REMEMBER YOUR ABC’s · 2019-10-07 · 1 cvh1 center vertical hinged 20 grn 1” thumb screws 4...

10
Page 1 3401 Mary Taylor Road Birmingham, Alabama 35235 (205) 439-8200 Drawn By: SH Project Title Sheet Title ASSEMBLY INSTRUCTIONS COVER SHEET MQ - K1030 - HD MQ - K1030 - hd 10’x10’ Custom MultiQuad R A SSEMBLE EACH COMPONENT SEPARATELY B UILD THE DESIRED LAYOUT C OVER YOUR MULTIQUAD LAYOUT WITH QUADS WHEN ASSEMBLING R REMEMBER YOUR ABC ’s... R

Transcript of REMEMBER YOUR ABC’s · 2019-10-07 · 1 cvh1 center vertical hinged 20 grn 1” thumb screws 4...

Page 1: REMEMBER YOUR ABC’s · 2019-10-07 · 1 cvh1 center vertical hinged 20 grn 1” thumb screws 4 red 2” thumb screws r *match numbers to construct. appendix k assembly instructions

Page 1

3401 Mary Taylor RoadBirmingham, Alabama 35235(205) 439-8200

Drawn By: SH

Project Title

Sheet Title

ASS

EMB

LYIN

STR

UC

TIO

NS

CO

VER

SH

EET

MQ

- K

1030

- H

D

MQ - K1030 - hd 10’x10’ Custom MultiQuad

R

ASSEMBLE EACH COMPONENT SEPARATELYBUILD THE DESIRED LAYOUTCOVER YOUR MULTIQUAD LAYOUT WITH QUADS

WHEN ASSEMBLINGR

REMEMBER YOUR ABC’s...

R

Page 2: REMEMBER YOUR ABC’s · 2019-10-07 · 1 cvh1 center vertical hinged 20 grn 1” thumb screws 4 red 2” thumb screws r *match numbers to construct. appendix k assembly instructions

MQ

- K

1030

- H

D

Page 2

3401 Mary Taylor RoadBirmingham, Alabama 35235(205) 439-8200

Drawn By: SH

Project Title

Sheet Title

ASS

EMB

LYIN

STR

UC

TIO

NS

ELEC

TRIC

AL

PLA

N

R

R

ELECTRICAL DROP500 Watts

FRONT OF DISPLAY

BACK OF DISPLAY

SID

E O

F D

ISPL

AY

SID

E O

F D

ISPL

AY

1 Square = 1’- 0”

MAIN ELECTRICAL DROP

Page 3: REMEMBER YOUR ABC’s · 2019-10-07 · 1 cvh1 center vertical hinged 20 grn 1” thumb screws 4 red 2” thumb screws r *match numbers to construct. appendix k assembly instructions

MQ

- K

1030

- H

D

Page 3

3401 Mary Taylor RoadBirmingham, Alabama 35235(205) 439-8200

Drawn By: SH

Project Title

Sheet Title

ASS

EMB

LYIN

STR

UC

TIO

NS

DES

IRED

LA

YOU

T

PARTS LIST:

# LABEL NAME

2x4 STANDARD TOWER2x4 MAX TOWER

R

R

2x4 MAX TOWER(SEE APPENDIX J)2x4 STANDARD TOWER

(SEE APPENDIX B)

2x4 STANDARD TOWER(SEE APPENDIX B)

1

2

1

2x2 STANDARD TOWER

(SEE APPENDIX E)

2x2 STANDARD TOWER

2x4 MAX TOWER(SEE APPENDIX J)

2x4 STANDARD TOWER(SEE APPENDIX B)

Page 4: REMEMBER YOUR ABC’s · 2019-10-07 · 1 cvh1 center vertical hinged 20 grn 1” thumb screws 4 red 2” thumb screws r *match numbers to construct. appendix k assembly instructions

MQ

- K

1030

- H

D

R

2x4 STANDARD TOWER

(SEE APPENDIX B)

2x2 STANDARD TOWER

(SEE APPENDIX E)

3401 Mary Taylor RoadBirmingham, Alabama 35235(205) 439-8200

Drawn By: SH

Project Title

Sheet Title

R

Page 4

ASS

EMB

LYIN

STR

UC

TIO

NS

EXPL

OD

ED L

AYO

UT

1. PLACE THE FAR LEFT TOWER INTO THE DESIRED LOCATION2. SLIDE ADJACENT TOWER INTO PLACE AND ATTACH USING THE CORNER CONNECTORS AND RED THUMB SCREWS (SEE APPENDIX A)3. REPEAT STEP 2 UNTIL ALL THE FRAMES ARE JOINED TOGETHER

2x4 MAX TOWER(SEE APPENDIX J)

2x4 MAX TOWER(SEE APPENDIX J)

2x4 STANDARD TOWER(SEE APPENDIX B)

