Five Reasons To Be Bullish Long-term on Renewable Energy
• Compliance with climate goals• Lower costs for wind and solar• Acceptance of renewables by utilities and
consumers• Smart grid interplay• Changing utility business models
Public Policy Consulting
Renewable Electricity Futures Study (REF)
Exploration of High-PenetrationRenewable Electricity Futures
Available at NREL.gov
Public Policy Consulting
NREL’s REF Findings
• Renewable electricity generation is more than adequate to supply 80% of total U.S. electricity generation in 2050 while meeting electricity demand on an hourly basis in every region of the country.
• Increased electric system flexibility can come from a portfolio of supply- and demand-side options, like flexible conventional generation, grid storage, new transmission, more responsive loads, and changes in power system operations.
• The are multiple paths using renewables that result in deep reductions in electric sector greenhouse gas emissions and water use.
• The direct incremental cost with high renewable generation is comparable to costs of other clean energy scenarios.
Public Policy Consulting
Helpful fact:
The US summer peak electrical use is around 800 GW.
Public Policy Consulting
Baseline Case
Public Policy Consulting
REF ITI Case
Public Policy Consulting
With incentives
No incentives
CO2 costs
Notes
•Unadjusted 2010 cost estimates were used for consistency
•Costs for wind and photovoltaics have fallen sharply in last two years (faster than these 2010 estimates)
•Cost of nuclear power has risen post-Fukushima (more than these 2010 estimates)
Public Policy Consulting
NREL’s estimate of continued cost reductions for wind energy
Public Policy Consulting
DOE’s Sunshot Program
Public Policy Consulting
Public Policy Consulting
Public Policy Consulting
FloridaColorado New Jersey GermanyArizona
Public Policy Consulting15
Public Policy Consulting
Solar Electric Density
• Use: 100 MW(ac)/mile2
• Colorado Peak Integrated Demand: 11GW
• Result: 110 mile2 required land area
Public Policy Consulting17
110 mi2
Public Policy Consulting
But what if 11 GW of solar were spread around the state in 100 MW installations?
It might look like this...
Public Policy Consulting19
Public Policy Consulting
Public Policy Consulting
Public Policy Consulting
Question: How do we explain the variations in outcomes•between NJ and GA •between the US and Germany
Answer: Policy; regulation; industry structure; incentives.
Public Policy Consulting
A Recent Hart Associates Poll
Public Policy Consulting
Compressed Air Energy Storage (CAES)
Public Policy Consulting
The Evolving Utility Business Model
• Multiple threats to business as usual
• Utilities must adapt in order to grow (survive)
• We need to change the regulatory incentives to
reward utilities for pursuing societal goals
• Regulation needs to produce greater firm efficiency
• Expect a new regulatory compact to emerge
Public Policy Consulting
Public Policy Consulting
Congratulations to the Alliance for 8+ years of leadership.
I look forward to your questions.
Thanks for the invitation.