RENEWABLE ENERGY FOR INDONESIA 2015 - EIBN · The hosting of the 1st Renewable Energy for Indonesia...

14
An International Conference and Exhibition on Geothemal, Hydro, Solar, Wind & Bio Energies www.there4i.org RENEWABLE ENERGY FOR INDONESIA 2015 24 - 25 November 2015 Holiday Inn Jakarta Kemayoran, Indonesia Media Partners: Endorsed by: World Alliance for Decentralized Energy WORLD ALLIANCE FOR DECENTRALIZED ENERGY World Council for Renewable Energy Thai Wind Energy Associaon American Council On Renewable Energy The Instute of Electrical Engineers of Japan (IEEJ) The Energy and Resources Insue Renewable Energy Industry Club, Federaon of Thai Industries Myanmar Engineering Council Cleantech Workshop Sponsor: Clean Energy Leader Sponsors: China Instute of Water Resources and Hydropower Research Organised by: Supported by: The Association of The Associaon of Private Power Producers

Transcript of RENEWABLE ENERGY FOR INDONESIA 2015 - EIBN · The hosting of the 1st Renewable Energy for Indonesia...

An International Conference and Exhibition on Geothemal, Hydro,Solar, Wind & Bio Energieswww.there4i.org

RENEWABLE ENERGY FORINDONESIA 201524 - 25 November 2015 Holiday Inn Jakarta Kemayoran, Indonesia

Media Partners:

Endorsed by:

World Alliance for Decentralized Energy WORLD ALLIANCE FOR DECENTRALIZED ENERGY

World Council for Renewable Energy

Thai Wind Energy Association

American Council On Renewable Energy

The Institute of Electrical Engineers of Japan (IEEJ)

The Energy and Resources Instittue

Renewable Energy Industry Club, Federation of Thai Industries

Myanmar Engineering Council

Cleantech Workshop Sponsor: Clean Energy Leader Sponsors:

China Institute of Water Resources and Hydropower Research

Organised by:Supported by:

The Association of

The Association of Private Power Producers

Optimising the Renewable Energy Potential Towards A Sustainable Energy Future

Indonesia is a large archipelago located at the south-east of mainland Asia, between the Pacific Ocean and the Indian Ocean. The country’s territory encompasses over 17,500 large and small islands with total land area about 1.91 million square kilometres. It is home for 250 million people and is the world fourth largest populous nation.

More than 62 million people or almost one third of Indonesia inhabitants are lack of access to electricity. These people mostly live in rural areas and the outer islands. Most power generation today is from convention thermal sources including fossil fuels such as oil, coal and natural gas. Indonesia’s current installed power capacity is at 52GW and the government has an ambitious plan to increase another 35GW in another five years. Demand is expected to grow at an average of 8.4% p.a. due to rapid urbanisation and industrialisation.

Today, renewable energy accounts for a small but growing portion of Indonesia’s electricity portfolio. The Government of Indonesia (GoI) has announced a medium term target for increasing the share of renewable energy in total energy mix to 25% by 2025. This means that massive new investment in power generation capacity is being developed using renewable energy. Indonesia is also planning to significantly increase investments in the energy sector including $38billion in the renewable energy sector.

The hosting of the 1st Renewable Energy for Indonesia 2015 (RE4I 2015) is set to provide a platform for potential investors to understand the key development issues of investing in Indonesia’s renewable energy sector; get updated on the new market directions, opportunities and economic priorities of the Indonesia’s renewable energy sectors at the same to build potential business networks with the local authorities and industry players.

OVERVIEW

Area : 1,904,569 sq km

Population : 255,993,674 (July 2015 est.)

Coastline : 1.3

TotalRenewableWaterResources : 2,019 cu km (2011)

AnnualPopulationgrowthrate : 0.92% (2015 est.)

Urbanisation : 53.7% of total population (2015)

GDP : $888.6 billion (2014 est.)

GDPpercapita : $10,600 (2014 est.)

Annual GPD Growth : 5% (2014 est.)

Agriculture Products : petroleum, tin, natural gas, nickel, timber, bauxite, copper, fertile soils, coal, gold, silver

Quick Facts

(source: World Factbook)

ABOUT INDONESIA RENEWABLE ENERGY MARKET

ABOUT INDONESIA RENEWABLE ENERGY MARKET

• Primary Energy Mix In Indonesia - Targeting 25% From NRE Source

19% increase of new & renewable energy (NRE) in 11 years

Indonesia NRE potential could reach more than 200.000 MW. Today,Indonesia has just used 6.8% of the total NRE Potential.

