![Page 1: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/1.jpg)
REMEDIATION OF INCE CENTRAL ESTATE IN WIGANA Part 2A Site
Tony Brown, SiLC – Director of Ground Engineering
John Crowther, SiLC - Technical Director
22nd September 2009
![Page 2: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/2.jpg)
2
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
Ince Central Estate, Wigan
![Page 3: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/3.jpg)
3
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
Site Location Plan
![Page 4: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/4.jpg)
4
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
Estate Layout
![Page 5: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/5.jpg)
5
Engineering & Environment Conference 2008Engineering & Environment Conference 2008
Ince Central Estate, Wigan – Remediation Project
• John Crowther – from Investigation to Options Appraisal
• Tony Brown – Trials and Remediation Works
![Page 6: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/6.jpg)
6
Engineering & Environment Conference 2008Engineering & Environment Conference 2008
From Investigations to Options Appraisal I
• Supplementary Desk Study• Supplementary Site Investigation• Groundwater issues assessed as not critical• Additional investigation carried out including
sampling within top 1m within each garden plot• Further investigation within ‘clear’ plots
![Page 7: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/7.jpg)
7
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
Composite Historical Plan
![Page 8: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/8.jpg)
8
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
GI Plan
![Page 9: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/9.jpg)
9
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
Results with Averaging Areas Shown
![Page 10: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/10.jpg)
10
Engineering & Environment Conference 2008Engineering & Environment Conference 2008
From Investigations to Options Appraisal II
Human Health Risk Assessment
• Derivation of Site Specific Values (SSV’s)– BP RISC (organics)– SNIFFER (inorganics)
• Sensitivity Analysis– Arsenic (including PBET)
![Page 11: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/11.jpg)
11
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
Arsenic SSV Derivation - 1Value mg/kg150 Utilises BP RISC model.
Assumptions:-
soil eating by child up to 6 years of age on 180 days per year as indicated on Table 6.1 of CLR 10
40 % bioavailability
child body weight 14.5kg
89 Utilises BP RISC model.
Assumptions:-
soil eating by child up to 6 years of age on 365 days per year as indicated on Table 4.3 of CLR 10 (discrepancy between tables in CLR10 reported to Environment Agency)
40% bioavailability
child body weight 14.5 kg
55 Utilises BP RISC model.
Assumptions:-
soil eating by child up to 6 years of age on 365 days per year as indicated on Table 4.3 of CLR 10 (discrepancy between tables in CLR10 reported to Environment Agency)
70% bioavailability
child body weight 14.5 kg
![Page 12: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/12.jpg)
12
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
Arsenic SSV Derivation - 2
40 Utilises BP RISC model.
Assumptions:-
soil eating by child up to 6 years of age on 365 days per year.
100% bioavailability (following meeting of 23-12-04)
child body weight 14.5 kg
38 Utilises BP RISC model.
Assumptions:-
soil eating by child up to 6 years of age on 365 days per year.
100% bioavailability.
child body weight 14 kg.
27 Utilises SNIFFER model (for metals only) following meeting of 27-01-05.
Assumptions:-
soil eating by child up to 6 years age on 365 days per year
100% bioavailability
child body weight 14kg
![Page 13: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/13.jpg)
13
Engineering & Environment Conference 2008Engineering & Environment Conference 2008
The Appraisal Criteria
1. Impact on residents’ health and quality of life
2. Technical feasibility and sustainability
3. Statutory powers and duties
4. Cost and potential availability of funding
5. Impact on structures, services and foundations
6. Timescales
7. Risks (to delivery of solution)
8. Opportunities
9. Impact on tenants
10. Impact on homeowners
11. Impact on the estate image
12. Wigan Council Housing Strategy and other strategies
![Page 14: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/14.jpg)
14
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
Total Scores for the Options
6
10
12
4
5
-4
-5 0 5 10 15
Cover front and rear gardens withclean soil
Excavate/replace soil in front and reargardens
Hard cover front and excavate/replace rear
Put the cleared site(s) to public openspace
Cover and redevelop for new homes
Excavate/replace soil and redevelopfor new homes
![Page 15: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/15.jpg)
15
Engineering & Environment Conference 2008Engineering & Environment Conference 2008
Liaison with Residents
• Only one initial public meeting
• ‘History’ Day
• Interviews – Consultant and Remediation Contractor
• Resident’s Liaison Group Participation
• Regular Newsletters
• Home Visits
• HPA Health Consultation Days
• 3 Stakeholder Meetings
![Page 16: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/16.jpg)
16
Engineering & Environment Conference 2008Engineering & Environment Conference 2008
Trials & Remediation Works
• Pilot Project
– Pair of semi-detached properties undertaken in May 2005
• Remediation of the first two Phases (1 & 2)
– 32 plots in northern part of the estate
• Lessons learnt for other phases
• ‘Architectural Details’
• Conclusions
![Page 17: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/17.jpg)
17
Engineering & Environment Conference 2008Engineering & Environment Conference 2008
Remediation Works – Pilot Project
Reasons for undertaking the pilot
– to establish whether residents can remain in their homes without risk to their health.
– to confirm feasibility of methodology adopted.
– to enable residents to appreciate the nature of the works to be undertaken.
Selection of the pilot
– vacant properties
– good access
– contaminated material encountered
![Page 18: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/18.jpg)
18
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
Remediation Works – Pilot Project44 & 46 The Grove
![Page 19: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/19.jpg)
19
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
Remediation Works – Pilot Project
![Page 20: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/20.jpg)
20
Engineering & Environment Conference 2008Engineering & Environment Conference 2008
Remediation Works – Pilot Project
• Two techniques implemented
– Excavate & Replace (600mm)
– “Capping” (200mm)
• Environmental Monitoring
– Air Quality (PM10, Nuisance Dust, Dust Analysis)
– Noise and Vibration
• Suitable import materials identified
![Page 21: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/21.jpg)
21
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
Remediation Works – Pilot Project
![Page 22: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/22.jpg)
22
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
![Page 23: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/23.jpg)
23
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
View prior to work commencing (44 The Grove)
![Page 24: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/24.jpg)
24
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
Excavation in progress (rear of 44 The Grove)
![Page 25: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/25.jpg)
25
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
Damaged drain (44 The Grove)
![Page 26: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/26.jpg)
26
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
Repaired drain (44/ 46 The Grove)
![Page 27: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/27.jpg)
27
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
Base of excavation (44 The Grove)
![Page 28: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/28.jpg)
28
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
Filling with sandy subsoil (44 The Grove)
![Page 29: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/29.jpg)
29
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
Topsoil placed (44 The Grove)
![Page 30: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/30.jpg)
30
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
New fencing erected. Topsoil placed and trees planted at rear of 46 The Grove
![Page 31: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/31.jpg)
31
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
Patio area being constructed (46 The Grove)
![Page 32: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/32.jpg)
32
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
Turf laid (44 The Grove)
![Page 33: REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.](https://reader036.fdocuments.us/reader036/viewer/2022081519/56649d055503460f949d856e/html5/thumbnails/33.jpg)
33
Contaminated Land & Brownfield Remediation Conference Contaminated Land & Brownfield Remediation Conference
Excavation in progress (46 The Grove)