RENAISSANCE ZARAGOZA WP1 Research, Technological
description
Transcript of RENAISSANCE ZARAGOZA WP1 Research, Technological
11
José A. TuréganoUofZ/ Head of GEE
5th RENAISSANCE meeting- Zaragoza 24-25/04/2008
W.P 1.1 Energy Policy, Planning, R&D
W.P. 1.2 Definition and Validation of Design Standards and Bids
W.P. 1.3 Wood-fuel supply chains assessment and organisation
W.P. 1.5 Socio-economic research
W.P 1.1 Energy Policy, Planning, R&D
W.P. 1.2 Definition and Validation of Design Standards and Bids
W.P. 1.3 Wood-fuel supply chains assessment and organisation
W.P. 1.5 Socio-economic research
EcoDesEcoDes: General approach (to be done by Oct 08): General approach (to be done by Oct 08)
UofZ: Collaboration with AytoZ: Rules about urban efficiencyUofZ: Collaboration with AytoZ: Rules about urban efficiency and definition of soft/hard bioclimatic design (by Oct 08)and definition of soft/hard bioclimatic design (by Oct 08)
W.P 1.1 Energy Policy, Planning, R&D W.P. 1.2 Definition and Validation of
Design Standards and Bids
W.P. 1.3 Wood-fuel supply chains assessment and organisation
W.P. 1.5 Socio-economic research
CENERCENER: · Design standards for the Public School C. Domingo (done): · Design standards for the Public School C. Domingo (done)
· Validation of expected PhV production (done)· Validation of expected PhV production (done)
UofZ: · Validation of Valdespartera standards compared with new CTUofZ: · Validation of Valdespartera standards compared with new CT
· Building Certification for monitored buildings· Building Certification for monitored buildings
· New rules concerning ventilation· New rules concerning ventilation
CENERCENER: Expected PhV production: Expected PhV production
NN
SS
UofZ: Validation of Valdespartera standardsUofZ: Validation of Valdespartera standards
EV
H/D
H&C increments
H/D
Orientation
EV
UofZ: Building Certification for monitored buildingsUofZ: Building Certification for monitored buildings
Parcela EdificioT.Pisos T. Edificios
Estructura Fachada Tabiques Rozas Enlucido Cableado Sondas Temp Gal T y H Salon Temp Habit Med FachaNorte X X X X X X X X X X 4 1Sur X X X X X X X X X X 4 1Oeste X X X X X X X X X X 3 1Norte XSur XOeste XNorte X X X X X 4 1Sur X X X X X 1 1Oeste X X X X X 2 1Norte X X X X X X 4 1Sur X X X X X X 4 1Oeste X X X X X X 3 1Norte X X X X X 4 1Sur X X X X X 4 1Norte X X X X X X X X X N/A 4 1Sur X X X X X X X X X N/A 4 1
21 Oeste X X X X X X X X X X N/A 3 1Norte X X X X X X X X X X N/A 4 1Sur X X X X X X X X X X N/A 4 1Oeste X X X X X X X X X X N/A 3 1Norte X X X X X 2 1Sur X X X X X 2 1Oeste X X X X X 4 1Norte X X X X X 4 1Sur X X X X X 5 1Oeste X X X X X
76 22
Estado de ejecucion
27
29
24
17
18
20
14
Estado Obra Contruccion Estado Sondas
12
13
UofZ: New rules concerning ventilationUofZ: New rules concerning ventilation
GEE in collaboration with the COAA, CIRCE, and promoterswill organize (7th may) a workshop about ventilation
W.P 1.1 Energy Policy, Planning, R&D W.P. 1.2 Definition and Validation of
Design Standards and Bids
W.P. 1.3 Wood-fuel supply chains assessment and organisation
W.P. 1.5 Socio-economic research
CENERCENER: · Design standards for the Public School C. Domingo (done): · Design standards for the Public School C. Domingo (done)
· Validation of expected PhV production (done)· Validation of expected PhV production (done)
UofZ: · Validation of Valdespartera standards compared with new CTUofZ: · Validation of Valdespartera standards compared with new CT
· Building Certification for monitored buildings· Building Certification for monitored buildings
· New rules concerning ventilation· New rules concerning ventilation
Next 18 months: Next 18 months:
To revise how current normative works To revise how current normative works with the “old” design of buildings in with the “old” design of buildings in ValdesparteraValdespartera
Share the analysis with Lyon and Share the analysis with Lyon and LombardyLombardy
W.P 1.1 Energy Policy, Planning, R&D
W.P. 1.2 Definition and Validation of Design Standards and Bids
W.P. 1.5 Socio-economic research
EcoDesEcoDes: Social testing (prepared to start): Social testing (prepared to start)
UofZ, ENDESA, Urbic: Coordination with EcoDes and waiting UofZ, ENDESA, Urbic: Coordination with EcoDes and waiting to assume different task concerning to assume different task concerning
· Users Presentations· Users Presentations· Data gathering and analysis. · Data gathering and analysis.
Next 18 months:Next 18 months:Strong actions concerning testing of users´ habits Strong actions concerning testing of users´ habits and the corresponding interaction, when possible, and the corresponding interaction, when possible, with data collected to modify and/or intensify the with data collected to modify and/or intensify the different ways of users´ information /formation.different ways of users´ information /formation.
W.P 2.1 Integrated Energy Networks
W.P. 2.2 Eco Buildings: Quality Control and Performance Analysis
W.P. 2.3 Monitoring and Analysis
W.P 2.1 Integrated Energy Networks
W.P. 2.2 Eco Buildings: Quality Control and Performance Analysis
W.P. 2.3 Monitoring and Analysis
EVZ: Physical Network in Valdespartera for Demonstration BuildingEVZ: Physical Network in Valdespartera for Demonstration Building
ENDESA: Electricity & gas consumption data (individual/global)ENDESA: Electricity & gas consumption data (individual/global)
UofZUofZ: Network organization with the above to complete data for a.: Network organization with the above to complete data for a.
Next 18 months:Next 18 months:
To define the necessary sheets to get a comprehensive and To define the necessary sheets to get a comprehensive and coherent information in an integrated network (Zaragoza, Lyon, coherent information in an integrated network (Zaragoza, Lyon, Lombardy)Lombardy)
W.P 2.1 Integrated Energy Networks
W.P. 2.2 Eco Buildings: Quality Control and Performance Analysis
W.P. 2.3 Monitoring and Analysis
EVZ: Demonstration Building Performance (waiting for building EVZ: Demonstration Building Performance (waiting for building c.)c.)
CENER: Electricity & gas consumption data (individual/global) for CENER: Electricity & gas consumption data (individual/global) for a.a.
UofZUofZ: · Comfort data and Auxiliary and Renewable data: · Comfort data and Auxiliary and Renewable data
· Network organization with the above to complete data for · Network organization with the above to complete data for a.a.
Next 18 months:Next 18 months:Local network, data probes, and Demonstration Building ( center Local network, data probes, and Demonstration Building ( center for data storage and presentation on line) will be functioning and for data storage and presentation on line) will be functioning and reporting information for the different analysis to verify the reporting information for the different analysis to verify the performance of everything planned.performance of everything planned.
W.P 2.1 Integrated Energy Networks
W.P. 2.2 Eco Buildings: Quality Control and Performance Analysis
W.P. 2.3 Common Monitoring and Analysis
UofZUofZ: Defining an energy flow and data presentation , revising : Defining an energy flow and data presentation , revising standards on each community standards on each community
Next 18 months: Next 18 months: to share and combine results with W.P. 2.2to share and combine results with W.P. 2.2