National Energy Mix 2014 National Energy Mix Target 2025

• A Total Of 135 Billion USD Investment In Renewable Energy Sector

• Renewable Energy Production and Potential

NO NRE RESOURCES INSTALLED CAPACITY(IC)

RATIO OF IC / RESOURCES(%)

1 2 3 4 5 = 4/31 Hydro 75,000 MW 7,572 MW 10.1 %2 Geothermal 28,910 MW 1,403.5 MW 4.9 %3 Biomass 32,654 MW 1,717.9 MW 5.4 %4 Solar 4.80 kWh/m2/day 48.05 MW -5 Wind 3 – 6 m/s 1.87 MW -6 Ocean 49 GW ***) 0.01 MW ****) -7 Uranium 3,000 MW *) 30 MW **) -

(source: National Energy Council)

(source: National Energy Council)

*) Identfied in the Kalan Basin in West Kalimantan**) As a center of research, non-energy

***) Source: National Energy Council****) BPPT’s Prototype

(source: National Energy Council)

Ready for Exploration or on Bidding Stage – 2590MW

Exploration Stage – 985MW

Ready for Exploitation – 940MW

Construction Stage – 117.5MW

Production Stage - 1201MW

Indonesia has an estimated geothermal energy potential of 29GW across more than 285 locations – equivalent to about 40% of world’s total geothermal reserves

The government is using only 4-5% of its geothermal capacity

In August 2014, Indonesia’s House of Representatives passed the Geothermal Law No. 21/2014 separating geothermal from other mining activities and thus paving the way for geothermal exploration in the country.

The Geothermal Fund Facility (GFF) provides support to mitigate risks and provide information regarding the relatively high upfront costs for geothermal development, as the government efforts to make the investment in geothermal energy more attractive.

Geothermal Energy in Indonesia• Geothermal Potential Map

(source:Perusahaan Listrik Negara [PT PLN (Persero)]

I have learnt more about investing in Myanmar especially the potential and the investment opportunities in the green energy sectors.

VikkineswaranSupramaniyanSeniorManagerTenagaNasionalBerhad,Malaysia

We’ve made a significant step forward for our work at Myanmar after our trip attending and exhibiting at the Myanmar Green Energy Summit in early Aug.

Kees-JanvanOeverenHeadofSection,EnergyAdvisory-CleanTechnologyCentreDet Norske Veritas Pte. Ltd

MGES 2014 is a good place to networking and understand the Myanmar’s energy scenario

VivekTanejaHeadofBusinessDevelopment,PowerDivisionThermaxLimited,India

This is an extremely productive conference. I am glad to be part of it!

GauriSinghDirector,CountrySupportandPartnershipsIRENA,UnitedArabEmirates

‘Here’s What Our Past Participants Said:’

ABOUT INDONESIA RENEWABLE ENERGY MARKET

Indonesia has an estimation of 75,670MW of hydropower potential and an addition of 770MW of mini- or micro-hydropower for development. 95% of the hydropower potential is not utilized.

A 2007 grant from the United Nations Development Program allowed Indonesia to create an Integrated Microhydro Development Program to accelerate hydropower development. The program focused on removing investment barriers and fostering technical capacity.

Feed-in Tariffs (FiTs) for hydropower projects generating less than 10 MW are currently regulated under MEMR Regulation No. 19/2015 at the rates of USD12.00 Cents/kWh (multiply by factor rate according to location) for up to 8 years and USD7.50 Cents/kWh (multiply by factor rate according to location) for up to 20 years. For hydropower projects generating less than 250 kW, the Feed-in Tariffs (FiTs) are at USD14.40 Cents/kWh (multiply by factor rate according to location) for up to 8 years and USD9.00 Cents/kWh (multiply by factor rate according to location) for up to 20 years.

The Feed-in Tariffs (FiTs) from hydropower harnessing water from reservoirs / dams or irrigation channels with capacity up to 10 MW, the purchase price is USD10.8 Cents/kWh (multiply by factor rate according to location) for up to 8 years and USD6.75 Cents/kWh (multiply by factor rate according to location) for up to 20 years. For projects generating less than 250 kW, the Feed-in Tariffs (FiTs) are at USD13.00 Cents/kWh (multiply by factor rate according to location) for up to 8 years and USD8.10 Cents/kWh (multiply by factor rate according to location) for up to 20 years.