Page 5: REMEMBER YOUR ABC’s · 2019-10-07 · 1 cvh1 center vertical hinged 20 grn 1” thumb screws 4 red 2” thumb screws r *match numbers to construct. appendix k assembly instructions

MQ

- K

1030

- H

D

R

Page 5

3401 Mary Taylor RoadBirmingham, Alabama 35235(205) 439-8200

Drawn By: AKHIII

Project Title

Sheet Title

ASS

EMB

LYIN

STR

UC

TIO

NS

GR

APH

ICS

LAYO

UT

PARTS LIST:# SIZE NAME

44 STANDARD QUAD23x23

R

MAIN WALL FLATTEN ELEVATION

4 SIDE QUAD12x23

4 L-SHAPED QUADS

A

B

C

D

1

1

2

3

4

5

6

78

10

9

11 121314 15

16

2 3 4 5 6 7 8 9 10 11 12 13 14 15 16*

Plan View*= ORIGIN

*

Page 6: REMEMBER YOUR ABC’s · 2019-10-07 · 1 cvh1 center vertical hinged 20 grn 1” thumb screws 4 red 2” thumb screws r *match numbers to construct. appendix k assembly instructions

APPENDIX A

ASS

EMB

LYIN

STR

UC

TIO

NS

CO

NN

ECTO

RS

&A

LIG

NM

ENT

TOO

LS

3401 Mary Taylor RoadBirmingham, Alabama 35235(205) 439-8200

Drawn By: AKHIII

Sheet Title

MQ-BTW CORNER ALIGNMENT TOOL INSTRUCTIONS(NOT REQUIRED IN EVERY CONFIGURATION)

MQ-CLMP SUPPLEMENTAL CONNECTOR INSTRUCTIONS(NOT REQUIRED IN EVERY CONFIGURATION)

MQ-TSR2 / MQ-TSG1 THUMB SCREW INSTRUCTION

R

THE MQ-BTW CORNER ALIGNMENT TOOL IS DESIGNEDTO AID IN THE ALIGNMENT OF FRAMES AS NEEDEDIN SOME MULTIQUAD CONFIGURATIONS.

AFTER TWO MULTIQUAD FRAMES ARE SET“CORNER-TO-CORNER” THE MQ-BTW SIMPLYSLIDES OVER THE CORNER AND SETTLES INTOPLACE. THIS, ALONG WITH THE ADJUSTMENTOF THE LEVELING FEET, WILL HELP WITH THEALIGNMENT OF THE FRAMES

THE MQ-CLMP IS A FRICTION-FIT (SLIDES ON) CONNECTOR/ ALIGNMENT TOOL FOR USE IN ABNORMAL MULTIQUAD FRAME CONFIGURATIONS, OR AS ADDITIONAL FRAME SECURITYIN SPECIAL SITUATIONS.

THE MQ-CLMP SIMPLY SLIDES OVER THE MULTIQUAD FRAME WHERE NEEDED

THE MQ-TSR2 IS A 2” RED THUMB SCREW. IT ISUSED TO CONNECT MULTIQUAD FRAMES INTOAN INLINE CONFIGURATION. MULTIQUAD FRAMESHAVE A LEFT AND A RIGHT SIDE AFTER CONSTRUCTION.THESE SCREWS PASS THROUGH ONE FRAME ANSCREW INTO ANOTHER ADJACENT FRAME.

THE MQ-TSG1 IS A 1” GREEN SCREW. THEY ARE USED TO ASSEMBLE MOST MULTIQUAD FRAMES

Page 7: REMEMBER YOUR ABC’s · 2019-10-07 · 1 cvh1 center vertical hinged 20 grn 1” thumb screws 4 red 2” thumb screws r *match numbers to construct. appendix k assembly instructions

APPENDIX B

ASS

EMB

LYIN

STR

UC

TIO

NS

2x4

STA

ND

AR

D F

RA

ME

MQ

-F24

3401 Mary Taylor RoadBirmingham, Alabama 35235(205) 439-8200

Drawn By: AKHIII

Sheet Title

1st Step) START WITH THE LEFT VERTICAL HINGE (LVH1) ON THE GROUND

3rd Step) ATTACH THE RIGHT HINGED SIDE (RVH1)

4th Step) ATTACH THE CENTER VERTICAL HINGED (CVH1)

2nd Step) ATTACH (2) TOP HORIZONTAL (TH1), (2) MIDDLE HORIZONTAL (MH1), (2) BOTTOM HORIZONTAL (BH1)

PARTS LIST:# LABEL NAME1 LEFT VERTICAL HINGEDLVH11 RIGHT VERTICAL HINGEDRVH12 BOTTOM HORIZONTALBH12 MIDDLE HORIZONTALMH12 TOP HORIZONTALTH12 CENTER VERTICAL HINGEDCVH1

20 1” THUMB SCREWSGRN4 2” THUMB SCREWSRED

*MATCH NUMBERS TO CONSTRUCT.

