renewable Energy Solution Using building foundations It’s a no brainer! Tony Amis GI Energy Business Development Director Dr Fleur Loveridge Royal Academy of Engineering Research Fellow © Geothermal International

Transcript of Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems...

Page 1: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Renewable Energy Solution Using building foundations

It’s a no brainer! Tony Amis

GI Energy Business Development Director

Dr Fleur Loveridge

Royal Academy of Engineering Research Fellow

© Geothermal International

Page 2: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Outline

• What and Why

• Planning

• Ensuring Good Practice

• Examples

• Long term Monitoring

• Conclusions

Tuesday, 24 May 2016 © GI Energy 2

Page 3: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Primary circuit options for GSHP systems

Systems can be combined to give optimal solution

Open Loop System

Closed Loop Systems

Page 4: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Advantages of GSHP Systems

• Lower operational costs • 4 times more efficient than gas fired boilers

• Reduced CO2 emissions

• Enhances benefits of other renewable solutions

• Reduced plant room requirements • units can provide heat and coolth

• Advantage for BREEAM / LEED buildings

• Attracts Renewable Heat Incentive

• which can offset higher capital cost of installation

• Provides a Stable & Sustainable renewable energy

Tuesday, 24 May 2016 © GI Energy 4

Page 5: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

The Renewable Energy Solution

Tuesday, 24 May 2016 © GI Energy 5

GI ENERGY Supply & Management

GSHP’s

Solar PV

Other (process)

CHP

Solar Thermal

Boilers

Chillers

ELECTRICAL POWER

HIGH GRADE HEATING

COOLING

LOW GRADE HEATING

TOP UP & OR BACK UP 10% - 200%+

Waste Heat

Recovery

30

- 4

0%

Re

ne

wab

le E

ne

rgy

Lo

w C

arb

on

So

luti

on

Aim

Long Term System Optimisation Maximising CO2 & Run Cost Savings

Thermal Storage

Free Cooling

Co

nve

nti

on

al

PRE HEATING

Page 6: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

What is an Energy Pile

6

www.geoheat.co.uk

Telephone: +44 (0)24 7667 3131

Geothermal Pipes in Typical Pile Detail

Schematic Only

SIZE Authored / Approved DWG NO REV

A3 CD / CD Schematic Only 1

SCALE NTS 10th January 2006 SHEET 1 OF 1

Geothermal loops generally installed full depth of pile to maximise geothermal energy

Reinforcement cage at top of the pile

w w w .g e o th e rm a lin t .c o .u k

T e le p h o n e : + 4 4 (0 )2 4 7 6 6 7 3 1 3 1

O n e N e w C h a n g e G e o th e rm a l S y s te m S c h e m a tic

S c h e m a tic O n ly

S IZ E A u th o re d / A p p ro v e d D W G N O R E V

A 3 C D / C D S c h e m a tic O n ly 1

S C A L E N T S 2 2n d

J u n e 2 0 0 7 S H E E T 1 O F 1

D ry C o o le r

1 ,1 1 5 k W C a p a c ity

R e ta il C o n d e n s e r C irc u it

T T a rg e t = 2 0oC , T m a x = 4 0

oC

O ffic e L T H W C irc u it

T F lo w = 5 0oC

O p e n L o o p W e ll P a ir

C F S & P a r tn e rs R e s p o n s ib il ity

1 3 N u m b e r H e a t P u m p s

in N + 1 C o n fig u ra t io n

Page 7: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Energy Piles in the UK Today

Tuesday, 24 May 2016 © GI Energy 7

Page 8: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Why Use Energy piles

1. Utilises the proposed new building foundations

2. No additional activity to add on to the critical path

3. No programme implications

4. Better solution than conventional ground loop solutions • Economically

• Provides a better thermal storage device than conventional ground loop enabling greater system out performance in the long term

5. Building protects loops from being damaged by future external works

6. Enables future expansion of property

Tuesday, 24 May 2016 © GI Energy 8

Page 9: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

UK Thermal Pile Standard

Tuesday, 24 May 2016 © GI Energy 9

UK Thermal Pile Standard Can be purchased from www.gshp.org.uk/shop.html

Identifies best practices, design, loop installation, laboratory testing, & field testing

Publications Substantiating Use of Energy Piles: 1. The Effects of Heating and Cooling energy piles under working load at Lambeth College UK 2007 2. Energy Pile Test at Lambeth College London: geotechnical and thermodynamic aspects of pile response to heat cycles – Geotechnique 2009 Peter Bourne Webb et al 3. Integrating Thermal Loops into Diaphragm walls of

Knightsbridge Palace Hotel 2009 4. Thermal Conductivity Evaluation of a pile group

using thermal conductivity Tracy Brettman 2011 5. Thermo- Mechanical Behaviour of Energy Piles -

Geotechnique 2012 Binod Almatya et al 6. Energy Pile Performance and Preventing Ground