To meet electricity demand, a total of 5.7GW new additional hydropower plant has been planned for the next 10 years and 20% expected to be developed by IPP.

Hydropower Energy in Indonesia

(source: Indonesia Investment Coordinating Board (BKPM)

It was good to be there and I think the audience was broad and knowledge. We are looking forward to keep our activities going in Myanmar.

Mr.JacobRasmussenBusinessDevelopmentManagerVestasAsiaPacific

MGES was an excellent platform to meet government officials, local associations, international NGOs, technology providers, project developers, etc. We hope to participate again in one of your conferences soon.

SakuraYAMASAKIManagingDirectorSingaporeSolarExchangePteLtd

ABOUT INDONESIA RENEWABLE ENERGY MARKET

‘Here’s What Our Past Participants Said:’

Solar Energy in Indonesia Indonesia offers significant solar power resources with 4.8kWh/m2 per day, but has yet to develop strong market

Current installed capacity is mostly solar home systems and utility-scale solar photovoltaic (PV) plants.

The feed-in Tariff (FiT) for solar energy is at US$0.25/kWh.

The GoI shown desire to attract foreign solar cell manufacturers to Indonesia to create jobs for local Indonesians and also drive interest in solar power writ large that could lead to export opportunities

Wind Energy in Indonesia Wind energy development program in Indonesia up to 2020 are 200MW which are currently still under procurement.

Offshore wind is providing more investment opportunities due to Indonesia’s lengthy coastlines and consistent ocean breezes.

The Gol will be tabling the final draft of the Feed-in Tariffs (FiT) for wind energy.

(source:Perusahaan Listrik Negara [PT PLN (Persero)]

(source:Perusahaan Listrik Negara [PT PLN (Persero)]

ABOUT INDONESIA RENEWABLE ENERGY MARKET

ABOUT SPONSORSHIP / EXHIBITION

SponsorshipPackages USD

Titanium Sponsor 30,000

Platinium Sponsor 20,000

Gold Sponsor 15,000

Silver Sponsor 12,000

Cocktail Sponsor 15,000

Luncheon Sponsor 10,000

Refreshment 5,000 per session

Conference Session Sponsor 5,000 per session

Conference Bag 15,000

Conference Kit 15,000

Marketing Brochure 10,000

Name Badge Lanyard 5,000

Advertisement (FPFC) 1,000

General Sponsorship

Size USD

6sqm 2,500

12sqm 5,000

Standard Exhibition Space

CONTACT U

S

CONTACT U

SMr.JasonChoongRenewable Energy for Indonesia 2015 Secretariatc/o: Confexhub Group

Suite 1707, Level 17, Plaza Permata6, Jalan Kampar, off Jalan Tun Razak50400 Kuala Lumpur, MalaysiaTel: +603 2771 1668Fax: +603 2771 1669Mobile: +6012 607 4993Email:[email protected]@confexhub.com

The Exhibition / Sponsorship OpportunitiesThe sponsorship program has been specially designed to give industry leaders opportunities to increase visibility and enhance corporate profile. Partners and sponsors will enjoy sustained profiling impact through continuous promotion before, during and even after the conference. There are various opportunities to support and be associated with this prestigious and unique event. Contact the organizer for more information.

WHY SPONSOR / EXHIBIT IN RE4I 2015? An ideal platform to project brand image and stay competitive in the industry

Establish your presence in a new market

Generate and establish new sales leads, business contacts and build network

Engage new partners from the region

Support existing clients and local agents

Power Generators & Utilities

Consulting & Engineering Companies

Energy Contractors

Energy Exchanges, Traders, Analysts

Energy Turnkey

Geothermal Developers & Consultants

Government Agencies / Ministries

Grid Energy Storage

Hydropower Developers & Consultants

Independent Power Producers

Mechanical & Electrical Suppliers

Mega Energy Structures Architects / Designers

Power & Energy Infrastructure Financing Institution

Power & Energy Infrastructure-related Service Provider

Power Plants Owners, Planners and Service Operators

Power Transmission & Distribution

Repair & Refurbishing

Strategic & Portfolio Investors

Solar & PV Manufacturer & Contractor

Tax & Legal Advisors

Technology & Service Providers for Power Generation

Turbine, Generators, Equipment Manufacturers

Water Resources Management

Wind Energy Providers & Consultants

Who Should Attend?

