Remediation Cost Estimating ToolsRemediation Cost Estimating Tools
Presentation at ASTSWMO Training Conference Clearwater, Florida
June 16, 2011
Robert Maxey, P.E.EPA Office of Resource Conservation & Recoveryy
Cleanup Programs [email protected]
![Page 2: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/2.jpg)
Materials in Today’ PresentationMaterials in Today Presentation
• Regulatory Basis for Financial Assurance & Cost Estimation
• Cost Estimating Resources
• Brief introduction to RACER Capabilities• Brief introduction to RACER Capabilities
• Cost Estimate Case Study for Landfill Closure & Post-closure
![Page 3: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/3.jpg)
Cost Estimating Tools on Conference Websiteg
• Maxey cost estimation presentationy p
• Guidance for Subpart G Closure & Subpart H Cost Estimating
Sample RACER remedial action printouts• Sample RACER remedial action printouts
• Keystone landfill cost estimateKeystone landfill cost estimate
• Subpart H financial requirementsp q
![Page 4: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/4.jpg)
EPA Regulatory Basis for Cost EstimationEPA Regulatory Basis for Cost Estimation
• RCRA Closure & Post-Closure• RCRA Closure & Post-Closure
• Municipal Solid Waste Landfill Closure
• Corrective Action, RCRA
• Superfund Remedial ActionSuperfund Remedial Action
• Underground Injection Wells
• PCBs
• CERCLA 108(b)
![Page 5: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/5.jpg)
Closure Plan ContentsClosure Plan Contents
Cl Pl A ti iti Cl R l t Cit tiClosure Plan Activities Closure Regulatory Citation From Part 264, Subpart G
Facility Description 111, Closure Performance StandardClosure Activities 112, Closure PlanDecontamination 112(b)(4), DecontaminationFinal Cover 112(b)(5) Closure Performance StandardsFinal Cover 112(b)(5), Closure Performance StandardsGroundwaterMonitoring
112(b)(5), Groundwater Monitoring
Survey Plat 116, Survey PlatClosure Certification 115, Certificate of ClosureClosure Schedule 112(b)(6), Closure ScheduleClosure Schedule 112(b)(6), Closure Schedule
![Page 6: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/6.jpg)
Cost Estimating forRCRA Financial Assurance
• Regulatory Requirements for Closure, Post-Closure & C ti A ti& Corrective Action
• Based upon Closure, Post-Closure & Corrective Action Plans
![Page 7: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/7.jpg)
Facility cost estimates are required for Closure & Post-closure
• Facility cost estimates shall be based upon closure &Facility cost estimates shall be based upon closure & post-closure plans
• Closure plan includes procedures & schedules for closing individual units & for final closure of theclosing individual units & for final closure of the facility
• Based on estimates of the maximum inventory of hazardous waste present on site at any given timehazardous waste present on site at any given time
• Plan includes descriptions of decontamination methodsP t l i t ll i b d 30• Post-closure maintenance usually is based upon 30-year periods of performance
![Page 8: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/8.jpg)
Facility Cost Estimates Shall Reflect the M t E i O tiMost Expensive Options
• Estimates shall reflect the maximum permitted quantities or volumes
• May need to provide either for new onsite disposal units or for offsite T&Donsite disposal units, or for offsite T&D
• Estimates shall be predicated upon concurrent closure activities
![Page 9: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/9.jpg)
Facility Cost Estimates Shall Reflect Thi d P t C tThird Party Costs
• Estimates shall not be based upon the use of in-house resources even if available
• Parent companies & subsidiaries shallParent companies & subsidiaries shall not be considered to be third parties
• Use market based pricing based upon• Use market-based pricing based upon outside, independent contractor servicesservices
![Page 10: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/10.jpg)
Facility Cost Estimates Shall Preclude Salvage Credits & Zero Costs for WastesSalvage Credits & Zero Costs for Wastes
Generated During Closure
• Potential salvage values – such as reusable drums or tanks – shall not be incorporated pinto cost estimate to offset costs
• Disposal costs for recycling of hazardous orDisposal costs for recycling of hazardous or non-hazardous materials with potential economic value shall not be assigned “zero” values
![Page 11: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/11.jpg)
Update Estimates Annually for I fl ti ChInflation or Changes