Freezing – Fleur Loveridge et al 2012

Page 10: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Geothermal Loops Have Now Been Installed Successfully In All Foundation Types

Small / large diameter bored piles –

Westminster Academy / One New Change

Piles under bentonite or dry bore – Bankside London

CFA piles - Canterbury University/ Belfast Police station/ Crossrail Depot

Driven Cast In-situ piles. North Kent Police Station

Driven Precast Piles – Balmore Glasgow

Diaphragm walls - Bulgari Hotel Knightsbridge / Crossrail Stations

Page 11: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

5th February 2009

11

Five Main Challenges

1. Understanding responsibilities

2. Introduction of loops into the pile cage

3. Effect of the piling technique a. Rotary piles

b. Driven cast in situ piles (DCIS)

c. Continuous flight auger pile (CFA)

4. Protection to loops

5. Ensure loop Integrity

Page 12: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

5th February 2009

12

Understanding responsibilities

Contractual relationships : potential limitations

Agreement of scope and responsibility

Importance of coordination

Evaluating critical points (installation and connection levels)

Consider any system redundancy (who is assigned the redundancy) and any fall back plan.

Consider your risk assessment throughout the process

Page 13: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

5th February 2009

13

Piling Technique - Rotary

Cage placed in an empty bore before concreting

Loops can be suspended below the cage

Steel at base is required

Care to be exercised if using a tremmie

Page 14: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

5th February 2009

14

Piling Technique – Driven Cast in Situ

Cage placed in an empty bore

Loops attached through cage onto full length heave steel bar

Page 15: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

5th February 2009

15

Fluid Concrete

A Single bar, rigid enough for the depth

Spacers

Use a vibrator if required – no mechanical surging

Piling Technique - CFA

Page 16: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

5th February 2009

16

Protection to loops

Foreign objects internally – block all ends

Protect with foam or steel to prevent mechanical damage from pile trimming

Dialogue with groundworker

Protection from other trades

Page 17: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

17

Ensure Integrity

Install full of water

Preferably under pressure

Testing involved for acceptance at every stage and handover

Page 18: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Case Study – One New Change, London

Land Securities & Skanska

trusted partners

• This 3.3MW, £3.4mn system in the City shows GSHPs are becoming mainstream solutions

• The system provides upward of 40% of the building’s energy needs, but meets all the stringent new planning requirements for CO2 reduction

• Completed in 2009

Tuesday, 24 May 2016 © GI Energy 18

Page 19: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

w w w .g e o th e rm a lin t .c o .u k

T e le p h o n e : + 4 4 (0 )2 4 7 6 6 7 3 1 3 1

O n e N e w C h a n g e G e o th e rm a l S y s te m S c h e m a tic

S c h e m a tic O n ly

S IZ E A u th o re d / A p p ro v e d D W G N O R E V

A 3 C D / C D S c h e m a tic O n ly 1

S C A L E N T S 2 2n d

J u n e 2 0 0 7 S H E E T 1 O F 1

D ry C o o le r

1 ,1 1 5 k W C a p a c ity

R e ta il C o n d e n s e r C irc u it

T T a rg e t = 2 0oC , T m a x = 4 0

oC

O ffic e L T H W C irc u it

T F lo w = 5 0oC

O p e n L o o p W e ll P a ir

C F S & P a r tn e rs R e s p o n s ib il ity

1 3 N u m b e r H e a t P u m p s

in N + 1 C o n fig u ra t io n

One New Change - Schematic

Page 20: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

© Geothermal International

One New Change, London

Page 21: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

ONC Energy Pile – Loop Installation

© Geothermal International

Page 22: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

One New Change- Headering Work

© Geothermal International

Page 23: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Completed Plant Room

Computer driven

according to various

scenarios

Page 24: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

One New Change Performance

Tuesday, 24 May 2016 © GI Energy 24

kWh

100,000 kWh

200,000 kWh

300,000 kWh

400,000 kWh

500,000 kWh

600,000 kWh

Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12 Dec-12

Energy exchanged with RCL

Heating Energy delivered

Cooling Energy Delivered

Electricity consumed by HP

Global annual efficiency of the GSHP system (*) 4.1

Annual CO2 savings (tons) 294

Annual financial savings (£) £62,374

Note: (*) Consumption of Heat pumps only; excludes all the pumps and auxiliary ancillaries. pumps only; excludes all the pumps and auxiliary ancillaries.

Page 25: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Bulgari Hotel - First Energy Diaphragm Wall Project in UK

• System:

– Diaphragm Wall & Energy Piles®

• Size:

– 150kW Heating

– 150kW Cooling

• Collector type:

– 50 Energy Piles

– 150m Energy D. Wall

• On Site: – Commissioned 2012

Page 26: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Crossrail Stations London

• System:

– Diaphragm Wall & Energy Piles®

• Size:

– 150kW-300kW Heating

– 150kW-300kW Cooling

• Collector type:

– Energy Piles

– Energy D. Wall

• On Site: – Farringdon Street

– Tottenham Court Road

– Bond street

– Fisher Street

– Paddington

Page 27: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Old Common Crossrail Depot

Tuesday, 24 May 2016 © GI Energy 27

The contract between Transport For London and Bombardier covers the supply & delivery of 65 new 200m long trains in 2017 & maintained for 32 years at Old Oak Common.