Unrivalled access to a target audience of energy producers, consultants, engineers, manufacturers, agents, distributors, policy makers, regulators and captains of the industry

A flagship event to exchange ideas with the industry experts while being updated on the latest policies, regulations and developments of Indonesia’s renewable energy sector

Explore investment opportunities in Indonesia’s renewable energy sector

A platform for networking and establishing contacts for future business collaborations

Benefits Of Attending RE4I 2015

Investment Policies and Financing Options For Renewable Energy In Indonesia

Geothermal Energy in the Indonesia Energy Mix: The Game Changer

Hydropower as Renewable Energy Source for Indonesia

Powering Indonesia through Solar Energy

Wind Power Potentials and Initiatives

The Role of Bioenergy in the Indonesia Energy Mix

Scaling Up Energy Security in Indonesia with Energy Storage

Summary Of Discussion Areas

ABOUT THE CONFERENCE

OUR PAST PARTICIPATING COMPANIES

PROGRAM

DAYONE:24NOVEMBER2015,TUESDAY7:30AM RE4I2015RegistrationBegins

8:30AM DelegatesTakeTheirSeatsatBallroom

8:40AM ArrivalofDistinguishedGuests

8:40AM ArrivalofGuestofHonor

OPENINGCEREMONY8:50AM INTRODUCTORYREMARKS

9:00AM SPECIALREMARKS:ASEANEnergyPlan2016–2020:Directions,OpportunitiesandChallengesIr. Dr. Saujayan Velautham, Executive Director, ASEAN Centre for Energy

9:20AM KEYNOTEADDRESSANDLAUNCHOFRE4I2015

9:40AM Networking & Refreshments Break

PLENARY SESSION10:10AM PlenaryAddress1:Indonesia’sNationalDevelopmentPlanforRenewableEnergy

*H.E. Dr. Ir. Rr. Endah Murniningtyas, Deputy Minister for Natural Resources & Maritime Affair, National Development Planning Board

10:35AM PlenaryAddress2:RenewableEnergyDevelopmentinIndonesia:PresentandFuturePlans*Ir. Rida Mulyana, Director General, New, Renewable Energy and Energy Conservation, Ministry of Energy & Mineral Resources

11:00AM PlenaryAddress3:RenewableEnergyInvestmentPotentialinIndonesia Mr. Surya Darma, Chairman, The Indonesian Renewable Energy Society

11:25AM PlenaryAddress4:PresentandFuturePlansforRenewableEnergyinIndonesiaMr. Syah Darwin Siregar, Head of Division, New Renewable Energy, PT PLN (Persero)

11:50AM PlenaryAddress5:DevelopingUtility-ScaleSolarandWindFarminIndonesia:MarketPotentialandStrategiesforSustainabilityMr. Ismael Guerrero Arias, President & Head-Origination, TerraForm Global, Inc.

12:15PM Luncheon for Guest Speakers and Delegates

SESSION ONE:InvestmentPoliciesAndFinancingOptionsForRenewableEnergyInIndonesia

1:15PM Paper1:Indonesia’sForeignDirectInvestmentPolicyfortheEnergySectorIr. R.S. Hanung Harimba Rachman, Director for Planning for Agribusiness and Natural Resources, Indonesia Investment Coordinating Board

1:45PM Paper2:CurrentLegalandTaxIssuesinIndonesia’sEnergySectorMr. Christopher Osborne, Partner, Watson Farley & Williams (Thailand) Ltd

2:15PM Paper3:FinancingOptionsforGreenEnergyProjectsinIndonesiaMr. Edgare Kerkwijk, Managing Director, Asia Green Capital

2:45PM Paper4:CleanTechnologiesAdaptioninAsia-IPExanAcceleratorandSinglePlatformMr. Deepak Wadhwa, Director - Business Development, Asia, IPEx Cleantech Asia

3:15PM Open Forum: Comments, Questions and Answers

3:25PM Networking & Refreshments Break

SESSIONTWO:

HydropowerAsRenewableEnergySourceForIndonesia3:55PM SpecialKeynote:UsingSustainabilityToolsToDriveProjectDevelopment–AnInternationalPerspective

Mr. Cameron Ironside, Program Director, International Hydropower Association

4:25PM Paper5:DevelopingIndonesia’sMicro-HydroPotentialsforRuralElectrificationMr. Faisal Rahadian, Chairman, Indonesian Microhydro Power Networks

4:55PM Paper6:HydropowerDevelopmentPlansandProgressinIndonesiaMr. Sutiyo Siswanto, Senior Manager for Hydro Energy, PT PLN