• To account for inflation, either: recalculate estimates annually using current pricing or multiply originalannually using current pricing, or multiply original estimate by an inflation factor
• If new units are added, expanded or closed, the cost estimate must be updated to reflect the changed p gconditions
11
![Page 12: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/12.jpg)
Facility cost estimates are required for closures & post-closures
• Facility cost estimates shall be based upon closure & t l lpost-closure plans
• Each activity listed in a permit or plan shall be y p pincluded & priced in the estimates
• Post-closure maintenance usually is based upon 30-ost c osu e a te a ce usua y s based upo 30year periods of performance
12
![Page 13: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/13.jpg)
REGULATORY GUIDANCE
• RCRA Guidance Manual for Subpart G Closure & Post-Closure Care Standards & Subpart H Cost Estimating Requirements,” OSWER Directive #9476 00-5 January 1987OSWER Directive #9476.00-5, January 1987
• Cost Estimates for Closure and Post-Closure Plans OSWER Directive No 9476 00-6 NovPlans, OSWER Directive No. 9476.00-6, Nov 1986
• Interim Guidance on Financial ResponsibilityInterim Guidance on Financial Responsibility for Facilities Subject to RCRA Corrective Action, (September, 2003)
![Page 14: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/14.jpg)
CostPro Software• Developed by EPA in mid-1990’sp y
• Based on various Subparts of Part 264
• Used primarily for estimating costs of closure and post closureand post-closure
• Follows methodology of OSWER DirectiveFollows methodology of OSWER Directive 9476.00-6 (1986)
![Page 15: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/15.jpg)
CostPro ModulesCostPro Modules• Container Storage Area• Tanks
S rface Impo ndments
• Drip Pads• Containment Buildings
Decontamination• Surface Impoundments• Waste Piles• Land Treatment
• Decontamination• Sampling & Analysis• Monitor Well Installation
• Landfills• Incinerator/Boiler/Industrial
Furnace
• Transportation• Treatment & Disposal
Furnace
![Page 16: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/16.jpg)
CostPro ProcedureCostPro Procedure• Identify waste management unitsIdentify waste management units• Identify closure & post closure
ti itiactivities• Complete inventory work sheets• Complete primary & secondary
worksheets• Evaluate cost summary worksheets
![Page 17: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/17.jpg)
RACER Software• Developed by USAF in early 1990’s for
CERCLA/RCRACERCLA/RCRA
• Used primarily for estimating costs of corrective actionsactions
• Also includes some models for closures and post-closures including various cap designsclosures, including various cap designs
• RACER has illustrations, costs, flowsheets, even if it is not used for estimatesis not used for estimates
• RACER can be used at feasibility study stage to improve remedy selectionimprove remedy selection
![Page 18: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/18.jpg)
Example RACER TechnologiesExample RACER Technologies
• Cleanup & landscaping • Solidification/ p p g• Load & haul• Feasibility Study
stabilization• Off-site Transportation
& DisposalFeasibility Study• UST Site Assessment• Air Stripping
& Disposal• Slurry Walls• UXO ClearanceAir Stripping
• Carbon Adsorption• Coagulation/
• UXO Clearance• Asbestos Removal
Coagulation/ Flocculation
![Page 19: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/19.jpg)
Suncor RefinerySuncor Refinery
• Operating refinery in Denver COOperating refinery in Denver, CO
• Past releases have resulted in soil and groundwater contamination
• Currently using containment to halt off• Currently using containment to halt off-site migration
![Page 20: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/20.jpg)
Remedial Action Component S l i U i RACERSelection Using RACER
Remedial Action Wizard Guides Technology Selection:
1. Step 1 – Choose media: GW + fuels/semivolatilesas contaminants
2 Step 2 For fuels select among: air sparging in2. Step 2 – For fuels, select among: air sparging, in-situ biodegredation, slurry wall, permeable reactive barrier, bioslurping
3. Step 3 – Choose technology for semivolatiles4. Step 4 - Technology list (next slide)
![Page 21: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/21.jpg)
Program Uses for RA WizardProgram Uses for RA Wizard
• CERCLA Feasibility Study Options Selection
• Provision of Financial Assurance for RCRA CA 550
![Page 22: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/22.jpg)