R

Page 8: REMEMBER YOUR ABC’s · 2019-10-07 · 1 cvh1 center vertical hinged 20 grn 1” thumb screws 4 red 2” thumb screws r *match numbers to construct. appendix k assembly instructions

APPENDIX E

ASS

EMB

LYIN

STR

UC

TIO

NS

2x2

STA

ND

AR

D

CO

UN

TER

MQ

-F22

C

3401 Mary Taylor RoadBirmingham, Alabama 35235(205) 439-8200

Drawn By: AKHIII

Sheet Title

1st Step) START WITH THE (LVR1) ON THE GROUND. ATTACH THE (THR1), (BHR1), AND (RVR1)

3rd Step) STAND UPRIGHT AND PLACE COUNTER ON TOP

2nd Step) ATTACH THE (2) CENTER VERTICLE (CVH2)

PARTS LIST:# LABEL NAME1 LEFT VERTICAL RECTANGLELVR11 RIGHT VERTICAL RECTANGLERVR11 BOTTOM HORIZONTAL RECT.BHR12 CENTER VERTICAL HALFCVH21 TOP HORIZONTAL RECTANGLETHR24 1” THUMB SCREWSGRN8 2” THUMB SCREWSRED1 COUNTER TOP FOR MQ-F22CCT1246

R

*MATCH NUMBERS TO CONSTRUCT.

COUNTER TOP

C2x

2 STA

NDAR

D CO

UNTE

R

Page 9: REMEMBER YOUR ABC’s · 2019-10-07 · 1 cvh1 center vertical hinged 20 grn 1” thumb screws 4 red 2” thumb screws r *match numbers to construct. appendix k assembly instructions

APPENDIX J

ASS

EMB

LYIN

STR

UC

TIO

NS

2x4

MA

X FR

AM

EM

QX-

F24

3401 Mary Taylor RoadBirmingham, Alabama 35235(205) 439-8200

Drawn By: AKHIII

Sheet Title

1st Step) START WITH THE LEFT VERTICAL HINGE (LVH1) ON THE GROUND

3rd Step) ATTACH THE RIGHT HINGED SIDE (RVH1)

4th Step) ATTACH THE CENTER VERTICAL HINGED (CVH1)

2nd Step) ATTACH (2) TOP HORIZONTAL (TH1), (2) MIDDLE HORIZONTAL (MH1), (2) BOTTOM HORIZONTAL (BH1)

PARTS LIST:# LABEL NAME1 LEFT VERTICAL HINGEDLVHX

1 RIGHT VERTICAL HINGEDRVHX2 BOTTOM HORIZONTALBH12 MIDDLE HORIZONTALMH12 TOP HORIZONTALTH11 CENTER VERTICAL HINGEDCVH1

20 1” THUMB SCREWSGRN4 2” THUMB SCREWSRED

R

*MATCH NUMBERS TO CONSTRUCT.

Page 10: REMEMBER YOUR ABC’s · 2019-10-07 · 1 cvh1 center vertical hinged 20 grn 1” thumb screws 4 red 2” thumb screws r *match numbers to construct. appendix k assembly instructions

APPENDIX K

ASS

EMB

LYIN

STR

UC

TIO

NS

MO

NIT

OR

MO

UN

TM

Q-S

M3Q

3401 Mary Taylor RoadBirmingham, Alabama 35235(205) 439-8200

Drawn By: AKHIII

Sheet Title

1st Step)ATTACH AND LOCK UNIVERSAL MONITORMOUNT TWO BOTH UPRIGHTS

3rd Step) THEN ATTACH MONITOR ON UNIVERSALMOUNT.

2nd Step) TAKE ASSEMBLED SPIDER MOUNT MAX AND SLIDE INTO FRAME. CLAMP THE BACK ONTO THE BACK CENTER BAR (1), THEN SLIDEFRONT DOWN UNTIL IT SETTLES (2).

PARTS LIST:# LABEL NAME1 LEFT SIDE ASSEMBLY11 RIGHT SIDE ASSEMBLY21 CENTER ASSEMBLY3

*ALL CONNECTION POINTS ARE NUMERICALLYAND COLOR COORDINATED

R

VERTICAL BAR (1) IS ADJUSTABLE FORMONITOR DEPTH. IT CAN BE MOVEDFORWARD OR BACK TO ACCOMMODATEALL FLAT PANEL MONITORS.

1

2

3

2

1

3

LEFT SIDE ASSEMBLY (DO NOT DISASSEMBLE)

RIGHT SIDE ASSEMBLY (DO NOT DISASSEMBLE)

CENTER ASSEMBLY (DO NOT DISASSEMBLE)

1

2

UNIVERSAL MOUNT