5:25PM Open Forum: Comments, Questions and Answers

5:35PM CONFERENCE DAY 1 ENDS

6:00PM – 8:00PM

DinnerWorkshoponCleanTechAdoption(byinvitationonly)

PROGRAM

*Invited and awaiting confirmation **This Program is subjected to change and for updated program, please logon on to www.there4i.org

Program @ 09 November 2015

DAYTWO:25NOVEMBER2015,WEDNESDAY

9:00AM SpecialAddress:RenewableEnergyProjectFinancing:RiskAllocation,BankabilityandMitigationDr. Pushkala Lakshmi Ratan, Regional Vice President- Asia Pacific, Renewable Energy, TÜV SÜD Asia Pacific Pvt. Ltd.

SESSION THREE:

GeothermalEnergyintheIndonesiaEnergyMix:TheGameChanger

9:30AM Paper7:DevelopmentPlanandOpportunitiesintheGeothermalSegmentinIndonesiaMr. Yudistian Yunis, Senior Manager of Geothermal, PT PLN

10:00AM Paper8:RisksandInvestmentBarriersforGeothermalDevelopmentsinIndonesiaMr. Martin T. O’Neill, Business Development Lead, Exergy S.p.A

10:30AM Open Forum: Comments, Questions and Answers

10:45AM Networking & Refreshments Break

SESSION FOUR:

WindPowerPotentialsandInitiatives

11:15AM Paper9:WindEnergyDevelopmentStatusandInitiativesinIndonesiaMr. Soeripno Marto Saputro, Chairman, Indonesia Wind Energy Society

11:45AM Paper10:Small-scaleWindFarmforRuralIndustrialisation*Ms. Yenni Andayani, Gas, New & Renewable Energy Director, PT Pertamina (Persero)

12:15PM Paper11:AcceleratingWindEnergyinIndonesiaMr. Torsten Pedersen, Head of Sales for Southeast Asia, Vestas

12:45PM Open Forum: Comments, Questions and Answers

1:00PM Luncheon for Guest Speakers and Delegates

SESSION FIVE:

PoweringIndonesiathroughSolarEnergy

2:00PM Paper12:SolarFarmsPlanningandOpportunitiesinIndonesiaMr. Heru Sriwidolo, Senior Manager of Alternative Energy, PT PLN

2:30PM Paper13:Prospectsofoff-GridSolarEnergyDevelopmentinIndonesiaforRuralElectrificationMr. John Eccles, Director - Global Hybrid Generation, First Solar

3:00PM Paper14:OptimisingSolarEnergyManufacturingasSignificantSourceforJobCreationMr. Darman Mappangara, Chairman, Indonesian Solar Module Manufacturer Association

3:30PM Paper15:OptimizedHybridizationandStorageofMini-GridsusingRenewableEnergySourcesfromSolar-PVMr. Frank Zimmermann, Business Development Manager Renewable Energies SE Asia, ILF Consulting Engineers (Asia) Ltd.

4:00PM Open Forum: Comments, Questions and Answers

4:10PM Networking & Refreshments Break

SESSION SIX:

TheRoleofBioenergyintheIndonesiaEnergyMix

4:40PM Paper16:BiomassEnergyUtilizationsinIndonesia:CurrentSituationandOpportunities*Mr. Tisnaldi, Director of Bioenergy, Directorate General of New, Renewable Energy and Energy Conservation

5:10PM Paper17:TrendsandProspectsofBiofuelinIndonesiaEnergyMixDr. Ir. Tatang Hernas, Chairman, Indonesian Association of Bioenergy Scientist and Technologist

5:40PM Open Forum: Comments, Questions and Answers

5:50PM CLOSING ADDRESS

6:00PM RENEWABLEENERGYFORINDONESIA2015ENDS

* Hotel rate is subjected to changes

DELEGATES ACCOMMODATION

HOLIDAYINNJAKARTAKEMAYORAN

Jl Griya Utama Blok B No 1, Jakarta Utara 14350, indonesia

Tel: +622129568800Fax: +62 21 2968 9710

ContactPerson:Ms.RosalinaP.Dewi

Email: [email protected]*[email protected]@ihg.com

Website:www.holidayinn.com/jktkemayoran

RoomType Single/Double(IDR)

Deluxe Room 1,150,000 nettExecutive Room 1,350,000 nettJunior Suite Room 1,600,000 nettExecutive Suite Room 2,000,000 nett

* Rates quoted are inclusive of 21% government tax and service charge

* Maximum occupancy per room is Two (2) persons only.