Oxygen Injection SystemOxygen Injection System• Air SpargingAir Sparging• Overhead Electrical Distribution• Decontamination Facilities• Decontamination Facilities• Residual Waste Management
P f i l L b M t• Professional Labor Management• 8 Groundwater Monitor Wells• Corrective Measures Design• Operations and Maintenance
![Page 23: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/23.jpg)
![Page 24: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/24.jpg)
Typical RCRA Cover
![Page 25: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/25.jpg)
Particle Size Determines Hydraulic Properties
MaterialMaterialDiameter Diameter
Range Range Typical Typical
Permeability Permeability MaterialMaterial ggLimits (mm)Limits (mm)
yy(cm/sec)(cm/sec)
B ldB ld 256256 0 10 1BoulderBoulder 256<256< 0.10.1CobbleCobble 64 to 25664 to 256 0.010.01PebblePebble 2 to 642 to 64 0.0010.001SandSand 1/16 to 21/16 to 2 1010--44SandSand 1/16 to 21/16 to 2 1010SiltSilt 1/256 to 1/161/256 to 1/16 1010--55
Cl < 1/256 10 7Clay < 1/256 10-7
![Page 26: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/26.jpg)
Preparations for Taxes & Estimates are Similar
T
• Wage income • Construction layers
Taxes Cap Estimateg
• Interest income• Asset sales
P l ti
y• Sources of clay, sand,
fill & haul distances• Width length & depth• Personal exemptions
• Tax deductions• 401(k) deductions
• Width, length & depth of cover
• Stormwater control401(k) deductions• Gas collection system• Geomembrane,
geotextile costsgeotextile costs• Location determines
labor costs
![Page 27: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/27.jpg)
Basis of Cap EstimateBasis of Cap Estimate• Landfill is 250 ft x 500 ft, 2.9 acres, 15 ft deep, , p• Clay cost: $16.50 per cubic yard• Geomembrane: $0.41/ft2
• Sand cost: $21.85 per cubic yard• Topsoil cost: $33.15 per cubic yard• Geotextile: $9.09/yd2
• Fill cost: $18.25 per cubic yard• Soil material can be adjacent to site (1 mile)
or close (within 20 miles)
![Page 28: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/28.jpg)
CostPro Outputs for Keystone LandfillCostPro Outputs for Keystone Landfill
• LF-2: Summary• LF-3: Installation of Undifferentiated Fill• LF-4: Installation of Clay Layer• LF-5: Installation of GeomembraneLF 5: Installation of Geomembrane• LF-6: Installation of Drainage Layer• LF-7: Installation of Earthen Layer
LF 8: Installation of Topsoil• LF-8: Installation of Topsoil• LF-9: Establishment of Vegetative Cover• LF-12: Installation of a Gas Collection System• LF-14: Installation of a Storm Water Control• LF-15: Survey Plat• LF-16: Certification of ClosureLF 16: Certification of Closure
![Page 29: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/29.jpg)
CostPro Outputs for Keystone Post-ClosureCost o Outputs o eysto e ost C osu e
• PC-2: Removal of Leachate
• PC-3: Site Security
• PC-4: Maintenance of Vegetative CoverPC 4: Maintenance of Vegetative Cover
• PC-5: Maintenance & Inspection
PC 6: Groundwater Monitoring• PC-6: Groundwater Monitoring
• PC-7: Deed Notation
• PC-11: Certification of Post-Closure
![Page 30: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/30.jpg)
Important Topics for U d di f C E iUnderstanding of Cost Estimates• Sampling & analysisSampling & analysis• Waste disposal• Waste transportation• Waste transportation• Remedial operations
M t i l t• Materials costs• CostPro estimates closure/post-cloure
tcosts• RACER estimates remedial action costs
![Page 31: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/31.jpg)
Information Sources for Review f C E iof Cost Estimates
• RCRA Part B Permit• RCRA Part B Permit
• Closure Plan
• Facility cost estimate
• Work plan
• Mine Plan of Operations• Mine Plan of Operations
• Company annual reports, 10(k)
![Page 32: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/32.jpg)
Tips for Cost Estimate ReviewTips for Cost Estimate Review
• Know what facility is doing withKnow what facility is doing with decontamination & other water
• Verify easily understood disposal costs
• Thoroughly review facility submissionsThoroughly review facility submissions to understand what is being presented
![Page 33: Remediation Cost Estimating ToolsRemediation … Estimating Tools on Conference Website •Maxeyyp cost estimation presentation • Guidance for Subpart G Closure & Subpart H Cost](https://reader031.fdocuments.us/reader031/viewer/2022030506/5ab3d2267f8b9adc638b8316/html5/thumbnails/33.jpg)
Typical Errors in Facility EstimatesTypical Errors in Facility Estimates
L t di l t• Low waste disposal costs
• Low materials costsLow materials costs
• Low sampling costsp g
• No maintenance of ongoing remedial
operations