ILC TARGET STATION – REMOTE HANDLING ILC TARGET STATION – REMOTE HANDLING

Remote Handling of ILC Target

KILC 12, April 24, 2012, Daegu, Korea 1

Jia Xuejun

Institute of High Energy Physics, CAS

Page 2: Remote Handling of ILC Target - ILC Agenda (Indico)

ILC TARGET STATION – REMOTE HANDLING

2

Titanium Alloy Rotates at 100m/s at rim Cryo-cooler, cryostat and vacuum pump If can be immersed in strong magnetic field then capture more positrons Strong Eddy current effects

Target Wheel

Page 3: Remote Handling of ILC Target - ILC Agenda (Indico)

ILC TARGET STATION – REMOTE HANDLING

3

Target Activity (150kW, 5000h)

Page 4: Remote Handling of ILC Target - ILC Agenda (Indico)

ILC TARGET STATION – REMOTE HANDLING

4

Dose rate of used Target (mSv/h@1m)

2 years

Page 5: Remote Handling of ILC Target - ILC Agenda (Indico)

ILC TARGET STATION – REMOTE HANDLING

5

Shielding calculation

Codes and libraries MCNPX2.5.0, CINDER90, libraries:mcplib04, e103, endf60 Target: Ti-6%wtAl-4%wtV, density 4.5g/cc Magnetite concrete: density 3.53 g/cc

Working area

Shielding cask

Page 6: Remote Handling of ILC Target - ILC Agenda (Indico)

ILC TARGET STATION – REMOTE HANDLING

6

Horizontal or vertical?

Remote handling concept

Page 7: Remote Handling of ILC Target - ILC Agenda (Indico)

ILC TARGET STATION – REMOTE HANDLING

7

Horizontal vertical ISIS target concept Hot-cell Very Expensive Complicated hydraulics, interlock systems Long period requirement Difficult to engineer

Whole plug replacement Not hot-cell, but plug storage pit (or area) Short period requirement Less shielding, less tunnelling All connections hands-on

Page 8: Remote Handling of ILC Target - ILC Agenda (Indico)

ILC TARGET STATION – REMOTE HANDLING

1. General Layout Used Target

& Container

Base

Target Station

New Target

Utilities:

Water pump

Vacuum Pump

etc.

Target Handling Container

8

Page 9: Remote Handling of ILC Target - ILC Agenda (Indico)

ILC TARGET STATION – REMOTE HANDLING

2. Components of the Target Station Assembly

Providing access to Target Module

Shield blocks

Base

Providing access to Clamp

Shield blocks Support Block

Target Box

Target Module

9

Page 10: Remote Handling of ILC Target - ILC Agenda (Indico)

ILC TARGET STATION – REMOTE HANDLING

10

Target Module Size: 1400×1140×1650mm Weight about 5 tons Target shielding cask: Cast steel plus concrete Weight about 10 tons Crane capacity: 20 tons, hook height: 3.5 m

2. Components of the Target Station Assembly

Page 11: Remote Handling of ILC Target - ILC Agenda (Indico)

ILC TARGET STATION – REMOTE HANDLING

2. Components of the Target Station Assembly

Target Module

One-Piece Shield

Target Wheel

Front panel of vacuum enclosure

Inflatable Seals

Back panel of vacuum enclosure

Target Box

Beam Pipe

11

Pipes

Zip-Lift

Page 12: Remote Handling of ILC Target - ILC Agenda (Indico)

ILC TARGET STATION – REMOTE HANDLING

Replaceable Seal Face

2. Components of the Target Station Assembly

Support Bar

Quick Release Clamp

Beam Pipe

Inflatable Seals

12

Page 13: Remote Handling of ILC Target - ILC Agenda (Indico)

ILC TARGET STATION – REMOTE HANDLING

2. Components of the Target Station Assembly

One-Piece Shield

Guide the Target Module

Fix the Target Module

13

Vacuum Valve

Shutdown the valves and keep vacuum

Page 14: Remote Handling of ILC Target - ILC Agenda (Indico)

ILC TARGET STATION – REMOTE HANDLING

3. Replacement of Target Station

1st Remove top shield blocks

14

Page 15: Remote Handling of ILC Target - ILC Agenda (Indico)

ILC TARGET STATION – REMOTE HANDLING

3. Replacement of Target

2nd Place the handling container and take out the target mould

15

Close the shield door

Page 16: Remote Handling of ILC Target - ILC Agenda (Indico)

ILC TARGET STATION – REMOTE HANDLING

16

3. Replacement of Target

3rd Place into parking enclosure and

load a new target module.

Page 17: Remote Handling of ILC Target - ILC Agenda (Indico)

ILC TARGET STATION – REMOTE HANDLING

4. Removal of Replaceable Seal Face (If needed)

17

Page 18: Remote Handling of ILC Target - ILC Agenda (Indico)

ILC TARGET STATION – REMOTE HANDLING

4. Removal of Replaceable Seal Face

18

Page 19: Remote Handling of ILC Target - ILC Agenda (Indico)

ILC TARGET STATION – REMOTE HANDLING

Replacement of target involves the following

basic operations: ( 12 hours ?)

• Switch off and isolate electric power to

magnets, Target Wheel

• Stop Target Wheel coolant pump, Drying

• Remove/disconnect water ,vacuum supply

• Close actuated vac valves on beam line and

AMD side each side of target station.

• De-pressurise both inflatable seal

• Attach lifting rods, withdrawal of target

plug into shield container with vac valve

closed.

• Installation of new target plug

• Connection of utility piping (water, power)

• Leak testing of inflatable seals and piping

connections

Page 20: Remote Handling of ILC Target - ILC Agenda (Indico)

ILC TARGET STATION – REMOTE HANDLING

Estimated cost

• Pillow seal: 2X100k

• Supporting structure, alignment : 150k

• Replaceable seal : 2X 50k

• Zip-lift, Remote handling tools: 200k

• Transfer cask and supporting : 300k

• Utilities: 50k (?)

• Crane : 100k (20tons)

• Required storage area : ≈30 - 40 m2

Page 21: Remote Handling of ILC Target - ILC Agenda (Indico)

ILC TARGET STATION – REMOTE HANDLING

21