* Rates are inclusive of breakfast* Complimentary wires/wireless internet access

Passport No. Date of Issue D M Y YD / /M Y Y

Country of Issue Expiry Date D M Y YD / /M Y Y

Title Mr. Mrs. Ms. Dr. Others (specify) :_________________

Name (as per passport)

Email

Job Title

Company

Address

Country

City/State Postcode

Mobile Number*

Telephone* Fax*

*(Please include country and area code)

HOTEL ROOM RESERVATIONChoice of Hotel:(Please specify name of hotel. Reservation is for approved RE4I 2015 hotels only)

Single or Twin-Sharing(Please Specify)

Check-In Date Check-Out Date

Rate Per Room Per Night(Please specify Rate)

Title Mr. Mrs. Ms. Dr. Others (specify) :_________________

Name

Below For Twin Sharing Room, Please Provide full name of room rate: ( As per passport).please added

MODE OF PAYMENT

PAYMENT BY CREDIT CARD (IDR) I hereby authorized IDR ________________ to be charged to my credit card below for the hotel reservation. Credit Card: Visa Master (3 digit Security Code Number - on back of card_____________ )

Name : (as appears on card) Credit Card No. :

Expiry Date : Signature : Date :*(Signature must correspond with the specimen signature of the Card Account)

Reservation of hotel rooms is on first-come-first served basis. Reservation will only be made upon receipt of this reservation Form. Credit Card payments for hotel accommodation are charged in IDR. Payment is to be made to the hotel specified by you and charge to your Credit Card account indicated below. Rooms booking confirmation letter will be issued by the hotel as proof of reservation.

Note: For room reservation, please complete the Hotel Reservation Form and fax or email to the hotel of your choice directly

HOTEL RESERVATION FORMRENEWABLE ENERGY FOR INDONESIA 2015

PLEASE COMPLETE AND FAX BACK TO +603 2771 1669

For enquir ies , p lease contact at +603 2771 1668 or emai l : [email protected]

REGISTRATION FORM

PAYMENTFull payment is required with your Registration Form before the Summit day. Tax-Receipt will only be issued upon receipt of full payment.

Summit registration fee includes lunch and refreshments. The Summit registration fee, however, does not include travel, accommodation and incidental costs.

All payments should be made in USD ($) by bank draft, telegraphic transfer or cash only.

All registrations by fax or post MUST reach us before 1 November 2015, after which late registrations will be considered as "WALK-INs" and subjected to "WALK-IN" fee.

Passport No. Date of Issue D M Y YD / /M Y Y

Country of Issue Expiry Date D M Y YD / /M Y Y

Title Mr. Mrs. Ms. Dr. Others (specify) :_________________

Name (as per passport)

Email

Job Title

Company

Address

Country

City/State Postcode

Telephone* Fax**(Please include country and area code)

(for correspondence purposes)

Delegates may be substituted at any time, in writing, at NO extra charge.

Cancellations received in writing before before 1 November 2015 will be refunded, less a USD100 administrative fee. Cancellations received thereafter are not refundable.

Confexhub reserves the right to reschedule or cancel the conference, exhibition, cocktail reception, due to circumstances beyond their control and reserves the right to make changes to the conference program or speakers without prior notice.

Should the event and all its related activities be cancelled, curtailed or adversely affected by any cause not within the reasonable control of Confexhub including but not limited to war, fire, national emergency, labor dispute, strike, lock-out, civil disturbance, Act of God, or non-availability of premises for any reason, Confexhub shall be under no obligation to refund all or part of the sums paid by the delegate in respect of his/her participation in the workshop. Confexhub shall be under no liability to the delegate or any other person in respect of any actions, proceedings, claims, demands, losses (including consequential losses), costs or expenses whatsoever which may be brought against or suffered or incurred by the delegate as the result thereof.

PARTICIPATION TERMS & CONDITIONS

RENEWABLE ENERGY FOR INDONESIA 2015

Fee per Delegate 1-2 Delegates

Walk-In Fee(registration with FULL payment received After 1 November 2015)

USD1,800

3 & Above

Early Bird Rate USD1,200 USD1,000

Normal Rate(registration with FULL payment received before 1 November 2015)

(registration with FULL payment received before 15 October 2015)

USD1,500 USD1,200