Renewable Project of the Year

Page 28: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

GI Renewable Energy Solution - Crossrail Old Oak Common Depot

• GSHP System will provide 1000kWth heating and 600kWth cooling using

• 52no 150m deep boreholes

• 466no 15m deep energy piles under the building

• CHP System will provide 420kWth heating and 290kWe of electrical load

• 200m² Solar Thermal will add a further 140kWth of hot water load

• 1500m² Solar PV will provide a further 220kWe

Tuesday, 24 May 2016 © GI Energy 28

Page 29: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Case Study – Old Oak Common Crossrail Depot - Energy Pile Construction

29

Page 30: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

GI Renewable Energy Solution Highlights - Old Oak Common Depot

Based Upon Electrical, Heating and cooling profiles provided by Atkins

• 54% Heating and cooling will be provided from renewable technology

• 20% of electrical load generated on site from CHP / Solar PV

• 33% Renewable energy solution

Providing Demonstrated Savings Of.....

• Run cost savings £97,000 per annum when compared against conventional equipment

• Renewable Heat Incentive £193,628/ annum

• 530Tonnes of CO2 per annum

• Potential payback on investment < 10 Years

Tuesday, 24 May 2016 © GI Energy 30

Through our controls & long term management we will be looking to outperform on current assessed performance..

Page 31: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

22 Station Road Cambridge

• 81 CFA energy piles of 450mm diameter

• 68 CFA energy piles of 600mm diameter

• Pile lengths between 20 m and 25 m

• Gault clay formation with high groundwater table

• Delivering • 280kW Heating

• 330kW cooling

• System Operational spring 2015

Tuesday, 24 May 2016 © GI Energy 31

Page 32: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Long Term Energy Pile Monitoring Sites

Dr Fleur Loveridge

Royal Academy of Engineering Research Fellow

Page 33: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Background & Rationale

• Energy piles are the most common energy geo-structure

• Analysis & design method adapted from traditional ground heat exchangers

• Few well documented operational case studies • Build confidence in energy performance

• Allow validation of analysis methods

• Two UK case studies in partnership with GI Energy

Page 34: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

The Crystal, Royal Victoria Dock

• Siemens landmark new all electric building in East London • 160 energy piles (600mm to 1200mm diameter; 21m deep) • 36 closed loop boreholes (137.5 mm diameter; 150m deep) • Monitoring single pile temperature and energy performance

Page 35: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Building Energy Use

• Predicted demand:

– Heating 307MWh/yr

– Cooling 173 MWh/yr

• Actual usage:

– Heating ~ 550 MWh/yr

– Cooling ~ 550 MWh/yr

Page 36: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Peak Power Supply

• Predicted demand:

– Nominal 600 kW

• Actual peak usage:

– Heating ~ 399 kW

– Cooling ~ 572 kW

Page 37: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Variable Thermal Load

• Up to 100 W/m peak transfer to piled foundations

• Peak pile capacity > 300 kW

Page 38: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

22 Station Road, Cambridge

• New office development

• 81 energy piles of 450 mm diameter

• 68 energy piles of 600 mm diameter

• Pile lengths between 20 m and 25 m

Page 39: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Instrumentation Plan

• Series of 6 no. 600mm dia piles

• Temperature sensors

• Heat meter

• Building energy monitoring

Page 40: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Concluding Remarks

• Energy Foundations are a great solution

• Importance to capture operational data from energy pile schemes

• Heat pump systems are more complex than traditional HVAC equipment >> require several years to optimise performance

• Complex thermal demands >> use hourly demand in analysis

• Recognition of demand uncertainty >> partnership between designer, constructer & users

Page 41: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

Acknowledgements

• Funding:

• Engineering and Physical Sciences Research Council (research grant number EP/H049010/1)

• Royal Academy of Engineering

• The Crystal

• Siemens, GI Energy, Balfour Beatty Ground Engineering, Arup, Foundation Developments Limited and IGS

• 22 Station Road

• GI Energy, Mott MacDonald, Central Piling and Wates

41

Page 42: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

GI Energy UK Headquarters

Contact - Tony Amis

[email protected]

Shillingwood House

Westwood Way

Westwood Business Park

Coventry

West midlands

CV4 8JZ

Mobile: +44 (0)7595 278 428

Phone: +44 (0)2476 850 403

www.gienergy.net

contact

Page 43: Renewable Energy Solution Using building foundations · 2016-06-01 · Advantages of GSHP Systems ... of pile to maximise geothermal energy Reinforcement cage at top of the pile www.

All contents of this presentation are copyright Geothermal International Limited. Reproduction is forbidden without specific permission of Geothermal International Limited.